U.S. Department of Justice
Federal Bureau of Prisons Administrative Division
Field Acquisition Office Grand Prairie, Texas 75051
July 25, 2017
ATTN: ALL BIDDERS
RE: Minutes of Pre-bid Conference
Solicitation IFBP05081700002 FCC Forrest City, Arkansas Replace Roofs
Dear Bidders, In reference to the above solicitation, attached are the pre-bid minutes and sign in sheet as a result of the pre-bid conference which was held on Wednesday, July 19, 2017.
These pre-bid minutes are for informational purposes only; are not intended to change any specifications/statement of work/drawings, terms or conditions of the solicitation;
and any changes to the solicitation shall be issued in subsequent amendments.
If you have any questions regarding these minutes, feel free to contact me at (972) 352- 4641 or e-mail at dpatton@bop.gov
Sincerely, Douglas V. Patton Contracting Officer Federal Bureau of Prisons Field Acquisition Office U.S. Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, Texas 75051
Attachment cc: Pre-Award File
SCS, FCC Forrest City COR, FCC Forrest City Facility Manager, FCC Forrest City Regional Facilities Administrator, SCRO mailto:dpatton@bop.gov
PRE-BID CONFERENCE MEETING MINUTES
REPLACE ROOFS, PROJECT (SClG)
LOW INSTITUTION
FCC FORREST CITY
JULY 19, 2017, 8:00 A.M.
The purpose of conducting this pre-bid conference is for the Low institution replace roofs project at FCC Forrest City. The meeting minutes will be posted to FEDBIZOPPS.
Attendees:
Stacey Abbott, Business Administrator Robert Fortune, Supervisory Contract Specialist Latina Barden, Contract Specialist Brent Ponder, Contract Specialist Bruce Dye, Engineering Technician James Robinson, Associate Warden Jared Hess, Facilities General Foreman Ron White, Safety Manager Timothy Carter, Complex Captain Scott Johnson, Deputy Captain J.J . Phillips, Inventory Management Specialist
Contractors:
Jose Torres, CYE Enterprises Mike Sebastian, Jolly Roofing Nick Ketcher, Ketcher & Co.
Brandon McCullough, Haralson Property Resources Shannon Walker, BS&G Kyle Roblyer, BS&G Steven Lailer, General Roofing Contractor Robert Butler, Carroll's Roofing & Construction Ryan Campbell, RBT Roofing Brian Abney, Mid Ark Roofing John Lamberth Osment Roofing David Robinson, RYCARS Construction Randy Hindman, Raintight Roofing Keith Rankin, Rankin Construction Nathan Stewart, JR&Co, Inc.
David Schilling, JR&Co, Inc.
Rusty Simon, Simeon Corporation Jeremy Thompson, Simeon Corporation Terry Walls, Seamless Systems Randy Purkey, Seamless Systems Nick Westerenbro, Fraley Roofing Bob Buchanan, HRI Gary Underwood, Incano Construction ll Page
Some of the mandatory requirements for this construction project are as follows:
The Human Resource Point of Contact for this project is Sandra Raper, Human Resource Specialist.
Mrs. Raper will obtain the information for the hired contractors in order for security background checks to be conducted.
The front cover of the solicitation outlines the forms and information that is to be submitted with your bids. The bid deadline is August 3, 2017 at 1 :00 p.m. unless otherwise amended . Any late bids will not be considered and will be rejected .
Labor Standards: Contractors must comply with the labor standards provisions listed in the solicitation that is covered under the Davis Bacon Act. All workers must be paid according to the terms of the wage determination set out by the Department of Labor.
Bid Guarantee: The Bid Guarantee must be submitted with your bid or your bid will be rejected .
The Bid Guarantee forms are SF24 or SF28 and the forms are in Section 5 - Attachments. The SF24 (Bid Bond) is the preferred method. The purposes of the bonds are to obtain financial protection against losses under contracts. Please refer to FAR Part 28.
The Miller Act applies on acquisitions over $150,000 for the requirement of performance & payment bonds. The bond forms are issued to the Contractor at time of award (SF25 and SF25A).
Representations and Certifications: This acquisition is a 100% small business set aside. The annual representations and certifications must be completed and updated in the System for Award Management (SAM) at www.sam.gov.
SAM, DUNs & Tax ID#: You must be registered in the System for Award Management at www.sam.gov. DUNS numbers can be obtained from DUN and Bradstreet at www.dnb.com or by calling 800-333-0505. Make sure your DUNS number and TAX ID number is on the SF-1442.
Equal Employment Opportunity: The hiring goal for this project is 26.5% for minorities and 6.9% for females . A good faith effort should be put forth by the contractor to achieve these goals.
Licensing and Permits: The Contractor is responsible for any licensing or permits that are required, such as building permits, etc.
Tax Exempt: This project is not tax exempt. The Government will not issue tax exemption certificates. It is the Contractors responsibility to determine if they are tax exempt. The Contractor should include any/all applicable taxes in their bid . The Contractor may contact the state comptroller' s office to determine/obtain any tax exempts if they are applicable.
Completion Period: The contract completion period is 365 calendar days after receiving the notice to proceed. This is when the clock starts for the contract performance period. Contractors need to be on-site with-in 10 days after the notice to proceed. If you are not on site you are in default and will be issued a cure notice, then a show cause notice and if the cure in not corrected, the Contractor will be defaulted if the show cause is not valid . The notice to proceed is issued after award . The NCIC processing time is built into the performance period . It could take up to ( 4) weeks for the clearance.
21 Page
Preconstruction Conference: The pre-construction conference will be held approximately 10 days after award. Also, bonds are due within 10 days after the award .
Time Extension: Time extensions for inclement weather will not be granted unless the weather is unusually severe and abnormal in comparison to prior years.
Progress Meetings: Progress meetings will be scheduled monthly. Applications for payments are to be submitted on AIA G702 and 702A or the Contractors own form as Jong as the information is similar to the G702. Contractors can get the G702 form from the American Institute of Architects or from the BOP.
Bruce Dye, Engineering Technician, reminded the contractors it is important to be familiar with the Statement of Work before bidding on the project. Once awarded, it is a fixed bid. The work will only be performed Monday-Friday, 6:00 a.m.-3:00 p.m., no weekends. Procedures were discussed such as processing in/out of the institution, rotating dumpsters, security measures, tool inventory, supply deliveries/storage, escort procedures and site visits. Electronic devices will not be allowed inside the institution at any time. Utilizing battery operated golf carts will be allowed. Fencing over the Control Center area can be removed if needed then replaced at the end of the work day. Regarding Quality Control, inspections will be performed daily to ensure specifications are being followed. No changes to specifications can be made without prior approval of the contracting officer. Core samples can be collected today as the contractors will be allowed to access the roof.
Timothy Carter, Complex Captain, reiterated the importance of security. If there is a lost tool , no matter how minor, it must be reported immediately to conduct searches of the area.
Ron White, Safety Manager, advised OSHA standards must be followed at all times. There will be safety spot checks to ensure compliance.
All questions that where asked during this conference will be addressed thru either clarifications and/or amendment posted to fedbizopps by Mr. Patton.
Any additional questions should be submitted to Doug Patton, FAO Contract Specialist/Construction, DPATTON@BOP.GOV no later than July 24, 2017, 3:00 p.m. CST. Mr. Patton will forward any inquiries to FCC Forrest City staff.
Latina Barden, Contract Specialist, expressed appreciation to all the attendees.
Meeting Adjourned at 8:42 a.m. LATINA
BARDEN
Digitally signed by LATINA BARDEN DN: c= US, o=U.S. Government, ou=Dept of Justice, ou= BOP, cn= LATINA BARDEN,
0.9.2342. 19200300. 100. 1. 1=1 5001003 059343 Date: 2017.07.25 13:42:12 -05 '00'
3J Page
| PRE BID CONF MEET MINUTES COVER LETTER |
| MINUTES FOR FBO |
| SIGN IN SHEET |
| 2017-07-25T13:51:07-0500 | |
| DOUGLAS PATTON |