Amendment_0004_08252016.pdf
PDF 791 KB Posted
- Attached to
- FCI EL RENO - REPAIR TUNNEL
- Solicitation number
- IFBP05071600003
About this file
AMENDMENT 0004
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour a nd date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date sp ecified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT:
Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force a nd effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
This form was electronically produced by Elite Federal Forms, Inc.
( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Cross-Out
IFBP05071600003
REPLACE TRANSFORMER
FCI EL RENO – PROJECT 5C4T
The following changes are made to the Solicitation documents:
1. Amend Item #34, Sheet S0.1 to remove the verbiage “Elevator Pit.” Amend Detail 16, Sheet S2.1 to read “Ceiling Repair @ Keynote 34.”
2. Amend Sheet S0.1 to add the following general note, “The contractor shall be responsible for all aspects of shoring, both engineering and installation.”
3. Amend “Tunnel Steam Phasing Plan” diagram note to read, “Kitchen Loads, See Sheet DP1.1, Note 4.”
4. Amend column “T” on “Tunnel Damage Schedule” Sheet S0.1 to replace all instances of 2” repair thickness with 2-1/2” repair thickness. Column “V” will therefore change as a result. The contractor shall be responsible to calculate new patch volumes in each case.
5. Amend Item #3, Sheet S0.1 to read, “Remove mildew using an approved method.”
6. Amend Sheet E6.1 to include information contained on attached Drawing Addendum #1, panel schedules for panels P-1 thru P-3.
7. INCORPORATE PAGE 3 OF THIS AMENDMENT, “DRAWING ADDENDUM”.
NO OTHER CHANGES ARE MADE AT THIS TIME.
DRAWING ADDENDUM #1
| Amendment 0004 |
| Flap_B_Tab_2_-_Amendment_0001_EL_RENO |
| Amendment 0001 - 07292016 |
| Flap B Tab 2 - SF-30 AMENDMENT 0001 |
3 NCIC
| Page 2 of Amend 3 ELE |
| Drawing Addendum #1 |
| contract_id_code: |
| first_page: 1 |
| last_page: 3 |
| modification_no: 0004 |
| effective_date: 08/25/2016 |
| requisition_no: 0061-16 |
| project_no: 5C4T |
| issued_by: Federal Bureau of Prisons |
Mid-Atlantic Regional Office/FAO 302 Sentinel Drive, Suite 200 Annapolis Junction, MD 20701
| code_2: |
| contractor_name_address: |
| administered_by: |
| check_1: Yes |
| amendment_solicitation_no: IFBP05071600003 |
| dated: 07/29/2016 |
| check_2: Off |
| contract_order_no: |
| dated_2: |
| code: FAO |
| faculty_code: |
| checkbox_1: Yes |
| copies: 01 |
| acct_and_appropriation: |
| check_a: Off |
| change_order: |
| check_b: Off |
| contract_order_modified: |
| check_c: Off |
| authority_of: |
| check_d: Off |
| other: |
| number_of_copies_return: 01 |
| amendment_description: |
AMENDMENT IS AS FOLLOWS:
A. SEE PAGE 2 FOR ALL CHANGES TO THE SOLICITATION.
NO OTHER CHANGES ARE MADE AT THIS TIME.
| signer_name_title: |
| contracting_name_title: |
| date_signed_contractor: |
| clear_form: |
| save_form_data: |
| Email Form: |
| checkbox_2: Off |
| checkbox_3: Yes |
| checkbox_4: Off |
| checkbox_5: Yes |
| date_signed_contracting_officer: |
File details come from the government source that posted it. Updated .