AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) 9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour a nd date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date sp ecified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
D. OTHER (Specify type of modification and authority)
E. IMPORTANT:
Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force a nd effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
BY
(Signature of Contracting Officer)
16C. DATE SIGNED
PREVIOUS EDITION UNUSABLE
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
This form was electronically produced by Elite Federal Forms, Inc.
( ) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.)
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
BOP02152
Typewritten Text
BOP02152
Typewritten Text
BOP02152
Cross-Out
General Decision Number: OK160041 08/12/2016 OK41
Superseded General Decision Number: OK20150041
State: Oklahoma
Construction Type: Building Building Construction -does not include residential construction consisting of single family homes and apartments up to and including 4 stories. (Including building projects on treatment plants)
County: Canadian County in Oklahoma.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016 1 01/15/2016 2 03/18/2016 3 04/22/2016 4 06/17/2016 5 07/01/2016 6 07/29/2016 7 08/12/2016
* BROK0005-004 06/01/2016
Rates Fringes
BRICKLAYER.......................$ 23.34 9.01
CARP0216-002 06/01/2013
Rates Fringes
MILLWRIGHT.......................$ 25.15 7.53
CARP0329-003 06/01/2013
Rates Fringes
CARPENTER (Form Work Only).......$ 21.86 6.85
ELEC1141-007 05/30/2016
Rates Fringes
ELECTRICIAN......................$ 31.00 17.25%+5.20
ELEC1141-029 06/01/2016
Rates Fringes
ELECTRICIAN (Low Voltage Wiring and Alarm Installation Only)............................$ 18.99 15.5%+5.20
ELEV0063-004 01/01/2016
Rates Fringes
ELEVATOR MECHANIC................$ 37.40 29.985+a+b
PAID HOLIDAYS:
a. New Year's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, the Friday after Thanksgiving, and Christmas Day.
b. Employer contributes 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; 6% for less than 5 years' service.-------------
ENGI0627-020 06/01/2016
Rates Fringes
POWER EQUIPMENT OPERATOR:
Group 1.....................$ 28.05 12.58 Group 2.....................$ 26.35 12.58 Group 3.....................$ 25.80 12.58 Group 4.....................$ 25.05 12.58 Group 8.....................$ 22.10 12.58 Group10.....................$ 21.10 12.58
POWER EQUIPMENT OPERATOR
GROUP 1: All Crane Type Equipment 200 ton and larger and including 400 ton capacity cranes. All Tower Cranes.
GROUP 2: All Crane Type Equipment 100 ton capacity and larger cranes, and less than 200 ton capacity.
GROUP 3: All Crane Type Equipment 50 ton capacity and larger cranes, and less than 100 ton capacity. Crane Equipment (as rated by mfg.) 3 cu. yd. and over Guy derrick Whirley Power Driven Hole Digger (with 30' and longer mast).
GROUP 4: CRANES with Boom Incl. Jib less than 100 ft and less than 3 cu. Yd.; Overhead Monorail Crane
GROUP 8: FORK-LIFT
GROUP 10:OILER; SEMI-TRAILER TRUCK DRIVER
IRON0048-014 06/01/2013
Rates Fringes
IRONWORKER (Ornamental and Structural)......................$ 23.10 12.88
PLUM0344-011 07/01/2016
Rates Fringes
PIPEFITTER (Excludes HVAC Unit Installation)...............$ 31.13 14.52
PLUM0344-012 07/01/2016
Rates Fringes
PLUMBER (Excludes HVAC Pipe and Unit Installation)...........$ 31.13 14.52
SFOK0669-002 01/01/2016
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 29.72 16.52
SHEE0124-010 07/01/2012
Rates Fringes
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 29.70 12.93
SUOK2012-021 07/30/2012
Rates Fringes
CARPENTER (Acoustical Ceiling Installation Only)...............$ 15.00 0.00
CARPENTER, Excludes Acoustical Ceiling Installation, Drywall Hanging, Form Work, and Metal Stud Installation................$ 14.83 2.00
CEMENT MASON/CONCRETE FINISHER...$ 15.47 0.00
DRYWALL FINISHER/TAPER...........$ 14.25 0.00
DRYWALL HANGER, Includes Metal Stud Installation..........$ 14.08 0.00
FENCE ERECTOR....................$ 16.00 0.00
GLAZIER..........................$ 12.02 2.42
HVAC MECHANIC (Installation of HVAC Unit Only, Excludes Installation of HVAC Pipe and Duct)............................$ 21.64 6.46
IRONWORKER, REINFORCING..........$ 17.11 0.00
LABORER: Common or General......$ 11.38 0.00
LABORER: Landscape..............$ 13.75 0.00
LABORER: Mason Tender - Brick...$ 12.00 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 13.00 1.91
LABORER: Pipelayer..............$ 12.39 0.00
LABORER: Plaster Tender.........$ 12.00 0.00
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 21.25 4.35
OPERATOR: Bulldozer.............$ 20.64 2.35
OPERATOR: Grader/Blade..........$ 14.28 1.70
OPERATOR: Loader (Front End)....$ 16.18 0.00
OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 13.38 1.54
PAINTER: Brush, Roller and Spray, Excludes Drywall
Finishing/Taping.................$ 12.17 0.00
PIPEFITTER (HVAC Pipe Installation Only)...............$ 25.35 5.17
PLASTERER........................$ 17.50 0.00
ROOFER...........................$ 16.66 0.00
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 19.45 6.38
TRUCK DRIVER: Dump and Flatbed Truck....................$ 11.60 0.00 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014.
PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination.
08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
SOLICITATION NO. IFBP05071600003
REPAIR TUNNEL
FCI EL RENO
UNITED STATES DEPARTMENT OF JUSTICE
FEDERAL BUREAU OF PRISONS
MID-ATLANTIC REGIONAL OFFICE
ANNAPOLIS JUNCTION, MARYLAND
ISSUE DATE: July 29, 2016
BID DUE DATE: September 9, 2016, by 12:00 P.M. EST
BIDS SHALL BE ADDRESSED TO:
Federal Bureau of Prisons
Mid Atlantic Regional Office
ATTN: JENNIFER BROUILLARD
302 Sentinel Drive, Suite 200 Annapolis Junction, MD 20701
INSTRUCTIONS TO BIDDERS
BID SUBMISSION PROCEDURES
SOLICITATION/INVITATION FOR BIDS
IFBP05071600003
TITLE: REPAIR TUNNEL
FCI EL RENO
DEADLINE FOR September 9, 2016
RECEIPT OF BIDS: 12:00 P.M. EST
MAIL BIDS TO:
ATTN: JENNIFER BROUILLARD
302 Sentinel Drive, Suite 200
NOTE: ANY BIDDERS DESIRING TO BE PRESENT DURING BID OPENING, OCCURING AT THE
FBOP MID-ATLANTIC REGIONAL OFFICE IN ANNAPOLIS JUNCTION, MARYLAND, MUST
SUBMIT THE NAME OF THE PERSON WHO WILL ATTEND NO LESS THAN 5 DAYS IN
ADVANCE OF THE DAY OF BID OPENING TO MS. JENNIFER BROUILLARD AT
jbrouillard@bop.gov. COMPLETION OF A NCIC FORM (FORM BP-A0660) WILL BE
REQUIRED AND IS INCLUDED IN THE ATTACHMENT SECTION OF THE SOLICITATION.
INSURE YOU INCLUDE IT IN YOUR EMAIL NOTIFICATION. VISITORS WILL BE REQUIRED
TO PRESENT IDENTIFICATION AT THE SECURITY CHECK POINT AND TO THE
OFFICIAL CONDUCTING THE BID OPENING.
PLEASE BE ADVISED - AN ABSTRACT OF THE BIDS RECEIVED WILL BE POSTED
TO THE FedBizOpps WEBSITE IMMEDIATELY AFTER THE BID OPENING.
THEREFORE, ATTENDANCE MERELY FOR THIS PURPOSE IS NOT NECESSARY.
***********************************IMPORTANT**********************************
CONTRACTORS MUST BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT (SAM) AT
WWW.SAM.GOV. THIS IS A 100% SMALL BUSINESS SET-ASIDE. YOUR BUSINESS SIZE
METRICS INFORMATION IN SAM MUST MEET THE SMALL BUSINESS SIZE STANDARD
REQUIREMENT FOR NAICS CODE 238390 (reference FAR provision 52.219-1 in the Representations & Certifications section of your SAM registration).
I. DOCUMENT REQUIREMENTS
Each bidder SHALL complete and submit 100% of all documents to include, clauses, and statements with his/her bid (1 original ink signature copy). Failure to furnish all required information or any rejection of or addition to the terms and conditions of the solicitation may cause your bid to be considered as non-responsive and ineligible for award.
YOUR DOCUMENTS WILL BE SCANNED AFTER BID OPENING. DO NOT
SUBMIT YOUR BID ON BOTH SIDES OF THE PAGE. DO NOT STAPLE ANY
OF YOUR DOCUMENTS – PLEASE USE CLIPS ONLY. DO NOT PUT YOUR
BID IN A BINDER OR FOLDER, OR PUNCH ANY HOLES IN IT. THE
ONLY OFFICE TYPE PRODUCTS TO BE UTILIZED WILL BE A CLIP TO
MAINTAIN THE FILE TOGETHER.
http://www.sam.gov/ http://www.sam.gov/
A. SECTION 1:
SF-1442 – Solicitation, Offer, and Award, pages 1 & 2
Complete blocks 10 and 14 thru 20c (remember to include the signer’s title in block 20a). If your company has a “doing business as” name reflected in your SAM registration, include this name as well in block 14. Ensure the address typed in block 14 matches the address in your SAM registration.
Blocks 21 thru 31c are to be completed only by the Government!
Include DUNS#, TAX ID#, CAGE Code, and email address where indicated in block 10.
B. SECTION 2:
Commodity or Services Schedule, page 4
Complete the Unit Price (JB = job) and Amount blocks (these amounts will be the same).
NOTE: The amounts listed in this section should be the same as the amount listed in block 17 of the SF-1442.
C. SECTION 5: Attachments, page 22.
1. SF-24 BID BOND
Reference Provision 52.228-1 and FAO-0001.
********************IMPORTANT*******************************
The bid bond must be submitted in original (ink signatures) with seals. Penal Sum of the bond must be at least 20% of the bid price, not to exceed $3 million, whichever is less.
Ensure that the surety information matches the information for the surety as posted in Treasury Circular 570, at the Department of the Treasury website:
http://www.fiscal.treasury.gov/fsreports/ref/suretyBnd/c57 0 a-z.htm
Ensure the liability limit for the surety (located at the bottom of the SF-24) is expressed as a dollar amount (not a percentage). Ensure the liability limit is either equal to the amount reflected for the surety in Treasury Circular 570 or is the amount at least equal to the penal sum of the bond
In the bid identification section, ensure the bid date reflects the current date that bids are due per the solicitation (review all amendments, if applicable, to check for any bid due date extensions).
Ensure the information for the Principal matches the information as posted in your SAM registration (e.g. company name, address and any “doing business as” name if applicable).
D. SECTION 7:
1. FAR Provision 52.204-8 - Pages 27-28
NOTE: Pursuant to section (b)(1) of this provision, provision 52.204-7 is included in this solicitation. Therefore, bidders should not mark either of the two options under section (b)(2).
Leave these options unmarked.
2. FAR Provision 52.204-20 – Page 29
Complete section (b), and section (c) if your response is affirmative.
3. FAR Provision 52.209-7 – Page 29
Complete Section (b).
4. FAR Provision 52.209-11 – Page 30
Complete the selections in sections (b)(1) & (b)(2) of this provision as applicable.
5. FAO-0019 – Page 31
Complete applicable paragraph in entirety (most commonly paragraph (c)). Ensure the date of this certification matches your bid date (block 20c on the SF-1442).
5. Past Performance Information – Page 31
See page 5 of these Instructions. You are responsible for the submission of Past Performance Information prior to the bid closing.
E. Amendments, if any, must be acknowledged and submitted with the bid by one of the methods described in item eleven of the Standard Form 30 (amendment of solicitation/modification of contract).
II. PRE-BID CONFERENCE:
*******************************IMPORTANT**********************************
A pre-bid conference/site visit is scheduled for Wednesday, August 17, 2016 at 9:00 AM local time. The pre-bid conference/site visit is not mandatory, however all bidders are urged to attend.
See provision 52.236-27 Alternate-I on Page 25 of the solicitation
FOR ALL INFORMATION.
NOTE: The emailed forms must include a cover letter indicating they are for the REPAIR TUNNELS project in addition to the following information:
• Company name and list/number of individuals from the company who will be attending.
• Phone number/point of contact for the company for notification of any NCICs that are denied.
NOTE: The FBOP is prohibited from divulging any information regarding any reasons for NCIC denials. Only the fact that a person has been denied will be communicated to the company point of contact.
III. PRE-BID QUESTIONS
Any questions relating to the solicitation after the closing of the pre-bid conference/site visit shall be sent in WORD FORMAT to Jennifer Brouillard, Contracting Officer, via email at jbrouillard@bop.gov no later than Friday, August 19, 2016 by 12:00 PM EST. In order to provide sufficient response time prior to the bid due date, the Government is establishing the above cut-off date for questions about the solicitation.
All bidders shall bid/offer in accordance with the current solicitation to include all amendments (if any) as issued by the Contracting Officer only.
IV. PAST PERFORMANCE INFORMATION REQUIRED
Refer to Provision FAO-0020, List of References and Banking Information at the bottom of Page 30 of the solicitation.
Attached to this document are two past performance questionnaires, one for your references, and one for your bank.
1. Past Performance Questionnaire: Forward this document to at least 5 companies/Government agencies who you have current work or have completed work within the last 24 months.
The references submitted should be in the same range as your bid price. Please submit reference forms for projects of a similar nature or as similar as possible. If you do not have references similar to what you are bidding for this project, please indicate so by including a separate letter with your bid stating so. Not having references similar will not determine your bid non-responsive.
2. Bank Reference: Forward this document to your bank and inform them in writing they are authorized to respond to this document.
Ensure they are aware that only this document will be accepted.
You are responsible to ensure the questionnaires are delivered to your references, and that they respond via forwarding the completed reference to jbrouillard@bop.gov. The completed reference documents must come from your reference, and not from an email address in your firm.
NOTE: Please do not email me asking if your references have been received, as your email will not be responded to. It is advised you follow up with your references to ensure they’ve replied.
mailto:jbrouillard@bop.gov
V. BID LABEL
Each bidder is requested to submit the following information in accordance with the instructions:
A. Bid Label (see template below)
1. This label shall be completed and used on the envelope containing the bid. This envelope shall be placed inside of shipping boxes or envelopes supplied by couriers such as FedEx. Complete the information on the label and cut and paste or transfer it to the LOWER left corner of the envelope containing your bid (not on the courier envelope/packaging). Print or type your name and address in the UPPER left corner of the envelope containing your bid.
BID/OFFER
SOLICITATION NO.
IFBP05071600003
DATE FOR RECEIPT OF BIDS/OFFERS
TIME FOR RECEIPT OF BIDS/OFFERS
OFFICE DESIGNATED TO RECEIVE BIDS/OFFERS
302 Sentinel Drive, Suite 200
CONTRACTING OFFICER NAME
Jennifer Brouillard
IFBP05071600003 – FCI EL RENO
THIS DOCUMENT MUST BE EMAIL DIRECTLY TO jbrouillard@bop.gov. DO NOT EMAIL BACK TO THE
REFERENCED CONTRACTOR.
PAST PERFORMANCE QUESTIONNAIRE
The contractor you are receiving this document from intends to offer a bid to the Federal Bureau of Prisons for an upcoming project. As a potential bidder who may receive the contract, it is required by law that Past Performance be examined. The intention of this request is to ensure contractor responsibility prior to expending your tax payer dollars and awarding a federal contract. It is imperative before we award tax dollars to firms, they are deemed capable and responsible.
A brief one (1) page survey is attached with a second page for comments. Please ensure you provide your professional opinion in the comments section so that I may combine your rating and comments into a fair rating. The deadline for response is no later than September 9, 2016 by 1:00pm, local time, as this is the day of the bid opening. Please respond as soon as possible. Please scan and email back, and don’t forget to sign the signature block.
This document, once completed, must be emailed to jbrouillard@bop.gov. Do not return this document to the Contractor who forwarded you this document.
Please provide the following information regarding YOUR Company/Government Agency in case I have questions:
a. Name of Company/Government Agency: _____________________________________
b. Telephone Number:______________________________________________________
c. Name/Title of Contact Person:______________________________________________
d. Contact Person E-Mail Address:_____________________________________________
e. Description of Work Performed:____________________________________________
f. Amount of Contract:______________________________________________________
g. Contract Status: Active or Complete ( circle one)
h. List Month/Year of Completion (if applicable):_________________________________
If you have any questions please do not hesitate to contact me, Jennifer Brouillard, Contracting Officer, at 301-317- 3255. Your assistance is greatly appreciated!
RESPONSIBILITY QUESTIONNAIRE
Contractor Name:
RATING
1 5/6 10 Poor Average Best
1 2 3 4 5 6 7 8 9 1
PERFORMANCE
WORKLOAD
How would you rate their overall performance to date?
How would you rate the contractor’s adherence to contract delivery and/or performance schedule?
How would you rate the contractor’s quality control?
How would you rate the contractor’s efforts in fostering good business relations?
How would you rate the contractor’s meeting all the contract requirements?
Has the contractor required changes to the contract due to contractor problems?
Yes No Comments
BUSINESS
ETHICS
Based on your observations, do you believe the contractor to be ethical in their business relationship with your organization?
Are you aware of any ethics problems being experienced by the contractor?
ORGANIZATION Does the contractor demonstrate good organizational structure?
Do you have recourse within the company if you are not satisfied with the on/off-site supervision? (Please explain under comments)
Are you aware of any organizational deficiencies with the contractor? (If yes, please explain under comments)
RESOURCES Did the contractor demonstrate themselves to have sufficient financial resources?
Did the contractor demonstrate themselves to have sufficient qualified personnel resources?
LEGAL Are you aware of any legal problems being experienced by the contractor?
GENERAL
If the work is complete would you have the contractor come back for another contract if this contract were completed?
Do you have anything else you would like to add? Please attach any notes you may have in reference to this contractor, either positive or negative.
Signed:________________________________ Date:_________
Company Name:_____________________________________________
PLEASE PROVIDE ANY COMMENTS EITHER POSITIVE OR NEGATIVE THAT YOU BELIEVE
COULD IMPACT THE GOVERNMENTS ABILITY TO DO BUSINESS WITH THIS
FIRM:__________________________________________________________________________________
IFBP05071600003 – FCI ELRENO
BANKING QUESTIONNAIRE
The contractor you are receiving this document from intends to offer a bid to the Federal Bureau of Prisons for an upcoming project. As a potential bidder who may receive the contract, it is required by law that Past Performance be examined. The intention of this request is to ensure contractor responsibility prior to expending your tax payer dollars and awarding a federal contract. It is imperative before we award tax dollars to firms, they are deemed capable and responsible.
A brief one (1) page survey is attached. Please ensure you provide the date the contractor’s bank account was opened, and respond to each of the three questions posed. The document does not require any detailed bank account information with the exception of the account number and the date the account was opened.
The deadline for response is no later than September 9, 2016 by noon, as this is the day of the bid opening. Please scan and email back, and don’t forget to sign the signature block.
This document, once completed, must be emailed to jbrouillard@bop.gov. Do not return this document to the Contractor who forwarded you this document.
If you have any questions please do not hesitate to contact me, Jennifer Brouillard, Contracting Officer, at 301-317- 3255. Your assistance is greatly appreciated!
IFBP05071600003 – FCI ELRENO
CONTRACTOR FINANCIAL INQUIRY:
THE INTENTION OF THIS REQUIREMENT IS TO ENSURE CONTRACTOR FINANCIAL RESPONSIBILITY PRIOR TO AWARDING A FEDERAL CONTRACT. THE COMPANY LISTED BELOW HAS GIVEN YOUR NAME AND INFORMATION SO THAT WE MAY CONTACT YOU TO INQUIRE REGARDING THEIR STANDING WITH YOUR BANK. IF YOU HAVE ANY QUESTIONS PLEASE DO NOT HESITATE TO CONTACT ME AT 301-317-3255.
Contractor:
Contractor Name: __________________________________
Contractor Point of Contact: __________________________________
Contractor Address: __________________________________
Name and Address of Financial Institution:
Name of Bank: __________________________________
Bank Point of Contact: __________________________________
Bank Address: __________________________________
PLEASE ANSWER THE FOLLOWING:
DATE ACCOUNT OPENED:________________________
1. Does the contractor maintain satisfactory account status (making timely debt payments, maintains positive cash flow and overdraft protection, etc.)?
[ ] always [ ] often [ ] not often
2. What credit standing does the contractor currently have?
[ ] excellent [ ] satisfactory [ ] fair [ ] poor
3. Generally, their average monthly balance in the last six months is:
[ ] less than $10,000 [ ] $10,000 - $100,000 [ ] greater than $100,000
Printed Name, Signature, and Title of Bank Representative Date
| Amendment 0003 |
| Flap_B_Tab_2_-_Amendment_0001_EL_RENO |
| Amendment 0001 - 07292016 |
| Flap B Tab 2 - SF-30 AMENDMENT 0001 |
3 NCIC
| Wage Rate - El Reno 08122016 |
| 1 - Instructions to Bidders - ERE |
| Past Performance Questionnaire |
| Banking Questionnaire |
| contract_id_code: |
| first_page: 1 |
| last_page: 17 |
| modification_no: 0003 |
| effective_date: 08/15/2016 |
| requisition_no: 0061-16 |
| project_no: 5C4T |
| issued_by: Federal Bureau of Prisons |
Mid-Atlantic Regional Office/FAO 302 Sentinel Drive, Suite 200 Annapolis Junction, MD 20701
| code_2: |
| contractor_name_address: |
| administered_by: |
| check_1: Yes |
| amendment_solicitation_no: IFBP05071600003 |
| dated: 07/29/2016 |
| check_2: Off |
| contract_order_no: |
| dated_2: |
| code: FAO |
| faculty_code: |
| checkbox_1: Yes |
| copies: 01 |
| acct_and_appropriation: |
| check_a: Off |
| change_order: |
| check_b: Off |
| contract_order_modified: |
| check_c: Off |
| authority_of: |
| check_d: Off |
| other: |
| number_of_copies_return: 01 |
| amendment_description: AMENDMENT IS AS FOLLOWS: |
A. Remove Wage Rate OK160041, Modification 0006 Dated 07/29/2016, and replace with OK160041, Modification 0007 Dated 08/12/2016. See attached.
B. INSTRUCTIONS TO BIDDERS: Remove the previous INSTRUCTIONS TO BIDDERS, and replace with new document (see attached).
NO OTHER CHANGES ARE MADE AT THIS TIME.
| signer_name_title: |
| contracting_name_title: |
| date_signed_contractor: |
| clear_form: |
| save_form_data: |
| Email Form: |
| checkbox_2: Off |
| checkbox_3: Yes |
| checkbox_4: Off |
| checkbox_5: Yes |
| date_signed_contracting_officer: |
File details come from the government source that posted it. Updated .