IFBP04181500005 PRE BID CONFERENENCE MEETING MINUTES REPLACE DA SURGE TANKS FCC TERRE HAUTE INDIANA
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Justice
Federal Bureau of Prisons Administrative Division
Field Acquisition Office Grand Prairie, Texas 75051
April 29, 2015
ATTN: ALL BIDDERS
RE: Minutes of Pre-bid Conference
Solicitation IFBP04181500005 FCC Terre Haute, Indiana Replace DA Surge Tanks
Dear Bidders, In reference to the above solicitation, attached are the pre-bid minutes and sign in sheet as a result of the pre-bid conference which was held on Tuesday, April 28, 2015.
These pre-bid minutes are for informational purposes only; are not intended to change any specifications/statement of work/drawings, terms or conditions of the solicitation;
and any changes to the solicitation shall be issued in subsequent amendments.
If you have any questions regarding these minutes, feel free to contact me at (972) 352- 4641 or e-mail at dpatton@bop.gov
Sincerely, Douglas V. Patton Contracting Officer Federal Bureau of Prisons Field Acquisition Office U.S. Armed Forces Reserve Complex 346 Marine Forces Drive Grand Prairie, Texas 75051
Attachment cc: Pre-Award File
SCS, FCC Terre Haute COR, FCC Terre Haute Facility Manager, FCC Terre Haute Regional Facilities Administrator, NCRO mailto:dpatton@bop.gov l . Downtime - The question was addressed if there was any limits to downtime of the tank and addressed by Nathan Vandiver Facility Manager. In the summer we have a little flexibility with regard to downtime, but very limited in the wintertime if this proceeds to that time frame. The switch over is to be as quick as possible to maintain orderly running of the facility.
2. Electricity - Are we to use existing electrical hook ups and are there any changes to be made electrically? This question was addressed by Joe Parr General Foreman . Yes, you are to use existing hookup and this will basically just be a switch out of the existing tank and tie in of new tank to the existing electricity that is already in place.
3. Pump hour meters -The next question was in regard to whether we need pump hour meters installed . This question was addressed by Joe Par. Yes, we want hour meters placed on the system so that we can check it diagnostically. This further clarifies the pump specifics not listed and is the industry norm.
4. Tie in for temporary DA Tank - The question was posed about a tie in for temporary DA tank. Joe Parr answered . Yes. A temporary Tie in is required and that it would be the responsibility of the contractor as stated in the statement of work.
5. The question was posed as to what tray style system we were requesting. Joe Parr stated that Yes, this is a tray style system. We are requesting a counter flow tray style system and that the tank provide a quality of feed water less than 30 parts per billion of dissolved oxygen. This is considered the industry norm.
6. There was a question posed about a vent valve vs. a fixed orifice. Joe Parr answered that in the drawing it is a valve not a fixed orifice.
7. Question was posed about chemical injection points. Joe Parr answered that chemical injection points will be on both ends below the water line as per drawings.
8. Question was posed about installing a sample cooler. Joe Parr stated that this is not in the statement of work but is the industry norm and would like to see it on the discharge of the DA.
| IFBP04181500005 PRE BID CONF MEET MINUTES COVER LETTER REPLACE DA SURGE TANKS FCC THX |
| IFBP04181500005 PRE BID MINUTES REPLACE DA SURGE TANK FCC THX |
| 20150428_1 |
| Q AND A PRE BID |
| 2015-04-29T12:56:11-0500 | |
| DOUGLAS PATTON |