Request for Information (RFI) 2

IFBP02131500001

Upgrade PLC System at FCI Schuylkill

1. Spec section 16130-3.3-B,C,D, call for all conduits below 3 meters to be concealed. All of the referenced locations have block walls with rebar and poured concrete in the cells of the blocks. They would all have to be channeled and patched. This would be very messy, time consuming and costly. Not to mention it would never match. Is this the intent? During the walk thru I noticed in some of these areas there is surface mounted conduits install now.

Please advise.

ANSWER:

16130-9

3.3

B. EXPOSED CONDUIT IS NOT PERMITTED FROM THE FINISHED

FLOOR TO 3 METERS ABOVE THE FINISHED FLOOR.

C. EXPOSED CONDUIT IS NOT PERMITTED WITH THE EXCEPTION OF

CEILINGS AT A HEIGHT OF 3.6 METERS OR HIGHER

D. EXPOSED CONDUIT IS NOT PERMITTED WITH THE EXCEPTION OF

THE CEILING.