View the file

Other files

File Type Posted
BidResultsMTAbuildingNYM.pdf PDF
Amendment2att1.PDF PDF
Amendment2att2.PDF PDF
Amendment2.PDF PDF
Site Visit Minutes for MTA Building.pdf PDF
Amendment1.PDF PDF
New Compressed —
Solicitation.pdf PDF
CoverLetterBricksNYMoct2010.pdf PDF
wagerates.PDF PDF
SOW.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request For Information (RFI) 1

IFBP02101100001

Masonry Repairs on Former MTA Building MCC New York

1. Name of Company on Site Visit Minutes "Minmas" , should be corrected as " Minhas".

ANSWER: WE APOLOGIZE FOR THE TYPING ERROR; HOWEVER, THE MINUTES

HAVE BEEN POSTED AND WILL NOT BE CHANGED.

2. How material submittal process will work on this project?

Should be ALL submitals mailed to PA?

ANSWER: ALL SUBMITTALS SHOULD BE MAILED TO THE DESIGNATED ON-SITE

CONTRACT MONITOR AT OR AFTER THE PRE-CONSTRUCTION CONFERENCE.

3. The Sidewalk Bridge will be required (by NYC) to perform this work. So, will personal of MCC provide an assistance to coordinate (and specially with relocation of parking cars) with adjacent agencies?

ANSWER: THE BUREAU OF PRISONS WILL PROVIDE ASSISTANCE WITH

PARKING CONTROL ON CARDINAL HAYES PLACE.

4. Should Contractor Provide a Security Guard (including booth) while sidewalk bridge erected, to avoid any intrusion in the building?

ANSWER: NO SECURITY GUARD WILL BE REQUIRED.

5. Corner Replacement: Should contractor follow a regular 2' by 2' (return) Corner Replacement Detail ([http://source.nycsca.org/ae/aes/d04/dwgs/0452002a.pdf] http://source.nycsca.org/ae/aes/d04/dwgs/0452002a.pdf), including a control joint or just repair brick along the crack according standard Brick Stitching Repair Detail ([http://source.nycsca.org/ae/aes/d04/dwgs/0452000a.pdf] http://source.nycsca.org/ae/aes/d04/dwgs/0452000a.pdf)?

ANSWER: REPAIR BRICK ALONG CRACKS ACCORDING TO STANDARD BRICK

STITCHING REPAIR DETAIL.

6. Should we include in proposal a new stucco coating at highest portion of South Wall at Cardinal Hayes Place?

ANSWER: NO. THE WORK WILL BE LIMITED TO THE CURRENT STATEMENT OF

WORK.

7. Prior to F&I of new Metal Coping as per detail ([http://source.nycsca.org/ae/aes/d07/dwgs/0760014a.pdf] http://source.nycsca.org/ae/aes/d07/dwgs/0760014a.pdf )we remove and dispose existing concrete coping stone?

ANSWER: REMOVE AND DISPOSE OF EXISTING CONCRETE COPING STONE WHEN

NECESSARY TO MEET THE CURRENT STATEMENT OF WORK.

8. Should we considered to provide a temporary fencing (as per NYC) for material storage and portable bathroom at Park Row Side?

ANSWER: FOLLOW ALL LOCAL CODES AND GUIDELINES.