RFI2final.pdf
PDF 24 KB Posted
- Solicitation number
- IFBP02101000001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResultsRoofsNYM.pdf | ||
| RFI1final.pdf | ||
| AMendment2.PDF | ||
| Amendment2rates.PDF | ||
| Site Visit for MCC - Replacement Roofs.pdf | ||
| Amendment1.PDF | ||
| Bond Forms June 23.zip | ZIP file | |
| CoverLetterRoofsNYMjuly2010.pdf | ||
| Solicitation.pdf | ||
| As Built Roof Plans and Details.pdf | ||
| StatementofWork.pdf | ||
| wagerates.PDF |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request For Information (RFI) 2
IFBP02101000001
Roof Repair and Replacement Project MCC New York
1. Is this a union job or prevailing wage?
ANSWER: THIS PROJECT WILL BE CONSTRUCTED UTILIZING THE DEPARTMENT
OF LABOR WAGE RATES. PLEASE SEE THE ATTACHMENT SECTION OF THE
SOLICITATION.
2. What is the anticipated start date?
ANSWER: THE PROJECT WILL START WITHIN 10 CALENDAR DAYS FROM THE
NOTICE TO PROCEED (NTP).
3. Were core samples taken of the roof showing the makeup and thickness of the roof? Please provide the data.
ANSWER: YES AND NO. ROOF CUTS WERE MADE BY AN INDEPENDENT
CONTRACTOR IN MARCH, 2008 TO GATHER INFORMATION PRIOR TO THIS
PROPOSAL. THE UNDERSIDE OF THE ROOF MEMBRANE WAS FOUND TO BE
SATURATED WITH WATER. NO EXACTING ANALYSIS WAS DEMANDED OF THE
CONTRACTOR.
4. There was a drawing done of the entire roof which is not posted with this solicitation - some contractors had it from a previous one. Will that be made available.
ANSWER: THIS PROJECT WILL BE BID BASED UPON THE DOCUMENTS POSTED
TO FEDBIZZOPPS FOR THIS SOLICITATION ONLY.
5. What would the cost to the contractor be for the US Marshalls if the would be needed on off hours?
ANSWER: THE UNITED STATES MARSHAL SERVICE’S PRESENTLY QUOTED
HOURLY RATE/COST IS $75.00 AN HOUR FOR AFTER HOURS WORK(MINIMUM
OF 4 HOURS WHICH IS $300.00 PER DAY). THIS MAY CHANGE. THE
SECURITY DOG DETAIL NORMALLY OPERATES 7:00AM TO 7:00PM, MONDAY
THROUGH FRIDAY. NORMAL DAYS OFF ARE SATURDAY’S, SUNDAY’S AND
HOLIDAYS. VENDOR WOULD NEED A CREDIT CARD. THE UNITED STATES
MARSHAL SERVICE IS NOT AFFILIATED WITH THE FEDERAL BUREAU OF
PRISONS. CONTACT THE UNITED STATES MARSHAL SERVICE, SOUTHERN
DISTRICT OF NEW YORK (S/NY), LOCATED AT 500 PEARL STREET, SUITE
400, NEW YORK, NY 10007.
6. Is there any asbestos present on the roof?
ANSWER: THE ROOFING MATERIAL WAS INSTALLED AT SOME POINT DURING
THE MIDDLE TO LATTER PART OF THE 1980'S. ROOF CUTS WERE MADE BY
AN INDEPENDENT CONTRACTOR IN MARCH, 2008 TO GATHER INFORMATION
PRIOR TO THIS PROPOSAL. THE UNDERSIDE OF THE ROOF MEMBRANE WAS
FOUND TO BE SATURATED WITH WATER. IT IS PRESUMED THAT THE ROOFS
DO NOT CONTAIN ASBESTOS.
7. Is it necessary to retain the razor wire removed from the roof? Is storage available on site? Will you be able to provide replacement wire?
ANSWER: REMOVE THE RAZOR RIBBONS AND INSTALL NEW OR SAME ON ROOF.
THERE IS INSUFFICIENT SPACE TO PROVIDE ON SITE STORAGE. THE
VENDOR WILL BE RESPONSIBLE FOR TRANSPORT AND DISPOSAL OF THE
RAZOR RIBBON. AN OFF SITE LOCATION, ADJACENT TO THE BROOKLYN NAVY
YARD, IS AVAILABLE FOR STAGING PRIOR TO DISPOSAL. THE FEDERAL
BUREAU OF PRISONS WILL PROVIDE REPLACEMENT RAZOR WIRE.
8. What permits will be required to work on this site? What city permits will be required?
ANSWER: IT IS THE CONTRACTOR’S RESPONSIBILITY TO OBTAIN ALL
REQUIRED PERMITS.
9. Will street closure permits be required for the crane operations? Will we need to coordinate crane operations with MCC/US Marshals?
ANSWER: COORDINATE ALL ACTIVITIES WITH THE METROPOLITAN
CORRECTIONAL CENTER. FOR THE PURPOSE OF THIS SOLICITATION THE
PROPERTY LINE OF THE METROPOLITAN CORRECTIONAL CENTER FOLLOWS THE
EDGE OF THE BUILDING. ALL ROADWAYS AND WALKWAYS SURROUNDING THE
MCC BELONG TO THE CITY. CONTACT THE CITY OF NEW YORK FOR
INFORMATION REGARDING PERMITS. THE UNITED STATES MARSHAL SERVICE
IS NOT AFFILIATED WITH THE FEDERAL BUREAU OF PRISONS. CONTACT THE
UNITED STATES MARSHAL SERVICE, SOUTHERN DISTRICT OF NEW YORK
(S/NY), LOCATED AT 500 PEARL STREET, SUITE 400, NEW YORK, NY
10007.
10. Will all electrical/mechanical connections and disconnections be the responsibility of the contractor or will this be completed by the MCC?
ANSWER: ALL ELECTRICAL/MECHANICAL CONNECTIONS AND DISCONNECTIONS
WILL BE THE RESPONSIBILITY OF THE CONTRACTOR. ALL
ELECTRICAL/MECHANICAL CONNECTIONS AND DISCONNECTIONS MUST BE
COORDINATED WITH THE METROPOLITAN CORRECTIONAL CENTER.
11. There are small copper roof areas connected to the Tier Roof Areas. Are these areas to be replaced? If so, what type of material is to be used?
ANSWER: YES. REPLACE WITH SAME OR LIKE MATERIAL OF EQUAL OR
GREATER QUALITY, STRENGTH AND ENDURANCE. ALL INSTALLED MATERIALS
MUST BE SUITABLE FOR THEIR INTENDED PURPOSE.