RFIreargateLOR.pdf
PDF 36 KB Posted
- Attached to
- Repair Rear Gates
- Solicitation number
- IFBP02081100002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResultsRearGateLOR.pdf | ||
| SiteMinutesLORsept13.pdf | ||
| WageRatesSept1.PDF | ||
| amendment2.pdf | ||
| Amendment1attach.PDF | ||
| Amendment1.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information (RFI) 1
IFBP02081100002
Repair Rear Gate at FCI Loretto
1. The statement of work mentions sliding gates and pedestrian gates. How many of each will be replaced? Also, will there be any drawings for this project?
ANSWER: There are two sliding gates and two pedestrian gates.
There are no “As Built” drawings for this project.
2. Our firm is looking at the Repair Rear Gates solicitation.
The SOW does not clearly indicate the extent of work required.
Is there a sketch or drawing you can send that more clearly shows the work required?
ANSWER: The “Statement of Work” specifically indicates the extent of work to satisfy the needs of the government. There are no sketches or drawings that reflect the required work, rather the specifications will be referenced regarding the work to be completed.
3. Can a contractor work 3 p.m. to midnight to avoid congestion at the rear gate?
ANSWER: No.