TOC.pdf
PDF 7 KB Posted
- Attached to
- Utility Replacement Project at the United States Penitentiary (USP) Lewisburg, Pennsylvania
- Solicitation number
- IFBLEW-0011
About this file
1-4 Table of Contents
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResultsLEWutil.pdf | ||
| BOP30A4.pdf | ||
| BOP30A4C.pdf | ||
| drawingsheet4rev1.pdf | ||
| RFI1lewUtilityFINALapril10POST.pdf | ||
| BOP30A3.pdf | ||
| SITEMINUTESSEWER1.pdf | ||
| 1_WAISDocumentRetrieval.htm | HTM file | |
| BOP30A2utilitiesLEWmarch25.pdf | ||
| BOP1442.pdf | ||
| Solicitation.pdf | ||
| WAISDocumentRetrieval.htm | HTM file | |
| BOP14422.pdf | ||
| Specifications.pdf | ||
| CoverLetterLEWutilities.pdf | ||
| BOP30A.pdf | ||
| Drawings.pdf | ||
| NewCompressed(zipped)Folder.zip | ZIP file |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TABLE OF CONTENTS
Page
SECTION I - SPECIAL CONTRACT REQUIREMENTS
I.1 BONDS
I.2 MAGNITUDE
I.3 SIZE STANDARD
I.4 LIQUIDATED DAMAGES
I.5 REQUIRED INSURANCE
I.6 INSPECTION OF WORK
I.7 PRE-CONSTRUCTION CONFERENCE
I.8 MATERIAL APPROVAL SUBMITTAL
I.9 PREPARATION OF PROGRESS SCHEDULES AND REPORTS
I.10 WORK HOURS
I.11 CONTRABAND
I.12 EXPLOSIVES
I.13 PARKING AND TEMPORARY OFFICE
I.14 SAFETY AND ACCIDENT PREVENTION
I.15 INSPECTING THE SITE
I.16 PAYMENT SERVICES
I.17 REQUEST FOR FINAL INSPECTION
I.18 DRAWINGS
I.19 CONTRACT SECURITY (3000-02 HUMAN RESOURCE MANAGEMENT
MANUAL)
SECTION II - REPRESENTATIONS AND CERTIFICATIONS
II.1 52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT--
CONSTRUCTION MATERIALS (MAY 2002)
II.2 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) Alternate I (FEB 1995)
II.3 PROTESTS FILED DIRECTLY WITH THE DEPARTMENT OF JUSTICE
(JAR 2852.233-70) (JAN 1998)
II.4 CONTRACTOR'S CERTIFICATION
II.5 BUSINESS MANAGEMENT QUESTIONNAIRE
II.6 EQUITABLE ADJUSTMENTS: WAIVER AND RELEASE OF CLAIMS
SECTION II - SOLICITATION PROVISIONS
II.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY
REFERENCE (FEB 1998)
Page: i
II.8 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN
2006)
II.9 52.216-1 TYPE OF CONTRACT (APR 1984)
II.10 52.222-5 DAVIS-BACON ACT--SECONDARY SITE OF THE WORK (JUL
2005)
II.11 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION
TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR
CONSTRUCTION (FEB 1999)
II.12 52.233-2 SERVICE OF PROTEST (SEP 2006)
II.13 FAITH-BASED AND COMMUNITY-BASED ORGANIZATIONS (AUG
2005)
SECTION III - CONTRACT CLAUSES
III.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
III.2 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS
FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)
III.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF
WORK (APR 1984)
III.4 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
III.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM
REREPRESENTATION (JUN 2007)
III.6 52.222-39 NOTIFICATION OF EMPLOYEE RIGHTS CONCERNING
PAYMENT OF UNION DUES OR FEES (DEC 2004)
III.7 52.225-9 BUY AMERICAN ACT--CONSTRUCTION MATERIALS (JAN
2005)
III.8 CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE (COTR)
(JAR 2852.201-70) (JAN 1985)
III.9 UNSAFE CONDITIONS DUE TO THE PRESENCE OF HAZARDOUS
MATERIAL (JAR 2852.223-70) (JUN 1996)
III.10 DEPARTMENT OF JUSTICE (DOJ) RESIDENCY REQUIREMENT -
BUREAU OF PRISONS CLAUSE (JUN 2004)
III.11 NOTICE OF CONTRACTOR PERSONNEL SECURITY
REQUIREMENTS (OCT 2005)
III.12 SECURITY OF PERSONAL DATA (DEC 2006)
III.13 CHANGES
III.14 CHANGES--SUPPLEMENT
SECTION IV - SUPPLEMENTAL PROVISIONS
ATTACHMENT I: SCHEDULE OF WAGE RATES
ATTACHMENT II: SPECIFICATIONS
ATTACHMENT III: DRAWINGS
ATTACHMENT IV: BOND FORMS
Page: ii
File details come from the government source that posted it. Updated .