About this file

1-4 Table of Contents

View the file

Other files

File Type Posted
BidResultsLEWutil.pdf PDF
BOP30A4.pdf PDF
BOP30A4C.pdf PDF
drawingsheet4rev1.pdf PDF
RFI1lewUtilityFINALapril10POST.pdf PDF
BOP30A3.pdf PDF
SITEMINUTESSEWER1.pdf PDF
1_WAISDocumentRetrieval.htm HTM file
BOP30A2utilitiesLEWmarch25.pdf PDF
BOP1442.pdf PDF
Solicitation.pdf PDF
WAISDocumentRetrieval.htm HTM file
BOP14422.pdf PDF
Specifications.pdf PDF
CoverLetterLEWutilities.pdf PDF
BOP30A.pdf PDF
Drawings.pdf PDF
NewCompressed(zipped)Folder.zip ZIP file
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TABLE OF CONTENTS

Page

SECTION I - SPECIAL CONTRACT REQUIREMENTS

I.1 BONDS

I.2 MAGNITUDE

I.3 SIZE STANDARD

I.4 LIQUIDATED DAMAGES

I.5 REQUIRED INSURANCE

I.6 INSPECTION OF WORK

I.7 PRE-CONSTRUCTION CONFERENCE

I.8 MATERIAL APPROVAL SUBMITTAL

I.9 PREPARATION OF PROGRESS SCHEDULES AND REPORTS

I.10 WORK HOURS

I.11 CONTRABAND

I.12 EXPLOSIVES

I.13 PARKING AND TEMPORARY OFFICE

I.14 SAFETY AND ACCIDENT PREVENTION

I.15 INSPECTING THE SITE

I.16 PAYMENT SERVICES

I.17 REQUEST FOR FINAL INSPECTION

I.18 DRAWINGS

I.19 CONTRACT SECURITY (3000-02 HUMAN RESOURCE MANAGEMENT

MANUAL)

SECTION II - REPRESENTATIONS AND CERTIFICATIONS

II.1 52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT--

CONSTRUCTION MATERIALS (MAY 2002)

II.2 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) Alternate I (FEB 1995)

II.3 PROTESTS FILED DIRECTLY WITH THE DEPARTMENT OF JUSTICE

(JAR 2852.233-70) (JAN 1998)

II.4 CONTRACTOR'S CERTIFICATION

II.5 BUSINESS MANAGEMENT QUESTIONNAIRE

II.6 EQUITABLE ADJUSTMENTS: WAIVER AND RELEASE OF CLAIMS

SECTION II - SOLICITATION PROVISIONS

II.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY

REFERENCE (FEB 1998)

Page: i

II.8 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN

2006)

II.9 52.216-1 TYPE OF CONTRACT (APR 1984)

II.10 52.222-5 DAVIS-BACON ACT--SECONDARY SITE OF THE WORK (JUL

2005)

II.11 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION

TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR

CONSTRUCTION (FEB 1999)

II.12 52.233-2 SERVICE OF PROTEST (SEP 2006)

II.13 FAITH-BASED AND COMMUNITY-BASED ORGANIZATIONS (AUG

2005)

SECTION III - CONTRACT CLAUSES

III.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

III.2 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS

FOR ILLEGAL OR IMPROPER ACTIVITY (JAN 1997)

III.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF

WORK (APR 1984)

III.4 52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

III.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM

REREPRESENTATION (JUN 2007)

III.6 52.222-39 NOTIFICATION OF EMPLOYEE RIGHTS CONCERNING

PAYMENT OF UNION DUES OR FEES (DEC 2004)

III.7 52.225-9 BUY AMERICAN ACT--CONSTRUCTION MATERIALS (JAN

2005)

III.8 CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE (COTR)

(JAR 2852.201-70) (JAN 1985)

III.9 UNSAFE CONDITIONS DUE TO THE PRESENCE OF HAZARDOUS

MATERIAL (JAR 2852.223-70) (JUN 1996)

III.10 DEPARTMENT OF JUSTICE (DOJ) RESIDENCY REQUIREMENT -

BUREAU OF PRISONS CLAUSE (JUN 2004)

III.11 NOTICE OF CONTRACTOR PERSONNEL SECURITY

REQUIREMENTS (OCT 2005)

III.12 SECURITY OF PERSONAL DATA (DEC 2006)

III.13 CHANGES

III.14 CHANGES--SUPPLEMENT

SECTION IV - SUPPLEMENTAL PROVISIONS

ATTACHMENT I: SCHEDULE OF WAGE RATES

ATTACHMENT II: SPECIFICATIONS

ATTACHMENT III: DRAWINGS

ATTACHMENT IV: BOND FORMS