SITEMINUTESSEWER1.pdf

PDF 50 KB Posted

Attached to
Utility Replacement Project at the United States Penitentiary (USP) Lewisburg, Pennsylvania
Solicitation number
IFBLEW-0011
Issued by

About this file

Site Visit/Pre-Bid Conference Meeting Minutes

View the file

Other files

File Type Posted
BidResultsLEWutil.pdf PDF
BOP30A4.pdf PDF
BOP30A4C.pdf PDF
drawingsheet4rev1.pdf PDF
RFI1lewUtilityFINALapril10POST.pdf PDF
BOP30A3.pdf PDF
1_WAISDocumentRetrieval.htm HTM file
BOP30A2utilitiesLEWmarch25.pdf PDF
BOP1442.pdf PDF
Solicitation.pdf PDF
WAISDocumentRetrieval.htm HTM file
BOP14422.pdf PDF
TOC.pdf PDF
Specifications.pdf PDF
CoverLetterLEWutilities.pdf PDF
BOP30A.pdf PDF
Drawings.pdf PDF
NewCompressed(zipped)Folder.zip ZIP file
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Site Visit / Pre-Bid Conference Minutes USP Lewisburg

Utility Replacement Project

IFB LEW-0011

Tuesday, April 1, 2008, IFB LEW-0011

On April 1, 2008 a site visit was conducted at USP Lewisburg for the Utility Replacement Project. The visit was conducted in an informal forum which consisted of a short meeting between staff and the contractors, followed by a guided tour of various locations throughout the Institution and grounds where the work is to be performed. The following individuals were present:

Robert J. Kruskie, Contracting Officer, FBOP - Central Office Douglas Shoch, Contract Specialist, FBOP - USP Lewisburg Jeff Hoffman, Engineering Tech., FBOP - USP Lewisburg Carlo Allodoli, FBOP - NERO Engineer Gary Clark, Volunteer Coordinator, FBOP - USP Lewisburg Dan Boggus, Facilities Manager, FBOP - USP Lewisburg Ron Hicks, Safety Manager, FBOP - USP Lewisburg Frank Passaniti, Captain, FBOP - USP Lewisburg Charles Church, James T. O’Hara, Inc Glenn Johnston, VP, Glenn Johnston, Inc.

Ernest E. Guffey, VP, Glenn Johnston, Inc.

Mark T. Harpster, Estimator, Glenn Johnston, Inc.

Nate Kerstetter, Project Manager, S&E Services Inc.

Gaurang Shah, Project Manager, S&E Services Inc.

Craig Fenton, President, Fenton Excavating & Construction Inc.

Dave Maneual, PM, G & R Charles Excavating Steve Bower, VP, Don E. Bower, Inc.

Frank Beishline, Estimator, Don E. Bower, Inc.

Don Bower, President, Don E. Bower, Inc.

Mitch Kauffman, Project Manager, Rogele, Inc.

Bill Shanafelt, VP, Casper Colosimo & Son, Inc.

Marc Kocher, Supervisor, Rogele, Inc.

Bill Shields, Project Manager, Ground Tech, Inc.

The site visit meeting commenced at approximately 9:00 a.m. at the outside Facilities Conference room. Doug Shoch identified himself as Administering Contracting Officer then introductions proceeded around the room. Mr. Shoch addressed the group by stating that all discussions or discoveries found during the site visit does not change or alter the solicitation. The solicitation can only be changed by a written formal amendment.

Mr. Shoch stated that all technical questions concerning the solicitation and related specifications should be faxed to Robert Kruskie at (570) 547-9203 or e-mailed to rkruskie@bop.gov by April 4, 2008. Mr. Shoch mentioned that Mr. Kruskie is the Contracting Officer in charge through the award phase of this project. After award the contract will be forwarded to USP

Lewisburg for administering. After receiving the questions / clarifications, Mr. Kruskie will work with the Facilities Department in obtaining the answers and information requested. If changes to the solicitation are necessary a formal amendment will be issued to the solicitation. The due date for bids is April 15, 2008 at 2:00 p.m. local time unless an amendment extends the bid opening date. Mr. Shoch mentioned to the contractors to make sure they refer to the fedbizzopps website up until the time they submit their bid for any changes which may occur. He reminded them as the cover letter stated that contractors must be registered at www.ccr.gov and complete the online representations and certifications application (ORCA) website at http:/ /orca.bpn.gov prior to bid opening. It was also mentioned by Mr.

Shoch that contractors are responsible for all applicable state and local taxes (no tax exemptions).

- Mr. Shoch discussed Change Orders and RFI procedures. Change Orders/Modifications can only be authorized by a Contracting Officer or Warranted Contract Specialist. This contract will be administered by the CAO located at USP Lewisburg, Pennsylvania.

The Contractor is responsible for all documentation to substantiate all contract changes. If the contractor believes they have been delayed by a differing site condition, the CAO must be notified immediately in writing and prior to proceeding with any corrective actions. Request For Information (RFI) - RFI’s are to be used by the Contractor to clarify information on the drawings and in the specifications. The Prime Contractor is responsible for numbering all RFI’s. RFI’s will not be accepted from any subcontractors. The Prime Contractor and all subcontractors must have copies of all contract specifications and plans at the construction site at all times. All questions pertaining to the contract documents shall be thoroughly researched prior to presenting them as RFI’s.

- Doug Shoch then spoke about Certificate of Payment/Payrolls and Department of Labor Wage Rates.

1. The Prime Contractor is responsible for ensuring:

-List of Subcontractors is provided -List of Key Personnel is provided -A Schedule of Values is provided -Ensure all certified payrolls are submitted -All labor standards and provisions are met -Proper wage rates are being applied -Overtime is paid to employees working over 40 hours in one week.

-Wage rates and EEO information are properly posted at the construction site http://www.ccr.gov

Application for Payments shall be prepared on an AIA (American Institute of Architects) Form G-702 “Application and Certificate for Payment” with original signatures.

- Gary Clark, Volunteer Coordinator discussed Notice of (Contractor Personnel Security Requirements) The Contractor shall be in compliance with the Homeland Security Presidential Directive-12 (HSPD-12) and Federal Information Processing Standard Publication 201 (FIPS 201) entitled “Personal Identification Verification (PIV) for Federal Employees and Contractors” as stated in the solicitation. All Contractors and subcontractors must be NCIC cleared prior to work on the construction site along with other procedures. Mr. Clark explained the process to the contractor, including the amount of time for USP Lewisburg staff to approve the contractor’s employees and the subcontractor’s employees.

Jeff Hoffman, Engineering Tech discussed the following topics:

(Access to the Site and Working Hours) The project site will be opened to the contractors five (5) days per week, Monday through Friday, excluding Federal holidays. Working hours are based upon a 40 hour work week, eight (8) hours per day. Actual on-site work will be approximately 35 hours per week. The Government assumes no responsibility to the Contractor nor to any of the subcontractors for shorter hours due to emergencies or entry and/or exit of workers at the job site. The COTR shall establish the work hour time frames for the duration of the project, subject to the approval of the Contracting Officer. Work hours and work days may be altered only with a 48 hour advanced approval of the Contracting Officer. All materials, supplies and lunches must be brought inside the secured institution for the entire day. NOTE: After the meeting, the Government decided that the project site will be opened to the contractors four (4) days per week, excluding weekends and Federal holidays. Working hours will be based upon a 40 hour work week, ten (10) hours per day.

Actual on-site work will be approximately 36 hours per week.

Again, the Government assumes no responsibility for shorter hours as stated above. An amendment will be issued in the near future changing the work hours to four ten hour days per week.

Contractor Vehicle Parking: The responsibility for the security and safety of the vehicle is that of the contractor and his/her employee. Parking will be made available near the construction site.

Progress Meeting: Progress meetings will be conducted on a monthly basis unless the Contracting Officer feels more meetings are needed. The Contractor shall submit Certified Weekly Payrolls from the Contractor and Subcontractors, anticipated monthly work activity schedule and a complete updated monthly progress report.

Institution Gate/Tool Policy: Mr. Hoffman along with the Captain discussed daily gate entrance procedures where your tools will be inventoried coming in and out of the institution for accountability. A tool inventory will be maintained at all times and any changes shall be coordinated with the COTR. Tools will be stored in a lock gang box or removed nightly from the construction site. Copies of any keys to these locks will be given to the COTR/Locksmith. 48 hour notice is required for the use of large equipment. A lay down area will be designated both inside and outside the institution for the contractor. It was noted that large equipment could be stored inside as long as it can be disabled and with approval of the captain.

Escorting Procedures: The Contractor will be escorted while performing under this contract. The contractor will submit to the COTR a list of all employees and types of equipment the contractor will be utilizing on a daily basis. The COTR will coordinate all escorts.

Trash Removal: It is the Contractor’s responsibility for removal of all trash and debris from the job site. An open top container will be provided by the Contractor at a location coordinated with the COTR. Trash containers must clear five counts at the rear gate before removal to the outside.

Utilities Furnished: The Contractor is authorized water, sewer and electric. The contractor is allowed to tap into water and electric at the contractor’s sole expense; however, any temporary taps must be removed by the Contractor prior to completion of the project. Cell phones are not allowed inside the institution.

Escorting Procedures: The Contractor will be escorted while performing under this contract. The contractor will submit to the COTR a list of all employees and types of equipment the contractor will be utilizing on a daily basis. The COTR will coordinate all escorts.

Captain Passaniti discussed (Institution Code of Conduct) The contractor shall inform his employees that intoxicating beverages, drugs and weapons are strictly prohibited.

Introduction of contraband shall be subject to the penalties prescribed by Title 18 USC-1791. Appropriate clothing must be worn at all times at the site. No fraternizing with inmates. If you happen to know an inmate personally, you must report it immediately to the COTR.

Delays: Douglas Shoch indicated that while working inside behind the secure wall there will be occasional delays for getting inside for such things as fog and emergency situations. When there is a fog delay, workers will not be allowed inside the institution until the fog clears. Mr. Kruskie reiterated that financial compensation would not be allowed and these delays are typical for working in a prison environment.

At approximately 10:00 am the tour of the work area commenced.

The Contractors were escorted inside the secure wall where they walked around the institution grounds. Areas visited included the Recreation Yard, Rear Gate and areas along the wall where the storm, sewer and water lines were located. The group then proceeded outside the secure the wall where the meeting ajourned.

Mr. Shoch reiterated one more time that any technical questions should be faxed to Robert Kruskie by Friday, April 4, 2008.

The site visit concluded at approximately 12:15 p.m.

Note: These minutes are provided for informational purposes only and any changes made to the solicitation shall be made by formal amendment.