About this file

This is an Invitation for Bid (IFB) No. 06A3228 issued by the California Department of Transportation (Caltrans) for on-call hazardous material survey testing and reporting services in Fresno, Kern, Kings, Madera, and Tulare Counties. The contract will provide services for asbestos and lead-based paint surveying, sampling, testing, and reporting for residential and commercial structures. The bid is scheduled for submission by October 28, 2025, with a proposed award date of November 13, 2025. The contract term is estimated to run from December 1, 2025, to November 30, 2028, with services to be performed on an on-call basis through individual service requests.

The bid includes specific pricing for various survey types, such as asbestos and lead-based paint inspections for residential structures up to 3,500 sq. ft. and commercial structures up to 10,000 sq. ft., with additional pricing for supplemental samples and testing. The solicitation includes a 5% small business preference and encourages participation from small businesses, disadvantaged businesses, and disabled veteran businesses. Bidders must be certified asbestos consultants or lead-related construction inspectors and must comply with prevailing wage requirements. The total contract value is not explicitly stated, but the bid includes unit pricing for various survey and testing services. Funding appears to be from state transportation funds, with potential federal participation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALIFORNIA STATE TRANSPORTATION AGENCY GAVIN NEWSOM, GOVERNOR

California Department of Transportation

ADMINISTRATION

DIVISION OF PROCUREMENT AND CONTRACTS

1727 30th STREET, MS 65

SACRAMENTO, CA 95816-7006

PHONE (916) 227-6000

TTY 711

https://dot.ca.gov/programs/procurement-and-contracts/

October 14, 2025

Invitation for Bid (IFB)

IFB # 06A3228

Notice to Prospective Bidders

You are invited to review and respond to this IFB 06A3228, titled On-Call Hazardous Material Survey Testing and Reports - Fresno, Kern, Kings, Madera, and Tulare Counties. In submitting your bid, you shall comply with the instructions found herein. In addition to those programs and preferences that are specified in this solicitation, Prospective Contractors are encouraged to consider programs and preferences that are available, such as those for the use of small businesses, disadvantaged businesses, disabled veteran businesses, and other businesses covered by State and Federal programs and preferences.

As required by Executive Order S-02-06, the California Department of Transportation (Caltrans) is committed to meeting the State’s twenty-five percent (25%) Small Business (SB) participation goal.

Certified SBs, Micro Businesses (MB) and Contractors willing to commit to subcontracting a minimum of twenty-five percent (25%) of their net price to certified SBs or MBs (if applicable) are encouraged to submit bids. See Section D, Special Programs in this IFB for requirements.

This Agreement requires Prevailing Wages if the total bid amount exceeds $15,000. If the total bid amount is under $15,000, then Prevailing Wage language will be removed prior to award. Refer to Attachment 3, Proposed Form of Agreement for requirement details.

The designated contact person for this IFB is:

Jean Mallare California Department of Transportation (Caltrans) Email address: Jean.Mallare@dot.ca.gov Phone: (279) 234-2288

Please note that no verbal information given will be binding upon Caltrans unless such information is issued in writing as an official addendum.

*Technical questions regarding this solicitation will be addressed, in writing, and in accordance with the Questions and Answers portion of this IFB. See Section C, Time Schedule for more details.

ALL REQUIRED DOCUMENTS ARE EITHER ATTACHED (ATTACHMENT 1) OR THE

DOCUMENT LINK IS PROVIDED ON ATTACHMENT 2, REQUIRED DOCUMENTS.

Sincerely, Jean Mallare Contract Analyst https://dot.ca.gov/programs/procurement-and-contracts/

Invitation for Bid IFB Number 06A3228

A) Purpose and Description of Services

1. Contractor shall furnish all labor, equipment, tools, parts, materials, supplies, qualified personnel, travel, and incidentals necessary to provide on-call hazardous materials sampling, testing, monitoring, analyzing, and reporting to Caltrans.

2. Refer to the Proposed Form of Agreement, Exhibit A, which is attached to this IFB, for a more complete description of services.

3. Bidders are hereby on notice the winning bidder cannot bid for the asbestos abatement contract if and when advertised by Caltrans.

B) Bidder’s Minimum Qualifications

1. Bidder shall possess at the time of bid submittal and for the duration of the Agreement, a valid and current registration with the Department of Industrial Relations (DIR). Caltrans will verify bidder’s DIR registration; it is not necessary to provide a copy. Subcontractor consultant and laboratories performing only the lab testing are exempt from the registration requirement.

2. Bidder shall be a Certified Asbestos Consultant (CAC) or an Assistant Technician working under the direction of a CAC with the Department of Industrial Relations Division of Occupational Safety and Health, working under the direction of a CAC to perform asbestos survey sample collection and inspection services. Proof of current and valid certification shall be submitted at time of bid submittal.

3. Bidder shall be a Certified Lead-Related Construction Inspector/Assessor with the California Department of Public Health to perform lead paint and ceramic tile inspection and x-ray fluorescence (XRF) testing work. Proof of current and valid certification shall be submitted at time of bid submittal.

1. Failure of Bidder to sufficiently meet any or all the minimum qualifications, in the opinion of Caltrans, will result in the Bidder’s bid deemed non-responsive.

C) Bid Requirements and Information

1. Time Schedule

It is recognized that time is of the essence. All bidders are hereby advised of the following schedule and will be expected to adhere to the required dates and times.

Event Date Time (Pacific Time)

IFB available to prospective bidders 10/14/2025 Written Question Submittal 10/21/2025 Final Date and Time for Bid Submission 10/28/2025 2:00 p.m.

Bid Opening 10/28/2025 2:30 p.m.

Proposed Award Date (estimate) 11/13/2025

2. Questions and Answers A. Questions regarding this IFB must be submitted by October 21, 2025. Bidders must submit their questions via e-mail to Jean.Mallare@dot.ca.gov.

B. Written questions must include: the individual's name, firm name, e-mail address and must reference IFB No. 06A3228.

C. Written responses to all questions will be collectively compiled and posted, as an Addendum, to the Cal eProcure website (https://caleprocure.com/pages/index.aspx). It is the responsibility of the bidder to access the Cal eProcure website for any changes or addenda that may be posted. Refer to this Section C, Time Schedule for the schedule of events and dates/times.

Bidder can contact the Contract Analyst named above.

https://caleprocure.com/pages/index.aspx

3. Costs Included in Bid Rates

Bid prices/rates shall include the cost of employer payments to or on behalf of employees, subsistence, travel, compensation insurance premiums, unemployment contributions, social security taxes, contract bond premiums, and any other taxes or assessments, including but not limited to, sales and use taxes required by law or otherwise and no additional allowance will be paid unless separate payment provisions in the Agreement should specifically provide otherwise.

4. Small Business Preference SB Preference will be granted on this IFB. Only firms certified as a “Small Business” or “Micro Business” with the Department of General Services (DGS), Office of Small Business and DVBE Service (OSDS) or contractors who commit to subcontracting a minimum of 25 percent (25%) of their net bid price to SB or MB, in the categories most appropriate to accomplish the prescribed services, will be granted this preference. For more information, refer to Section D, Special Programs.

5. State General Prevailing Wage Rates State General Prevailing Wage Rates will apply for the Counties of Fresno, Kern, Kings, Madera, and Tulare, as described in the attached Proposed Form of Agreement, Exhibit B. The predetermined general prevailing wage rates published by the Director of Industrial Relations may be obtained via the Internet at: https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm, It is the bidder's responsibility to use the correct classification determination published by the Department of Industrial Relations (DIR). By signing the Bid/Bidder Certification Sheet, the Bidder acknowledges this is a public works contract subject to Labor Code Sections 1720-1861, and that if awarded this Agreement, it will be the Bidder’s responsibility to ensure that all prevailing requirements are met, including but not limited to the payment of appropriate prevailing wages rates to all employees who participate and perform services under this Agreement, Department of Industrial Relations registration, submittal of weekly certified payroll records, and employment of apprentices throughout the duration of the Agreement.

6. Federal Prevailing Wage Rates Federal Prevailing Wages apply to this Agreement and are attached to the Proposed Form of Agreement.

7. Mandatory Organic Waste Recycling Contractor generating organic waste or commercial solid waste shall comply with SB 1383; also Contractor will arrange for the recycling services required by this section in a manner that is consistent with State and local laws and requirements, including a local ordinance or local jurisdiction’s franchise agreement, applicable to the collection, handling, or recycling of organic waste and commercial solid waste. This requirement does not modify, limit, or abrogate Contractor’s right to sell or donate its recyclable organic waste materials consistent with the requirements of Public Resources Code Sections 42649.8 et seq. When applicable, Contractor must comply with these provisions.

8. Motor Carrier Permit Requirements A. Contractor is responsible for determining whether California Vehicle Code Sections 34601 and

34620 require Contractor to have a valid Motor Carrier Permit (MCP) issued by the Department of Motor Vehicles (DMV) in order for Contractor to lawfully perform any part or aspect of the work described in Proposed Form of Agreement, Exhibit A and, if California Vehicle Code Sections 34601 and 34620 do require same for any part or aspect of such work, Contractor must have a valid MCP(s) issued from the DMV for its services as a Motor Carrier of Property under this Agreement. Contractor shall pay any required fees necessary to obtain https://www.dir.ca.gov/OPRL/DPreWageDetermination.htm and maintain in good standing during the entire term of this Agreement the any such required MCP(s).

B. The MCP(s), if any, required for Contractor’s Motor Carriers of Property under California Vehicle Code Sections 34601 and 34620 shall be on file with Contractor for the duration of this Agreement. Upon request of Caltrans Contract Manager, Contractor must immediately provide to Caltrans a copy of the required MCP(s), if any.

9. Contractor Registration Program A. No Contractor or Subcontractor may be listed on a bid proposal for a contract with prevailing wages unless registered with the Department of Industrial Relations (DIR), pursuant to Labor Code Section 1725.5 with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a).

B. No Contractor or Subcontractor may be awarded an agreement with prevailing wages unless registered with DIR pursuant to Labor Code Section 1725.5. Subcontractor consultant and laboratories performing only the lab testing are exempt from the registration requirement.

C. Caltrans will verify each of the registration numbers prior to Agreement award. Bidders that do not possess the required DIR registration will be deemed non-responsive and rejected from further consideration in the solicitation process.

D. If Contractor lists Subcontractor who is believed to be performing work that is not subject to the registration requirements, written confirmation from DIR must be obtained and submitted with the proposal to validate the bid.

10. Subcontractors Bidder may subcontract portions of the work as defined in the attached Proposed Form of Agreement, Exhibit A. If a subcontractor(s) is/are used, complete the Subcontracting Provisions/List (ADM-1511). Bidder must ensure that the subcontractor(s) will have all necessary licenses, permits, and/or certifications to accomplish its portion of the work. Failure of a subcontractor(s) to have the proper licenses, permits, and/or certifications, shall be cause for rejection of bid.

11. Standard Title VI/Nondiscrimination Assurances (DOT Order No. 1050.2A) Caltrans, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Statute 252, 42 USC Sections 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any Agreement entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.

12. Insurance A. The bidder who receives the Agreement award, will be requested to provide a Certificate of

Insurance providing proof of insurance to the Division of Procurement and Contracts within 10 working days after the date of notification of award. The State’s Office of Risk and Insurance Management will review insurance certificates and/or proof of self-insurance documentation before execution of the Agreement. Refer to the Proposed Form of Agreement, Exhibit E, for the applicable and specific Insurance requirements and coverage limits.

B. The insurance carrier shall provide an endorsement for the additional insured statement as follows:

Caltrans, State of California, its officers, agents, and employees shall be included as additional insured, but only with respect to work performed for the State of California under this Agreement.

C. The additional insured endorsement must accompany the certificate of insurance.

D. Satisfying A Self-Insured Retention (SIR)

All insurance required by this Agreement must allow, but not require, the State to pay any SIR and/or act as Contractor’s agent in satisfying any SIR. The choice to pay any SIR and/or act as Contractor’s agent in satisfying any SIR is at the State’s discretion. If the State chooses to pay any SIR and/or act as Contractor’s agent in satisfying any SIR, Contractor shall reimburse the State for the same.

E. Available Coverages/Limits In the event the insurance coverages obtained by Contractor is broader in scope than, and/or the limits are higher than, those required under the Agreement, all such broader coverage and/or higher limits available to Contractor shall also be available and applicable to the State.

13. California Civil Rights Laws Any person that submits a bid or proposal to, or otherwise proposes to enter into or renew an Agreement with, a State agency with respect to any Agreement in the amount of one hundred thousand dollars ($100,000) or more shall certify, under penalty of perjury, at the time the bid or proposal is submitted or the Agreement is renewed, that they satisfy all of the conditions set forth in California Public Contract Code Section 2010 and they shall execute the California Civil Rights Laws Certification (DOT ADM-0076), provided as a link in Attachment 2, Required Documents, completed, signed, and returned with its bid or proposal.

14. Darfur Contracting Act A. The Darfur Contracting Act, Public Contract Code Section 10475-10481, applies to any company that currently or within the previous three (3) years has had business activities or other operations outside of the United States. The Act was passed by the California Legislature and signed into law by the Governor to preclude State agencies generally from contracting with “scrutinized” companies that do business in the African nation of Sudan (of which the Darfur region is a part), for the reasons described in Public Contract Code Section 10475. All bidders shall complete the Darfur Contracting Act Certification (DOT ADM- 0077), provided as a link in Attachment 2, Required Documents, and submit with the proposal.

B. If your company has not, within the previous three (3) years, had any business activities or other operations outside of the United States, complete Option 1 on DOT ADM-0077.

C. A scrutinized company is a company doing business in Sudan as defined in Public Contract Code Section 10476. Scrutinized companies are ineligible to, and cannot bid on, or submit a bid or proposal for an Agreement with a State agency for goods or services. (Pub. Cont. Code Section 10477(a)).

D. Therefore, Public Contract Code Section 10478(a) requires a company that currently has (or within the previous three (3) years has had business activities or other operations outside of the United States to certify that it is not a “scrutinized” company when it submits a bid or proposal to a State agency.

E. A scrutinized company may still, however, submit a bid or proposal for an Agreement with a State agency for goods or services if the company first obtains permission from the

Department of General Services according to the criteria set forth in Public Contract Code Section 10477(b).

15. Executive Order N-6-22 – Russia Sanctions On March 4, 2022, Governor Gavin Newsom issued Executive Order N-6-22 (the EO) regarding Economic Sanctions against Russia and Russian entities and individuals. “Economic Sanctions” refers to sanctions imposed by the U.S. government in response to Russia’s actions in Ukraine, as well as any sanctions imposed under state law unless the contract has been Federalized (i.e.

there is federal participation in any phase). By submitting a bid or proposal, Contractor represents that it is not a target of Economic Sanctions. Should the State determine Contractor is a target of Economic Sanctions or is conducting prohibited transactions with sanctioned individuals or entities, that shall be grounds for rejection of the Contractor’s bid/proposal any time prior to contract execution, or, if determined after contract execution, shall be grounds for termination by the State.

16. Executive Order N-12-23 – Generative Artificial Intelligence (GenAI) Technology Use and Reporting

A. The State of California seeks to realize the potential benefits of GenAI, through the development and deployment of GenAI tools, while balancing the risks of these new technologies. Bidder / Offeror must notify the State in writing if it:

1) Intends to provide GenAI as a deliverable to the State; or

2) Intends to utilize GenAI, including GenAI from third parties, to complete all or a portion of any deliverable that materially impacts:

1. Functionality of a State system,

2. Risk to the State, or

3. Contract performance.

Note: For avoidance of doubt, the term “materially impacts” shall have the meaning set forth in State Administrative Manual (SAM) § 4986.2 Definitions for GenAI.

B. Failure to report GenAI to the State may result in disqualification. The State reserves the right to seek any and all relief to which it may be entitled to as a result of such non-disclosure.

C. Upon notification by a Bidder / Offeror of GenAI as required, the State reserves the right to incorporate GenAI Special Provisions into the final contract or reject bids/offers that present an unacceptable level of risk to the State.

D. Government Code 11549.64 defines “Generative Artificial Intelligence (GenAI)” as an artificial intelligence system that can generate derived synthetic content, including text, images, video, and audio that emulates the structure and characteristics of the system’s training data.

17. Bid Submittal A. All bids must be submitted and received by Caltrans Division of Procurement and Contracts, Bid Unit, by dates and times shown in Section C, Bid Requirements and Information.

B. The mailing package/envelope should be labeled as follows:

Note: All packages not clearly or properly labeled as indicated below, including overnight mail and hand delivered packages, may be rejected.

https://www.gov.ca.gov/wp-content/uploads/2022/03/3.4.22-Russia-Ukraine-Executive-Order.pdf

YOUR RETURN ADDRESS Agreement No. 06A3228 Bid Due Date: 10/28/2025 Bid Due Time: 2:00 p.m.

Bid Opening Date: 10/28/2025

Bid Opening: 2:30 p.m.

Attention: Jean Mallare

California Department of Transportation (Caltrans) Division of Procurement and Contracts ATTN: Bid Unit 1727 30th Street, 4th Floor, MS 65 Sacramento, CA 95816-7006

BID SUBMITTAL DO NOT OPEN

C. Late bids will not be considered.

D. All bids shall include the documents identified on the IFB’s Required Documents, located at the end of the solicitation. Bids not including the required documents may be deemed non-responsive. A non-responsive bid is one that does not meet the basic bid requirements.

E. Only an individual who is legally authorized to bind the proposing firm contractually shall sign all documents requiring a signature, and each document must bear a signature.

F. If your bid is hand delivered, you must date, and time stamp the sealed envelope/package immediately upon arrival. The date/time stamp machine is located in the lobby on the first floor to the right of the security guard station at the address noted above. After date/time stamping, the bid should be placed in the locked bid cabinet located below the time stamp. If the bid package is too large to be electronically stamped, date/time stamp one of the labels provided and attach it to the proposal package. When the bid package is too large for the locked bid cabinet, ask the security guard to call the Division of Procurement and Contracts reception desk at (916) 227-6000 to have your bid package picked up.

G. Bid opening will be held via teleconference at 2:30 p.m. on the date specified in Section C, Bid Requirements and Information. Bidders may participate via teleconference by calling 1- 866-700-7952 and entering the pass code 7089821#. Calls will be accepted beginning at 2:20 p.m. until the conclusion of the bid opening. Bids will be read in Agreement numeric order;

questions will not be allowed; and information will not be repeated. Initial bid opening results will be posted online on the Division of Procurement and Contracts website at https://dot.ca.gov/programs/procurement-and-contracts/bid-results by 3:00 p.m. on the day following the bid opening. The Agreement will be awarded to the lowest responsible bidder meeting the requirements outlined in the IFB after verification and applicable incentives are applied as stated in Evaluation and Selection below.

H. Bids must include the performance of all the services described herein. Any attempt to modify the bid document to deviate from the work specifications will not be considered and will cause a bid to be rejected.

I. A bid may be rejected if it is conditional, incomplete, or if it contains any alterations of form or other irregularities of any kind. Caltrans may reject any bid on the basis that it is not responsive or from a non-responsible bidder and may waive any immaterial deviation in a bid.

Caltrans waiver of an immaterial defect shall in no way modify the IFB document or excuse the bidder from full compliance with all requirements if awarded the Agreement.

https://dot.ca.gov/programs/procurement-and-contracts/bid-results

J. Costs for developing bids and in anticipation of award of an agreement is entirely the responsibility of the bidder and shall not be charged to the State.

K. Only an individual who is authorized to bind the bidding firm contractually shall sign the

Bid/Bidder Certification Sheet. The signature must also indicate the title or position that the individual holds in the firm. A bid with an unsigned Bid/Bidder Certification Sheet may be rejected.

L. A bidder may modify a bid after its submission by first withdrawing the original bid and then by resubmitting a new bid prior to the bid submittal deadline. Bidder modifications offered in any other manner, oral or written, will not be considered.

M. A bidder may withdraw a bid by, prior to bid opening, submitting a written withdrawal request to Caltrans, at DPAC.BidUnit@dot.ca.gov, signed by the bidder or an agent authorized in accordance with Section K above. A bidder may thereafter submit a new bid prior to the bid submittal deadline. Bids may not be withdrawn without cause subsequent to bid submittal deadline. Please contact the Caltrans analyst located on page 1 of this IFB with any questions.

N. Caltrans may modify the IFB prior to the date fixed for submission of bids by the issuance of an addendum sent to all parties who received a bid package.

O. Caltrans reserves the right to reject all bids for reasonable cause.

P. Bidders are cautioned not to rely on Caltrans during its evaluation process to discover and report to the bidder any defects and/or errors in the submitted documents. Before submitting their documents, bidders should carefully proof them for errors and full adherence to the IFB requirements.

Q. Where applicable, the bidder should carefully examine work sites and specifications. Bidder shall investigate conditions, character, and quality of surface or subsurface materials or obstacles that might be encountered. No additions or increases to the Agreement amount will be made due to a lack of careful examination of work sites and specifications.

R. Caltrans does not accept alternate agreement language from a bidder. A bid with such language will be considered a counter proposal and will be rejected. The State’s General Terms and Conditions (GTC) are not negotiable. Also, the winning bidder(s) must complete, sign, and submit all pages of the Contractor Certification Clauses (CCC 04/2017) as part of the Agreement award process. Both the GTC 02/2025 and CCC 04/2017 may be viewed at:

https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources- List-Folder/Standard-Contract-Language.

18. Evaluation and Selection A. At the time of bid opening, each bid proposal’s total and any small business and/or micro business information (if applicable) will be read aloud. Bids are considered preliminary pending review and verification of applicable bid requirements such as: small business preference, incentives, DVBE, licensing, bonding, qualifications, or other requirements as stated in the IFB. Agreements will be awarded to the lowest responsive and responsible bidder.

B. Caltrans will check the bid submittal package to verify it received all required documents.

Positive verification of required documents will be performed to determine its responsiveness to the State's needs.

C. Bids that contain false or misleading statements, or which provide references, which do not support an attribute or condition claimed by the bidder, shall be rejected.

mailto:DPAC.BidUnit@dot.ca.gov https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language https://www.dgs.ca.gov/OLS/Resources/Page-Content/Office-of-Legal-Services-Resources-List-Folder/Standard-Contract-Language

D. The Agreement, if awarded, shall be awarded to the lowest responsible bidder who submits the lowest bid and meets all the specifications. A bid meets the specifications if it complies with all the requirements in this solicitation. In the event of a tie bid, Caltrans will draw lots to determine the successful bidder. Only one (1) bid may be submitted by an entity: individual, firm, partnership, corporation, joint venture, or combination thereof. Receipt of more than one

(1) bid from an entity will result in all bids from that entity being rejected and returned to the bidder.

19. Award A. Preliminary bid results may be viewed on the internet after 3:00 p.m. on the first (1st) business day following the bid due date at https://dot.ca.gov/programs/procurement-and-contracts/bid-results.

B. Whenever an Agreement is awarded under a procedure that provides for competitive bidding, but the Agreement is not to be awarded to the low bidder, the low bidder shall be given notice five (5) working days prior to the award of the Agreement by email.

C. Upon written request by any bidder, the Notice of the Intent to Award shall be posted in a public place in the office of the awarding agency, as well as online at https://dot.ca.gov/programs/procurement-and-contracts/notices-of-intent-to-award, for at least five (5) working days prior to awarding the Agreement. This information can also be obtained by contacting the Contract Analyst directly.

D. Upon award of the Agreement, Contractor shall complete and submit to Caltrans, the Payee Data Record (STD 204), to determine if Contractor is subject to State income tax withholding pursuant to California Revenue and Taxation Code Section 18662 et seq. This form can be found on the Internet at https://www.dgs.ca.gov/PD under the heading Forms. No payment shall be made unless a completed STD 204 has been returned to Caltrans.

20. Protest Bidders have the right to protest the award of Caltrans Agreements subject to the following processes and procedures.

A. Filing a Protest: The initial protest must be submitted to DGS, Office of Legal Services, and

Caltrans, Protest Unit, prior to the award of the Agreement. When a protest has been submitted, the Agreement shall not be awarded until either the protest has been withdrawn or DGS has decided the matter. The written protest must be sent, either via e-mail or regular mail, to the addresses below:

California Department of Transportation (Caltrans) Division of Procurement and Contracts Attention: Bid, Protest, and Dispute Branch Chief 1727 30th Street, MS 65 Sacramento, CA 95816 Phone Number: (916) 639-6322 Email:

DPAC.Protest.Disputes.Terminations@dot.ca.gov

Department of General Services Office of Legal Services Attention: Bid Protest Coordinator 707 Third Street, 7th Floor, Suite 7-330 West Sacramento, CA 95605 Phone Number: (916) 376-5080 Email: OLSProtests@dgs.ca.gov

B. Within five (5) days after filing the initial protest, the protesting bidder shall file with DGS and Caltrans, Protest Unit a full and complete written statement specifying the grounds for the protest. The full written protest statement must be sent to the same addresses above.

Note: E-mail is the preferred method of protest delivery. If a bidder uses regular mail, It is suggested that you submit any protest by certified or registered mail.

https://dot.ca.gov/programs/procurement-and-contracts/bid-results https://dot.ca.gov/programs/procurement-and-contracts/bid-results https://dot.ca.gov/programs/procurement-and-contracts/notices-of-intent-to-award https://www.dgs.ca.gov/PD mailto:DPAC.Protest.Disputes.Terminations@dot.ca.gov mailto:OLSProtests@dgs.ca.gov

21. Standard Conditions of Service

A. Service shall not begin prior to the express date set by Caltrans Contract Manager and Contractor, after all approvals have been obtained, and the Agreement is fully executed.

Should Contractor fail to commence work at the agreed upon time, Caltrans Contract Manager, upon five (5) days written notice to Contractor, reserves the right to terminate the Agreement. In addition, Contractor shall be liable to Caltrans for the difference between Contractor's bid price and the actual cost of performing work by the second lowest bidder or by another Contractor.

B. All performance under the Agreement shall be completed on or before the termination date of the Agreement.

C. Antitrust Provisions

1) In submitting a bid to a public purchasing body, the bidder offers and agrees that if the bid is accepted, it will assign to the purchasing body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 USC Section 15 or under the Cartwright Act Chapter 2, commencing with Section 16700, of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, materials, or services by the bidder for sale to the purchasing body pursuant to the bid. Such assignment shall be made and become effective at the time the purchasing body tenders final payment to the bidder (Gov. Code Section 4552).

2) If the awarding body or public purchasing body receives, either through judgment or settlement, a monetary recovery for a cause of action assigned under this chapter, the assignor shall be entitled to receive reimbursement for actual legal costs incurred and may, upon demand, recover from the public body any portion of the recovery, including treble damages, attributable to overcharges that were paid.

3) Upon demand in writing by the assignor, the assignee shall, within one (1) year from such demand, reassign the cause of action assigned under this part if the assignor has been or may have been injured by the violation of law for which the cause of action arose and (a) the assignee has not been injured thereby, or (b) the assignee declines to file a court action for the cause of action (Gov. Code Section 4554).

D. If the bidder is awarded the Agreement and refuses to sign the Agreement presented for signature within the time and manner required, the bidder will be liable to Caltrans for actual damages resulting to Caltrans therefrom or 10 percent (10%) of the amount bid, whichever is less.

E. Loss Leader usage is prohibited in this solicitation: It is unlawful for any person engaged in business within this State to sell or use any article or product as a “loss leader” as defined in California Business and Professions Code Section 17030. “Loss Leader” means any article or product sold at less than cost: a) where the purpose is to induce, promote or encourage the purchase of other merchandise; or b) where the effect is a tendency or capacity to mislead or deceive purchasers of prospective purchasers; or c) where the effect is to divert trade from or otherwise injure competitors.

F. No oral understanding or agreement shall be binding on either party.

D) Special Programs

The following Special Programs are applicable to this IFB.

Small Business (SB) or Microbusiness (MB) Preference A. Government Code Section 14835 et seq. requires that a five percent (5%) preference be given to contractors who qualify as a Certified SB or MB. References to a small business (SB) shall also include micro-business (MB). The rules and regulations of this law, including the definition of a SB for the delivery of services, are contained in Title 2, California Code of Regulations, Section 1896 (2 CCR Section 1896) et seq.

B. To claim the SB or MB preference, Contractor must have its principal place of business located in California, satisfy all of the SB or MB requirements, and be certified by the California Department of General Services (DGS), Office of Small Business and Disabled Veteran Business (DVBE) Services (OSDS). The preference amount may not exceed fifty thousand dollars ($50,000) for any bid. If prospective contractor is claiming the five percent (5%) certified SB or MB preference, complete Section 16 of the Bid/Bidder Certification Sheet. Additionally, Contractor may satisfy the non-SB requirements described below.

C. Pursuant Government Code Section 14838 and 2 CCR Section 1896, if a bidder is not a certified SB, but wishes to be eligible for the five percent (5%) non-small business (NSB) preference, the bidder must subcontract at least twenty five percent (25%) of its net bid price to one or more certified SBs. If bidder is claiming the five percent (5%) non-SB (NSB) preference, complete Section 17 of the Bid/Bidder Certification Sheet, as well as Subcontracting Provisions/List, ADM-1511. The bidder shall list the names of all certified SB firms being claimed for credit.

Bidders must include quotes from each subcontractor, on the subcontractor letterhead. The quote must at minimum include the following: 1) type of services performed, or goods supplied 2) estimated hours, or quantity of goods 3) hourly rate, or unit price 4) total quote amount. This preference shall not be awarded to a noncompliant bidder and shall not be used to achieve any applicable minimum requirements.

D. Certified SB and MB bidder(s) shall have precedence over NSB bidders in the application of SB preference(s).

E. SB preferences may not be applied to any bid deemed non-responsive with the solicitation instructions or from a non-responsible bidder.

F. Questions regarding the certification approval process or SB program should be directed to OSDS at (800) 559-5529 or (916) 375-4940, or by email:osdshelp@dgs.ca.gov.

G. SB or MB bidders or bidders using the “Non-Small Business” preference shall be granted a preference consisting of five percent (5%) of the lowest responsible bidder’s total bid if the lowest bid is from a non-certified SB or MB.

H. Additional references are at https://www.dgs.ca.gov/PD/Services/Page-Content/Procurement- Division-Services-List-Folder/Certify-or-Re-apply-as-Small-Business-Disabled-Veteran-Business- Enterprise.

mailto:osdshelp@dgs.ca.gov https://www.dgs.ca.gov/PD/Services/Page-Content/Procurement-Division-Services-List-Folder/Certify-or-Re-apply-as-Small-Business-Disabled-Veteran-Business-Enterprise https://www.dgs.ca.gov/PD/Services/Page-Content/Procurement-Division-Services-List-Folder/Certify-or-Re-apply-as-Small-Business-Disabled-Veteran-Business-Enterprise https://www.dgs.ca.gov/PD/Services/Page-Content/Procurement-Division-Services-List-Folder/Certify-or-Re-apply-as-Small-Business-Disabled-Veteran-Business-Enterprise

Contractor’s Name STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 06A3228 BID PROPOSAL 1 of 2 ADM-1412 (REV. 9/2025) Attachment 1

CONTRACTOR’S NAME (Please Print):

ITEM

NO.

ESTIMATED

QUANTITY

UNIT OF

MEASURE ITEM DESCRIPTION

Unit Price (Price Per Unit of

Measure)

Total (Estimated Quantity

X Unit Price)

1 3 Per Report Asbestos survey report and testing for a residential structure up to 3500 sq. ft. with up to 150 Polarized Light Microscopy (PLM) samples

2 15 Per each additional 100 sq. ft.

Additional charge per 100 sq. ft. over 3500 sq. ft.

for survey report and testing of a residential structure

3 10 Per Report Asbestos survey report and testing for a commercial or multi-family structure up to 10,000 sq. ft. with up to 250 PLM samples

4 30 Per each additional

1,000 sq. ft.

Additional charge per 1,000 sq. ft. over 10,000

sq. ft. for survey report and testing of a commercial or multi-family structure

5 5 Per additional sample Additional PLM tests for asbestos $ $

6 10 Per each sample Point Counting $ $

7 3 Per Report Lead survey report and testing for a residential structure up to 3500 sq. ft. with up to 500 X-Ray Fluorescence (XRF) samples

8 15 Per each additional 100 sq. ft.

Additional charge per 100 sq. ft. over 3500 sq. ft.

for survey report and testing of a residential structure

9 10 Per Report Lead survey report and testing for a commercial or multi-family structure up to 10,000 sq. ft. with up to 1200 XRF

10 30 Per each additional

1,000 sq. ft.

Additional charge per 1,000 sq. ft. over 10,000

sq. ft. for survey report and testing of a commercial or multi-family structure

STATE OF CALIFORNIA ∙ DEPARTMENT OF TRANSPORTATION Agreement Number 06A3228 BID PROPOSAL 2 of 2 ADM-1412 (REV. 9/2025) Attachment 1

ITEM

NO.

ESTIMATED

QUANTITY

UNIT OF

MEASURE ITEM DESCRIPTION

Unit Price (Price Per Unit of

Measure)

Total (Estimated Quantity

X Unit Price)

11 5 Per additional sample Additional XRF tests for lead-based paint $ $

TOTAL BID PROPOSAL $

1) Above quantities are estimates only and are given as a basis for comparison of bids. No guarantee is made or implied as to the exact quantity needed.

2) In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail.

3) Do not alter, modify, or change this bid proposal. Any alterations, modifications, or changes to this bid proposal will be grounds to reject the bid.

4) Each line item must be bid. Do not leave any unit price column blank or this bid proposal will be deemed non-responsive.

Attachment 2

Required Documents The following documents should be submitted, or your bid may be considered non-responsive.

Do not submit this checklist, the Proposed Form of Agreement, company advertisements, brochures, informational pamphlets, or any other document unless specifically noted in the IFB Requirements and/or as listed below.

☐ Attachment 1 - Bid Proposal (ADM-1412)

☐ Bid/Bidder Certification Sheet (DOT ADM-1416) Bid/Bidder Certification Sheet

☐ Subcontracting Provision/List (DOT ADM-1511) Subcontracting Provisions/List

☐ California Civil Rights Laws Certification (DOT ADM-0076) California Civil Rights Laws Certification

☐ Darfur Contracting Act Certification (DOT ADM-0077) Darfur Contracting Act Certification

Proof of certification as a Certified Asbestos Consultant (CAC) or Assistant Technician working under the direction of a CAC with the Department of Industrial Relations Division of Occupational Safety and Health

☐ Proof of certification as a Certified Lead-Related Construction Inspector/Assessor with the California Department of Public Health

The following documents will be requested of the WINNING BIDDER at time of contract award;

they are NOT required at time of bid submittal:

☐ Contractor Certification Clauses (CCC 04/2017) Contractor Certification Clauses

☐ Insurance (Requirements outlined in Proposed Form of Agreement, Exhibit E, Items 1 & 2)

☐ Payee Data Record (STD 204) Payee Data Record https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1416 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM1511 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0076 https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=DOTADM0077 https://www.dgs.ca.gov/-/media/Divisions/OLS/Resources/CCC-042017.pdf?la=en&hash=4DE3E4DC414511AE378794200BA43EBF91C758EE https://www.documents.dgs.ca.gov/dgs/fmc/pdf/std204.pdf

Attachment 3

Proposed Form of Agreement

Note to Bidders: The following pages represent a sample of the Agreement that will be awarded, if any, from this IFB. Please review it carefully and present any questions in writing to the contact identified for this IFB. Do not return this Attachment with your bid.

2. The term of this Agreement is:

Agreement Number 06A3228

Exhibit A

Commercial Services Agreement–Federal

Scope of Work

1. Contractor agrees to provide all qualified personnel, labor, equipment, tools, parts, materials, supplies, travel, and incidentals necessary to provide on-call hazardous materials sampling, testing, monitoring, analyzing, and reporting on Caltrans-owned residential and commercial structures.

2. The services shall be performed at various locations in Fresno, Kern, Kings, Madera, and Tulare Counties.

3. Any reference to Caltrans Contract Manager shall also include his/her designee.

4. This Agreement will commence on December 1, 2025 (estimate), or upon approval by the

Department of General Services (DGS), whichever is later, and no work shall begin before that time. This Agreement is of no effect unless approved by DGS. Contractor shall not receive payment for work performed prior to approval of the Agreement and before receipt of notice to proceed by Contract Manager. This Agreement will expire on November 30, 2028 (estimate). The services shall be provided during working hours, 8:00 a.m. through 5:00 p.m., Monday through Friday, except holidays. The parties may amend this Agreement as permitted by law.

5. All inquiries during the term of this Agreement will be directed to the project representatives listed below. Contractor shall provide advance written notice and receive advance written approval by Caltrans Contract Manager, without the necessity of an amendment, before changing the Project Manager noted below.

California Department of Transportation (Caltrans)

Contractor: TBD

Section/Unit: Section/Unit:

Contract Manager: TBD Project Manager:

Address: Address:

Business Phone Number: Business Phone Number:

Email: Email:

6. Assignment of Work A. On an on-call basis, Caltrans Contract Manager shall assign specific services, as described herein, to Contractor through the issuance of a Service Request. A Sample Service Request is shown on Attachment 4.

B. All work requested shall be limited to the type of work specified in this Exhibit, A, Scope of Work. Payment for these services shall be in accordance with Exhibit B, Budget Detail and Payment Provisions and Attachment 1, Bid Proposal.

C. Work assigned to Contractor may also be initiated through service calls. All calls to initiate work will be followed up with a written Service Request within three (3) working days.

D. Contractor shall complete all service request assignments and service calls and submit a report of findings within 10 working days after receipt of the request (Service Request or service call, whichever comes first) unless additional time is authorized by Caltrans Contract Manager.

E. Contractor’s telephone shall be answered by an office employee between 8:00 a.m. and 5:00 p.m., Monday through Friday. An answering service or mechanical device will not be acceptable. An answering service may be used between 5:00 p.m. and 8:00 a.m., and on Saturdays, Sundays, and State holidays.

F. In no case shall Contractor engage in any solicitation of business that might subject Caltrans to any liability for payment while providing services under this Agreement.

G. Caltrans will pay only for work requested by Caltrans Contract Manager. Caltrans Contract Manager will notify (either by Service Request or service call) Contractor of the location, nature, and extent of the work to be done. This notification shall be the complete instruction and authorization for the proposed work and Contractor shall comply fully with all requirements set forth in the Service Request or service call.

H. Contractor shall only perform the work authorized in the Service Request. If non-contemplated work is required to accomplish the intent of the order, or if any work not on the original order is requested by lessee of the Caltrans property, additional authorization shall be obtained from Caltrans Contract Manager before said work is begun and the Service Request will be amended accordingly.

7. Collecting, Inspecting, Testing and Analysis Requirements

A. A Certified Asbestos Consultant (CAC) or Assistant Technician working under the direction of a CAC shall perform the asbestos survey sample collection and inspection services.

B. A certified Lead-Related Construction Inspector/Assessor shall perform lead paint and ceramic tile inspection and x-ray fluorescence (XRF) testing work.

C. All collection, testing, analysis, equipment, and materials shall be prescribed by the National Institute of Occupational Safety and Health (NIOSH); United States Environmental Protection Agency (USEPA); National Emission Standards for Hazardous Air Pollutants (NESHAP); United States Department of Housing and Urban Development (HUD) Guidelines of Hazard Control/Abatement; California Department of Industrial Relations, Division of Occupational Safety and Health (Cal-OSHA); California Department of Toxic Substance Control (DTSC); and all other federal, State, or local compliance regulations in connection with asbestos, lead-based paint exposure standards for workplace settings, and air monitoring for asbestos and lead-based paint related activities

8. Scope of the Survey A. Contractor shall survey the designated real property improvements and fixtures for the presence of all forms of asbestos and lead-based paint and otherwise known hazardous materials in all readily accessible areas, as well as sealed off areas such as tunnels, caverns, and bulkhead crawl spaces.

1) Asbestos Survey Report and Testing for a residential structure up to 3,500 sq. ft. with up to 150 Polarized Light Microscopy (PLM) samples.

2) Asbestos Survey Report and Testing for a commercial or multi-family structure up to 10,000 sq. ft with up to 250 PLM samples.

3) Asbestos testing will follow guidelines as outlined in Environmental Protection Agency (EPA) standards, Title 40, Chapter I, Subchapter R Part 763, Subpart E, Appendix E to Subpart E of Part 763.

B. Contractor shall identify all forms of Asbestos Containing Material (ACM) and lead-based paint present and indicate its location, friability, condition, asbestos content, and type (through testing analysis), and accessibility, including floor plans for identifying specific areas containing ACM and lead-based paint. Contractor shall test all types of building materials, including, but not limited to, exterior siding, roofing felts, mastics, walls, floors, building materials, and caulking.

1) Lead Survey Report & Testing for a residential structure up to 3,500 sq. ft. with up to 500 XRF Samples.

2) Lead Survey Report & Testing for a commercial or multi-family structure up to 10,000

sq. ft. with up to 1,200 XRF.

3) Lead testing will follow guidelines as outlined in EPA standards, Title 40, Chapter I, Subchapter R, Part 745 Subpart L § 745.227.

9. Survey Guidelines/Testing

A. Definitions

1) Asbestos: Asbestos is defined by 15 USC Section 2542, the Asbestos Hazard Emergency Response Act (AHERA).

2) Laboratory: The laboratory shall be accredited by the American Industrial Hygiene Association (AIHA), or the National Institute of Standards and Technology (NIST) National Volunteering Laboratory Accreditation Program (NVLAP) and possess any locally required certifications.

B. Transportation of samples: The samples shall be collected by Contractor in small vials that will be transported by Contractor for laboratory testing. Contractor shall not transport a combined sample volume or weight exceeding a total volume of five (5) gallons or a total weight of 50 pounds at one (1) time.

C. Methods of analysis: Examination shall be by PLM for asbestos and XRF for lead-based paint.

D. Destructive Sampling: Exploratory demolition may be necessary to complete the survey.

Contractor shall fully inform Caltrans Contract Manager about such destructive sampling and assure coordination of all patching and repair work, specifically including patching roof areas. Contractor is not responsible for performing such replacements; but is fully responsible for clarifying intentions in writing prior to commencement of the work.

10. Report Contractor shall prepare two (2) bound originals, one (1) unbound original copy, and a portable document format (PDF) email of the report that will include:

A. A detailed summary of the site inspection, sampling, and analytical data.

B. Identification and summary of all forms of ACMs and/or lead-based paint and any other hazardous materials, its location, friability, conditions, accessibility, asbestos content, and type.

C. Date of survey and names of surveyors.

D. A floor plan of the facility (not necessarily to scale) depicting locations of all sampling and location of all hazardous materials.

E. Field log sheets.

F. Laboratory analysis results.

G. A description of all inaccessible areas not surveyed.

H. Conclusions.

11. Point Counting

After a survey report is compiled, a sample may need to be further examined and may require “point counting” to determine the actual level of hazardous material the sample contains.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .