Z2PZ--894NRM21002: Replace Walk Area, ADA Plates and Curb Island, Fort Snelling National Cemetery
Solicitation number
36C78623B0040
Issued by

About this file

This is an invitation for bids for construction services. The Department of Veterans Affairs National Cemetery Administration is seeking to replace walk areas, ADA plates, and curb islands at Fort Snelling National Cemetery. The work includes removing and replacing concrete walkways, curb and gutter, and detectable warning plates. The contractor must provide all labor, equipment, materials, and construction services. The solicitation is a 100% set-aside for service-disabled veteran-owned small businesses. The response due date is September 22, 2023. The period of performance is 90 calendar days from notice to proceed. The contractor must adhere to all specifications, safety requirements, and conduct standards detailed in the attachment.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 134

36C78623B0040 X 08-04-2023

_________________________ F365700-21-0000089 894NRM21002

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172

Department of Veterans Affairs National Cemetery Administration Contracting Services claude.humphrey@va.gov

Claude Humphrey 708-202-8387 ext. 77051

Replace Walk Area, ADA Plates and Curb Island at Fort Snelling National Cemetery

The Department of Veterans Affairs, National Cemetery Administration has a requirement for a Firm Fixed Price (FFP) contract for a Contractor to provide all Management, Supervision, Labor, Equipment, Materials, Parts, Tools, etc., required and necessary to provide complete construction services to fully Replace Walk Area, ADA Plates and Curb Island at Fort Snelling National Cemetery, and all other work necessary to complete the work as will described herein.

This Invitations for Bids (IFB) procurement opportunity is 100% Set-Aside for Service-Disabled Veteran Owned Small Business (SDVOSB) In Accordance With (IAW) the Veterans First Program, 38 USC 8127 and 8128.

Authority 38 U.S.C. 8127 (Public Law 109-461).

Only SDVOSB firms verified eligible in Vetbiz.gov, with the Certified Veteran Enterprise (CVE) Seal on their registration will be considered.

Firms must also have current registration in the System for Award Management database at www.SAM.gov and have completed online Representatives and Certifications prior to Award.

Bidder must represent that it is a SDVOSB concern under NAICS code assigned to this acquisition and is SBA VetCert verified for eligibility in the https://veterans.certify.sba.gov/ - database.

In accordance with VAAR 819.7003 (b), SDVOSB firms must be verified in the SAB VetCert database, https://veterans.certify or hold a re-verification symbol next to the firm's name prior to contract award.

Prospective Offerors must be registered in Small Business Administration website - https://veterans.certify.sba.gov/ Vets 4212 at https://www.dol.gov; and System for Award Management (SAM) at https://www.sam.gov/SAM at the time of Bid submission AND at time of award.

The Product / Service Code is Z2PZ – Repair or Alteration of Other Non-Building Facilities The North American Industry Classification System code is 238110 - Poured Concrete Foundation and Structure Contractors.

The Size Standard for this procurement is $19 million dollars.

The Magnitude of Construction range for this procurement is estimated to be between $100,000 and $250,000.

There is an organized pre-bid site visit scheduled. See 52.236-27 Site Visit for detailed site visit information.

Interested Bidders are strongly encouraged to attend the Pre-Bid Site Visit Conference.

All Requests for Information (RFI) must be sent in writing to the Contracting Officer. See section A.3 8 QUESTIONS

14 90

X X 52.211-10

X 14

0 3PM CDT

09-22-2023

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Base Bid Grand Total: $ __________________________

36C786

Department of Veterans Affairs National Cemetery Administration Contracting Services 18434 Joplin Road Triangle VA 22172 http://www.tungsten-network.com/customer -campaigns/veterans-affairs/

1-877-752-0900

X

Claude Humphrey Va-NCA-2023-0006

36C78623B0040

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

A.3 CONTRACT ADMINISTRATION DATA

A.4 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING

A.5 PRICE/COST SCHEDULE

A.6 STATEMENT OF WORK

INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS

1.1 52.228-1 BID GUARANTEE (SEP 1996)

1.2 52.228-15 PERFORMANCE AND PAYMENT BONDS—CONSTRUCTION (JUN

2020)

1.3 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)

(FEB 2021)

1.4 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.214-31 ELECTRONIC BIDS (DEC 1989)

2.2 52.216-1 TYPE OF CONTRACT (APR 1984)

2.3 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (MAY 2014)

2.4 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.7 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

2.9 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

2.10 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION (OCT 2018)

2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

2.12 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY

ACCESSIBILITY NOTICE (FEB 2023)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023) .. 39

3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021)

3.5 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND

REPRESENTATION (JUN 2020)

GENERAL CONDITIONS

4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,

AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER

COVERED ENTITIES (NOV 2021)

4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984)

4.5 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)

4.6 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(MAR 2023)

4.7 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

4.8 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT (DEC 2010)

4.9 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)

4.10 52.236-4 PHYSICAL DATA (APR 1984)

4.11 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.12 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022)

4.13 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

4.14 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (MAY 2020)

4.15 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

4.16 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)

4.17 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.18 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.19 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.20 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

4.21 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT

ADMINISTRATION (OCT 2020)

4.22 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) .. 75

4.23 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

4.24 VAAR 852.246-71 REJECTED GOODS (OCT 2018)

4.25 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.26 IT CONTRACT SECURITY

4.27 REQUEST FOR INFORMATION (RFI) FORM

4.28 PAST PERFORMANCE

A.3 CONTRACT ADMINISTRATION DATA

1. CONTRACT ADMINISTRATION: All contract administration matters will be handled by the following individual(s):

a. CONTRACTOR: _____________________

Unique Entity ID: _____________________ DUNS Number: _____________________

Contact Person: _____________________ Telephone #: _____________________ e-Mail Address: _____________________ Tax Identification Number: _____________________

NOTE: Starting Monday, April 4, 2022, the new Unique Entity ID from SAM.gov will be the official, Federal Government-wide identifier used for Federal contract awards.

b. GOVERNMENT: Contracting Officer (36C786)

Department of Veterans Affairs, National Cemetery Administration Contracting Service 18434 Joplin Road Triangle, VA 22172

2. CONTRACTOR REMITTANCE ADDRESS: Effective January 1, 1999, all payments by the Government to the Contractor will be made in accordance with Federal Acquisition Regulation (FAR) Clause 52.232-34, Payment by Electronic Funds Transfer. Contractor must be registered in the System for Award Management (SAM) database in accordance with FAR Clause 52.212-1(k).

3. INVOICES: Invoices shall be submitted within ten (10) business days after performance and acceptance of services and must include the VA Project Number, Contract Number, Purchase Obligation Number, Dates of Service, Detailed description of the services provided and Total Amount Due. Payment for services provided under the terms of this contract will be made in arrears, within thirty (30) calendar days, upon receipt of properly executed invoice(s) in accordance with:

• 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012)

• UPON ACCEPTANCE OF SERVICES

• In order to comply with the Improper Payment Elimination and Recovery Act of 2010

(IPERA), the VA has mandated electronic invoice submission to the Veterans Affairs Financial Services Center (VAFSC). VAFSC has partnered with OB10 e-Invoicing network, for submissions of all electronic invoices to VA. OB10 electronic invoicing is free to all VA vendors. In order to submit electronic invoices, all VA vendors must register with OB10 by submitting an email to VA.Registration@ob10.com or calling 1- 877-752-0900 option 2 for Enrollment.

• Contractor shall submit an electronic invoice within ten (10) business days after performance and acceptance of services to the Veterans Affairs Financial Services Center (VAFSC) e-Invoice through the website at https://portal.tungsten-mailto:VA.Registration@ob10.com https://portal.tungsten-network.com/Login.aspx network.com/Login.aspx . For questions regarding the submission of VA electronic invoices, OB10 customer service may be contacted at 1-877-489-6135.

• All invoices shall reference the vendor’s name and address, customer name, contract number, appropriate obligation/funding order number, description of services provided, quantity provided, unit price, and total invoice amount (any additional info). Invoices shall also include any payment discount terms.

• For questions regarding invoice receipt or payment, please call VAFSC directly at 1-877- 353-9791 or email vafsccshd@va.gov

4. GOVERNMENT INVOICE ADDRESS: All invoices from the Contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 “Electronic Submission of Payment Requests.” to the following web address: http://www.fsc.va.gov/einvoice.asp.

FACSIMILE, E-MAIL, AND SCANNED DOCUMENTS ARE NOT ACCEPTABLE

FORMS OF SUBMISSION FOR PAYMENT REQUESTS.

For assistance setting up e-Invoice, the below information is provided:

* Tungsten Network e-Invoice Setup Information: 1-877-489-6135

* Tungsten Network e-Invoice email: VA.Registration@ob10.com <http://VA.Registration@ob10.com/>

* FSC e-Invoice Contact Information: 1-877-353-9791

* FSC e-invoice email: vafsccshd@va.gov <http://va.gov/>

5. CONTRACT AUTHORITY: The Contracting Officer acting within the scope of the contract and his/her duties and responsibilities is the only person authorized to approve changes or modify any of the requirements of this request. The Contractor shall communicate with the Contracting Officer on all matters pertaining to Contract Administration. Only the Contracting Officer is authorized to make commitments or issue changes that affect pricing, quantities or quality of performance, delivery terms and conditions, or the term of the contract.

6. CONTRACTING OFFICER’S REPRESENTATIVE: Notwithstanding the Contractor’s responsibility for total management during the performance of the contract, the administration of the contract will require maximum coordination between the Government and the Contractor. The Contracting Officer will designate a Contracting Officer’s Representative (COR) for the project, of which all work coordination shall be made through the COR. The Contractor shall be provided a copy of the COR’s Delegation of Authority letter outlining the scope of the COR’s duties and responsibilities. No other person shall be authorized to act in such capacity unless appointed in writing by the Contracting Officer.

7. SUBMITTAL OF BIDS: A public bid opening will occur by telephone conference using the following:

Call Line: 872-701-0185 Conference ID: 893 548 778# NOTE: Bids must be submitted to the attention of the Contracting Officer identified on the SF 1442 cover page, No Later Than the date/time specified.

a. DO NOT wait until the last hour of the submission due date to submit bid documents. Bidders are highly encouraged to submit bid packages 2-3 hours in advance of the time specified to avoid system lock outs.

b. Bid submitted must meet the time constraints as set forth in the solicitation.

1. Bids submitted without the below stated (g) Bid package requirements will not be accepted and will be considered to be NONRESPONSIVE.

https://portal.tungsten-network.com/Login.aspx mailto:vafsccshd@va.gov http://www.fsc.va.gov/einvoice.asp mailto:VA.Registration@ob10.com http://ob10.com/ mailto:vafsccshd@va.gov http://va.gov/

2. Late or incomplete Bids will NOT be considered and deemed to be nonresponsive.

c. Document /transmittal naming convention. Solicitation number, Project Description, and Company name

EXAMPLE: 36C78623B0040, _ Shrines, _ ABC 123 Corp.

d. Bid package shall be one (1) pdf document combining the following minimum required documents:

• Completed blocks 14-20c of the back of the SF 1442, ensuring full completion of all blocks;

• Completed Contract Administration Data sheet identifying the Solicitation number, Project Description, Company name and address, POC name, Phone number, eMail address, and Company’s Unique Entity ID / DUNS numbers;

• Completed Price/Cost Schedule;

• Completed Contractor Cost Estimate Worksheet;

• Completed, signed and attached SF30 Amendments (if applicable);

• Completed Past Performance sheet;

• Copied/scanned digital copy of the Bid Bond (if applicable); (ensure to lightly darken raised seals)

e. NO FAX/ FACSIMILE SUBMITTED BIDS WILL BE ACCEPTED.

f. Bids shall be subject to the terms and conditions of the solicitation.

8. QUESTIONS: All questions regarding this solicitation must be submitted in writing (email is acceptable) to: Claude Humphrey (claude.humphrey@va.gov. Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing. No phone responses will be accepted. NOTE: All questions must reference the Solicitation number, Project number (if applicable) and the Description of the project in the Header or Opening Statement.

9. CONTRACTOR PERFORMANCE ASSESSMENT REPORTING SYSTEM:

a. FAR 42.1502 directs all Federal agencies to collect Past Performance information on contracts. The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation.

One (1) or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.

b. The Past Performance evaluation process is a totally paperless process using CPARS.

CPARS is a web-based system that allows for electronic processing of the performance evaluation report. Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.

c. It is requested that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than thirty (30) calendar days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.

d. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, mailto:claude.humphrey@va.gov https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html systems requirements, and training information for CPARS is available at https://www.cpars.gov/.

e. Within sixty (60) calendar days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.

1. Contractor Representatives may then provide comments in response to the evaluation or return the evaluation without comment.

2. Your comments should focus on objective facts in the AO's narrative and should provide your views on the causes and ramifications of the assessed performance.

3. All information provided should be reviewed for accuracy prior to submission.

4. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.

5. Your response is due within sixty (60) calendar days after receipt of the CPAR.

On day fifteen (15), the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.

6. If you do not sign and submit the CPAR within sixty (60) days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."

f. The following guidelines apply concerning your use of the past performance evaluation:

1. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions. Strictly control access to the evaluation within your organization. Ensure the evaluation is never released to persons or entities outside of your control.

2. Prohibit the use of or reference to evaluation data for advertising, promotional material, pre-award surveys, responsibility determinations, production readiness reviews, or other similar purposes.

g. If you wish to discuss a Past Performance evaluation, you should request a meeting in writing to the CO no later than seven (7) calendar days following your receipt of the evaluation. The meeting will be held via telephone or other means during your sixty

(60) calendar day review period.

h. A copy of the completed past performance evaluation will be available in CPARS for your viewing and for Government use supporting source selection actions after it has been finalized.

(End of Administration Data) https://www.cpars.gov/ https://www.cpars.csd.disa.mil/ https://www.cpars.gov/

A.4 852.219-77 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING

CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION

VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF

COMPLIANCE FOR SERVICES AND CONSTRUCTION (SEP 2021) (DEVIATION)

(a) Pursuant to 38 U.S.C. 8127(k)(2), the offeror certifies that—

(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:

[Contracting Officer check the appropriate box below based on the predominant NAICS code assigned to the instant acquisition as set forth in FAR 19.102.]

(i) [] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-10 or VOSBs as set forth in 852.219-11. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.

(ii) [xx] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-10 or VOSBs as set forth in 852.219-11. Any work that a similarly situated VIP-listed subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(iii) [] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs as set forth in 852.219-10 or VOSBs as set forth in 852.219-11. Any work that a similarly situated subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.

(3) If VA determines that an SDVOSB/VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:

(i) Referral to the VA Suspension and Debarment Committee; Page 17 of 17

(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and

(iii) Prosecution for violating section 1001 of title 18.

(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract.

The Contracting Officer may, at their discretion, require the Contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the Contracting Officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.

(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.

(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed, and returned with the offeror’s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.

CERTIFICATION:

I hereby certify that _________________________________will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of ______________________________.

Printed Name of Signee: _________________________________

Printed Title of Signee: __________________________________

Signature: _____________________________________________

Date: _________________________

Company Name and Address: _____________________________

A.5 PRICE/COST SCHEDULE

CLIN DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT

0001 894NRM21002

Contractor shall provide and furnish all Management, Supervision, Labor, Equipment, Materials, Parts, Tools, etc., required and necessary to provide complete construction services to fully Replace Walk Area, ADA Plates and Curb Island at Fort Snelling National Cemetery, and all other work necessary to complete the work as described herein.

1.00 JB $ ___________ $ ___________

GRAND TOTAL $ ____________

Contract Ultimate Period of Performance Completion time is ninety (90) Calendar Days After issuance of the Government’s Notice to Proceed Notification.

(End of Bid Schedule)

894NRM21002: Replace Walk Area, ADA Plates and Curb Island, Fort Snelling National Cemetery

The Contractor shall provide all Management, Supervision, Labor, Equipment, Materials, Parts, Tools, etc., required and necessary to provide complete construction services to fully Replace Walk Area, ADA Plates and Curb Island at Fort Snelling National Cemetery, and all other work necessary to complete the work as described herein.

A.6 STATEMENT OF WORK

The Contractor shall provide all Management, Supervision, Labor, Equipment, Materials, Parts, Tools, etc., required, and necessary to provide complete construction services to fully Replace Walk Area, ADA Plates and Curb Island at Fort Snelling National Cemetery, and all other work necessary to complete the work as described herein.

I. SCOPE

Contractor shall inspect the grounds where the work is to be completed and ascertain the work deemed necessary and required to complete the work outlined herein, failure of the Contractor to fully inspect grounds prior to performing the work shall not relieve the Contractor from performing in accordance with the strict intent and meaning of the specifications without additional cost to the Government.

The work will consist of but will not be limited to (not necessarily in the order indicated) the removal and replacement of two (2) Walk Area; the removal and replacement of the ADA Detectable Warning Panels; as well as the removal and replacement of the Adjacent Concrete Curb Islands; and also the Installation of six (6) new Bollards in an area adjacent to the columbariums;

and the Inspection and testing to ensure proper compliance and functionality.

1. The Contractor shall submit an ‘After Inspection Report’ of Contractor’s findings, listing any deficiencies found and recommendations, to the COR and Contracting Officer for review and approval prior to commencing the work.

2. The report will include all aspects of the construction services needed to provide fully Replace Walk Area, ADA Plates and Curb Island at the Fort Snelling National Cemetery as specified herein.

3. Prior to beginning any work, the Contractor shall survey the site and review the Statement of Work to determine the extent of the work.

4. The Contractor shall take all necessary precautions to avoid damages to existing items to remain in place, to be reused, or to remain the property of the Cemetery.

5. Any damaged items shall be repaired or replaced as approved by the COR.

6. The Contractor shall locate, tag, and identify any utilities irrigation system piping, sprinkler heads, and other components and make all necessary adjustment or connections from the existing utilities and shall reroute any utility line, which may impact construction.

7. The Contractor shall grade the site within the construction limits to maintain proper site drainage; all ground surfaces shall be graded to provide runoff toward drains and/or swales.

8. The Contractor shall repair and restore any damage to roads, turf or surrounding area that occurs during construction.

II. TASKS

A. Remove two (2) walk areas; each approximately 65’ x 17’ in area and each containing 18 linear feet of ADA detectable warning panels and each containing two (2) concrete curb landscape islands as well as depressed curb and gutter along the front of the ADA plates.

Sawcut existing concrete, if necessary, to not damage existing surfaces which are to remain.

B. The concrete walkway shall be replaced with new 5” thick concrete sidewalk with 4500 psi strength, low-chert, 6% air entrained, fiber mesh reinforcement. Haul, spread and compact 4” of DOT aggregate crushed stone base course. Base course will need to be properly compacted prior to placement of concrete. Provide a light broom finish as well as the required expansion joints (with urethane joint sealant) and saw cut contraction joints and apply one (1) coat of sealer.

C. The depressed curb and gutter to be replaced shall match the profile, slope and dimensions of the existing curb and gutter being removed and shall also include the 4” of compacted aggregate base course as stated above. Remove the existing concrete and necessary sub-grade as needed to complete the project.

D. The existing barrier curb islands shall be removed and replaced with B6.12 curb and gutter (Reverse Gutter Slope) along with the 4” of compacted aggregate base course as stated above. The concrete mix design shall be the same as the concrete walkway. Remove the existing concrete, landscape stone and necessary sub-grade as needed to complete the project.

E. The ADA detectable warning panels shall be removed and replaced with new six (6) 24” x 36” plates for an overall length of 18 linear feet per area (2 areas). The new ADA plates shall be of the brand name ADA Solutions ( https://adatile.com/cast-in-place-replaceable/), or approved equal and shall be replaceable, composite and black in color.

F. Procure and install six (6) Bollards to be positioned in the two (2) walk areas being removed and replaced (specific location to be determined by the COR). The Bollards shall be of the brand name Vestil), or approved equal (https://www.vestil.com/product.php?FID=673) and must be identical to the Bollards already installed on the grounds for ease of repair and replacement.

G. Contractor shall be responsible for traffic control and shall obtain, erect, maintain and remove signs, barricades, flagmen and other traffic control devices as may be required and necessary for the purpose of regulating, warning or guiding traffic.

H. The route of construction traffic to and from the project worksite shall be clear of debris at all times as well as the required safety signage and barricades for the safe passage of visitors. Thoroughly clean up the work area at the end of each day and at the completion of the project, and always leave the premises clean and free of waste, scrap, used equipment or material delivered to the site by Contractor or Contractor’s personnel.

All work must be done in strict accordance with the manufacturer’s requirements and installation guidelines. All materials and layout of site will be pre-approved by the COR before materials are ordered or work commences.

III. TIL SPECIFICATIONS

All work shall be performed In Accordance With (IAW) the National Cemetery Administration (NCA) Master Construction Specifications (MCS) as indicated in herein, inclusive of the attached, following VA TIL Specifications.

Section 01 00 02 – General Requirements https://adatile.com/cast-in-place-replaceable/ https://www.vestil.com/product.php?FID=673

Section 01 33 23 – Shop Drawings Product Data and Samples Section 01 74 19 – Construction Waste Management Section 03 30 53 – Short Form Cast in Place Concrete Section 32 05 23 – Cement and Concrete for Exterior Improvements

All work shall be performed in a professional workmanship like manner. All adjacent disturbed surfaces shall be repaired to the same quality standards of the existing work and shall also match the adjacent areas. At the completion of the work and upon satisfactory acceptance by the Government, the Contractor shall provide to the COR and Contracting Officer any applicable Operation and Maintenance Manuals, a certificate of Warranty / Guarantee that all work done under the contract shall be free from defaults, faulty materials or workmanship for a minimum of one (1) year from the date of final acceptance.

Contractor hereby agrees to repair or replace deficiencies within the specified time frame by the direction of the COR or Contracting Officer at Contractor's own expense and shall be corrected to the satisfaction of the Government.

The work shall include full compliance with all related specifications requirements, including, but not limited to, the Contractor providing all requirements necessary permit(s). All work required to achieve these results shall be at the Contractor's expense with no additional costs to the Government.

Note: See Attached Fort Snelling Map and Photos of Improvement Area and Existing Condition Photos

IV. SITE INVESTIGATION INSPECTION

Per FAR 52.236-3, Contractor should survey / inspect the site prior to submitting a bid/proposal/quote in order to be fully aware of the Scope of Services required and to adequately gather existing unit’s product information, model numbers and all necessary and matching standards and requirements. Contractor shall perform a ‘Site Investigation’ to verify the magnitude of all dimensions/measurements and site conditions before start of the work or the ordering of any equipment, parts and or materials. Failure to do so shall not relieve the successful offeror from performing in accordance with the strict intent and meaning of the specifications without additional cost to the Government.

Contractor shall submit an ‘After Inspection Report’ of Contractor’s findings, listing each respective Flagpole deficiencies found and recommended repair/work solutions to the COR and Contracting Officer for review and approval prior to commencing the work.

Any electrical work shall be in accordance with the latest edition of the National Electrical Code (NEC) and local building codes. Failure to do so shall not relieve the Contractor from performing in accordance with the strict intent and meaning of the specifications without additional cost to the Government.

V. MATERIAL SUBMITTALS

All submittals, samples, etc., called for by the specification requirements shall be approved by the COR and/or the Contracting Officer before any work associated with or required by said submittal, samples, etc., is to begin. The Contractor shall prepare and submit all submittals as specified in the contract or as requested by the COR and/or the Contracting Officer.

a. Be advised and reminded that the COR cannot approve submittals that would result in a change to the contract terms or conditions, or that would affect a cost or time change; The Contracting Officer is the only person authorized to approve and issue supplemental agreements, change orders, stop order, modifications, payments, etc., on the Government behalf.

The Contractor must acquire the COR’s approval once materials has been approved to start the work. All work shall be performed in a professional workmanship like manner, adhere to VHA and NCA standards, be done in strict accordance with the requirements set forth herein, manufacturer’s requirements, installation guidelines; and be in accordance with applicable Federal, State and Local codes and regulations; inclusive of applicable OSHA Construction Safety Guidelines.

VI. SPECIFICATIONS AND DRAWINGS DISCREPANCIES

In the case of any differences between the Statement of Work, Specification and/or Drawings, the specifications will prevail and govern over the Statement of Work and/or Drawings. Any Statement of Work, Specification and/or Drawings discrepancies should be brought to the immediate attention of the Contracting Officer and COR for clarification. Any errors or omissions in the Statement of Work, Specification and/or Drawings must be provided promptly to the Contracting Officer and COR, but in no case later than the start of related work.

VII. CONSTRUCTION PROGRESS PHOTO DOCUMENTATION

During the construction through completion, Contractor shall provide photographic documentation of construction progress and at selected milestones per the Contracting Officer and/or the COR.

The photos shall meet the following qualifications:

Photo elements:

a. Digital image shall be taken with a professional grade camera with minimum size of 6 megapixels (MP) capable of producing 200x250mm (8 x 10 inch) prints with a minimum of 2272 x 1704 pixels and 400x500mm (16 x 20 inch) prints with a minimum 2592 x 1944 pixels.

b. Before construction services work, the area, building, adjacent streets, roadways, parkways, driveways, curbs, sidewalks, landscaping, adjacent utilities and adjacent structures surrounding the site shall be photo documented. Overlapping photographic techniques shall be used to ensure maximum coverage.

c. If site work or area preparation is extensive, this documentation may be required immediately before construction services work begins and at several pre-determined intervals during work commencement.

Photography of employees, visitors, volunteers, and others on NCA premises is strictly prohibited.

Photographing of NCA premises (buildings, grounds, property, site) is allowed ONLY with written permission from the COR.

VIII. PERIOD OF PERFORMANCE

The Contractor shall complete all work including submittals, reviews, quality control, repair/construction services, punch list corrections, clean up, invoicing and closeouts documentation submittal within ninety (90) calendar days of Government issuance of the Notice to Proceed.

The Contractor shall develop and provide the Contracting Officer with a Project Schedule and Cost Schedule within ten (10) calendar days of Government issuance of the Notice to Proceed.

IX. WORK HOURS

Normal construction services work hours for this project shall be 7:30 a.m. to 4:00 p.m., CST Monday through Friday, excluding Saturday, Sunday and Federal Holidays. Contractor work hours may be modified only by written approval of the Contracting Officer, at no additional cost to the Government.

The Contractor shall coordinate with the COR to establish a work schedule and to ensure that no work is being performed at the immediate site of a scheduled interment or ceremony. The Contractor shall be responsible for ensuring that no contract work causes any funeral, ceremony, procession or visitation to be delayed, altered, or otherwise impacted in such a way that the dignity or security of the event is compromised.

The Contractor may request authorization in advance from the Contracting Officer to work outside of normal service hours at no additional cost to the Government. Written Authorization must be pre-approved in advance and prior to working and is at the sole discretion of the Contracting Officer.

Contractor, Contractor’s employees and sub-contractors must check-in with the COR, daily, upon arrival at the Fort Snelling National Cemetery prior to beginning any work and prior to departing the facility/property after the day’s work is completed.

X. XIII. HOLIDAYS

The following federal holidays are observed:

• New Year's Day - January 1

• Inauguration Day (DC Metropolitan Area Only) - January 20 every 4 years

• Martin Luther King's Birthday - 3rd Monday in January

• President's Day - 3rd Monday in February

• Memorial Day - Last Monday in May

• Juneteenth- June 19

• Independence Day - July 4

• Labor Day - 1st Monday in September

• Columbus Day - 2nd Monday in October

• Veterans Day - November 11

• Thanksgiving Day - 4th Thursday in November

• Christmas Day - December 25

And any other holiday proclaimed by the President as a Federal Holiday. When a holiday falls on a Sunday, the following Monday will be observed as a legal holiday. When a holiday falls on a Saturday, the preceding Friday shall be observed as a holiday.

XI. CONTRACTOR QUALITY CONTROL

The Contractor’s Site Superintendent will:

a. be on site, at all times, whenever work is being performed by Contractor or subcontractors’ employees, to ensure adequately supervision and communication;

b. review and approve submittals;

c. inspect the quality of work performed; and

d. certify the completed work for payment and other purposes.

Note that there may be infrequent stoppages in work at the order of the Contracting Officers Representative (COR) due to burial services being conducted in the area.

Contractor will meet with COR at the start of each workday to ensure that no construction activities will interfere with burials on that specific day.

XII. CONTRACTOR'S RESPONSIBILITIES

The Contractor will be responsible for ensuring that all work is done in a manner that safeguards NCA visitors, employees, and the public. Contractor will be responsible for and obtain all necessary licenses and/or permits required to perform the work. Contractor shall take all precautions necessary to protect persons and property from injury or damage during the performance of this contract. Contractor shall be responsible for any injury to himself/herself, his/her employees, or others, as well as for any damage to personal or public property that occurs during the performance of this contract that is caused by him/her or his/her employees' fault or negligence. Contractor shall maintain personal liability and property damage insurance prescribed by the laws of the State of Minnesota.

XIII. NATIONAL CEMETERY ADMINISTRATION DIGNITY STANDARDS

1. Every action by contractor personnel at a National Cemetery must be performed with the special care, reverence, dignity, and respect that acknowledge the cemetery as the final resting place that commemorates the service and sacrifice those service members, Veterans, and their families made for our Nation. Critically important is the awareness, required of the contractor employees, of the remains buried in the grounds where the work is performed.

The utmost care must be given to these remains and the headstones and flat grave markers that mark those gravesites and memorialize the service of individuals.

a. Contractors cannot walk, stand, lean, sit or jump on headstones or markers. Nor can they drive over them. Contractor personnel should use tools approved by the Contracting Officer Representative (COR), such as shovels, pry bars or pinch bars to lift flat markers out of the ground; pickaxes are not an acceptable tool.

b. No tools, equipment or other items will be placed or leaned on headstones or markers.

Once headstones/markers are removed from the socket, do not place on dirt piles or mud;

they should be carefully placed on each associated gravesite and protected in such a way as to prevent any soiling and be out of the way of any other work.

c. Headstones shall be removed from their sockets using wooden and/or metal clamps. If metal clamps are used, the area that contacts the headstone must be protected with a rigid fabric that will prevent damage to and marking of the headstone.

Clamps may be attached to a skid steer loader (i.e., Bobcat®) or similar machine to extract the headstone from the socket. When headstones are removed from their sockets, they shall be carefully stored on each associated gravesite; do not lean headstones against each other. Use care not to scratch or damage headstones in any manner. The headstones shall be laid with front inscription side up while the headstone is lying horizontally on the ground. The headstone shall be protected from direct ground contact while lying horizontally. The protection method shall be as approved by the COR and shall be free of deterioration in weather. An approved method is to support each headstone with two wood 4X4’s. Alternate methods can be approved. Cardboard shall not be used.

b. Wood or other suitable appropriate and attractive material shall be used to keep the headstones from contact with the soil while lying horizontally during the construction period. This also shows respect towards the families visiting the gravesites and the remains that are buried.

a. Contractor shall be responsible for replacing damaged headstones and markers and for restoring turf damaged during performance of this work.

b. Additionally, should any activity result in the exposure and/or damage to any remains, container for remains (i.e., casket or urn), or outer burial container, the Contractor must contact the COR, Director/Assistant Director, and Contracting Officer (CO) for guidance.

2. Any doubts as to proper procedures shall be brought to the attention of the COR, Director/Assistant Director, and CO for guidance or resolution.

3. The Contractor is required to discuss the guidance with their employees and have each employee sign a statement of compliance and deliver the signed statement to the COR before work may begin.

XIV. STANDARDS OF EMPLOYEE CONDUCT

The National Cemetery Administration (NCA) are national shrines that honors Veterans with a final resting place and lasting memorials that commemorate their service to our Nation. The standards of work, appearance, and procedures performed by Contractors at National Cemeteries shall reflect this nation’s concern for those interred there. Due to the sensitive mission of the cemetery, Contractor’s personnel must exercise and exhibit absolute decorum, composure, and stability at all times.

As the work being performed is at a National Cemetery all Contractor’s employee must always look professional and neat in appearance; and be fully clothed to include upper garment to cover the body from the waist to neck and long…