IFB Soliciation - TN NP NATR 5570-463P.pdf
PDF 3 MB Posted
- Attached to
- Natchez Trace Parkway Federal contract opportunity
- Solicitation number
- 693C73-25-B-000013
About this file
This is an Invitation for Bid (IFB) for the installation of an architectural steel post and mesh barrier system on the Natchez Trace Double Arch Bridge in Williamson County, Tennessee. The project is restricted to certified Small Business Concerns and is solicited by the Federal Highway Administration's Eastern Federal Lands Highway Division, with solicitation number 693C73-25-B-000013. The work includes removing the existing temporary fence, repairing and painting concrete parapets, reinstalling emergency call boxes, and installing a new architectural steel post and mesh barrier system on the rear face of existing concrete parapets.
The project is expected to cost between $5,000,000 and $8,000,000, with a performance period of 425 calendar days. Bid documents will be issued around September 10, 2025, and are available exclusively through SAM.gov. Bidders must complete annual representations and certifications online, including the VETS-4212 form. The contract requires compliance with federal acquisition regulations, Davis-Bacon wage requirements, and includes specific technical specifications for materials, installation, painting, and site restoration. Interested bidders must submit comprehensive documentation, including detailed shop drawings, material certifications, and a quality assurance plan.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - TN NP NATR 5570-463P.pdf | ||
| FP14_Eng.pdf | ||
| Bridge Inspection Report_5570-463P.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| Categorical Exclusion Form (NEPA).pdf | ||
| VETS-4212 Form.pdf | ||
| Plans - TN NP NATR 5570-463P.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract No.
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
TN NP NATR 5570-463P
NATIONAL PARK SERVICE
NATCHEZ TRACE PARKWAY
Installation of Architectural Steel Post and Mesh Barrier System on the Natchez Trace
Double Arch Bridge
CONTRACTOR:
ADDRESS:
PMIS# 288211
SOLICITATION
IFB No. 693C73- 25-B-000013
This Contract Cites
STANDARD SPECIFICATIONS (FP-14)
STATE
COUNTY
PARK
Tennessee
Williamson
Natchez Trace Parkway
TYPE OF IMPROVEMENT
This work on the bridge includes the removal of the existing fence, repair of the existing concrete parapets, painting/recoating of the existing concrete parapets, removal of existing emergency call boxes, the installation of a permanent Architectural Steel Post and Mesh Barrier System on the rear face of the existing concrete parapets, and other miscellaneous work.
Sthedule
A
Project Length Totals
For Parking Areas, Lane Miles is calculated as SQFT/1 lft (nominal) lane
Parking
Area Roadway / Parking Area / Other Stations / SQFT Linear
Feet
D Natchez Trace Parkway 10245.03 To ll893.03 1,648
0.31
Route
Miles
0.31
0.00
Lane
Miles
0.00
TABLE OF CONTENTS
Page
Notice to Bidders 1 through 3
Checklist for Bid Submission 1 through 2
*SF-1442 Solicitation, Offer, and Award 1 through 4
Statement of Work 1 page
Bid Schedule Instructions 1 through 2
*Bid Schedule B-1 through B-3
*SF-24 Bid Bond C-1 through C-4
FEDERAL ACQUISITION REGULATION & TRANSPORTATION ACQUISITION
REGULATION SOLICITATION PROVISIONS & CONTRACT CLAUSES
Index to Federal and Transportation Acquisition Regulations 1 through 6
Representations and Certifications (SAMs online) D-1 through D-2
Instructions to Bidders E-1
*Socioeconomic Program Requirements F-1 through F-5
Minimum Wage Schedule F-6 through F-13
*General Contract Requirements G-1 through G-10
Construction Contract Requirements H-1 through H-5
Special Contract Requirements J-1 through J-55
Section K K-1 through K-3
Permits 1 page
SPECIFICATIONS ON SAM.GOV
Plans 1 through 65
Categorical Exclusion Form (NEPA) 1 through 17
Bridge Inspection Report_5570-463P 1 through 29
*Bidder’s Qualification Form 1 through 7
*Federal Contractor Veterans’ Employment Report VETS-4212 1 through 5
*BOLD FACED ITEMS ARE TO BE INCLUDED WITH THE
BID SUBMITTAL PACKAGE*
NOTICE TO BIDDERS
CONTRACT FORMAT:
Bidders should note that the format of this contract is in accordance with Federal Acquisition
Regulations (FAR), promulgated by the General Services Administration (GSA), effective April 1, 1984, including all applicable revisions. Applicable FAR provisions and clauses are incorporated in this contract by reference or full text as indicated in the INDEX before the D-pages in this booklet.
FAR provisions and clauses incorporated by reference can be accessed on the Internet website at https://www.acquisition.gov/. Bidders are encouraged to review the documents thoroughly before submitting a bid.
PROPOSAL BOOKLET AND OFFER SUBMITTAL:
It is the responsibility of the Bidder to verify that this bid is complete as listed in the Table of Contents. The Bidder is responsible for submitting all required forms and documents with the bid.
Bidders should use the Checklist for Bid Submission included in this booklet to check that their bids are complete.
CONSTRUCTION CONTRACTS:
Additional guidance is given in FAR Subpart 35.005 where the majority of the project work is complex and specialized such as restoration work, bridge painting, and proprietary construction techniques (i.e. proprietary Cintec arch strengthening.) There are exceptions and they will be reviewed on a case-by-case basis.
HAZARDOUS MATERIALS IDENTIFICATION AND MATERIAL SAFETY DATA:
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data, the apparent low Bidder must submit prior to award a Material Safety Data Sheet (MSDSs) for all hazardous materials that the Bidder identifies in paragraph (b) of this clause in Section G of this booklet. Failure to submit MSDSs may render the Bidder ineligible for award of contract. The apparent low Bidder should submit their MSDSs within two weeks after bid opening.
INTERNET BASED DATA BASES - REQUIRED INPUT:
According to FAR Subpart 4.1102 contractors are required to be registered in the System for
Award Management (SAM) at the time a bid is submitted. Access the following web site to register: https://www.sam.gov/.
According to FAR Subpart 4.1201 contractors are required to complete electronic annual representations and certifications in SAM accessed via https://www.sam.gov/ as a part of required registration.
NOTICE:
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of
52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial
Services. Contracting Officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to update their entity registration to remove these representations in SAM.
https://www.sam.gov/
According to FAR Subpart 22.1302 (b) federal contractors and sub-contractors MUST complete the required annual Vets-4212 Form in order to be eligible for a contract award. It can be completed on-line at http://www.dol.gov/vets/vets4212.htm. The annual filing period for Form VETS-4212 is
August 1 through September 30. Reports filed before August 1 will be treated as part of the previous year's filing cycle. Federal contractors and subcontractors who are required to file a form VETS-4212 can submit their forms electronically by using either the VETS-4212 Reporting Application or batch filing process, or by using the paper form by email or U.S. mail. It is recommended that you file your form electronically at https://vets4212.dol.gov/vets4212. Please visit http://www.dol.gov/vets/vets4212.htm for more information on the reporting process.
PAYMENT:
Bidders are advised to review the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP), subsection 109.05, concerning direct and indirect payment included under a pay item in the bid schedule.
PROGRESS PAYMENTS:
ALL payments will be made via Electronic Funds Transfer (EFT) as such; the payment information in SAM must be accurate in order for contractors' invoices to be considered proper invoices for the purpose of prompt payment under DOT contracts. Contractors must input and maintain (update as necessary) their EFT information in the SAM database. Bidders are advised that under FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts, upon request, progress payments will include premiums paid by the Contractor to obtain performance and payment bonds as required under this contract. These payments shall not be made in addition to the contract price. As specified in the FP, “Section 151 - MOBILIZATION", payments for performance and payment bond premiums shall be included in mobilization.
WELFARE-TO-WORK INITIATIVE:
The President’s Welfare Reform Bill was initiated to assist welfare recipients and hopefully aid welfare recipients to find gainful employment. In support of this bill, Contractors are encouraged to hire welfare recipients whenever possible and to use welfare recipients in performance of duties on Government contracts.
INCREASING SEAT BELT USE IN THE UNITED STATES:
The President’s Executive Order 13043 dated April 16, 1997, was issued to increase the use of seat belts in the United States. In support of this Order, contractors and subcontractors are encouraged to adopt and enforce on-the-job seat belt policies for their employees when operating company-owned, rented, or personally owned vehicles.
OBTAINING BID DOCUMENTS:
Invitation For Bid (IFB) documents will not be mailed. All solicitation documents are available for direct download from the Contract Opportunities website: https://sam.gov/. Contractors are encouraged to register on the website (for this specific project) in order to receive automatic notifications when a document is added or updated for this specific project. All questions about this construction project must be emailed to the following address:
eflhd.contracts@dot.gov.
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MONITORING THE WEB PAGES
NOTED ABOVE FOR ALL CHANGES TO THE SOLICITATION AND ACTING ON
THOSE CHANGES.
http://www.dol.gov/vets/vets4212.htm https://vets4212.dol.gov/vets4212 http://www.dol.gov/vets/vets4212.htm https://sam.gov/ mailto:eflhd.contracts@dot.gov
PLEASE NOTE: For security reasons, individuals requiring access to all government buildings must present a valid photo ID and be escorted to their destination by a Government employee. All visitors attending bid openings are urged to arrive at least 1 hour prior to a scheduled bid opening. All visitors must sign in at the main entrance of the Quantum Park facility and wait to be escorted by a
Government employee to Eastern Federal Lands Highway Division (EFLHD) in Suite 200. Visitors must then register with the EFLHD Receptionist. A Government employee will collect all bids. Prior to the bid opening, a Government employee will escort all bidders to the bid opening. Unescorted visitors will be denied entry and no exceptions will be made.
PLEASE NOTE ELECTRONIC BIDS WILL BE ACCEPTED VIA EMAIL
ONLY AT EFLHD.CONTRACTS@DOT.GOV. Bids sent to any other email address besides EFLHD.Contracts@DOT.GOV will not be accepted. Bids will not be accepted via facsimile. Hand-delivered bids are not recommended unless the contractor is also attending the bid opening.
mailto:EFLHD.CONTRACTS@DOT.GOV mailto:EFLHD.Contracts@DOT.GOV
CHECKLIST FOR BID SUBMISSION
The following is a checklist of items included in the proposal/bid package that are required to be completed and returned (or filled in on-line) to the address in Block 7 of the Standard Form 1442, Solicitation, Offer, and Award (page 1). This checklist is for informational purposes only and is not required to be filled out by the bidder. Failure to submit a complete bid may be cause to reject your bid.
PLEASE NOTE ELECTRONIC BIDS WILL BE ACCEPTED VIA EMAIL ONLY
AT EFLHD.CONTRACTS@DOT.GOV. Bids sent to any other email address besides
EFLHD.Contracts@DOT.GOV will not be accepted. Bids will not be accepted via facsimile. Hand-delivered bids are not recommended.
1. Bid Envelope (If the Bidder elects not to send the bid electronically via email to
EFLHD.Contracts@dot.gov):
a. Addressed as shown in Block 7 of SF-1442
b. In the lower left corner, indicate the following: Solicitation No., Project Name & Number, and mail to Suite E2-3-300, ATTENTION: ACQUISITIONS. If bids are hand-delivered, bring them to the main entrance of Quantum Park, and ask for the Federal Highway Administration (EFLHD)
Receptionist to be contacted and an EFLHD representative will come to collect the bid. HAND-
DELIVERED BIDS ARE NOT RECOMMENDED.
2. Standard Form 1442: Solicitation, Offer and Award
a. Block 14: Name and Address of Bidder.
b. Block 15: Telephone Number of Bidder.
c. Block 16: Remittance Address if different from Block 14.
d. Block 19: All Amendments Acknowledged, with dates of Amendments.
e. Block 20: Bid is signed and dated.
3. Bid Schedule - (Pages B-1 through B-3)
a. Unit bid price and bid amount provided for each pay item in numbers.
b. Corrections initialed.
4. Standard Form 24, Bid Bond (Pages C-1 through C-4) (Required if bid guarantee is bid bond)
a. Date executed
b. Legal name and address of bidder.
c. Type of organization.
d. State of incorporation (if applicable).
e. Name and business address of Treasury approved surety.
f. Penal sum of bond (not less than 20% of bid total).
g. Bid identification.
h. Signature of Bidder
i. Seal, if corporation
j. Signature of Surety
k. Seal, if corporation
BIDS RECEIVED WITHOUT A VALID BID BOND WILL BE REJECTED.
mailto:EFLHD.CONTRACTS@DOT.GOV mailto:EFLHD.Contracts@DOT.GOV mailto:EFLHD.Contracts@dot.gov
CHECKLIST FOR BID SUBMISSION
5. Power of Attorney.
a. Dated on or before execution date of bond
b. Power has original signature of surety, or is embossed with surety's seal in the certification section
BIDS RECEIVED WITHOUT A VALID POWER OF ATTORNEY WILL BE REJECTED.
6. Bidder's Qualifications form (provided separately as part of the Bid Documents Package).
Form completed, signed and submitted with bid
7. System for Award Management (SAM): The contractor is currently registered in the System For Award Management (SAM) database at https://www.sam.gov/ at the time the bid is submitted. If the contractor elects to not have its active SAM registration viewable by the public, then the contractor must submit a copy with the bid.
8. Online Representations and Certifications Application: The contractor's Representations and Certifications have been input online via the electronic database at https://www.sam.gov/.
9. VETS – 4212 Reporting: The contractor has completed the annual reporting requirement online at http://www.dol.gov/vets/vets4212.htm.
The annual filing period for Form VETS-4212 is August 1 through September 30. Reports filed before
August 1 will be treated as part of the previous year's filing cycle. Federal contractors and subcontractors who are required to file a form VETS-4212 can submit their forms electronically by using either the VETS-
4212 Reporting Application or batch filing process, or by using the paper form by email or U.S. mail. It is recommended that you file your form electronically at https://vets4212.dol.gov/vets4212. Please visit http://www.dol.gov/vets/vets4212.htm for more information on the reporting process.
12. INVOICING FOR PAYMENTS: The Contractor affirms that it does not operate any diversity, equity, and inclusion (DEI) initiatives that are inconsistent with the Equal Protection principles of the Constitution and the non-discrimination requirements of Federal law, as interpreted by the Supreme Court in Students for Fair Admissions v. Harvard, 600 U.S. 181 (2023).
NOTE: THE CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY THAT ALL
DATA IN THE ABOVE DATABASES IS CORRECT EACH TIME A BID PACKAGE
IS SUBMITTED. FAILURE TO PROPERLY INPUT AND/OR UPDATE YOUR DATA
PRIOR TO BID SUBMISSION MAY CAUSE THE BID TO BE REJECTED.
https://www.sam.gov/ https://www.sam.gov/SAM/ http://www.dol.gov/vets/vets4212.htm https://vets4212.dol.gov/vets4212 http://www.dol.gov/vets/vets4212.htm
SOLICITATION, OFFER,
AND AWARD
2. TYPE OF SOLICITATION
6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.
PAGE OF PAGES
7. ISSUED BY CODE 8. ADDRESS OFFER TO
SOLICITATION
(Construction, Alteration, or Repair)
1. SOLICITATION NO. 3. DATE ISSUED
IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.
9.
INFORMATION
a. NAME
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."
CALL:
FOR
SEALED BID (IFB)
NEGOTIATED (RFP)
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
SUITE E2-3-300
693C73
ATTN: Acquisitions
ASHBURN VA 20147
See Block 7
DAVID BOGNER
b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
EFLHD.Contracts@dot.gov
See Block 10 x
09/10/2025
693C7325B000013
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
This Invitation for Bids is for the Natchez Trace Parkway, Project TN NP NATR
5570-463P, located in Williamson County, Tennessee in strict accordance with the Solicitation/Contract instructions, notices, clauses, provisions, items listed below, and for the quantities of work actually performed at the unit prices as bid in the Bid Schedule, including all applicable Federal, State, and local taxes.
FP - Standard Specification for Construction of Roads & Bridges on Federal Highway Projects.
Bid Schedule, Section B - pages B-1 through B-3.
Special Contract Requirements, Section J - pages J-1 through J-55.
Plans, Sheets 1 through 65.
Categorical Exclusion Form (NEPA), pages 1 through 17.
Bridge Inspection Report_5570-463P, pages 1 through 29.
Permits, 1 page.
Issuance of this solicitation does not guarantee that an award will be made. Any resulting awards are subject to the availability of funding and the discretion of the awarding entity, including cancellation or amendment based on a determination of change in agency needs.
11. The Contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and is not required.is, b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
d. Offers providing less than
12b. CALENDAR DAYSYES NO
(If "YES", indicate within how many calendar days after award in Item 12b.)
10 425 calendar days and complete it within ________________ ________________ calendar days after receiving
Continuation Sheet, Block 11
10/14/2025
NSN 7540-01-155-3212
x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________
STANDARD FORM 1442 (Rev. 8/2014)
Prescribed by GSA
FAR(48 CFR) 53.236-1(d)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ____________________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in item 13d. Failure to insert any number means the offeror accepts the minimum in item 13d.)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
CODE FACILITY CODE
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
OFFER (Must be fully completed by offeror)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this document and return (Contractor is not required to sign this document.)
Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award.
No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. DATE
BY
2PAGE OF
EFLHD-CO
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
SUITE E2-2-200
ATTN: CONSTRUCTION
ASHBURN VA 20147
28. NEGOTIATED AGREEMENT 29. AWARD
Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.)
10 U.S.C. 2304(c) 41 U.S.C. 3304(a)
STANDARD FORM 1442 (REV. 8/2014) BACK
FFEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
A/P Branch, AMZ-150 PO Box 25710 OR E-MAIL
9-AMC-AMZ-EFLINVOICES@FAA.GOV
Oklahoma City OK 73125
Block 26
CONTINUATION OF SF 1442
Block 2:
This project is RESTRICTED - Bids will be accepted from all eligible Small
Business concerns.
This procurement falls under North American Industry Classification System (NAICS) code 237310 - Highway, Street, and Bridge Construction (see FAR Subpart 19.10).
Electronic bids will be accepted via email sent to EFLHD.Contracts@dot.gov. Please be sure to indicate the solicitation number, project number, and ATTN: David Bogner on the subject line of your email. Please note you must include a scanned copy of your official bid bond along with your bid documents if you submit your bid electronically.
Block 9:
PHYSICAL DATA AVAILABLE FOR REVIEW
1. Manual on Uniform Traffic Control Devices for Streets and Highways, 2024 Edition, published by the Federal Highway Administration. https://mutcd.fhwa.dot.gov/.
2. National Park Service Sign Manual, revised - January 1988, United States Department of the Interior. https://highways.dot.gov/federal-lands/design/highway-design-library.
3. Categorical Exclusion Form (NEPA)
4. Bridge Inspection Report_5570-463P
5. Permits
Data and information furnished or referred to above is for the Contractor's information. The
Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
A Government representative can be available to show the project to prospective offerors.
All requests for site visits see Section E of the solicitation and e-mail all questions concerning this construction project to the following e-mail address eflhd.contracts@dot.gov. Interested parties must provide the Solicitation Number and the relevant project name with all requests and questions.
Block 11:
The performance period to complete all Schedule A work will be 425 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
See Completion of Work section of the B-Pages – Bid Schedule Instructions for further information. The completion time for the contract is not to exceed the maximum time above. Work restrictions can be found in SCR Sections 108 and 156.
Notice to Proceed will be issued within 30 days following receipt of acceptable performance and payment bonds. (Actual Notice to Proceed date will be 10 days from issuance or the date specified in the Notice.)
mailto:EFLHD.Contracts@dot.gov https://mutcd.fhwa.dot.gov/ https://highways.dot.gov/federal-lands/design/highway-design-library
CONTINUATION OF SF 1442
Bidders are to assume that the award of the contract and approval of the Contractor’s
Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause
52.228- 15) may result in the start of construction activities to be no earlier than
December 2025. See Subsection 108.01 of the SCRs for additional details.
Block 12A:
Furnish performance and payment bonds in accordance with FAR Clause 52.228-15.
Block 13:
A bid guarantee in the amount of not less than 20 percent of the bid price or $3 million, whichever is less, is required with this bid. If the bidder fails to provide the required bid guarantee, such failure may require rejection of the bid. Reference FAR Provision 52.228-1, Bid Guarantee. Please note you must include a scanned copy of your official bid bond along with your bid documents if you submit your bid electronically.
Block 17:
Amounts should be completed as follows:
Schedule A - $
Other:
The estimated price is expected to fall within the price range of $5,000,000 to $8,000,000.
Responsibility of bidders shall be evaluated in accordance with the information provided on the Bidder's Qualification Form, which can be downloaded from the Contract Opportunities website located at http://SAM.gov. FP-14 versions can be downloaded at the FHWA web site located at http://flh.fhwa.dot.gov/resources/specs/.
Electronic bids must contain the required signatures (electronic or by hand).
http://sam.gov/ http://flh.fhwa.dot.gov/resources/specs/
STATEMENT OF WORK
Sealed bids from certified Small Business Concerns only will be accepted for the Natchez Trace
Parkway, Project TN NP NATR 5570-463P, Solicitation Number 693C73-25-B-000013, located in Williamson County, Tennessee. This project consists of the installation of architectural steel post and mesh barrier system on the Natchez Trace Double Arch Bridge. The work on the bridge includes the removal of the existing temporary fence, repair of the existing concrete parapets, painting/recoating of the existing concrete parapets, removal and reinstallation of existing emergency call boxes, the installation of architectural steel post and mesh barrier system on the rear face of the existing concrete parapets, and other miscellaneous work.
The project is expected to fall within the price range of $5,000,000 to $8,000,000.
The performance period to complete all contract work will be 425 calendar days after the issuance of the Notice to Proceed.
BID SCHEDULE INSTRUCTIONS
PROJECT: TN NP NATR 5570-463P
BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to
Bidders. While preparing the bid, comply with the following:
COMPLETING THE BID SCHEDULE
Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit
Bid Price and Amount Bid for the pay item. Determine the Bid Total by adding the amounts of the listed items, and show in the block provided on Page B-3. In case of multiplication errors, the
Amount Bid for the item will be based on the Unit Bid Price.
To be eligible for award, bidders must submit prices for each pay item.
Review Subsection 109.05 of the FP (standard specifications book) regarding scope of payment for direct and indirect payment work.
Fill in the Bid Total as directed on the Bid Summary page.
The amount in Block 17 of the SF 1442 should be completed as follows:
Schedule A - $ .
SCHEDULE OF WORK
The Bid Schedule is comprised of the following:
Schedule A – Pages B-1 through B-2.
COMPLETION OF WORK
The Government has estimated the number of calendar days necessary to complete all contract work from the effective date of the Notice to Proceed to contract completion. The maximum number of calendar days allowed (i.e. the contact performance period) is shown in Block 11 of the SF-1442 and described below.
The performance period to complete all Schedule A work will be 425 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
In developing a construction schedule to determine the number of calendar days, the Government considered and included the work limitations shown in Sections 108 and 156 of the FP and
Special Contract Requirements (SCRs). Specific work limitations may be (but are not limited to): national legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. The Government also considered those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc.); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc.); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc.). The Government also considered time required for preparing material and drawing submittals, and the allowable
Government review times for those submittals (Subsection 104.03 of the FP and SCRs).
Bidders are to assume that the award of the contract and approval of the Contractor’s
Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-
15) may result in the start of construction activities to be no earlier than December 2025.
See Subsection 108.01 of the SCR’s for additional details.
BASIS FOR AWARD
The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation
Total Price of Project, which is defined as:
Schedule A (Base Contract) Bid Total.
BID SCHEDULE
Project No : TN NP NATR 5570-463P Schedule : A Schedule Type : Base
Project Name : Installation of Architectural Steel Post and Mesh Barrier System on the Natchez Trace Double Arch Bridge
AMD# Line Item Number Pay Item Number Description Supplemental Description
Quantity Unit Unit Price Amount
A1010 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL LPSM
A1020 15501-0000 CONSTRUCTION
SCHEDULE ALL LPSM
A1030 15701-0000 SOIL EROSION
CONTROL ALL LPSM
A1040 15720-0000
STORM WATER
POLLUTION
PREVENTION
PLAN
ALL LPSM
A1050 20302-0700
REMOVAL OF
FENCE
(BRIDGE
PARAPET
MOUNTED, CHAIN
LINK FENCE,
BARBED WIRE
TOP)
2,982.000 LNFT
A1060 20702-0200
GEOTEXTILE
FILTER, CLASS 1,
TYPE B
100.000 SQYD
A1070 25102-0100
PLACED RIPRAP,
METHOD A,
CLASS 1
15.000 TON
A1080 55222-0000 REPAIR
CONCRETE
(BRIDGE
PARAPET) ALL LPSM
A1090 56205-0000 DEBRIS SHIELD ALL LPSM
A1100 56301-1000
PAINTING,
CONCRETE
STRUCTURE
(CONCRETE
PARAPET) ALL LPSM
B-1
A1110 61901-2100
FENCE, CHAIN
LINK, 96-INCH
HEIGHT
185.000 LNFT
A1120 61902-2700 GATE, CHAIN LINK 4.000 EACH
A1130 63502-2000
TEMPORARY
TRAFFIC
CONTROL,
PORTABLE
CHANGEABLE
MESSAGE SIGN
2.000 EACH
A1140 63502-3900
TEMPORARY
TRAFFIC
CONTROL,
CONSTRUCTION
SIGN
20.000 EACH
A1150 63503-0300
TEMPORARY
TRAFFIC
CONTROL,
BARRICADE TYPE
120.000 LNFT
A1160 63504-1000
TEMPORARY
TRAFFIC
CONTROL,
CONSTRUCTION
SIGN
379.000 SQFT
A1170 63641-0500 RELOCATE CALL
BOX
(REMOVE CALL
BOX) 2.000 EACH
A1180 63701-0000 FIELD OFFICE 1.000 EACH
A1190 67001-0000
PROJECT LUMP
SUM
(STEEL POSTAND
MESH BARRIER
SYSTEM)
ALL LPSM
A1200 15101-0000 MOBILIZATION ALL LPSM
Submitted By: Schedule Total:
B-2
B - 3
BID SUMMARY
Project TN NP NATR 5570-463P
(1) Schedule A (Base Contract) Bid Total (from Page B-2) = (1) $____________________
The performance period for the completion of Schedule A is 425 calendar days.
Bid Bond (See Instructions on Page 3)
Date Bond Executed (Must Not Be Later Than Bid Opening Date)
OMB Control Number: 9000-0001 Expiration Date: 1/31/2027
Principal (Legal Name And Business Address) Type Of Organization ("X" One)
State Of Incorporation
Surety(ies) (Name And Business Address)
Percent Of Bid Price
Penal Sum Of Bond Amount Not To Exceed Million(s) Thousand(s) Hundred(s) Cents
Bid Identification Bid Date Invitation Number
Authorized For Local Reproduction Previous Edition Is Not Usable
STANDARD FORM 24 (REV. 10/2023)
Prescribed by GSA - FAR (48 CFR) 53.228(a)
For (Construction, Supplies Or Services)
Obligation:
We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.
Conditions:
The Principal has submitted the bid identified above.
Therefore:
The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the Principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.
Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government. Notice to the Surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.
Other (Specify) Individual Partnership Joint Venture Corporation
2.
(Seal)2.(Seal)
1.
1.
1.
1. 3.2.
Name(s) (Typed)
Signature(s)
Individual Surety(ies)
Name(s) And Title(s) (Typed)
Corporate Seal
(Seal)
3.
(Seal)
2.
(Seal) Signature(s)
Principal
2.
State Of Incorporation Liability Limit ($)
2.
2.
1.Name(s) And Title(s) (Typed)
Signature(s) 1. 2. Corporate Seal
Corporate Seal
Su re ty C
Name And Address
Signature(s) Name(s) And Title(s) (Typed)
1.
1.
2.
2.
State Of Incorporation Liability Limit ($)
Corporate Seal
Name(s) And Title(s) (Typed)
Su re ty D
Signature(s)
Name And Address
1.
1.
2.
2.
State Of Incorporation Liability Limit ($)
Corporate Seal
Liability Limit ($)State Of Incorporation
1.
1.
Su re ty A
Name And Address
Su re ty B
Name(s) And Title(s) (Typed)
Signature(s)
Name And Address
Corporate Surety(ies)
Witness:
The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.
STANDARD FORM 24 (REV. 10/2023) PAGE 2
STANDARD FORM 24 (REV. 10/2023) PAGE 3
Corporate Seal
Su re ty F
Name And Address
Signature(s) Name(s) And Title(s) (Typed)
1.
1.
State Of Incorporation
2.
2.
Liability Limit ($)
Corporate Seal
Name(s) And Title(s) (Typed)
Su re ty G
Signature(s)
Name And Address
1.
1.
2.
2.
State Of Incorporation Liability Limit ($)
Corporate Seal
State Of Incorporation Liability Limit ($)
2.
2.
1.
1.
Name And Address
Signature(s) Name(s) And Title(s) (Typed)
Su re ty E
Instructions
1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.
2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.
3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).
4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the Liability
Limit block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.
(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "Corporate Surety(ies)." In the space designated
"Surety(ies)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.
(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.
5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New
Hampshire, or any other jurisdiction requiring adhesive seals.
6. Type the name and title of each person signing this bond in the space provided.
7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and
"offeror."
STANDARD FORM 24 (REV. 10/2023) PAGE 4
Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC §
3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0001. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General
Services Administration, Regulatory Secretariat Division (MVCB), 1800 F Street, NW, Washington, DC
20405.
CONTRACT CLAUSES INDEX
FEDERAL ACQUISITION REGULATION (FAR) TRANSPORTATION ACQUISITION REGULATION (TAR)
(Updated thru FAC 2025-05 on 8/07/2025)
FAR & TAR CLAUSES INCORPORATED BY REFERENCE
CLAUSE TITLE DATE REMARKS
52.202-1 DEFINITIONS Jun-20 52.203-3 GRATUITIES Apr-84 52.203-5 COVENANT AGAINST CONTINGENT FEES May-14 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT Jun-20 52.203-7 ANTI-KICKBACK PROCEDURES Jun-20 52.203-8 CANCEL & RECOVER OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY May-14 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY May-14 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS Jun-20 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT Nov-21 52.203-14 DISPLAY OF HOTLINE POSTER(S) Nov-21 52.204-2 SECURITY REQUIREMENTS (ALT II - (Apr 84)) Jan-25 52.204-7 SYSTEM FOR AWARD MANAGEMENT Jan-25 Contractor Mandatory Internet Data Input 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS Jun-20 Contractor Mandatory Internet Data Input 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE Oct-18 Contractor Mandatory Internet Data Input 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS Oct-16 Contractor Mandatory Internet Data Input 52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING Aug-20 52.204-17 OWNERSHIP OR CONTROL OF OFFEROR Aug-20 52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE Aug-20 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS Jan-25 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS Nov-21
52.209-6
PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS
DEBARRED, SUSPENDED OR PROPOSED FOR DEBARMENT, OR VOLUNTARILY EXCLUDED Jan-25
52.209-11
REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY OR A FELONY
CONVICTION UNDER ANY FEDERAL LAW Feb-16
52.214-5 SUBMISSION OF BIDS Mar-97 52.214-19 CONTRACT AWARD -- SEALED BIDDING-CONSTRUCTION Aug-96 52.214-26 ALT 1 AUDIT AND RECORDS -- SEALED BIDDING (ALT 1 - (MAR 09)) Jun-20 52.214-27 PRICE REDUCTION FOR DEFECTIVE COST OR PRICING DATA - MODIFICATIONS - SEALED BIDDING Jun-20 52.214-28 SUBCONTRACTOR COST OR PRICE DATA -- MODIFICATIONS--SEALED BIDDING Aug-20 52.214-29 ORDER OF PRECEDENCE - SEALED BIDDING Jan-86 52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE Apr-91 52.214-35 SUBMISSION OF OFFERS IN THE U.S. CURRENCY Apr-91 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE Nov-20 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS Jan-25 52.219-14 LIMITATIONS ON SUBCONTRACTING Sep-21
52.252-2 Clauses Incorporated By Reference (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. The full text of a clause may be accessed electronically at this address: www.acquisition.gov
(End of Clause)
(Updated thru FAC 2025-05 on 8/07/2025)
52.219-16 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN Sep-21 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION Jan-25 52.219-31 NOTICE OF SMALL BUSINESS RESERVE Mar-20 52.219-32 ORDERS ISSUED DIRECTLY UNDER SMALL BUSINESS RESERVES Mar-20 52.219-33 NONMANUFACTURER RULE Sep-21 52.222-3 CONVICT LABOR Jun-03 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS -- OVERTIME COMPENSATION May-18 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS - SECONDARY SITE OF THE WORK May-14 52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS Aug-18 Contractor Mandatory Wage Rates Posting 52.222-7 WITHHOLDING OF FUNDS May-14 52.222-8 PAYROLLS AND BASIC RECORDS Jul-21 Contractor Weekly Payroll Submittals 52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS Feb-88 52.222-11 SUBCONTRACTS (LABOR STANDARDS) May-14 52.222-12 CONTRACT TERMINATION -- DEBARMENT May-14 52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED REGULATIONS May-14 52.222-14 DISPUTES CONCERNING LABOR STANDARDS Feb-88 52.222-15 CERTIFICATION OF ELIGIBILITY May-14 52.222-19 CHILD LABOR - COOPERATION WITH AUTHORITIES AND REMEDIES Jan-25 52.222-32 CONSTRUCTION WAGE RATE REQUIREMENTS - PRICE ADJUSTMENT (ACTUAL METHOD) Aug-18
52.222-35 EQUAL OPPORTUNITY FOR SPECIAL DISABLED VETERANS, VETERANS OF THE VIETNAM ERA, & OTHER ELIGIBLE VETERANS Jun-20
52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES Jun-20 52.222-37 EMPLOYMENT REPORTS ON VERTERANS Jun-20 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT Mar-15 52.222-50 COMBATING TRAFFICKING IN PERSONS Nov-21 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION Jan-25 52.222-62 PAID SICK LEAVE UNDER EXECUTIVE ORDER 13706 Jan-22
52.223-2 REPORTING OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (DEVIATION XXX 2025 May-24 http://www.biopreferred.gov
52.223-5 POLLUTION PREVENTION AND RIGHT TO KNOW INFORMATION May-24 52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (DEVIATION XXX 2025) May-24 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES Feb-21 52.226-7 DRUG-FREE WORKPLACE May-24 52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING May-24 52.227-1 AUTHORIZATION AND CONSENT Jun-20 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT Jun-20 52.227-4 PATENT INDEMNITY-CONSTRUCTION CONTRACTS Dec-07 52.227-14 RIGHTS IN DATA - GENERAL May-14 52.227-17 RIGHTS IN DATA - SPECIAL WORKS Dec-07 52.228-2 ADDITIONAL BOND SECURITY Oct-97 Contractor Submittal Requirement 52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION Jan-97 52.228-11 INDIVIDUAL SURETY - PLEDGES OF ASSETS Feb-21 52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS Dec-22 52.228-14 IRREVOCABLE LETTER OF CREDIT Nov-14 Contractor Submittal Requirement 52.228-17 INDIVIDUAL SURETY - PLEDGE OF ASSESTS BID GAURANTEE Feb-21 52.229-3 FEDERAL, STATE, AND LOCAL TAXES Feb-13 52.230-2 COST ACCOUNTING STANDARDS Jun-20 52.230-3 DISCLOSURE AND CONSISTENCY OF COST ACCOUNTING PRACTICES Aug-20 52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS Jun-10 Contractor Submittal Requirement 52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS May-14
(Updated thru FAC 2025-05 on 8/07/2025)
52.232-13 NOTICE OF PROGRESS PAYMENTS Apr-84 52.232-16 PROGRESS PAYMENT Nov-21 52.232-17 INTEREST May-14 52.232-18 AVAILABILITY OF FUNDS Apr-84 52.232-23 ASSIGNMENT OF CLAIMS May-14 52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS Jan-17 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD MANAGEMENT Oct-18 52.232-39 UNINFORCEABILITY OF UNAUTHORIZED OBLIGATIONS Jun-13 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS Mar-23 52.233-1 ALT 1 DISPUTES (ALT-1, DEC-91) May-14 52.233-3 PROTEST AFTER AWARD Aug-96 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM Oct-04 52.236-2 DIFFERING SITE CONDITIONS Apr-84 52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK Apr-84 52.236-5 MATERIAL AND WORKMANSHIP Apr-84 52.236-6 SUPERINTENDENCE BY THE CONTRACTOR Apr-84 52.236-7 PERMITS AND RESPONSIBILITIES Nov-91 52.236-8 OTHER CONTRACTS Apr-84 52.236-9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES & IMPROVEMENTS Apr-84 52.236-10 OPERATIONS AND STORAGE AREAS Apr-84 52.236-11 USE AND POSSESSION PRIOR TO COMPLETION Apr-84 52.236-12 CLEANING UP Apr-84 52.236-13 ACCIDENT PREVENTION Nov-91 Contractor Submittal Requirement 52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS Apr-84 52.236-17 LAYOUT OF WORK Apr-84 52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION Feb-97
52.240-1
PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR ASSEMBLED BY AMERICAN
SECURITY DRONE ACT - COVERED FOREIGN ENTITIES Nov-24
52.242-13 BANKRUPTCY Jul-95 52.242-14 SUSPENSION OF WORK Apr-84 52.243-4 CHANGES Jun-07 52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (DEVIATION XXX 2025) Jan-25 52.245-1 GOVERNMENT PROPERTY Sep-21 52.245-2 GOVERNMENT PROPERTY INSTALLATION OPERATION SERVICES Apr-12 52.246-12 INSPECTION OF CONSTRUCTION Aug-96 52.249-2 ALT 1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (ALT-I, Sep-96) Apr-12 52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) Apr-84 52.253-1 COMPUTER GENERATED FORMS Jan-91
TAR CLAUSES INCORPORATED BY REFERENCE
1252.211-70 INDEX FOR SPECIFICATIONS Nov-22 1252.201-70 CONTRACTING OFFICER'S REPRESENTATIVE Nov-22 1252.228-74 NOTIFICATION OF PAYMENT BOND PROTECTION Nov-22
(Updated thru FAC 2025-05 on 8/07/2025)
FAR & TAR CLAUSES INCORPORATED BY FULL TEXT
CLAUSE TITLE DATE SECTION SECTION TYPE REMARKS
52.203-17
CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM
EMPLOYEES OF WHISTELBLOWER RIGHTS Nov-23 G GEN'L CONTRACT REQS.
52.203-18
PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN INTERNAL
CONFIDENTIALITY AGREEMENTS OR STATEMENTS - REPRESENTATION Jan-17 G GEN'L CONTRACT REQS.
52.203-19
PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY AGREEMENTS OR
STATEMENTS Jan-17 G GEN'L CONTRACT REQS.
52.204-23
PROHIBITION ON CONTRACTING FOR HARDWARE, SOTFWARE, AND SERVICES DEVELOPED OR
PROVIDED BY KASPERSKY LAB COVERED ENTITIES Dec-23 G GEN'L CONTRACT REQS.
52.204-25
PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMINICATIONS AND VIDEO
SURVEILLANCE SERVICES OR EQUIPMENT Nov-21 G GEN'L CONTRACT REQS.
52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION Jun-23 G GEN'L CONTRACT REQS.
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS Oct-18 G GEN'L CONTRACT REQS.
52.211-12 LIQUIDATED DAMAGES - CONSTRUCTION Sep-00 H CONSTR. CONTRACTS REQS Government Fill In 52.223-3 ALT I HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (ALT-I, JUL-95) Feb-21 G GEN'L CONTRACT REQS. Contractor Submittal Reqs 52.223-4 RECOVERED MATERIAL CERTIFICATION May-08 G GEN'L CONTRACT REQS. Contractor Submittal Reqs 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA DESIGN ITEMS May-08 G GEN'L CONTRACT REQS. Contractor Reporting Reqs 52.225-11 ALT I BUY AMERICAN - CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (ALT 1 - NOV-23) Nov-23 F SOCIOECON PROG REQS 52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION Jun-20 G GEN'L CONTRACT REQS. Contractor Submittal Reqs 52.248-3 Alt 1 VALUE ENGINEERING - CONSTRUCTION (ALT -I APR-84) Oct-20 G GEN'L CONTRACT REQS. Contractor Submittal Reqs
TAR CLAUSES INCORPORATED BY FULL TEXT
1252.232-70 ELECTRONIC SUBMISSION OF FPAYMENT REQUESTS (Deviation 8-25) AMENDMENT 01 Nov-22 G GEN'L CONTRACT REQS.
FAR PT 22.9 NONDISCRIMINATION BECAUSE OF AGE POLICY Feb-64 F SOCIOECON PROG REQS Executive Order 11141-Not A Clause
(Updated thru FAC 2025-05 on 8/07/2025)
FAR & TAR PROVISIONS INCORPORATED BY REFERENCE
CLAUSE TITLE DATE REMARKS
52.204-20 PREDECESSOR OF OFFEROR Aug-20 52.204-22 ALTERNATIVE LINE ITEM PROPOSAL Jan-17 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS-CERTIFICATION Nov-21 52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS Dec-89 52.214-4 FALSE STATEMENTS IN BIDS Apr-84 52.214-5 SUBMISSION OF BIDS Mar-97 52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS Apr-84 52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS Nov-99 52.214-18 PREPARATION OF BIDS -- CONSTRUCTION Apr-84 52.214-19 CONTRACT AWARD -- SEALED BIDDING -- CONSTRUCTION Aug-96 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATION Feb-24 52.219-2 EQUAL LOW BIDS Oct-95 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR TRANSACTIONS RELATING TO IRANJun-20
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by the paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision my be accessed electronically at this address: www.acquisition.gov (End of Clause)
52.252-1 Solicitation Provisions Incorporated By Reference (Feb 1998)
(Updated thru FAC 2025-05 on 8/07/2025)
FAR PROVISIONS INCORPORATED BY FULL TEXT
PROVISION TITLE DATE SECTION SECTION TYPE REMARKS
52.203-11
CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE
CERTAIN FEDERAL TRANSACTIONS Sep-24 F
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION XXX 2025) Jan-25 D REPS & CERTIFICATIONS Mandatory Contractor On-Line Input
52.204-24
REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO
SURVEILLANCE SERVICES OR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .