IFB Lump Sum Division Spreadsheet - Shrine.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Y1PZ--CND SHRINES - Ft Douglas, Ft Sam Houston, Ft Bliss, Ft Gibson, Biloxi, Ft Logan, Fayetteville
Solicitation number
36C78623B50194
Issued by

About this file

This spreadsheet template is for use in submitting lump sum bids for construction divisions for multiple cemetery projects. The spreadsheet lists construction divisions from the NCA Master Construction Specifications and includes columns for lump sum costs for each division to be utilized on the named project. Relevant federal contract opportunity details include: solicitation number 36C78623B50194 for cemetery shrine construction projects at Fort Douglas, Fort Sam Houston, Fort Bliss, Fort Gibson, Biloxi, Fort Logan, and Fayetteville under the Department of Veterans Affairs National Cemetery Administration. Bidders are required to break out lump sums for base and option CLINs as applicable for each project.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp)
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.

If a Division is not being used put N/A in that field.

You can Add additional items you feel are appropriate.

IFB Number
Project Name
DivisionCLIN 1CLIN 2CLIN 3CLIN 4CLIN 5CLIN 6CLIN 7CLIN 8CLIN 9Total
Division 0
Special Sections
Division 1
General Requirements
Division 2
Existing Conditions
Division 3
Concrete
Division 4
Masonry
Division 5
Metals
Division 6
Wood and Plastic
Division 7
Thermal and Moisture
Division 8
Doors and Windows
Division 9
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 22
Plumbing
Division 23
Heat, Ventilating, and Air Conditioning
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 31
Earthwork
Division 32
Exterior Improvements
Division 33
Utilities
Bonds

*Each Project requires it's own Spreadsheet. Bidder shall breakout Base CLIN (0001) and any Options CLINs associated.