IFB Lump Sum Division Spreadsheet.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 36C78624B50293
About this file
This document appears to be an Invitation for Bid (IFB) spreadsheet for the Yellowstone National Shrine Project. The spreadsheet lists the various construction divisions and associated line items (CLINs) required for the project, with lump sum pricing required for each division. The project is solicited under IFB Number 36C78624B50293 by the Department of Veterans Affairs National Cemetery Administration. The spreadsheet includes divisions for special sections, general requirements, existing conditions, concrete, masonry, and various other construction trades. Contractors are required to provide a lump sum price for each applicable division to arrive at a total grand lump sum bid. No specific response date, award date, or set-asides are provided in this document. This appears to be a template spreadsheet for contractors to complete as part of their bid submission for the Yellowstone National Shrine Project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C78624B50293 0002.docx | DOCX document | |
| 36C78624B50293 0001.docx | DOCX document | |
| 938 turf HS.pdf | ||
| Wage Determination_Yellowstone County MT.txt | TXT text file | |
| SOW - Yellowstone Shrine Project - FY24 -FINAL.doc | DOC document | |
| 36C78624B50293_1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| This Division List is copied from: NCA MASTER CONSTRUCTION SPECIFICATIONS (https://www.cfm.va.gov/til/ncaSpec.asp) |
| Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number. |
If a Division is not being used put N/A in that field.
You can Add additional items you feel are appropriate.
| IFB Number | 36C78624B50293 | ||||
| Project Name | Yellowstone National Shrine Project | ||||
| ERROR:#NAME? | |||||
| Division | CLIN 1 | CLIN 2 | CLIN 3 | CLIN 4 | Total |
| Division 0 | |||||
| Special Sections | |||||
| Division 1 | |||||
| General Requirements | |||||
| Division 2 | |||||
| Existing Conditions | |||||
| Division 3 | |||||
| Concrete | |||||
| Division 4 | |||||
| Masonry | |||||
| Division 5 | |||||
| Metals | |||||
| Division 6 | |||||
| Wood and Plastic | |||||
| Division 7 | |||||
| Thermal and Moisture | |||||
| Division 8 | |||||
| Doors and Windows | |||||
| Division 9 | |||||
| Finishes | |||||
| Division 10 | |||||
| Specialties | |||||
| Division 11 | |||||
| Equipment | |||||
| Division 12 | |||||
| Furnishings | |||||
| Division 13 | |||||
| Special Construction | |||||
| Division 22 | |||||
| Plumbing | |||||
| Division 23 | |||||
| Heat, Ventilating, and Air Conditioning | |||||
| Division 25 | |||||
| Integrated Automation | |||||
| Division 26 | |||||
| Electrical | |||||
| Division 27 | |||||
| Communications | |||||
| Division 28 | |||||
| Electronic Safety and Security | |||||
| Division 31 | |||||
| Earthwork | |||||
| Division 32 | |||||
| Exterior Improvements | |||||
| Division 33 | |||||
| Utilities | |||||
| Bonds | |||||
| Grand Total |
File details come from the government source that posted it. Updated .