IFB Front Ends and Specs.pdf

PDF 458 KB Posted

Attached to
NEW, PMAA, St. Vrain SP - South Campground Paving
Solicitation number
IFB1 PMAA 2027000026 4
Issued by
Denver County, Denver City, Colorado

About this file

This is an Invitation for Bids (IFB) document issued by the Colorado Division of Parks and Wildlife for the St Vrain State Park South Campground Paving project (Project No. C27VR1). The project involves paving improvements to the south campground access road and parking loops at St Vrain State Park located at 3785 Weld County Road #24.5, Longmont, Colorado. Work includes widening the existing road where necessary, performing subgrade preparation, furnishing and placing base course material, and furnishing and placing Hot Mix Asphalt Pavement (HMA). The base bid covers road preparation for the main drive (10,525 square yards), road base material for the main drive (2,740 tons), asphalt paving at 4.5 inches thick for the main drive (2,605 tons), and pavement markings. Five optional add items are available for bidding, each covering road preparation, asphalt paving, and road base for individual parking loops (Loops 1 through 5). A non-mandatory pre-bid conference is scheduled for September 1, 2026 at 9:00 a.m. at the project site. Sealed bids must be received by September 10, 2026 at 1:30 p.m. at Colorado Parks and Wildlife, 6060 Broadway, Denver, Colorado 80216. The anticipated notice of award is September 11, 2026, with a notice to proceed date of October 5, 2026 and substantial completion date of November 5, 2026. The contract duration is 60 calendar days from the notice to proceed. Questions must be submitted in writing to Sean Lehocky (sean.lehocky@state.co.us) by September 4, 2026 at 4:00 p.m., with responses posted by September 8, 2026.

A five-percent bid bond, certified check, or cashier's check is required for bid proposals of $50,000 or more. The successful bidder must furnish a 100% performance bond and material and labor bond if the contract equals or exceeds $150,000. Colorado Labor requirements mandate that at least 80% of work on projects exceeding $500,000 be performed by Colorado labor, with written justification required if this percentage cannot be met. Service Disabled Veteran Owned Small Businesses (SDVOSBs) certified through the U.S. Department of Veterans Affairs may receive a 5% bid preference. Resident bidder preferences apply in accordance with Colorado law. The Buy Clean Colorado Act requirements apply, requiring Environmental Product Declarations (EPDs) for eligible materials including asphalt and asphalt mixtures to comply with established Global Warming Potential limits. Insurance requirements include Workers' Compensation, Commercial General Liability ($1,000,000 combined single limit), Automobile Liability ($1,000,000 each accident), and Pollution Liability ($1,000,000 each occurrence). Liquidated damages are set at $228 per day for contract delays. The contractor must comply with Colorado Department of Transportation Standard Specifications for Roads and Bridge Construction, obtain a Stormwater Management Permit (disturbing more than one acre), and submit traffic control and construction access control plans. Contractors must register with the Colorado Secretary of State and provide proof of good standing. All work must be completed within the specified timeline with substantial completion required by November 5, 2026.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

St Vrain SP South Campground Paving

BIDDING AND CONTRACT INFORMATION

PROJECT NO. C27VR1

IFB1: IFB1 PMAA 2027*26

NOT MANDATORY PRE-BID CONFERENCE: September 1, 2026 at 9:00 a.m.

BID OPENING: September 10, 2026 at 1:30 p.m.

TABLE OF CONTENTS

C27VR1

BIDDING AND CONTRACT INFORMATION

Starting Page

Invitation for Bids Bid Schedule Measurement and Payment Instructions to Bidders Contractor’s Qualifications and References

SPECIFICATIONS

CONSTRUCTION DRAWINGS

APPENDICES

END OF TABLE OF CONTENTS

INVITATION FOR BIDS

The Colorado Division of Parks and Wildlife is accepting sealed bids for paving the south campground access road and parking loops. Work includes widening the existing road where necessary, performing subgrade preparation, furnishing and placing base course material, and furnishing and placing Hot Mix Asphalt Pavement.

Sealed bids will be received by Colorado Parks and Wildlife, 6060 Broadway, Denver, CO 80216 until September 10, 2026 at 1:30 p.m., after which the bids will then be made public. Bids shall be submitted using the form provided in the project specifications. On-line bid submittals are not accepted.

A five-percent (5%) Bid Bond, certified check, or cashier’s check is required with bid proposals of $50,000.00 or more.

(Not Mandatory) Pre-bid conference: September 1, 2026 at 9:00 a.m. at the project site in the parking area south of the dump station, shown as the staging and stockpiling area.

Project Address: St Vrain State Park 3785 Weld County Road #24.5 Longmont, CO 80504 Weld County

Project Coordinates: Latitude: 40° 10' 04.24" Longitude: 104° 59' 27.81" View Google Map Location – https://maps.app.goo.gl/WqcY5c6qicCSQE8r6

Contractor Questions: All questions related to the project shall be submitted via e-mail to the Project Manager, Sean Lehocky at sean.lehocky@state.co.us. The deadline for questions is September 9, 2026 at 4:00 p.m.. Questions submitted after the deadline will not be addressed. All questions and answers will be posted as solicitation amendments on the Vendor Self Service (VSS) website. Bidders may not automatically be notified of the existence of a modification or addendum. It is the responsibility of the bidder to check the VSS website periodically to see if any modifications have been issued. Failure to retrieve such modifications and include their provisions in your bid response may result in your bid being deemed non-responsive.

Plans and specifications are available for all bidders on the web at: www.colorado.gov/vss

The following is a tentative project schedule, which will be revised and expanded by the selected Contractor and submitted to the Project Manager for review:

(NOT MANDATORY) PRE-BID CONFERENCE September 1, 2026 at 9:00 a.m.

WRITTEN QUESTIONS DUE September 4, 2026 at 4:00 p.m.

QUESTION RESPONSES POSTED TO CORE September 8, 2026 at 2:00 p.m.

BID OPENING September 10, 2026 at 1:30 p.m.

NOTICE OF AWARD September 11, 2026 (Tentative) NOTICE TO PROCEED October 5, 2026 (Tentative) SUBSTANTIAL COMPLETION November 5, 2026 (Tentative)

BID SCHEDULE

DEPARTMENT OF NATURAL RESOURCES

COLORADO PARKS AND WILDLIFE

STATE OF COLORADO

Proposes to furnish all labor, equipment, materials, and incidentals needed to complete the St Vrain SP South Campground Paving. The work shall be completed in 60 calendar days from the date of the Notice to Proceed. We have read and made, the “Instructions to Bidders”, the “General Conditions for Capital Construction”, the Written Specifications, and the Construction Drawings part of this bid.

Technical Specifications related to construction materials and methods for work embraced under this Contract shall consist of references to, but not limited to, the Colorado Department of Transportation Most Current Standard Specifications for Roads and Bridge Construction.

Special attention should be given to these references and revisions noted within.

UNITS: LF= linear foot, SF= square foot, SFF= square face foot, LS= lump sum, SY= square yard, CY= cubic yard, TON= tons, AC= acres

Service Disabled Veteran Owned Small Business Statement (SDVOSB): The undersigned bidder shall certify by checking below that the corporation, partnership, or sole proprietorship IS or IS NOT claiming a 5% bid preference in accordance with C.R.S. 24-103-211. SDVOSB certification must be included with your bid.

Is: Is Not:

Colorado Labor: The undersigned bidder shall certify by indicating the percentage of Colorado labor of the total workforce to be utilized for this project in accordance with C.R.S. 8-17-101.

Colorado Labor shall be employed to perform at least 80% of the work on a public works project greater that $500,000.00. A written justification for not meeting this percentage must be included with your bid.

% of Colorado Labor: ___________

Addendum Inclusion Statement: The undersigned bidder shall certify by listing below that all Addendums have been considered and included as part of the Contractor’s proposal. The Addendum numbers that the Contractor has included as part of his proposal shall be listed in the space provided.

Addendums:

Base Bid: Furnish and install all materials and labor for the completion of the Base Bid Improvements per the Construction Drawings and Specifications.

Base Bid Items: Quantity Unit Unit Cost Total Item Cost

1. Mobilization. 1 LS $ $

2. Road Preparation - Main Drive 10525 SY $ $

3. Road Base - Main Drive 2740 TON $ $

4. Asphalt Paving, 4.5” Thick – Main Drive 2605 TON $ $

5. Pavement Markings 1 LS $ $

Base Bid AMOUNT _$______________________

Base Bid AMOUNT:(PLEASE WRITE OUT BID AMOUNT)

DOLLARS

Add Item #1 Bid: The following bid items are to be completed by the bidder, and are additional items and are NOT to be included in the Base Bid. Any combination of loops may be bid to arrive at the selection of the lowest responsible bidder, but road preparation, gravel, and asphalt must all be bid for each loop that is included in the bid.

Furnish and install all materials and labor for the Add Item #1 Bid per the Construction Drawings and Specifications.

Add Item #1 Optional Bid Items: Quantity Unit Unit Cost Total Item Cost

6. Loop 1 Road Preparation 2,055 SY $ $

7. Loop 1 Asphalt Paving, 4.5 inch thick 509 TON $ $

8. Loop 1 Road Base 33 TON $ $

9. Loop 2 Road Preparation 2,704 SY $ $

10. Loop 2 Asphalt Paving, 4.5 inch thick 669 TON $ $

11. Loop 2 Road Base 44 TON $ $

12. Loop 3 Road Preparation 3,606 SY $ $

13. Loop 3 Asphalt Paving, 4.5 inch thick 892 TON $ $

14. Loop 3 Road Base 58 TON $ $

15. Loop 4 Road Preparation 4,579 SY $ $

16. Loop 4 Asphalt Paving, 4.5 inch thick 1,133 TON $ $

17. Loop 4 Road Base 74 TON

18. Loop 5 Road Preparation 4,228 SY $ $

19. Loop 5 Asphalt Paving, 4.5 inch thick 1,046 TON $ $

20. Loop 5 Road Base 68 TON $ $

Add Item #1 Bid AMOUNT _$______________________

Add Item #1 Bid AMOUNT:(PLEASE WRITE OUT BID AMOUNT)

DOLLARS

(A Corporate Signature Block)

Company Name

A Corporation

Date , 20

Colorado VSS Vendor ID# (if available) _____________________________________

By President Attested to by Secretary

(A Partnership Signature Block) A limited partnership of , general partner;

doing business as (dba)

Company Name

Colorado VSS Vendor ID# (if available) _____________________________________ by General Partner

(A Sole Proprietorship Signature Block) A Sole Proprietorship of (dba)

Colorado VSS Vendor ID# (if available) _____________________________________ by Owner

MEASUREMENT AND PAYMENT

The following descriptions delineate the Work, materials, and how measurements of completed Work will be made and paid for, for each bid item in the Bid Schedule. The Bidder is to read these definitions and price their proposal accordingly.

Bid Item 1 – Mobilization This bid item includes the mobilization of personnel, equipment and supplies at the project site in preparation for the Work, as well as the establishment and maintenance for the duration of the Contract of the Contractor’s sanitary facilities, protective fencing and barricades not included elsewhere, necessary facilities, and all other costs incurred or labor and operations which must be performed prior to beginning the other items under the Contract. This item shall include any costs for required bonding of this project. This item shall also include marshalling, disassembly and security of all items indicated on the Construction Drawings or Specifications or installed as part of mobilization and demobilization from the site. Payment will be made in two installments: the first 60% will be paid on the first month’s pay estimate, and the remaining 40% after the final cleanup has been completed and approved.

Bid Item 2 – Road Preparation – Main Drive This bid item includes all labor, materials, equipment, and independent testing services for subgrade preparation and grading for the Main Access Road and parking areas as noted on the plans and specifications. The unit price for this item shall include removing the top 20 inches of material and mixing it, scarifying the 4 inches below the removed material, and replacing 12 inches post-mixing, then adjusting the moisture content, and compacting to a minimum 95% of standard Proctor density. Proofrolling of the completed subgrade may be required by the Project Manager, and any soft areas shall be replaced at the Contractor’s expense.

Measurement and payment for this item will be by the Square Yard of subgrade processed.

Bid Item 3 – Asphalt Paving, 4.5” Thick – Main Drive This bid item includes all labor, materials, equipment, submittals, compaction, and independent testing services for paving a 24-foot wide roadway, complete and ready to use, as shown on the plans and specifications, and as approved by the Project Manager. This item assumes 2 courses of Hot Mix Asphalt (HMA) will be placed to achieve the specified 4.5-inch total compacted thickness. Measurement for this item will be based on load tickets delivered to the site, and paid based on the unit price in Tons. The load tickets shall be submitted by the Contractor with the pay application.

Bid Item 4 – Road Base – Main Drive This bid item includes all labor, materials, equipment, submittals, and independent testing services for the 8 inches CDOT Class 6 Aggregate Base Course (ABC) to be used in the composite road subgrade, and the 4 inches of class 6 ABC to be used for the road shoulders as shown on the plans and specifications. The 8-inch depth of gravel in the composite subgrade shall consist of Class 6 road base as noted on the plans, placed at optimum moisture content and compacted to a minimum 95% of standard proctor density. The method to bring mixture to optimum moisture and density will not be measured or paid for separately, but shall be included in the unit price for this item. Measurement for this item will be based on load tickets delivered to the site, and paid based on the unit price in Tons. The load tickets shall be submitted by the Contractor with the pay application.

Bid Item 5 – Pavement Markings This bid item includes all labor, materials, equipment, and submittals for pavement markings required by state traffic control standards. Payment will be made in one installment at the lump sum price listed in the bid schedule.

Add Item #1, Optional Bid Items 6, 9, 12, 15, 18: Road Preparation: Loops 1 through 5 This bid item includes all labor, materials, equipment, and independent testing services for subgrade preparation and grading for the camping loops shown in the plans and specifications.

The unit price for this item shall include removing the top 20 inches of material and mixing it, scarifying the 4 inches below the removed material, and replacing 12 inches post-mixing, then adjusting the moisture content, and compacting to a minimum 95% of standard Proctor density. Proofrolling of the completed subgrade may be required by the Project Manager, and any soft areas shall be replaced at the Contractor’s expense. Measurement and payment for this item will be by the Square Yard of subgrade processed. Any combination of loops may be bid, but road preparation (this item), gravel (Add Item #2), and asphalt (Add Item #3) must all be bid for each loop that is included in the bid.

Add Item #1, Optional Bid Items 7, 10, 13, 16, 19: Asphalt Paving, 4.5” Thick - Loops 1 to

This bid item includes all labor, materials, equipment, submittals, compaction, and independent testing services for paving a 24-foot wide roadway, complete and ready to use, as shown on the plans and specifications, and as approved by the Project Manager. This item assumes 2 courses of Hot Mix Asphalt (HMA) will be placed to achieve the specified 4.5-inch total compacted thickness. Measurement for this item will be based on load tickets delivered to the site, and paid based on the unit price in Tons. The load tickets shall be submitted by the Contractor with the pay application. Any combination of loops may be bid, but road preparation (Add Item #1), gravel (Add Item #2), and asphalt (this item) must all be bid for each loop that is included in the bid.

Add Item #1, Optional Bid Items 8, 11, 14, 17, 20: Road Base Loops 1 to 5 This bid item includes all labor, materials, equipment, submittals, and independent testing services for the 8 inches of class 6 aggregate to be used in the composite road subgrade, and the 4 inches of class 6 ABC to be used for the road shoulders as shown on the plans and specifications. The 8-inch depth of gravel in the composite subgrade shall consist of Class 6 road base as noted on the plans, placed at optimum moisture content and compacted to a minimum 95% of standard proctor density. The method to bring mixture to optimum moisture and density will not be measured or paid for separately, but shall be included in the unit price for this item. Measurement for this item will be based on load tickets delivered to the site, and paid based on the unit price in Tons. The load tickets shall be submitted by the Contractor with the pay application. Any combination of loops may be bid, but road preparation (Add Item #1), gravel (this item), and asphalt (Add Item #3) must all be bid for each loop that is included in the bid.

As a footnote to the bid items, the following items have NOT been included as specific pay items and ARE to be considered incidental to the construction for which they are required:

• Testing

• Water, watering, and dust control

• Dewatering

• Temporary facilities and utilities

• Traffic control

• Barricades and other required safety provisions

This concludes the bid items listed in the proposal. The only payments made under this contract are for the bid items listed herein, and no additional payments will be made to the Contractor for work specified or shown in these Contract Documents. If any discrepancies exist, the Contractor shall notify the Project Manager in writing, requesting clarification.

END OF SECTION

INSTRUCTIONS TO BIDDERS

PROJECT: St Vrain SP South Campground Paving

PROJECT NO: C27VR1

1. Bidders must review the plans and specifications, construction site and conditions in their entirety, and determine the problems that may be encountered in performing the work.

The bidder shall include any costs associated with his/her findings in the prices quoted in the proposal. Documents will be available on the State of Colorado VSS website www.colorado.gov/vss. No additional copies of the drawings and specifications will be provided by the Division of Parks and Wildlife at any time before or after the bid opening.

2. All work must conform to the requirements stated in the “General Conditions for Capital Construction”.

3. All questions concerning this project shall be in writing directed to the Project Manager identified in the Invitation for Bids. The Invitation for Bids also identifies important dates and deadlines for this project.

4. BID SCHEDULE:

A. The bidder shall include on the signature page, their Vendor ID (if available) obtained from registration on the Colorado VSS website.

B. The bidder shall complete the Minority Business, Service Disabled Veteran Owned Small Business and Colorado Labor statements as well as acknowledge addendum(s) on the first page of the Bid Schedule.

C. All bid items shall include a unit and extended price or the bid will be disqualified. The bidder shall write in words and numerically the total base bid and add/alternate (if applicable) amounts on the included Bid Schedule. If conflicts exist between the written words and the numerical amount, the actual line item unit cost shall take precedence.

D. The Bid Schedule shall be signed manually in ink:

1) If the bidder is a corporation, use the corporate signature block, insert the name of the state in which the company was incorporated, and include the Employer Identification Number (E.I.N.) in the appropriate spaces. The bid must be signed by an officer (President or Vice President), and the title indicated. The signature of the officer shall be attested to by the Secretary and properly sealed. Cross out incorrect titles and insert correct ones, if necessary.

2) If the bidder is a partnership, use the partnership signature block. Cross out the word "Limited" if the partnership is a general one. Print each partner's name and note the proportion of the partnership that each partner has. The majority or general partner must sign the proposal. The same person must sign the contract, if awarded. Print the company name in the appropriate space.

3) If the bidder is a proprietorship, use the sole proprietorship signature block, print in the owner's name, Social Security number, and the business name in the blanks provided, and the owner signs the owner blank.

5. BID BOND: A bid bond is required for all competitive sealed bids when the price exceeds

$50,000. A bid guarantee in an amount not less than five percent (5%) of the total bid price must be submitted in the form of a firm commitment, such as a bid bond, bank money order, certified check or cashier's check. Checks or money orders should be made payable to the Treasurer, State of Colorado. An irrevocable letter of credit is not acceptable as a bid guarantee. Failure to furnish a bid guarantee in the proper form and amount by the time set for opening of bids may be cause for rejection of the bid.

6. PERFORMANCE BOND, LABOR AND MATERIAL BOND: The successful bidder shall furnish a bond in the amount of 100% of the contract price for performance and for material and labor payment when bid is equal to or exceeds $150,000. The bond shall be executed on the standard State of Colorado form. The State requests that the Surety and Contractor leave the date of the Contract found on the first page of each bond form, blank and we will ‘pen’ in the date after the Controller executes the Contract. These bonds will be submitted along with the standard State Agreement form within 10 days of the "Notice of Award."

7. VENDOR BOND ASSISTANCE: Any vendors that need support responding to solicitations may contact the Colorado Supplier Diversity Navigator at the Statewide Equity Office of Supplier Diversity dhr.colorado.gov/statewide-equity-office/supplier-diversity. Services provided include assistance with responding to solicitations, interpretation of solicitation documents, technical assistance referrals, availability of resources, and bond assistance under the Construction Statewide Bond Assistance Program dhr.colorado.gov/statewide-equity-office/supplier-diversity/construction-and-bond-assistance , through which eligible contractors can apply for assistance in securing the required bonding. The office can be reached during normal business hours by calling 303-866-5765 or emailing DPA_SupplierDiversityHelp@state.co.us.

8. RESIDENT BIDDER PREFERENCE: When a contract for commodities or services is to be awarded to a bidder (projects >$500,000), a resident bidder shall be allowed a preference against a nonresident bidder equal to the preference given or required by the state in which the nonresident bidder is a resident. (§24-103-906 C.R.S.) A resident bidder is authorized to transact business in the State of Colorado, maintains a place of business in Colorado and pays unemployment compensation taxes.

9. SERVICE DISABLED VETERAN OWNED SMALL BUSINESSES (SDVOSB’s): SDVOSB’s, who are incorporated or organized in Colorado or maintain a place of business or have an office in Colorado and who are officially registered and verified as a SDVOSB by the Center for Veteran Enterprise within the U.S. Department of Veterans Affairs. (www.vip.vetbiz.gov), may receive a 5% preference on their bid. This preference applies only to the price, and the SDVOSB’s must still meet all other qualifications required in the bid. SDVOSB’s claiming this preference shall submit documentation of SDVOSB certification Issued through the U.S. Department of Veterans Affairs in their response to the solicitation. Bid submissions without this documentation will not be given a preference.

10. COLORADO LABOR: Colorado Labor shall be employed to perform at least eighty percent (80%) of the work on a public works project (>$500,000) per CRS 8-17-101. BIDS/CORE notice to require bidder to indicate 80% Colorado labor in bid or proposal and provide written justification if the 80% Colorado labor is not included in the bid. The justification is a requirement of the bid or proposal submittal. State Agency shall waive the 80% requirement and post justification on its web site; if there is reasonable evidence to demonstrate insufficient Colorado labor to perform the work and, if compliance with the 80% would create an undue burden that would substantially prevent a project from proceeding to completion.

Posting of the agency’s written waiver should include but not be limited to contractor’s justification for insufficient available Colorado labor and the agency’s determination that there is an undue burden negatively impacting the project schedule, budget/appropriation, quality/standards of care or any other specific requirement of the project due to compliance with the 80% Colorado labor requirement. The posting of rational should be made on the date of the award and remain for not less than thirty (30) calendar days in a conspicuous web site location of the state agency under the title – “Reporting Requirements for Public Projects as per HB13-1292”.

11. BUY CLEAN COLORADO ACT:

A. The Buy Clean Colorado (BCCO) Act is focused on reducing embodied carbon emissions of state Public Projects by means of Eligible Material selection. The BCCO Act requires the Office of the State Architect (OSA) to establish a maximum acceptable Global Warming Potential (GWP) limit for each category of Eligible Materials, which include:

asphalt and asphalt mixtures, cement and concrete mixtures, glass, post-tension steel, reinforcing steel, structural steel, and wood structural elements.

B. During Eligible Material procurement, the Contractor shall work with material suppliers to collect compliant Environmental Product Declarations (EPDs) for all permanently installed Eligible Materials. Only third-party verified EPDs will be accepted. The Contractor shall furnish EPDs to the State prior to the installation of an Eligible Material. The EPD must show that the Eligible Material is within the established GWP limits applicable to this Contract, attached as an exhibit. The State shall verify the installation of Eligible Materials.

C. If an EPD is unavailable, the Contractor shall notify the State, and with prior State approval, the Contractor may install an alternative Eligible Material with an EPD. The State may direct the Contractor to work with the State’s designated Project Manager to determine alternative products with EPDs. If an Eligible Material that meets the maximum acceptable GWP limit for a category of Eligible Materials is not reasonably priced or is not available to the Contractor on a reasonable basis, the Contractor shall submit to the State a Construction-Phase Waiver form in the template provided by OSA as Form EE-5.30 and in consideration of the EPD Exemption Justifications published by OSA as Form EE-5.1, both of which are available at <https://osa.colorado.gov/energy-environment/buy-clean-colorado-act>.

D. For Eligible Materials sourced over 100 miles outside of the project site, the Contractor shall record and report information relating to the transportation of the Eligible Materials. The Contractor shall record the weight of the cargo (lbs.), the type of vehicle used for transporting the Eligible Materials, and the total distance traveled (miles) or the zip codes of the distributor and project site.

E. The Contractor shall certify compliance with its obligations related to BCCO by completing the “EPD Construction Submittal” and “Transportation” tabs of the EPD Submittal & Sign-Off Report, which is attached to the Contract as an Exhibit.

12. SUBMITTAL OF BID: The completed Bid must be received by the deadline identified in the

Invitation for Bid. You must include as part of your bid the following items:

A. Provide completed Bid Schedule as described above.

B. Provide Bid Bond (if required) as described above.

C. SDVOSB certification issued through the U.S Department of Veterans Affairs (if applicable).

D. Colorado Labor Justification if not using 80% Colorado Labor (if applicable).

E. Contractor’s Qualifications and References Statement.

This information is to be enclosed in a sealed envelope marked "SEALED BID". Include the bid opening date and time.

The envelope shall be addressed to:

ATTN: Joe DeCrescentis

COLORADO PARKS AND WILDLIFE

6060 Broadway

Denver, CO 80216

Bidders Name and Address should appear in the Upper Left Corner of the envelope.

13. METHOD OF AWARD: The lowest responsible bid, taking into account the Colorado resident bidder preference provision of Colorado Law, will be determined by and the purchase order or contract will be issued, to the extent that the total dollar amount is within available funds to finance the construction. If all bids exceed such amount, the right is reserved to reject all bids. The Division of Parks and Wildlife reserves the right to reject any or all proposals, to waive informalities, and to accept any proposal deemed desirable.

Additive alternates will be used in determining the lowest responsible bidder within the amount available to finance the contract, added in the numeric order listed. An equal number of alternates shall be added to the base bid of each bidder within funds available to finance the contract for purposes of determining the lowest responsible bidder.

The bidder must be registered to do business in the State of Colorado with the Secretary of State www.sos.state.co.us. A Certificate of Good Standing will be required to process the Agreement.

If Federal funds are utilized for this project, the contract cannot be awarded to a contractor which has been disbarred or suspended or is otherwise excluded from or ineligible for participation in federal assistance programs. The excluded parties list can be found at the following web site: https://www.sam.gov/

14. UNIT COST: The price quoted in the proposal shall include the costs of labor, materials, equipment, and incidentals required to provide a fully complete and functioning unit as shown and described in the plans and specifications. The price stated in the proposal shall be complete, and represent total payment for each item in the proposal. No additional payment will be made for the work presented in the proposal.

15. INSURANCE: The successful bidder will be required to submit proof of insurance at the time of executing the agreement. Proof of insurance must be submitted on certificates showing the minimum coverage amounts.

A. The Contractor is required to procure and maintain at all times during the term of this contract the insurance coverage listed below:

1) Workers’ Compensation and Employer’s Liability Insurance, as required by state statute, including occupational disease, covering all of contractor or subcontractor employees acting within the course and scope of their employment.

2) Commercial General Liability Insurance written on ISO occurrence form CG 00 01 10/93 or equivalent, covering premises operations, fire damage, independent contractors, products and completed operations, blanket contractual liability, personal injury, and advertising liability with minimum limits as follows:

a. $1,000,000 combined single limit written on an occurrence basis;

b. $1,000,000 general aggregate;

c. $1,000,000 products and completed operations aggregate; and

d. $50,000 any one fire.

e. If any aggregate limit is reduced below $1,000,000 because of claims made or paid, the contractor shall immediately obtain additional insurance to restore the full aggregate limit and furnish to the State a certificate or other document satisfactory to the State showing compliance with this provision.

3) Automobile Liability Insurance covering any auto (including owned, hired and non-owned autos) with a minimum limit as follows: $1,000,000 each accident combined single limit.

4) Pollution liability policy with minimum limits of $1,000,000 each occurrence and $1,000,000 Annual Aggregate covering any environmental damage caused by the contractor or subcontractor during the Work with the State included as an additionally insured party.

B. The State of Colorado shall be named as an Additional Insured on the Commercial General Liability, Automobile Liability, policy insurance certificates and Colorado Parks and Wildlife must be named as the certificate holder for all coverages 1-4 noted above (leases and construction contracts will require the additional insured coverage for completed operations on endorsements CG 2010 11/85, CG 2037, or equivalent). Coverage required of the contract will be primary over any insurance or self-insurance program carried by the State of Colorado.

C. The Insurance shall include provisions preventing cancellation or non-renewal without at least 45 days prior notice to the State by certified mail.

D. The Insurance shall include a waiver of subrogation for all coverages.

E. The contractor will require all insurance policies in any way related to the contract and secured and maintained by the contractor to include clauses stating that each carrier will waive all rights of recovery, under subrogation or otherwise, against the State of Colorado, its agencies, institutions, organizations, officers, agents, employees and volunteers.

F. All policies evidencing the insurance coverage required hereunder shall be issued by insurance companies satisfactory to the State. No later than 15 days prior to the expiration date of any such coverage, the contractor shall deliver the State certificates of insurance evidencing renewals thereof.

16. If the successful bidder, upon acceptance of his bid by the OWNER, fails to execute such further contractual documents, and give such bond(s) (including any necessary coinsurance or reinsurance agreements) as may be required within ten (10) days after receipt of the Notice of Award, the contract may be terminated for default. In such event the CONTRACTOR shall be liable for any cost of procuring the work which exceeds the amount of his bid, and the bid guarantee shall be available toward offsetting such difference.

17. The bidder is not to give any information concerning his proposal to any other bidder or receive any information concerning another proposal.

18. SALES TAX: The Division of Parks and Wildlife is exempt from paying Colorado sales tax.

Any materials and supplies purchased for this contract are exempt. The Contractor will need to obtain an exemption number from the Department of Revenue for this project and each subcontractor is required to obtain one under the general contractor.

19. QUANTITIES: Quantities stated in the bid schedule and construction documents are estimates only and may increase or decrease during construction. The contractor will perform the required quantity of work based on the unit prices stated in the Bid Schedule except as provided in Section 4.2 of the "General Conditions for Capital Construction."

20. WORK STOPPAGE: Work stoppage is a possibility. The contractor must request all shutdowns or stoppages in writing. If a shutdown is granted, the Division will pay for only work that has been totally completed. No advanced payment of mobilization will be made.

21. CONSTRUCTION SCHEDULE: The Contractor shall submit a written project schedule and supporting data to the Project Manager as soon as possible after the receipt of the Notice of Award. The schedule shall describe key milestones and duration of project activities.

The supporting data for the schedule shall include a complete list of anticipated submittals and due dates, and the key ordering and delivery lead times. The Contractor shall schedule the sequence of construction to consider the delivery of long lead-time items. It shall be the Contractor's responsibility to notify the Project Manager of any problem in conforming to the Contract Documents, Specifications, and Construction Drawings for any element of the proposed improvements prior to its construction.

22. SCHEDULE OF VALUES: Submit typed schedule of values on AIA Form G703, or a similar typewritten format on white 8-1/2" x 11" paper. Use the Table of Contents of these Contract Documents as a basis of format. Identify each line item with number and title of the Specification section. The schedule of values shall aggregate the total contract amount, and be divided so as to facilitate payments to subcontractors and suppliers. Upon request by the Project Manager, support values given with data that will substantiate their correctness. The schedule, when approved by the Project Manager, will be used as a basis for the Contractor's application for payment. Break down installed costs into delivered costs of products and total installed costs with overhead and profit. Provide a summary of the cost and origin of the five most costly manufactured items containing more than fifty percent iron or steel to be installed on the project. Revise the schedule to list change orders for each application for payment.

23. SCHEDULE OF SUBCONTRACTORS, MAJOR EQUIPMENT AND MATERIALS SUPPLIERS: The

Contractor shall provide the Owner, prior to the commencement of any Work, a detailed listing of subcontractors and major equipment and materials suppliers indicating their name, address, description of service or equipment and materials being provided, if they are a woman owned or minority owned business enterprise (WBE/MBE), and their vested monetary interest in the contract. The Contractor shall not award any Work to a subcontractor, transfer or assign any portion of the Contract Work, without the written approval of the Owner. Records shall be maintained throughout the duration of the Contract and periodically submitted at the time the Contractor submits progress payment applications. The Owner will use these records to verify the Contractor’s level of indebtedness prior to making final payment.

24. DIVISION APPROVAL OF INDEPENDENT TESTING LABORATORY: The Contractor shall submit the name and qualifications of the independent testing laboratory to the Project Manager as soon as possible after the receipt of the Notice of Award. The Division may request personal interviews, and retains the right to reject the proposed candidates without reservation. If a candidate is rejected, the Contractor shall provide an alternative that is acceptable, and work shall not begin until approval is obtained.

25. CONSTRUCTION CONTROL PLAN: A traffic, excavation, and construction access control plan shall be submitted by the Contractor and approved by the Owner prior to the commencement of work. The disruption to project area visitors shall be kept to a minimum.

The plan shall take into consideration all users, including motorists, cyclists, and pedestrians. The Contractor shall provide all lights, signs, barricades, flagmen, or other devices necessary to provide for public safety in accordance with the current United States Department of Transportation’s Manual of Uniform Traffic Control Devices.

26. STORMWATER MANAGEMENT PLAN: This project will disturb more than 1 acre of ground, so a State stormwater control permit is required. The Contractor must submit a copy of the permit certification and the Stormwater Management Plan to the Owner for approval prior to the commencement of Work. The plan shall describe how the work shall remain in substantial compliance with the requirements of the Stormwater Management Program of the State Health Department, and Specification Section 02279.

27. Colorado Parks and Wildlife shall not be obligated or liable for any cost incurred by any company or individual reviewing this proposed project or prior to the issuance of a contract approved by the Controller of the State of Colorado or such assistant as he may designate.

Any and all costs, to review the project, inspect the proposed construction site, prepare and or submit bids will be the sole responsibility of the bidder.

28. A submission in response to the solicitation acknowledges acceptance by the proposer of all unaltered terms and conditions, as set forth herein. Any proposed exception taken to the State’s Terms and Conditions must be clearly and thoroughly identified and supported and acceptable alternatives must be proposed. Failure to do so shall be deemed a waiver of any rights to subsequently raise exception and/or request modification, except as outlined or specified in this solicitation. Submission of exceptions does not guarantee their acceptance, however, and such submittal will be taken into consideration during proposal review and scoring by the evaluation team. The state reserves the right to reject any changes suggested to PO or Contact terms and conditions and award to the next most advantageous qualified responsive vendor.

29. PROTESTED SOLICITATIONS AND AWARDS: An aggrieved party may file a protest concerning a material issues(s), at any phase of solicitation, including but not limited to, specifications, award or a disclosure of information marked confidential in the bid. The protest shall be submitted via email to the DNR Procurement Official as noted below within ten (10) business days after such aggrieved person knows, or should have known, of the facts giving rise thereto. Reference CRS 24-109-102, as amended, and Procurement Rule R-24-109-102-01, et seq.

DNR Procurement Official: Ion Cotsapas, ion.cotsapas@state.co.us

The written protest shall include, as a minimum, the following:

A. The name and address of the protestor;

B. Appropriate identification of the procurement by bid or award number;

C. A statement of the reasons for the protest, and any available exhibits, evidence, or documents substantiating the protest.

30. ACH/EFT PAYMENTS: Contractors are highly encouraged to consider signing up for ACH/EFT payments. ACH/EFT payments provide the advantage of ensuring quick and secure payments for the goods and services that vendors provide to the State. ACH/EFT payments help avoid the unnecessary, and sometimes inevitable delays in mail, and the possibility of lost warrants which will further delay vendor payment. DNR’s goal is to pay vendors as soon as possible - signing up for the ACH/EFT is an important step in making this happen. For additional information about signing up for ACH/EFT payments, please contact the Project Manager identified in the Invitation for Bids.

31. In accordance with procurement code and CRS 24-103-904 titled “Purchasing Preference for Environmentally Preferable Products”, bidders responding to this solicitation may seek to qualify for the preference and governmental bodies conducting this solicitation shall award a contract to a bidder who offers environmentally preferable products subject to the condition in the code and procurement rules.

32. ALTERNATIVE PRODUCTS: Certain materials and equipment have been specified by manufacturers’ trade names. This was done to establish the minimum quality and type of product desired. Alternatives to the manufacturers’ products may be used if the Project Manager determines they are equal. The Award will be based on the products identified in the plans.

33. NOTICE OF CONTRACTOR’S SETTLEMENT: If the project exceeds $150,000.00, a Final Settlement will be advertised via electronic media on the Colorado VSS website at www.colorado.gov/vss.

34. CONTRACT CLOSE OUT: Final Payment Statement: In addition to submittals required by the conditions of the Contract, provide submittals required by governing authorities and submit a final statement of accounting giving total adjusted Contract Sum, previous payments and sum remaining due. Provide a final summary of the cost and origin of the five most costly manufactured items containing more than fifty percent iron or steel that were installed on the project. The Contractor shall submit lien waivers for all subcontractors and material suppliers as part of the final payment statement.

35. LIQUIDATED DAMAGES: The parties agree that time is of the essence of the Contract and of the Specifications wherever a definite and certain length of time is fixed for the performances of any act. A daily charge will be made against the Contractor for each calendar day that any work remains uncompleted after the elapse of contract time. This daily charge will be deducted from any money due to the Contractor. This deduction will not be considered a penalty, but as liquidated damages.

The liquidated damages set forth is an amount, agreed to by the Contractor and the Division, as reasonably representing additional project construction administration costs incurred by the Division and projected loss of revenue to the Park if the Contractor fails to complete performance within the contract time. For this project, the Liquidated Damages will be $228 per day.

Due account shall be taken of any adjustment of the contract time for completion of the work granted under the provisions of subsection 8.5 of the General Conditions for Capital Construction. Permitting the Contractor to continue and finish the work or any part thereof after elapse of contract time will not operate as a waiver on the part of the Division on any of its rights under the Contract.

Any deduction assessed as liquidated damages under this section shall not relieve the Contractor from liability for any damages or costs resulting from delays to other contractors on the project or other projects caused by a failure of the assessed Contractor to complete the work according to contract times.

36. WORK HOURS ON PROJECT SITE: All work on this project site will be allowed as follows:

8am to 6pm or otherwise approved by the Project Manager.

37. PERFORMANCE MONITORING CRS §§ 24-106-107:

A. PERFORMANCE MEASURES AND STANDARDS:

Performance measures and Standards as defined in the General Conditions for Capital Construction shall be the basis for this Contract. This includes but is not limited to the following:

1) The Contractor shall prepare a project schedule at project startup and continue to update the schedule throughout construction providing detailed justifications for construction delays and schedule changes.

2) The Contractor shall submit all required product information as defined in the Construction Drawings & Specifications. In turn, the State’s Project Manager shall review and comment within 10 days of receipt.

3) The State’s Project Manager and the Contractor shall conduct Construction Progress Meetings and Quantity Verification Inspections at least monthly or as otherwise determined necessary during Construction activities.

B. ACCOUNTABILITY:

Project and Contract administration will provide accountability by documenting and evaluating the progression of construction and the ability to follow the agreed upon construction schedule. The Contractor shall report regularly on achievement of the performance measures and standards specified above and failure to do so allows the governmental body to withhold payment until successful completion of all or part of the contract and the achievement of established performance standards. Payment by the State to the Contractor shall be made without delay upon successful completion of all or any part of the contract in accordance with the payment schedule specified in the contract or as otherwise agreed upon by the parties.

C. MONITORING REQUIREMENTS:

The State will evaluate the Contractor’s performance by preparing monthly progress reports and monthly construction schedule updates provided by the Contractor as well as performing site visits to verify quantities based on the Bid Schedule, inspections to verify quality of work, and reviews of performance data as construction progresses to ensure that the results, objectives and obligations of the contract are met.

D. NONCOMPLIANCE RESOLUTION:

Methods and mechanisms as defined in the General Conditions for Capital Construction shall be used to resolve any situation in which the State's monitoring assessment determines noncompliance, including termination of the contract.

END OF SECTION

CONTRACTOR’S QUALIFICATIONS AND REFERENCES

ST VRAIN SP SOUTH CAMPGROUND PAVING

Interested firms shall submit as an attachment to the bid proposal one (1) copy of the following document. Failure to provide a completed Contractor’s Qualification Statement with the sealed bid proposal will result in disqualification. This format can be expanded up to five (5) total pages maximum.

1. Provide summaries of three (3) similar commercial construction projects in the past five (5) years that include materials, trades, and sitework of similar scope. Include the project name, contract value, and a brief description of the project.

Project #1:

Project #2:

Project #3:

2. Provide reference information for the example projects. Include the owner’s name, the reference point of contact, and their phone number.

Project #1:

Project #2:

Project #3:

SPECIFICATIONS

PROJECT I.D. NO. C27VR1

IFB1: PMAA 2027*26

PRE-BID CONFERENCE: September 1, 2026 at 9:00 a.m.

BID OPENING: September 10, 2026 at 1:30 p.m.

TABLE OF CONTENTS

St Vrain SP South Campground Paving

C27VR1

DIVISION I - SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

SECTION 01010 - SUMMARY OF WORK

SECTION 01023 - MINOR CONTRACT REVISION

SECTION 01200 - CONSTRUCTION MEETINGS

SECTION 01300 - SUBMITTALS

SECTION 01310 - CONSTRUCTION SCHEDULES

SECTION 01410 - LABORATORY TESTS

SECTION 01500 - TEMPORARY UTILITIES AND CONTROLS

SECTION 01710 - PROJECT CLEANING

SECTION 01720 - AS-CONSTRUCTED AND RECORD DOCUMENTS

DIVISION 2 - SITE WORK

SECTION 02050 - MOBILIZATION

SECTION 02210 - FINISH GRADING

SECTION 02279 - WATER QUALITY CONTROL

SECTION 02513 - HOT MIX ASPHALT PAVEMENT

SECTION 02545 - AGGREGATE BASE COURSE

DIVISION 1 - GENERAL REQUIREMENTS

GENERAL CONDITION:

Please read the most current "General Conditions for Capital Construction" in your possession.

They apply to all Divisions of these specifications, accompanying drawings and to this proposed project.

SECTION 01010 - SUMMARY OF WORK

1. LOCATION:

(Not Mandatory) Pre-bid conference: September 1, 2026 at 9:00 a.m. at the project site in the parking area south of the dump station, shown as the staging and stockpiling area.

Project Address: St Vrain State Park 3785 Weld County Road #24.5 Longmont, CO 80504 Weld County

Project Coordinates: Latitude: 40° 10' 04.24" Longitude: 104° 59' 27.81"

2. DESCRIPTION OF THE WORK:

The project will improve the road and parking surface at the park. Work includes surface preparation of the existing drive, furnishing and placing base course material where necessary, widening the existing drive where necessary, and furnishing and placing Hot Mix Asphalt Pavement.

All work shall be in compliance with these specifications and construction drawings.

3. CONSTRUCTION COMMENCEMENT:

The Contractor shall be allowed from the date of approval of contract documents through the CONTRACT START DATE (as indicated on the Notice to Proceed letter) to submit shop drawings and product approvals and order and delivery of materials.

4. ADDITIONAL PROVISIONS:

The work and the compensation, therefore, shall be as covered by these specifications consisting of furnishing all plant, labor, equipment and materials required to perform the work shown on the drawings and listed in the bid schedule, unless otherwise stipulated or approved in writing by the Capital Development Program Manager.

Division field engineering personnel are authorized to supervise the construction of this project in accordance with the previously approved plans and specifications and change orders. All changes in the work shall be approved in writing by the Capital Development Program Manager before being activated in accordance with Section 4, Item 4.2 of the General Conditions for Capital Construction.

The specifications included herein are the Specifications for this project. If there should be a difference between the Specifications and the drawings, the Specifications shall govern.

5. CONTRACTOR RESPONSIBILITY:

Visit the site and determine to your own satisfaction the amount and type of work to be performed to complete the project in accordance with the drawings, specifications and Contract Documents before submitting your bid.

Furnish sufficient qualified help to the Project Manager for setting construction controls.

Before final payment will be made on the completed contract, submit to the Owner all specified warranties, and other product warranties.

6. SUBCONTRACTED WORK:

Contractor shall not subcontract any portion of the work without written consent of the Project Manager, which consent shall not unreasonably be withheld. In cases where such consent is given, the Contractor shall perform with his own organization work amounting to not less than 50 percent of the total contract cost, as determined by the Project Manager, except that any items agreed to by the Project Manager as “specialty items” may be performed by subcontract and the cost of any such specialty items so performed by subcontractor may be deducted from the total cost before computing the amount of work required to be performed by the Contractor with his own organization.