This is a technical drawings and specifications document prepared for the City of Portsmouth, Virginia Department of Engineering for the Warfield Canal Dredging project (IFB 52-26-SKL). The project encompasses dredging operations along the Warfield Canal located in Portsmouth, VA, with work areas designated as West Dredge (Station 9+25.00 to 12+75.00) and East Dredge (Station 19+75.00 to 22+75.00). The document includes comprehensive site plans, existing condition surveys, dredging plans for both western and eastern sections, cross-sections, profiles, invasive vegetation removal specifications, erosion and sediment control (E&S) details, and maintenance of traffic plans. The drawings are dated 05/07/2026 and indicate survey work completed in April and May 2023, with water elevation measurements documented at various points along the canal ranging from elevations of 6.72 to 7.42 feet.

The technical specifications detail existing infrastructure including concrete headwalls, rip-rap protection, retention walls, various diameter drainage pipes and culverts (ranging from 24 inches to 72 inches), and associated appurtenances such as catch basins and sediment control structures. The project requires comprehensive erosion and sediment control measures including turbidity curtains, stone construction entrances, silt fencing, soil stabilization matting, and pipe outlet protection. Site conditions show multiple utilities requiring coordination, including a 15-foot drainage easement, various 40-foot and 50-foot drainage easements, planting strips, and streetscapes along adjacent rights-of-way including Warfield Drive, Carrington Crescent, Roosevelt Boulevard, and Cavalier Boulevard. Maintenance of traffic plans are provided to address impacts on multiple roadways during construction operations. The document emphasizes compliance with Virginia Stormwater Management Handbook standards and VDOT specifications for all construction activities.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

C O

VE

R

S H

EE

T

G-1

CONTACT INFORMATION

CITY OF PORTSMOUTH, VA

DEPARTMENT OF ENGINEERING

1101 WARFIELD DRIVE,PORTSMOUTH, VA 23669

WARFIELD CANAL DREDGING

05/07/2026

BEFORE YOU DIG, TO MISS THE

UTILITIES

CALL

�MISS UTILITY� OF VIRGINIA

DIAL 811

OR

1-800-552-7001

(TOLL FREE)

NORTH

SURVEYOR: ENGINEER:

CONTACT INFORMATION

PORTSMOUTH CONTACTS:

UTILITY AND GOVERNING AGENCIES CONTACT LIST

(NOTE: CONTACTS LISTED ON SHEET C-1 ARE FIELD CONTACTS)

Sheet List Table

05/07/2026

G-2

W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

G

EN

ER

AL

N O

TE

S

GENERAL CONSTRUCTION & DREDGING NOTES

CONSTRUCTION NOTES

GENERAL NOTES FOR ENVIRONMENTAL

CONSTRUCTION STANDARDS

CONSTRUCTION SEQUENCE

DEMOLITION AND EROSION & SEDIMENT CONTROL NOTES

SEQUENCE OF CONSTRUCTION CLARIFICATION:

CITY OF PORTSMOUTH SITE PLAN GENERAL NOTES

NOTES

G-3

W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

G

EN

ER

AL

A N

D E

&S N

O

TE

S

VIRGINIA STORMWATER MANAGEMENT HANDBOOK NOTES EROSION AND SEDIMENT CONTROL NARRATIVE

CITY OF PORTSMOUTH VIRGINIA STORMWATER MANAGEMENT PROGRAM (VSMP)

GENERAL EROSION AND SEDIMENT CONTROL NOTES

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

C-1

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

C-2

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

C-3

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

C-4

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

C-5

' D

RA

IN

AG

E

EA

SE

M

EN

T

(M .B

. 7 , P

. 4

POST

42"CLF42"CLF FALLING

CONC. HW

CONC. HW

INV=4.76

INV=4.58

T.O.B.

T.O.S.

CONC. HW

INV=6.74

RIP-RAP

T.O.S.

T.O.B.

T.O.S.

T.O.B.

E.O.W.

E.O.W.

E.O.W.

48"CLF

RET. WALL

T.O.S.

E.O.W.

60"CLF

T.O.B.

T.O.S.

E.O.W.

T.O.S.

E.O.W.

T.O.B.

RIP-RAP

T.O.S.

E.O.W.

T.O.B.

T.O.S.

E.O.W.

T.O.B.

RIP-RAP

FRAME

SHED

T.O.S.E.O.W.

T.O.B.

T.O.S.E.O.W.

T.O.B.

RIP-RAP

FRAME

SHED

T.O.S.

E.O.W.

T.O.B.

RIP-RAP

T.O.S.

E.O.W.

T.

O.

B.

T.O.S.

E.O.W.

T.O.B.

T.O.S.

E.O.W.

T.O.B.

T.O.S.

E.O.W.

T.O.B.

FRAME

SHED

T.O.S.

E.O.W.

T.O.B.

T.O.S.

E.O.W.

T.O.B.

RIP-RAPRIP-RAP

36"CLF

FOV

36"CLF

RIP-RAP

T.O.S.

E.O.W.

T.O.B.

T.O.S.

T.O.B.

60"CLF

"C

LF

60"CLF E.O.W.

T.O.B.

E.O.W.

T.O.B.

"W

DF

T.O.S.

E.O.W.

T.O.B.

T.O.W. @12 PM

ON 05/01/2023

EL=7.42

T.O.W. @3 PM

ON 04/27/2023

EL=6.85

T.O.W. @10:30 AM

ON 04/27/2023

EL=6.72

T.O.W./ N.T.R.

ON 04/25/2023

EL=6.80

WARFIELD DRIVE

(50' PUBLIC RIGHT-OF-WAY)

(M.B. 7, P. 8)

WARFIELD DRIVE

(50' PUBLIC RIGHT-OF-WAY)

(M.B. 7, P. 8)

WARFIELD DRIVE

(50' PUBLIC RIGHT-OF-WAY)

(M.B. 7, P. 4)WARFIELD DRIVE

(50' PUBLIC RIGHT-OF-WAY)

(M.B. 7, P. 4)

C A

R R

IN

G

TO

N

C R

ESC

EN

T SO

U

TH

(50' PUBLIC RIG

HT-O

F-W

AY)

(M .B. 8, P. 17)

CARRINGTON CRESCENT NORTH

(50' PUBLIC RIGHT-OF-WAY)

(M.B. 7, P. 4)

R O

O

SE

V

EL

T

BO

U

LE

V A

R D

(6 0'

P U

BL

IC

R

IG

H T-

O F-

W

AY

(M

.B . 8

, P . 1

7)

INV=6.27

IN

V=

7.9

INV=7.87

BROKEN

CONC. PIPE

INV=6.54

INV=5.53

CONC. HW

RIP-RAP

CONC. HW

RET. WALL

WD. CANOPY

RET. WALL

RET. WALL

POST(3)

"C

LF

FOV

42"CLF REMAINS RET.

WALL

RET. WALL

RET. WALL

RET. WALL

DAMAGED

RET. WALL DAMAGED

RE

T.

W

AL

L

POST(2)POST(3)

POST

CONC. HW

48"CLF

POST(4)

CONC. HW

FRAME

SHED

48"CLF

GATE

POST

RIP-RAP

E.O.W.

T.O.B.

RIP-RAP

E.O.W.

T.O.B.RIP-RAP

E.O.W.

T.O.B.

E.O.W.

T.O.B.

E.O.W.

T.O.B.

INV=5.62

T.O.W. @ 4:30 PM

ON 05/02/2023

EL=7.40

EOI

RIP-RAP

48"CLF

T.O.B.

E.O.W.

48"CLF

T.O.W. @ 3:20 PM

ON 05/03/2023

EL=7.08

E.O.W.

T.O.B.

36"CLF

T.O.B.

E.O.W.

"W

DF

"W

DF

RIP-RAP

RIP-RAP

T.O.B.

E.O.W.

T.O.B.

E.O.W.

CATV PED.

24"CONC. C&G

T.O.W. @ 3:40 PM

ON 05/05/2023

EL=7.08

RIP-RAP

E.O.W.

T.O.B.

E.O.W

T.O.B.

E.

O.

W

T.

O.

B.

60"

CLF

72"WDF

"C

LF

RI

P-

RA

P

WD. DECK

RE

T.

W

AL

L

CB #1

RIM=12.64

STR. INV= 5.86

CONC. HW

CONC.

HW

INV=6.40

INV=6.30RIP-RAP

INV=6.01INV=5.90

10"CM

10"MAPLE

AS

PH

. S

UR

FA

CE

T.O.W. @ 2:20 PM

ON 05/08/2023

EL=6.97

"C

ON

C.

C &G

SDMH #4

RIM=15.22

STR. INV=4.54

SDMH #5

RIM=15.26

STR. INV=4.50

CB #3A

RIM=12.32

NO INV.

CB #3B

RIM=12.28

STR. INV=4.91

GR

AS

S

ME

DI

AN

24"CONC. C&G

CONC.

HW

RI

P-

RA

P

T.

O.

B.

E.

O.

W

RET. WALL

RET. WALL

"C

LF

"C

LF

E.

O.

W

T.

O.

B.

T.

O.

B.

E.

O.

W

RI

P-

RA

P

T.

O.

B.

T.O.S.

E.O.W.

ROOSEVELT BOULEVARD

(60' PUBLIC RIGHT-OF-WAY)

(M.B. 8, P. 17)

ASPH. SURFACE

CB #2

RIM=12.48

STR. INV= 6.12

IN

V=

6.0

IN

V=

6.1

40' DRAINAGE EASEMENT

(M.B. 7, P. 4)

50' DRAINAGE EASEMENT

(M.B. 4, P. 20)

' D

RAI

NAG

E

EA

SE

MEN

T

(M .B

. 7 , P

. 4

40' DRAINAGE EASEMENT

(M.B. 7, P. 4)

50' DRAINAGE EASEMENT

(M.B. 4, P. 20)

12' D R

AIN

AG

E EASEM

EN

T

(M .B. 7, P. 4)

10' PLANTING STRIP

(M.B. 4, P. 20)

' D

RA

IN

AG

E

EA

SE

M

EN

T

(M .B

. 7 , P

. 4

40' DRAINAGE EASEMENT

(M.B. 7, P. 4)

50' DRAINAGE EASEMENT

(M.B. 6, P. 3)

' D

R

AI

N

AG

E

EA

SE

M

EN

T

(M .B

. 6 , P

. 6 1)

10' PLANTING STRIP

(M.B. 6, P. 3)

' D

R

AI

N

AG

E

EA

SE

M

EN

T

(M .B

. 7 , P

. 4

72"CLF

42"CLF

42"CLF

WD. DECK

INV=6.56

CONC.

HW

INV=6.31

T.

O.

B.

E.

O.

W

T.

O.

B.

E.

O.

W

T.

O.

B.

E.

O.

W

T.

O.

S.

T.

O.

B.

E.

O.

W

T.

O.

S.

40' DRAINAGE EASEMENT

(M.B. 8, P. 17)

50' DRAINAGE EASEMENT

(M.B. 6, P. 3)

' D

RAINAGE EASEMENT

(M .B. 8

, P . 1

7)

' D

R

AI

N

AG

E

EA

SE

M

EN

T

(M .B

. 8 , P

. 1 7)

' D

R

AI

N

AG

E

EA

SE

M

EN

T

(M .B

. 8 , P

. 7 3)

15' DRAINAGE EASEMENT

(M.B. 8, P. 73)

12' DRAINAGE EASEMENT

(M.B. 8, P. 73)

RI

P-

RA

P

18"STUMP

W D.

D

EC

K

COP DISK 8-141

N: 3,454,577.581 E:12,108,394.537

EL=12.88

TRAV #103 PIN/CAP

N: 3,454,352.661 E:12,108,445.560

EL=15.23

TRAV #101 DH

N: 3,453,946.052 E:12,105,663.887

EL=12.46

TBM IS A CHISELED

SQUARE SET IN CB

EL=12.46

N

°4 6'

"W

.7 7'

(S U

R

VE

Y

BA

SE

LI

N E)

10' PLANTING STRIP

(M.B. 4, P. 20)

FR

AM

E

SH

ED

48"CLF

36"CLF

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F) PIN(F) PIN(F) PIN(F) PIN(F) PIN(F) PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)

PIN(F)PIN(F)PIN(F)PIN(F)PIN(F)PIN(F)

PIN(F)

PIN(F) PIN(F)

10"MAPLE

48"CLF

72"CLF

ZO

NE

X (S

HA

DE

D)

ZO

NE

X

(U

NS

HA

DE

D)

ZO

NE

X (S

HA

DE

D)

ZO

NE

X (U

NS

HA

DE

D)

ZO

NE

X (S

HA

DE

D)

ZO

NE

X

(U

NS

HA

DE

D)

ZO

NE

X (S

HA

DE

D)

ZO

NE

X

(U

NS

HA

DE

D)

ZONE X (SHADED)

ZONE X (UNSHADED)

ZONE X (SHADED)

ZONE X (UNSHADED) ZONE X (SHADED)

ZONE X (UNSHADED)

ZONE X (SHADED)

ZONE X (UNSHADED)

ZONE X (SHADED)ZONE X (UNSHADED)

ZONE X (SHADED)

ZONE X (UNSHADED)

ZONE X (SHADED)

ZONE X (UNSHADED)

ZONE X (SHADED)

ZONE X (UNSHADED)ZONE X (SHADED)

ZONE X (UNSHADED)

10"MAPLE

N79°46'46"E 225.02'

(SURVEY BASELINE)

COP DISK 1-141

N: 3,453,985.979 E:12,105,885.339

EL=13.76

WIRE TO

GROUND

DIST.=18.60

WIRE TO

GROUND

DIST.=17.10

WIRE TO

GROUND

DIST.= 14.90

T.O.W. @ 1:20 PM

ON 05/18/2023

EL=6.96

RI

P-

RA

P

RI

P-

RA

P

5"CEDAR

27"PINE

24"PINE

27"PINE

12"GUM

18"MAPLE

15"MAPLE

"C

H

ER

R Y

W D

FR

AM

E

SH

ED

' D

R

AI

N

AG

E

EA

SE

M

EN

T

(M .B

. 6 , P

. 6 1)

"A

SH

10"ASH

BUSH

24"MAGNOLIA

12"DEAD TREE

10"TW-MULBERRY

5"BIRCH

6"

BI

R C

H

5"

BI

R C

H

6"BIRCH

5"MIMOSA

30"TW-MULBERRY

E.O.W.

T.O.S.

T.O.B.

"M

U

LB

ER

R

Y( 2)

"M

AP

LE

8" M

AP

LE

5" G

U M

"M

AP

LE

6" G

U M

CONC. HW

C A

V A

LI

ER

BO

U

LE

V

A R

D (1

' P

U

BL

IC

R

IG

H

T- O

F- W

AY

(M .B

. 7 , P

. 4

COP BRASS DISK

LOCATED 2.7'

FROM CURB & 34'

FROM SEWER

MANHOLE

EL=13.76

BRASS COP DISK

SET IN A CB

EL=12.88

W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

NORTH

D R

ED

G

IN

G

P

LA

N

IN

D

EX

C-6

WARFIELD DRIVE

(50' PUBLIC RIGHT-OF-WAY)

(M.B. 7, P. 4)

CARRINGTON

CRESCENT NORTH

(50' PUBLIC RIGHT-OF-WAY)

(M.B. 7, P. 4)

C A

V A

LI

ER

R O

A D

(1

' P U

BL

IC

R

IG

H T-

O F-

W

AY

(M

.B . 7

, P . 4

CARRINGTON

CRESCENT SOUTH

(50' PUBLIC RIGHT-OF-WAY)

(M.B. 8, P. 17)

ROOSEVELT BOULEVARD

(60' PUBLIC RIGHT-OF-WAY)

(M.B. 8, P. 17) R

O O

SE

V

EL

T

BO

U

LE

V

A R

D (6

0' P

U

BL

IC

R

IG

H

T- O

F- W

AY

(M .B

. 8 , P

. 1 7)

' D

RAINAGE EASEMENT

NORTH

LEGEND

W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

D R

ED

G

IN

G

P

LA

N (W

ES

T)

C-7

NORTH W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

D R

ED

G

IN

G

P

LA

N (E

AS

T)

C-8

NOTES

LEGEND

INV=7.87

BROKEN

CONC. PIPE

INV=6.54

WD. CANOPY

10' PLANTING STRIP

(M.B. 4, P. 20)

PIN(F)

"C

H

ER

R Y

W D

FR

AM

E

SH

ED

' D

R

AI

N

AG

E

EA

SE

M

EN

T

(M .B

. 6 , P

. 6 1)

"A

SH

10"ASH

BUSH

24"MAGNOLIA

12"DEAD TREE

10"TW-MULBERRY

5"BIRCH

6"

BI

R C

H

5"

BI

R C

H

6"BIRCH

5"MIMOSA

PI

PE

O U

TF

AL

L (W

ES

T)

W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

NORTH

LEGEND

C-9

EXISTING PIPE OUTFALL (WEST)

STA: 9+75.00 TO STA: 11+25.00

EXISTING PIPE OUTFALL (EAST)

STA: 19+75.00 TO STA: 21+25.00

WEST DREDGE

STA: 9+25.00 TO STA: 12+75.00

EAST DREDGE

STA: 19+75.00 TO STA: 22+75.00

W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

PR

O

FI

LE

S

C-10

WEST DREDGE

STA: 11+20

WEST DREDGE

STA: 11+00

EAST DREDGE

STA: 20+90

EAST DREDGE

STA: 21+20

EAST DREDGE

STA: 21+50

W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

C

R O

SS

S

EC

TI

O N

S

C-11

POST

T.O.S.

T.O.B.

T.O.S.

E.O.W.

E.O.W.

48"CLF

RET. WALL

T.O.S.

E.O.W.

60"CLF

T.O.B.

T.O.S.

E.O.W.

T.O.S.

E.O.W.

T.O.B.

RIP-RAP

T.O.S.

E.O.W.

T.O.B.

T.O.S.

E.O.W.

T.O.B.

RIP-RAP

T.O.S.E.O.W.

T.O.B.

T.O.S.

E.O.W.

T.O.B.

T.O.W. @10:30 AM

ON 04/27/2023

EL=6.72

INV=6.27

RET. WALL

40' DRAINAGE EASEMENT

(M.B. 7, P. 4)

50' DRAINAGE EASEMENT

(M.B. 4, P. 20)

' D

RAI

NAG

E

EA

SE

MEN

T

10' PLANTING STRIP

(M.B. 4, P. 20)

48"CLF

72"CLF

' D

RA

IN

AG

E

EA

SE

M

EN

T

(M .B

. 7 , P

. 4

RIP-RAPRIP-RAP

36"CLF

FOV

36"CLF

RIP-RAP

T.O.S.

60"CLF

"C

LF

60"CLF E.O.W.

T.O.B.

E.O.W.

T.O.B.

"W

DF

T.O.W. @12 PM

ON 05/01/2023

EL=7.42

INV=5.53

CONC. HW

RET. WALL

RET. WALL

POST(3)

"C

LF

FOV

42"CLF REMAINS RET.

WALL

RET. WALL

DAMAGED

POST(2)POST(3)

POST

CONC. HW

POST(4)

RIP-RAP

E.O.W.

T.O.B.

RIP-RAP

E.O.W.

T.O.B.

INV=5.62

' D

RA

IN

AG

E

EA

SE

M

EN

T

(M .B

. 7 , P

. 4

40' DRAINAGE EASEMENT

(M.B. 7, P. 4)

50' DRAINAGE EASEMENT

(M.B. 6, P. 3)

' D

R

AI

N

AG

E

EA

SE

M

EN

T

' D

R

AI

N

AG

E

EA

SE

M

EN

T

(M .B

. 7 , P

. 4

36"CLF

ZONE X (SHADED)

ZONE X (UNSHADED)

ZONE X (SHADED)

ZONE X (UNSHADED)

W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

IN

VA

SI

VE

VE

G

ET

AT

IO

N

R

EM

O

VA

L

LEGEND

VEG-1

NORTH

EO

I

T.O .W

3:

PM

ON

/03 /20

EL

=7 .08

36"WDF

RIP-RAP

T.O .B.

E.O .W

CA

TV

PE

D.

"C

ON

C.

C &G

T.O .W

3:

PM

ON

/05 /20

EL

=7 .08

RIP-RAP

E.O .W

T.O .B.

E.O.W.

T.O.B.E.O.W.

T.O.B.

"C

LF

"W

DF

36"CLF

RIP-RAP

WD.

DE

CK

RET. WALL

CB

#1

RI

M=1

2.6

ST

R.

IN

V=

5.

CO

NC

. H W

CO

NC

HW

IN

V=

6.3

RI

P-

RA

P

IN

V=

6.0

IN

V=

5.9

"C

M

"C

ONC

. C

&G

CO

NC

HW

RO

O

SE

VE

LT

B

O

UL

EV

AR

D

(6 0'

PU

BL

IC

R

IG

HT

-O F-

W

AY

(M .B

. 8 , P

. 1 7)

AS

PH

. S

UR

FA

CE

CB

#2

RI

M=1

2.4

ST

R.

IN

V=

6.

INV=6.19

' D

RA

IN

AG

E

EA

SE

M

EN

T

50' DRAINAGE EASEMENT

(M.B. 8, P. 17)

ZO

NE

X (S

HA

DE

D)

ZO

NE

X (U

NS

HA

DE

D)

5"

CE

DA

R

"P

IN

E

"P

IN

E

"P

IN

E

"G

UM

"M

AP

LE

"M

AP

LE

NORTH

W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

W

ES

T E&

S

PL

AN

ES-1

E&S LEGEND

INV=7.87

BROKEN

CONC. PIPE

INV=6.54

WD. CANOPY

10' PLANTING STRIP

(M.B. 4, P. 20)

PIN(F)

"C

H

ER

R Y

W D

FR

AM

E

SH

ED

' D

R

AI

N

AG

E

EA

SE

M

EN

T

(M .B

. 6 , P

. 6 1)

"A

SH

10"ASH

BUSH

24"MAGNOLIA

12"DEAD TREE

10"TW-MULBERRY

5"BIRCH

6"

BI

R C

H

5"

BI

R C

H

6"BIRCH

5"MIMOSA

CONC. HW

INV=6.74

RIP-RAP

T.O.S.

T.O.B.

T.O.S.

T.O.B.

E.O.W.

E.O.W.

48"CLF

' D

RAI

NAG

E

EA

SE

MEN

T

ZONE X (SHADED)

ZONE X (UNSHADED)

W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

C U

LV

ER

T E&

S

PL

AN

S

NORTH

ES-2

E&S LEGEND

42"CLF42"CLF FALLING

CONC. HW

CONC. HW

INV=4.76

INV=4.58

T.O.B.

T.O.S.

RIP-RAP

E.O.W.

10"MAPLE

AS

PH

. S

UR

FA

CE

"C

ON

C.

C &G

CB #3A

RIM=12.32

NO INV.

CB #3B

RIM=12.28

STR. INV=4.91

GR

AS

S

ME

DI

AN

TRAV #103 PIN/CAP

N: 3,454,352.661 E:12,108,445.560

EL=15.23

N

°4 6'

"W

.7 7'

(S U

R

VE

Y

BA

SE

LI

N E)

10"MAPLE

ZONE X (SHADED)

ZONE X (UNSHADED)

ZONE X (SHADED)ZONE X (UNSHADED)

10"MAPLE

WIRE TO

GROUND

DIST.=18.60

WIRE TO

GROUND

DIST.=17.10

WIRE TO

GROUND

DIST.= 14.90

30"TW-MULBERRY

E.O.W.

T.O.S.

T.O.B.

"M

U

LB

ER

R

Y( 2)

"M

AP

LE

8" M

AP

LE

5" G

U M

"M

AP

LE

6" G

U M

CONC. HW

C A

V A

LI

ER

BO

U

LE

V

A R

D (1

' P

U

BL

IC

R

IG

H

T- O

F- W

AY

(M .B

. 7 , P

. 4

NORTH W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

EA

ST

E &S

P

LA

N

ES-3

E&S LEGEND

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

E& S

D

ET

AI

LS

TYPICAL LAYOUTS:

STREAMS, PONDS & LAKES (PROTECTED & NON-TIDAL)

STAKE OR ANCHOR, EVERY

100' (TYPICAL)

FILL AREA

STREAM

FLOW

100'

TYP.

* THIS DISTANCE IS

VARIABLE

TIDAL WATERS AND/OR HEAVY WIND & WAVE ACTION

FLOOD

EBB

100'TYP.

EXISTING

CAUSEWAY

100'

TYP.*

ANCHOR &

ANCHOR BUOY

BARRIER MOVEMENT DUE

TO TIDAL CHANGE

FILL AREA* THIS DISTANCE IS VARIABLE

SHORELINE

ANCHOR PT.

SHORELINE

ANCHOR PT.

PROPOSED

TOE OF SLOPE

ANCHOR

POINT

SHORELINE

ANCHOR

POINT

TURBIDITY

CURTAIN

SHORELINE

LIMITS

OF CONSTR.

C-SCM-09-3

TURBIDITY CURTAIN TYPICAL LAYOUTS

SOURCE: ADAPTED FL DOT STDSv1.1

FOLDS FOR COMPACT STORAGE

DEPTH ACCORDING TO NEED ECONOMY FABRICS AVAILABLE

18 OZ. 300 LB/IN. STANDARD

100 FT. STANDARD LENGTH

FOLDS EVERY 6 FEET

(BLOW-UP OF SHACKLE CONNECTION)

1/4 IN. TIE ROPE

NYLON REINFORCED VINYL ALL SEAMS HEAT SEALED

FLOTATION

5/8 IN. POLYPROPYLENE ROPE

1/4 IN. CHAIN

TYPE I

TYPE II

18 (OR 22) OZ. VINYL

COVERED NYLON

PVC SLOT

CONNECTOR

WATER

SEAL

GALVANIZED #24

SAFETY HOOK

FLOTATION

TOP LOAD LINE

5/16 VINYL COATED CABLE

STRESS PLATE (TO REMOVE

PRESSURE FROM FLOATS)

DEPTH ACCORDING TO NEED

STRESS BAND STRESS PLATE 5/16 IN. CHAIN

BALLAST & LOAD LINE

C-SCM-09-1

TURBIDITY CURTAIN TYPE I & II

SOURCE: AMER. BOOM AND BARRIER CORP.

v1.1

12' MIN.

EXISTING GROUND

B

70' MIN.

10' MIN.

A

10' MIN.

SECTION B-B

6'-7"

SECTION A-A

PLAN VIEW

3" MIN.

3" MIN.

B

70' MIN.

6" MIN. A

SIDE ELEVATION

3'

12' MIN.

10' MIN.

REINFORCED CONCRETE DRAIN SPACE

FILTER CLOTH

* MUST EXTEND FULL WIDTH

OF INGRESS AND EGRESS

OPERATION

POSITIVE DRAINAGE

TO SEDIMENT

TRAPPING DEVICE

VDOT #1 COURSE

AGGREGATE

EXISTING

PAVEMENT

WASHRACK

(OPTIONAL)

MOUNTABLE BERM

(OPTIONAL)FILTER CLOTH

5:1

EXISTING

PAVEMENT

C-SCM-03-1

STONE CONSTRUCTION ENTRANCE

SOURCE: VA. DSWC, MD ESC STDSv1.1

PERSPECTIVE VIEW

5' MIN.

6' MAX.

10' MAX.

PERSPECTIVE VIEW

METAL FENCE

PERSPECTIVE VIEW

PLASTIC FENCE

CONVENTIONAL

METAL(T) OR (U)

POSTS

POLYETHYLENE

FABRIC (ATTACH

TO POSTS WITH

METAL TIE WIRES)

BRACING

CONCRETE

FOOTING

GROUND LINE

LINE POST

WIRE

FABRIC

SOURCE: VDOT STDS.,

C-PCM-01-1

SAFETY FENCE

VA DSWC, CONWED PLASTICSv1.1

SHEET FLOW INSTALLATION

(PERSPECTIVE VIEW)

POINTS A SHOULD BE HIGHER THAN POINT B.

DRAINAGEWAY INSTALLATION

(FRONT ELEVATION)

A B

FLOW

A

3'MAX.

FLOW

4"

FLOW

1. SET THE STAKES

3. STAPLE THE FILTER MATERAIL TO

STAKES AND EXTENT IT INTO THE

TRENCH.

4. BACKFILL AND COMPACT

THE EXCAVATED SOIL.

2. EXCAVATE A 4"x4" TRENCH

UPSLOPE ALONG THE LINE OF

STAKES.

FLOW

SOURCE: ADAPTED FROM STRAW &

C-PCM-04-2B

CONSTRUCTION OF SILT FENCE

WITHOUT WIRE SUPPORT

FAB. BARRIERS, SHERWOOD & WYANTv1.1

ES-4

PIPE OUTLET TO FLAT

AREA WITH NO DEFINED

CHANNEL

FILTER CLOTH

KEY IN 6"-9"

RECOMMENDED FOR THE

ENTIRE PERIMETERSECTION A-A

d

La

0%

PLAN VIEW

AA

3do do

A

A do

PIPE OUTLET TO WELL

DEFINED CHANNEL

3do (MIN.)

La

0%

SECTION A-A

PLAN VIEW

FILTER CLOTH

KEY IN 6"-9"

RECOMMENDED FOR THE

ENTIRE PERIMETER

d

NOTES

1. APRON LINING MAY BE RIPRAP, GROUTED RIPRAP, GABION BASKET,

OR CONCRETE.

2. La IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING

FIGURE C-ECM-15-3 AND FIGURE C-ECM-15-4

3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NO LESS THAN 6

INCHES.

C-ECM-15-1

PIPE OUTLET CONDITIONS

SOURCE: VA DSWCv1.1

CORRECT METHODS OF TREE FENCING

TRIANGULAR BOARD FENCE CORRECT TRUNK ARMORING

DRIP LINE

SNOW FENCE

BOARD FENCE

PLASTIC FENCE

CORD FENCE

C-SSM-01-2

FENCING AND ARMORING

SOURCE: VA. DSWCv1.1

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

E& S

D

ET

AI

LS

6"

18"

PIN

STAPLE

STAKE

1) 1x4 TRIANGULAR SURVEY STAKE - MINIMUM

10" IN LENGTH. PLACEMENT OF THE STAKE

ACROSS THE FLOW OF THE WATER IS

THOUGHT TO PROVIDE A "PINBALL EFFECT"

TO HELP SLOW THE VELOCITY.

2) 11 GAUGE STEEL - MINIMUM 1" WIDE BY 6"

IN LENGTH STEEL STAPLE - 2"x8" STAPLE

MAYBE REQUIRED IN CERTAIN SOIL

CONDITIONS.

3) STEEL PINS - 3/16 DIAMETER STEEL PIN BY

18" IN LENGTH WITH A 2" DIAMETER

WASHER ON TOP. (SEE ILLUSTRATION)

11 GAUGE STEEL

6"x1"x6" STAPLE

2" DIA.

WASHER

3/16" DIA.

STEEL PIN

v1.1 SOURCE: PRODUCT LITERATURE FROM GREENSTREAT, INC. C-SSM-05-3

OF TREATMENT-2 SOIL STABILIZATION MATTING

STAKES STAPLES, & PINS FOR INSTALLATION

SOIL STABILIZATION MATTING SHALL

BE USED IN CONJUNCTION WITH RIPRAP

AT OUTLET END OF PIPE.

6"-8"

6"-8"

1'-2"

1'

1'

FLOW

FLOW

ENTRENCH EDGES

OF MATERIAL 6"

CHECK SLOTS TO BE

CONSTRUCTED AS PER

MANUFACTURERS

RECOMMENDATIONS.

TRANSVERSE CLOSED

CHECK SLOT

UPSTREAM AND

DOWNSTREAM TERMINAL

TRANSVERSE OPEN

CHECK SLOT

TYPICAL TREATMENT - 2

SOIL STABILIZATION

MATTING INSTALLATION

C-SSM-05-4SOURCE: VDOT ROAD & BRIDGE STDS.v1.1

FILL SLOPE SECTION

WATER TABLE

SOIL STABILIZATION MATS SHOULD

BE INSTALLED VERTICALLY

DOWNSLOPE FOR BEST RESULTS. NOTE: SLOPE SURFACE

SHALL BE SMOOTH AND

FREE OF ROCKS, LUMPS

OF DIRT, GRASS AND

STICKS. MAT SHALL BE

PLACED FLAT ON

SURFACE FOR PROPER

SOIL CONTACT.

OVE

RL

AP

AT

R

OLL

TE

RM

IN

AL

DIRT SHALL BE TAMPERED

PRIOR TO LAYING TOP

LAP OVER

TOE BERM

SLOPE LINING

(DRY SLOPE)

SLOPE LINING

(WET SLOPE)

FILTER CLOTH

4' ABOVE SOURCE

OF WATER (AQUIFER)

MIN. 6"OVERLAP

TRENCH INTO BERM AND

PROGRESS DOWNSLOPEMAINTAIN SLOPE ANGLE

TOP OF

CUT SLOPE

TREATMENT - 2

BOTTOM OF FILL SLOPE

BOTTOM OF CUT SLOPE

SOIL

TREATMENT - 2

POLYPROPYLENE

NON-WOVEN

(NEEDLE PUNCHED)

GEOTEXTILE FILTER

CLOTH (BEHIND

TREATMENT - 2)

BOTTOM OF CUT SLOPE

4' 2'

1'

2'

5'

5'

TYPICAL TREATMENT - 2

SOIL STABILIZATION MATTING

SLOPE INSTALLATION

C-SSM-05-5SOURCE: VDOT ROAD & BRIDGE STDS.v1.1

3 1/2 STAPLES PER SQ. YD.

2 STAPLES PER SQ. YD.

1 1/2 STAPLES PER SQ. YD.

1 STAPLE PER SQ. YD.

D

C

B

A

DC

C

B

C

B

C

B

A A

B

1:12:13:14:1

FT

NOTE: FOR OPTIMUM RESULTS, THESE RECOMMENDED

STAPLE PATTERN GUIDES MUST BE FOLLOWED.

SUGGESTED ANCHORING METHODS VARY

ACCORDING TO THE MANUFACTURER. THIS

CHART SHOWS HOW SLOPE LENGTHS AND

GRADIENTS AFFECT STAPLING PATTERNS.

LOW

FLOW

CHANNEL

MED. / HIGH

FLOW

CHANNEL

AND

SHORELINE

v1.1 SOURCE: PRODUCT LITERATURE FROM NORTH AMERICAN GREEN C-SSM-05-6

RECOMMENDATIONS FOR TREATMENT - 2

(SOIL STABILIZATION MATTING)

GENERAL STAPLE PATTERN GUIDE AND

ES-5

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

M

AI

N

TE

N

AN

C E

O F

TR

AF

FI

C

P

LA

N S

T-1

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

M

AI

N

TE

N

AN

C E

O F

TR

AF

FI

C

P

LA

N S

T-2

LANE ENDS

MERGE

LEFT ENDS

LANE

RIGHT

ENDS

LANE

RIGHT

WORK

ROAD

AHEAD

WORK

ROAD

AHEAD

WORK

ROAD

AHEAD

WORK

ROAD

AHEAD

END

ROAD WORK

END

ROAD WORK

END

ROAD WORK

END

ROAD WORK

LANE ENDS

MERGE

LEFTCAVALIER BLVD

W

AR

FIELD

D

R

IVE

VAUGHN CT.

BASIE CRESENT

M

IN

EO

LN

ELLIN

G

TO

N

SQ

R O

O

SEVELT BLVD

D

AR

R

EN

D R

JAM

AL LN

BRANDON LN.

LISTO

N

LN

ROBINSON RD.

W

AR

FIELD

D

R

W

AR

FI

EL

D C

AN

AL

D R

ED

G

IN

G

PR

EP

AR

ED

F O

R

C

IT

Y O

F

PO

R

TS

M O

U

TH

M

AI

N

TE

N

AN

C E

O F

TR

AF

FI

C

P

LA

N S

C

AV

AL

IE

R B

LV

D

T-3

N O

R

TH

MAINTENANCE OF TRAFIC LEGEND

Sheets and Views
G-1 COVER SHEET
G-2 GENERAL NOTES
G-3 GENERAL AND E&S NOTES
C-1 EXISTING SITE CONDITIONS
C-2 EXISTING SITE CONDITIONS
C-3 EXISTING SITE CONDITIONS
C-4 EXISTING SITE CONDITIONS
C-5 EXISTING SITE CONDITIONS
C-6 DREDGING PLAN INDEX
C-7 DREDGING PLAN (WEST)
C-8 DREDGING PLAN (EAST)
C-9 PIPE OUTFALL (WEST)
C-10 PROFILES
C-11 CROSS SECTIONS
VEG-1 INVASIVE VEGETATION REMOVAL
ES-1 WEST E&S PLAN
ES-2 CULVERT E&S PLANS
ES-3 EAST E&S PLAN
ES-4 E&S DETAILS
ES-5 E&S DETAILS
T-1 MAINTENANCE OF TRAFFIC PLANS
T-2 MAINTENANCE OF TRAFFIC PLANS
T-3 MAINTENANCE OF TRAFFIC PLANS CAVALIER BOULEVARD