IFB 27-85-3360SH - DRAWINGS.pdf
PDF 5 MB Posted
- Solicitation number
- IFB-128354
- Issued by
- Halifax County, Virginia
About this file
This file consists of architectural drawings and specifications for an Invitation for Bid (IFB 27-85-3360SH) issued by Hanover County Public Schools for HVAC and ceiling replacement work at Chickahominy Middle School, located at 9450 Atlee Station Road, Mechanicsville, Virginia 23116. The project scope includes replacement of rooftop units, diffuser and ductwork replacement in corridors and classrooms, condensate line replacement, building automation system controls work, and complete corridor ceiling replacement with partial ceiling removal, rework, and replacement in classroom spaces. The base bid encompasses these core mechanical and ceiling elements. Additive Alternate #1 includes boiler replacement, gas water heater replacement, and all associated mechanical, plumbing, electrical work, and building automation controls. Additive Alternate #2 covers complete lighting and ceiling replacement in classroom spaces. The architectural and engineering team includes RRMM Architects, PC (Architecture/Planning/Interiors) and Simmons, Rocke, Charlie & Prince, Inc. (MEP Engineering), with offices in Richmond and other Virginia locations. The contract drawings include title sheets, first floor ceiling plans, mechanical floor plans with ductwork and water/gas piping, mechanical room floor plans, schedules and details, electrical legends and panel schedules, and partial floor plans for electrical and lighting systems, all dated September 14, 2026.
The drawings establish comprehensive scope requirements for demolition, protection, and restoration work, including removal and salvage of existing mechanical and electrical fixtures, light fixtures, speakers, fire alarm devices, security system devices, and ceiling-mounted equipment for reinstallation. The contractor must protect all existing carpet, corridor floors, and other surfaces with 45-mil heavy-duty cardboard floor protection during construction. Detailed notes address removal and replacement of suspended acoustical tile ceilings at the same heights as existing conditions, protection of existing servers and server racks, management of above-ceiling cables, and repair of any damaged spray-on fireproofing. The contractor is required to label, remove, and store all existing furniture and equipment in designated corridor areas and return items to original locations upon project completion. Lintel schedule notes specify requirements for CMU bond beams with reinforcing bars meeting ASTM 615 Grade 60 standards and minimum 2000 PSI grout, along with coordination requirements for holes cut in existing CMU walls. The drawings also include UL-classified firestop system details for through-penetrants in rated walls, with specifications for metallic pipes, conduits, and fill materials to maintain fire ratings of 0 to 2 hours.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB 27-85-3360SH - PROJECT MANUAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHICKAHOMINY MS REAR WING HVAC
REPLACEMENT
HANOVER COUNTY PUBLIC SCHOOLS
RRMM ARCHITECTS, PC
ARCHITECTURE / PLANNING / INTERIORS
VICINITY MAP CONSULTANTS OWNER LOCATION MAP
SIMMONS, ROCKECHARLIE & PRINCE, INC
MEP ENGINEERING
10150 STAPLES MILL ROAD, SUITE A
GLEN ALLEN, VA 23060
PHONE 804-262-7323
HANOVER COUNTY PUBLIC SCHOOLS
200 BERKLEY ST,
ASHLAND, VA 23005
PHONE 804-365-4500
SITE
SITE
1317 Executive Boulevard, Suite 200 Chesapeake, VA 23320
(757) 622-2828
310 First Street, Suite 100M Roanoke, VA 24011
(540) 344-1212
3700 Koppers Street, Suite 300 Baltimore, MD 21227
(410) 234-8444
2900 South Quincy Street, Suite 710 Arlington, VA 22206
(703) 998-0101
115 South 15th Street, Suite 502 Richmond, VA 23219
(804) 277-8987
TRUE
NORTH
TRUE
NORTH
ADDITIVE ALTERNATE DESCRIPTIONS
BASE BID: THE BASE BID CAN GENERALLY BE DESCRIBED AS ROOFTOP UNIT REPLACEMENT,
DIFFUSER AND DUCTWORK REPLACEMENT IN THE CORRIDORS AND CLASSROOMS,
CONDENSATE LINE REPLACEMENT, ASSOCIATED BAS CONTROLS WORK, COMPLETE
CORRIDOR CEILING REPLACEMENT, AND PARTIAL CEILING REMOVAL, RE-WORK, AND
REPLACEMENT AS NEEDED IN CLASSROOM SPACES TO ACCOMMODATE MECHANICAL WORK
SHOWN ON MECHANICAL DRAWINGS.
ADDITIVE ALTERNATE #1: CAN GENERALLY BE DESCRIBED AS BOILER REPLACEMENT, GAS
WATER HEATER REPLACEMENT, AND ALL ASSOCIATED MECHANICAL, PLUMBING, AND
ELECTRICAL WORK, AND ASSOCIATED BAS CONTROLS WORK. REFER TO PME DRAWINGS FOR
ADDITIONAL INFORMATION.
ADDITIVE ALTERNATE #2: CAN GENERALLY BE DESCRIBED AS COMPLETE LIGHTING AND
CEILING REPLACEMENT IN CLASSROOM SPACES. REFER TO SHEET A-101 AND ELECTRICAL
DRAWINGS FOR ADDITIONAL INFORMATION.
Lic. No. 15121
DANIEL J. WEIGAND
T
T E C
IH
C
R
A
C
T
O M M O
N W
EA
L FO
H
A N I
G I
R
I V
RRMM
ARCHITECTS, PC
D A
T E
D R
A W
N
P R
O J E
C T
D E
S
IG
N E
D
C H
E C
K E
D
(804)277-8987
115 South 15th Street, Suite 502 Richmond, Virginia 23219
M A
R K
R E
V
IS
IO
N
S
D A
T E
B Y
D E
S C
R
IP
T
IO
N
0' 16' 32' 48'
1/32" = 1'-0"
0' 8' 16' 24'
1/16" = 1'-0"
4' 0' 4' 8' 16'
3/32 = 1'-0"
0' 4' 8' 12'
1/8" = 1'-0"
0' 2' 4' 6'
1/4" = 1'-0"
0' 1' 2' 4'
3/8" = 1'-0"
3' 0' 1' 2' 3'
1/2" = 1'-0"
6" 0' 1' 2'
3/4" = 1'-0"
6" 0' 6" 1' 1.5'
1" = 1'-0"
3" 9" 0' 3" 6" 1'
1 1/2" = 1'-0"
9" 0' 2" 4" 6"
3" = 1'-0"
5"3"1" 0' 1" 2" 3"
6" = 1'-0"
0' 1" 1.5"
12" = 1'-0"
D
C
B
A
E
D
C
B
A
E
SHEET
P R
O J E
C T
D R
A W
IN
G
1 2 3 4 5 6
1 2 3 4 5 6
/1
/2
:3
:3
P
M A u to d e s k D o c s
/2
-0 H
C P
S C h ic k a h o m in y M
S H
V A
C /2
-0 v
H
C P
S C h ic k a h o m in y M
S H
V A
C R e p la c e
A
R C
H .r v t
G-001
/1
/2
-0
R R
M M
R R
M M
R R
M M
T
IT
L E
S H
E E
T
C H
IC
K
A H
O M
IN
Y
M S
R E
A R
W
IN
G H
V A
C R
E P
L A
C E
M E
N T
H A
N O
V E
R C
O U
N T
Y P
U B
L
IC
S C
H O
O L
S
A
T L E
E S
T A
T
IO
N R
O A
D
M E
C H
A N
IC
S
V
IL
L E
V
IR
G
IN
IA
09/14/2026
SHEET INDEX
SHEET NUMBER SHEET TITLE
PROJECT TITLE SHEET
G-001 TITLE SHEET
ARCHITECTURAL
A-101 FIRST FLOOR CEILING PLAN
MECHANICAL
M101 PART FLOOR PLANS - DUCTWORK - BASE BID
M201 PART FLOOR PLANS - WATER PIPING - BASE BID
M202 PART FLOOR PLAN - GAS PIPING
M301 MECHANICAL ROOM FLOOR PLANS - ALTERNATE #1
M401 SCHEDULES AND DETAILS - MECHANICAL
ELECTRICAL
E101 LEGEND, NOTES AND PANEL SCHEDULES
E201 PARTIAL FLOOR PLANS - ELECTRICAL
E301 PARTIAL FLOOR PLANS - LIGHTING
+9' - 3"+7' - 9"
1 1/4" / 1'-0"
+7' - 9"
+9' - 3"
+7' - 9"
+9' - 3"
+7' - 9"
+9' - 3"
+7' - 9"
+9' - 3"
+7' - 9"
+9' - 3"
+7' - 9"
+9' - 3" +9' - 3"
+7' - 9" +7' - 9"
+9' - 3"
+8' - 6"
+9' - 3" +7' - 9"
+8' - 6"
+7' - 11"
+7' - 8"
+8' - 6" +8' - 6"
/ 1 '-0
+7' - 9 1/2"
+7' - 10"
+9' - 2 1/2"
+8' - 6"
+8' - 6"
SCIENCE
LAB
G33
CLASSROOM
G26
CLASSROOM
G07
CLASSROOM
G10
CORRIDOR
E08
GIRL'S
TOILET
E10 CLASSROOM
B33
SCIENCE
LAB
B26
PREPROOM
F03
ELECTRICAL
F16
CLASSROOM
B12
BOY'S
TOILET
F06 CLASSROOM
A29
CLASSROOM
A26
CLASSROOM
A07
CORRIDOR
F11
CORRIDOR
F12 SCIENCE
LAB
A14
CONF A
F15
PREP
ROOM
F14
STORAGE
B34
SRO
E03
PREP
ROOM
E02 +7' - 8"
+7' - 11"
+9' - 2"
CORRIDOR
F04
CHAPTER-1
G24 TUTORIAL
STUDY
G05
CLASSROOM
G08 CLASSROOM
B31
CLASSROOM
B24
MECHANICAL
ROOM
D19
CLASSROOM
B10
CLASSROOM
A27
STORAGE
F07
CHAPTER-1
A24
BOOK
STOR
D55
TUTORIAL
STUDY
A05
CLASSROOM
D64
CORRIDOR
C07
CORRIDOR
C28
CORRIDOR
C41
CORRIDOR
D37
CORRIDOR
D58
CORRIDOR
D21
CLASSROOM
G31
/8
'-0
+7' - 11"
+11' - 0"
/8
'-0
+7' - 11"
/8
'-0
+7' - 11"
+11' - 0"
+7' - 10 1/2"
+10' - 11 1/2"
+7' - 9"
+9' - 3"
+7' - 11"
+10' - 11 1/2"+11' - 0"
+7' - 11"
/8
'-0
/8
'-0
+7' - 11"
+11' - 0"
/8
'-0
+7' - 11"
BOOK
STOR
C25
CORRIDOR
E04
1 1 1 1
/4
'-0
" 1
/4
'-0
/4
'-0
/4
'-0
/4
'-0
/4
'-0
/4
'-0
/4
'-0
1 1/4" / 1'-0"
/8
'-0
/8
'-0
+8' - 6"
+8' - 6" +8' - 6" +8' - 6" +8' - 6"
+8' - 6"
+7' - 11" +7' - 11" +7' - 11"
+7' - 11" +7' - 11"
+7' - 11" +7' - 11"
+ 8' - 10" + 8' - 10"
1 1 1
1 1 1 1
1 1
1 1 1
1 1 1
1 1
TRUE
NORTH
PLAN
NORTH
SCOPE OF WORK
EXISTING
BIDDING LEGEND
A. REMOVE, SALVAGE AND SAVE FOR RE-INSTALLATION ALL EXISTING MECHANICAL AND ELECTRICAL LIGHT FIXTURES, EXIT LIGHTS, TRACK LIGHTS, SPEAKERS, FIRE ALARM DEVICES, SECURITY SYSTEM DEVICES, IT DEVICES, CORD REELS, GRILLES, REGISTERS, DIFFUSERS AND ALL OTHER CEILING-MOUNTED DEVICES (EXCEPT FOR THOSE SHOWN AS NEW) ATTACHED TO OR INSTALLED IN EXISTING SUSPENDED ACOUSTICAL TILE CEILING. ALSO SEE MECHANICAL DRAWINGS.
THE CONTRACTOR SHALL VISIT THE PROJECT SITE TO DETERMINE THE NUMBER AND LOCATION OF THE EXISTING MECHANICAL AND ELECTRICAL LIGHT FIXTURES, EXIT LIGHTS, SPEAKERS, FIRE ALARM DEVICES, SECURITY SYSTEM DEVICES, IT DEVICES, GRILLES, REGISTERS, DIFFUSERS AND ALL OTHER CEILING-MOUNTED DEVICES TO BE REMOVED, SALVAGED AND RE-INSTALLED.
B. REMOVE EXISTING SUSPENDED ACOUSTICAL TILE CEILINGS IN ALL SPACES WHERE NEW CEILINGS ARE SHOWN. PROVIDE NEW 2' BY 2' SUSPENDED ACOUSTICAL TILE CEILING AT SAME HEIGHT AS EXISTING REMOVED CEILING. RE-INSTALL ALL EXISTING SALVAGED LIGHT FIXTURES, EXIT LIGHTS, TRACK LIGHTS, SPEAKERS, FIRE ALARM DEVICES, SECURITY SYSTEM DEVICES, IT DEVICES, CORD REELS, GRILLES, REGISTERS, DIFFUSERS AND ALL OTHER CEILING-MOUNTED DEVICES (EXCEPT FOR THOSE SHOWN AS NEW). NOTE: FOR ROOMS AND SPACES WITH EXISTING SLOPED CEILINGS, PROVIDE NEW SUSPENDED ACOUSTICAL TILE CEILING AT SAME HEIGHTS AND SLOPE AS EXISTING REMOVED CEILING. ALSO SEE
MECHANICAL DRAWINGS.
C. FOR ROOMS AND SPACES WITH EXISTING SLOPED CEILINGS: REMOVE, SALVAGE AND SAVE FOR RE-INSTALLATION ALL EXISTING MECHANICAL AND ELECTRICAL FIXTURES, GRILLES AND DEVICES (EXCEPT FOR THOSE SHOWN AS NEW) ATTACHED TO EXISTING SUSPENDED ACOUSTICAL TILE CEILING; SEE MECHANICAL AND ELECTRICAL DRAWINGS. REMOVE EXISTING 2' BY 4' SUSPENDED ACOUSTICAL TILE CEILING. PROVIDE NEW 2' BY 2' SUSPENDED ACOUSTICAL TILE CEILING AT SAME HEIGHTS AND SLOPE AS EXISTING REMOVED CEILING. RE-INSTALL ALL EXISTING SALVAGED FIXTURES, GRILLES AND DEVICES (EXCEPT FOR THOSE SHOWN AS NEW); SEE MECHANICAL AND ELECTRICAL DRAWINGS.
D. THE CONTRACTOR SHALL LABEL AND REMOVE ALL EXISTING EQUIPMENT AND FURNISHINGS FROM THE ROOMS PRIOR TO THE START OF DEMOLITION AND CONSTRUCTION. THE EXISTING EQUIPMENT AND FURNISHINGS SHALL BE STORED IN THE SPACES AS SHOWN ON THE PHASING DRAWINGS. AT THE CONCLUSION OF THE CONSTRUCTION, ALL EXISTING
EQUIPMENT AND FURNITURE SHALL BE RETURNED TO THE ORIGINAL ROOMS.
E. ALL DEMOLITION WORK IN ANY INTERIOR SPACE IN THE PROJECT SHALL BE CARRIED OUT IN A MANNER TO AVOID DAMAGE OF ANY KIND TO ALL ADJACENT SURFACES AND FINISHES WHICH WILL REMAIN IN THE FINISHED PROJECT.
F. ALL EXISTING WALLS, CEILINGS, FLOORS, SUBSTRATES, AND OTHER SURFACES WHICH WILL REMAIN EXPOSED IN THE FINISHED WORK AND WHICH ARE MARRED OR DAMAGED BY DEMOLITION WORK OR ANY OTHER CONSTRUCTION WORK SHALL BE PATCHED AS REQUIRED TO MATCH THE ADJACENT SURFACE. SUCH SURFACES WHICH ARE COATED WITH EXISTING PAINT SHALL BE REPAINTED WITH SUFFICIENT COATS OF PAINT TO COMPLETELY HIDE THE PATCHING WORK.
G. ALL DEMOLITION WORK SHALL BE CARRIED OUT IN A MANNER TO PROTECT ALL ADJACENT SURFACES WHICH REMAIN IN PLACE, PARTICULARLY FINISH SURFACES WHICH WILL REMAIN EXPOSED IN THE COMPLETED WORK. ANY DAMAGE SHALL
BE REPAIRED TO MATCH SURROUNDING WORK.
H. WHEREVER EXISTING MECHANICAL DEVICES OR ELECTRICAL DEVICES OCCUR ON OR IN EXISTING SURFACES WHICH ARE REMOVED, COORDINATE WITH MECHANICAL AND ELECTRICAL SUBCONTRACTORS FOR REMOVAL, SALVAGE AND RE-
INSTALLATION OF THE FIXTURES AND DEVICES.
I. WHEREVER ANY EXISTING CEILING OR OTHER ARCHITECTURAL SURFACE OR FINISH IS DEMOLISHED OR OTHERWISE DISTURBED BY THIS WORK, PROVIDE COMPLETE COORDINATION WITH MECHANICAL AND ELECTRICAL WORK FOR REMOVAL AND/OR RELOCATION OF ANY AND ALL FIXTURES, DEVICES, DUCTS, ETC., AS REQUIRED FOR A COMPLETE AND PROPER INSTALLATION OF ALL BUILDING FEATURES IN COMPLIANCE WITH ALL APPLICABLE CODES AND REGULATIONS.
J. ALL NEW THROUGH-WALL PIPE SLEEVES SHALL BE STUFFED AND SEALED.
K. ALL NEW THROUGH-WALL PIPE SLEEVES IN RATED WALLS SHALL BE STUFFED AND SEALED WITH RATED FIRE STOPPING.
L. LIGHTS IN AREAS WITH ALUMINUM CEILING GRIDS SHALL HAVE ADDITIONAL LIGHT SUPPORT WIRES PROVIDED.
M. THE CONTRACTOR SHALL NOT USE ANY EXISTING SCHOOL EQUIPMENT, SUCH AS CARTS, TRASH CANS, LADDERS, VACUUM CLEANERS, ETC. IF ANY EXISTING SCHOOL EQUIPMENT IS USED BY THE CONTRACTOR, THAT EQUIPMENT WILL BE GIVEN TO THE CONTRACTOR AND THE CONTRACTOR WILL BE BACK-CHARGED FOR THE PURCHASE OF NEW
REPLACEMENT EQUIPMENT FOR THE OWNER.
N. CEILING HEIGHTS ARE PROVIDED USING EXISTING INFORMATION AVAILABLE. CONTRACTOR TO VERIFY ALL EXISTING CEILING HEIGHTS TO BE REPLACED AND CONFIRM ANY MODIFICATIONS TO NEW CEILING HEIGHTS.
GENERAL REFLECTED CEILING PLAN DEMOLITION AND NEW
WORK NOTES:
EXISTING FURNITURE, STORAGE BOXES &
EQUIPMENT MOVING NOTES:
A. THE EXISTING CORRIDORS SHALL SERVE AS THE TEMPORARY STORAGE AREA FOR ALL EXISTING FURNITURE, STORAGE BOXES AND EQUIPMENT FROM THE EXISTING ROOMS IN THE DESIGNATED AREAS AS SHOWN ON THE FIRST FLOOR TEMPORARY STORAGE LOCATION FOR FURNITURE AND EQUIPMENT DIAGRAM, 1/A-102. THE CONTRACTOR SHALL PROTECT THE EXISTING CORRIDOR FLOORS AND ALL OTHER
EXISTING SURFACES FROM DAMAGE DURING THE ENTIRE CONSTRUCTION PERIOD, AND THE
CONTRACTOR SHALL COVER THE EXISTING CORRIDOR AND COMMONS FLOORS USED FOR STORAGE
WITH 45 MIL THICK HEAVY-DUTY ROLLED CARDBOARD TEMPORARY FLOOR PROTECTION (RAM BOARD BRAND, OR APPROVED EQUAL), WITH ADJACENT SECTIONS OF CARDBOARD TAPED TO EACH OTHER.
B. ALL EXISTING FURNITURE, STORAGE BOXES AND EQUIPMENT SHALL BE LABELED BY EXISTING ROOM NUMBER AND SHALL BE MOVED TO THE CORRIDORS, WHERE IT SHALL BE STORED, AND GROUPED BY ROOM NUMBER. AT THE CONCLUSION OF CONSTRUCTION, THE CONTRACTOR SHALL MOVE ALL EXISTING FURNITURE, STORAGE BOXES AND EQUIPMENT BACK TO ITS ORIGINAL ROOM, AND THE ROOM NUMBER
LABELS SHALL BE REMOVED.
C. IMPORTANT: THE CONTRACTOR SHALL VISIT THE JOBSITE AND REVIEW THE EXISTING FURNITURE AND EQUIPMENT IN EACH ROOM DURING THE BIDDING PROCESS TO FULLY UNDERSTAND THE SCOPE OF THE
FURNITURE AND EQUIPMENT MOVING WORK.
D. THE CONTRACTOR SHALL ASSUME THAT EACH ROOM INVOLVED IN THE PROJECT WILL HAVE UP TO THREE (3) CARDBOARD BOXES THAT SHALL BE MOVED BY THE CONTRACTOR. THE CARDBOARD BOXES
SHALL BE APPROXIMATELY 18” WIDE BY 18” INCHES DEEP BY 16” INCHES TALL.
E. THE CONTRACTOR SHALL REVIEW, PROVIDE A WRITTEN INVENTORY LIST AND CERTIFY THAT ALL EXISTING FURNITURE, STORAGE BOXES AND EQUIPMENT TO BE MOVED IN EACH ROOM IS IN UNDAMAGED CONDITION PRIOR TO IT BEING MOVED. IF ANY EXISTING FURNITURE OR EQUIPMENT IS DAMAGED DURING THE MOVING PROCESS, THE CONTRACTOR SHALL PAY THE FULL AMOUNT NECESSARY TO PROVIDE NEW REPLACEMENT FURNITURE OR EQUIPMENT. IF THE CONTRACTOR FINDS THAT ANY EXISTING FURNITURE
OR EQUIPMENT IS DAMAGED PRIOR TO BEING MOVED, THE CONTRACTOR SHALL PROVIDE
PHOTOGRAPHIC DOCUMENTATION TO THE OWNER BEFORE THE EXISTING FURNITURE AND EQUIPMENT IS MOVED, AND THE CONTRACTOR’S INVENTORY LIST SHALL ALSO INDICATE THE CONDITION AND THE
DAMAGE.
A. EXISTING CARPET FLOORING PROTECTION NOTES:
THE CONTRACTOR SHALL PROTECT ALL EXISTING CARPET FLOORS AND ALL OTHER EXISTING SURFACES FROM DAMAGE DURING THE ENTIRE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL COVER ALL EXISTING CARPET FLOORS WITH 45 MIL THICK HEAVY-DUTY ROLLED CARDBOARD TEMPORARY FLOOR PROTECTION (RAM BOARD BRAND, OR APPROVED EQUAL), WITH ADJACENT SECTIONS OF CARDBOARD
TAPED TO EACH OTHER, BUT NOT TAPED TO THE CARPET.
B. EXISTING CORRIDOR FLOORING PROTECTION NOTES:
THE CONTRACTOR SHALL PROTECT ALL EXISTING CORRIDOR FLOORS AND ALL OTHER EXISTING
SURFACES FROM DAMAGE DURING THE ENTIRE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL
COVER ALL EXISTING CORRIDOR FLOORS WITH 45 MIL THICK HEAVY-DUTY ROLLED CARDBOARD
TEMPORARY FLOOR PROTECTION (RAM BOARD BRAND, OR APPROVED EQUAL), WITH ADJACENT
SECTIONS OF CARDBOARD TAPED TO EACH OTHER.
C. EXISTING FLOORING PROTECTION NOTES (FOR SPACES OTHER THAN ROOMS WITH CARPET OR FOR
CORRIDORS):
THE CONTRACTOR SHALL PROTECT ALL EXISTING FLOORS AND ALL OTHER EXISTING SURFACES FROM
DAMAGE DURING THE ENTIRE CONSTRUCTION PERIOD.
EXISTING FLOORING PROTECTION NOTES:
A. THE CONTRACTOR SHALL REFER TO SECTIONS 01210 AND 17810 FOR WORK
INVOLVING EXISTING SPRAY-ON FIREPROOFING.
B. THE CONTRACTOR SHALL REPAIR ANY DAMAGED OR MISSING SPRAY-ON
FIREPROOFING IN THE AREA OF THE WORK THROUGH THE ALLOWANCE
PROVIDED FOR IN SECTION 01210. ALL NEW SPRAY-ON FIREPROOFING
SHALL PROVIDE THE SAME LEVEL OF FIRE PROTECTION AS THE EXISTING
FIREPROOFING.
C. THE CONTRACTOR SHALL NOT REMOVE ANY OF THE EXISTING SPRAY-ON
FIREPROOFING AT THE AREA OF THE WORK. IF ANY EXISTING SPRAY-ON
FIREPROOFING IS REMOVED BY THE CONTRACTOR, THE CONTRACTOR
SHALL REPAIR THE EXISTING SPRAY-ON FIREPROOFING AT THE
CONTRACTOR’S EXPENSE.
D. THE CONTRACTOR SHALL SEEK TO UTILIZE THE EXISTING ABOVE-CEILING
HANGERS FOR ALL NEW WORK TO THE GREATEST EXTENT POSSIBLE IN
ROOMS AND SPACES THAT HAVE EXISTING SPRAY-ON FIREPROOFING.
EXISTING SPRAY-ON FIRE PROTECTION
NOTES:
A. THE CONTRACTOR SHALL SECURE ALL EXISTING UNSECURED ABOVE-
CEILING CABLES TO THE ROOF OR FLOOR STRUCTURE ABOVE. REFER TO
SECTIONS 01210 AND 02413 FOR WORK INVOLVING EXISTING ABOVE-
CEILING CABLES.
EXISTING ABOVE-CEILING CABLE
MANAGEMENT NOTES:
A. AT EXISTING SERVER LOCATIONS, THE CONTRACTOR SHALL PROVIDE
PROTECTIVE PLYWOOD COVERS OVER ALL EXISTING COMPUTER SERVERS
AND SERVER RACKS, AND THEN COVER THE PLYWOOD COVERS WITH
PLASTIC SHEETING. SERVER RACKS ARE APPROXIMATELY 3' x 3' x 8' TALL, AND ARE FLOOR-MOUNTED OR WALL-HUNG.
PROTECTION OF EXISTING SERVERS AND
SERVER RACKS:
REMOVE, SALVAGE AND SAVE EXISTING CEILING MOUNTED DEVICES, LIGHT
FIXTURES, ETC. REMOVE, SALVAGE AND SAVE EXISTING SUSPENDED
ACOUSTICAL PANEL CEILING SYSTEM AS REQUIRED FOR ABOVE CEILING
MECHANICAL WORK. REFER TO MECHANICAL DRAWINGS FOR NEW WORK.
REINSTALL SUSPENDED ACOUSTICAL PANEL CEILING AT ORIGINAL ELEVATION
AND LOCATION. REINSTALL ALL EXISTING CEILING MOUNTED DEVICES, LIGHT
FIXTURES, ETC. AT ORIGINAL LOCATION.
NEW LIGHTS, DIFFUSERS, AND RETURN GRILLES IN THIS ROOM, TYPICAL.
REFER TO MECHANICAL AND ELECTRICAL DWGS FOR ADDITIONAL
INFORMATION.
NEW WORK KEY NOTES:
ADDITIVE ALTERNATE #2
REMOVAL AND REPLACEMENT OF EXISTING CEILINGS AS PART OF
ADDITIVE ALTERNATE #2 SCOPE ARE INDICATED BY THE HATCH:
ALL OTHER CEILING REPLACEMENT IS INCLUDED IN BASE BID
8" WIDE X 8" DEEP
CMU BOND BEAM
WITH (2) #4 BOTTOM
TYPICAL CLEAR
OPENING IN INTERIOR
PARTITION WALLS 1'-0"
TO 4'-0" WIDE (UNO)
DESCRIPTION LOCATIONCONFIGURATION
L1
MARK
LINTEL SCHEDULE
A. REINFORCING BARS IN CMU BOND BEAMS SHALL
BE ASTM 615 GRADE 60.
B. FILL ALL BOND BEAMS WITH f'c AT 28 DAY, 2000
PSI MINIMUM PORTLAND CEMENT GROUT.
SHORE BOND BEAMS UNTIL GROUT HAS CURED.
C. BEAR ALL CMU BOND BEAMS 8" ON REINFORCED
MASONRY JAMBS EACH END UNLESS NOTED
OTHERWISE.
D. SHORE EXISTING WALLS AS REQUIRED WHERE
NEW LINTELS ARE TO BE INSTALLED WITHIN
EXISTING WALLS.
E. ALL TRADES CUTTING HOLES IN EXISTING CMU
WALLS SHALL COORDINATE THEIR WORK WITH
THE MASON SO THAT AN APPROPRIATE LINTEL
MAY BE PROVIDED AT THE OPENING. AT
LOCATIONS ABOVE CEILINGS, PRECAST CMU OR
PRECAST CONCRETE LINTELS MAY BE
SUBSTITUTED FOR BOND BEAM LINTELS
INDICATED SO LONG AS THE SAME UNIT SIZE
AND REINFORCING STEEL IS PROVIDED.
LINTEL SCHEDULE NOTES
Lic. No. 15121
DANIEL J. WEIGAND
T
T E C
IH
C
R
A
C
T
O M M O
N W
EA
L FO
H
A N I
G I
R
I V
RRMM
ARCHITECTS, PC
D A
T E
D R
A W
N
P R
O J E
C T
D E
S
IG
N E
D
C H
E C
K E
D
(804)277-8987
115 South 15th Street, Suite 502 Richmond, Virginia 23219
M A
R K
R E
V
IS
IO
N
S
D A
T E
B Y
D E
S C
R
IP
T
IO
N
0' 16' 32' 48'
1/32" = 1'-0"
0' 8' 16' 24'
1/16" = 1'-0"
4' 0' 4' 8' 16'
3/32 = 1'-0"
0' 4' 8' 12'
1/8" = 1'-0"
0' 2' 4' 6'
1/4" = 1'-0"
0' 1' 2' 4'
3/8" = 1'-0"
3' 0' 1' 2' 3'
1/2" = 1'-0"
6" 0' 1' 2'
3/4" = 1'-0"
6" 0' 6" 1' 1.5'
1" = 1'-0"
3" 9" 0' 3" 6" 1'
1 1/2" = 1'-0"
9" 0' 2" 4" 6"
3" = 1'-0"
5"3"1" 0' 1" 2" 3"
6" = 1'-0"
0' 1" 1.5"
12" = 1'-0"
D
C
B
A
E
D
C
B
A
E
SHEET
P R
O J E
C T
D R
A W
IN
G
1 2 3 4 5 6
1 2 3 4 5 6
/1
/2
:3
:3
P
M A u to d e s k D o c s
/2
-0 H
C P
S C h ic k a h o m in y M
S H
V A
C /2
-0 v
H
C P
S C h ic k a h o m in y M
S H
V A
C R e p la c e
A
R C
H .r v t
A-101
/1
/2
-0
R R
M M
R R
M M
R R
M M
F
IR
S T
F L
O O
R C
E
IL
IN
G
P L A
N
C H
IC
K
A H
O M
IN
Y
M S
R E
A R
W
IN
G H
V A
C R
E P
L A
C E
M E
N T
H A
N O
V E
R C
O U
N T
Y P
U B
L
IC
S C
H O
O L
S
A
T L E
E S
T A
T
IO
N R
O A
D
M E
C H
A N
IC
S
V
IL
L E
V
IR
G
IN
IA
09/14/2026
SCALE: 3/32" = 1'-0"
FIRST FLOOR RCP PLAN - BASE BID & ADD. ALT. 2
NOT TO SCALE
KEY PLAN
System No. W-J-1067
SECTION A-A
W J
A
Reproduced Courtesy of Underwriters Laboratories, Inc.
February 03, 2025
A
1. Wall Assembly — Min 3-3/4 in. and 5 in. (95 and 127 mm) thick reinforced lightweight or normal weight (100-150 pcf or 1600-2400 kg/m3) concrete for 1 and 2 h rated assemblies, respectively. For items 2F and 2G, min 6 in. (152 mm) thick reinforced lightweight or normal weight
(100-150 pcf or 1600-2400 kg/m3) concrete. Wall may also be constructed of any UL Classified Concrete Blocks*. Max diam of opening is 32-1/4
in. (819 mm).
See Concrete Blocks (CAZT) category in the Fire Resistance Directory for names of manufacturers.
2. Through—Penetrants — One metallic pipe, conduit or tubing to be installed either concentrically or eccentrically within the firestop system. The annular space for items 2A to 2E shall be min 0 in. to max 2-1/4 in. (57 mm). These pipes/tubings may be installed with continuous point contact.
The annular space for items 2F and 2G shall be min 0 in. to max 1-1/2 in. (38 mm). Pipe, conduit or tubing to be rigidly supported on both sides of wall assembly. The following types and sizes of metallic pipes, conduits or tubing may be used:
A. Steel Pipe — Nom 30 in. (762 mm) diam (or smaller) Schedule 10 (or heavier) steel pipe.
B. Iron Pipe — Nom 30 in. (762 mm) diam (or smaller) cast or ductile iron pipe.
C. Conduit — Nom 4 in. (102 mm) diam (or smaller) steel electrical metallic tubing or 6 in. (152 mm) diam (or smaller) steel conduit.
D. Copper Tubing — Nom 6 in. (152 mm) diam (or smaller) Type L (or heavier) copper tubing.
E. Copper Pipe — Nom 6 in. (152 mm) diam (or smaller) Regular (or heavier) copper pipe.
F. Aluminum Pipe — Nom 2 in. (51 mm) diam (or smaller) Schedule 5 (or heavier) aluminum pipe for use in closed (process or supply) piping systems.
G. Aluminum Conduit — Nom 2 in. (51 mm) diam (or smaller) aluminum electric metallic tubing (EMT) or rigid aluminum conduit for use in closed (process or supply) piping systems.
The hourly T Ratings of the firestop system are equal to 0 Hr when items 2A to 2E are used and equal to 1/2 Hr when items 2F and 2G are used.
The hourly CAN F and FH Ratings are equal to 0 Hr when items 2F and 2G are used.
C
C
LA
SS IF IED
Classified by Underwriters Laboratories, Inc.
to UL 1479 and CAN/ULC-S115
US ANSI/UL1479 (ASTM E814) CAN/ULC S115
F Rating — 1 and 2 Hr (See Items 1 and 3) F Rating — 0, 1 and 2 Hr (See Items 1, 2 and 3)
T Rating — 0 and 1/2 Hr (See Item 2) FT Rating — 0 Hr
L Rating At Ambient — Less Than 1 CFM/sq ft FH Rating — 0, 1 and 2 Hr (See Items 1, 2 and 3)
L Rating At 400 F — Less Than 1 CFM/sq ft FTH Rating — 0 Hr
L Rating At Ambient — Less Than 5.1 L/s/m2
L Rating At 400 F — Less Than 5.1 L/s/m2
3. Fill, Void or Cavity Material* — Min 5/8 in. (16 mm) thickness of fill material applied within the annulus, flush with both surfaces of wall. At the point or continuous contact locations between pipe and wall, a min 1/2 in. (13 mm) diam bead of fill material shall be applied at the pipe-wall interface on both surfaces of wall.
HILTI CONSTRUCTION CHEMICALS, DIV OF HILTI INC — FS-ONE MAX Intumescent Sealant
* Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification (such as Canada), respectively.
| ARCHITECTURAL |
| A-101 - FIRST FLOOR CEILING PLAN |
| G-001 - TITLE SHEET |
| MECHANICAL 9-14-26 |
| M101 |
| M201 |
| M202 |
| M301 |
| M401 |
| ELECTRICAL 9-14-26 |
| E101 |
| E201 |
| E301 |
File details come from the government source that posted it. Updated .