IFB 26-070 ADDENDUM #1.pdf
PDF 687 KB Posted
- Attached to
- Snow Removal Services
- Solicitation number
- 2138534
- Issued by
- Dutchess County, New York
About this file
This Addendum #1 document modifies Invitation for Bid (IFB) 26-070 for snow and ice removal services issued by the New York State Office of Mental Health (OMH) for Rockland Psychiatric Center's Hudson River locations. The addendum refines ice control specifications for the five-year contract with an anticipated start date of November 2, 2026. Key modifications clarify that contractors must provide vehicles equipped with salt spreaders, with salt as the primary ice control agent unless the facility requests alternatives such as Magic Salt or sand combinations. Calcium-based products are designated for sidewalks while salt is specified for roads and parking lots. The addendum emphasizes that ice buildup must be minimized to prevent slippery conditions and that winter sand, when used, must consist of hard clean screened particles uniformly graded and reasonably free from silt, loam, or clay. An exception is noted for continuously accumulating snow when salt and sand applications prove ineffective for traction. All proposals remain due October 1, 2026 by 3:00 PM EST, with mandatory site visit registration required by September 3, 2026 at 3:00 PM and the site visit scheduled for September 10, 2026 at 10:00 AM.
The addendum requires proposers to acknowledge receipt and compliance by providing an original signature, date, and attachment to Attachment A of the Solicitation Cover Sheet as part of formal proposal submission. The underlying IFB establishes contracting goals for Minority-Owned Businesses (16%), Women-Owned Businesses (14%), and Service-Disabled Veteran-Owned Businesses (6%). Snow accumulation limits are set at three inches on roadways, parking lots, and walkways with final cleanup required within five hours after storm completion. The contractor must maintain 24-hour operational readiness and respond within one hour of notification from the Plant Superintendent or Campus Safety. All work is subject to New York State prevailing wage requirements under Prevailing Rate Case number 2026901685, and the bid structure is based on estimated yearly service occurrences of 40 events at the main campus and 20 events at the bus stop sidewalk along Cheney Drive, multiplied across the five-year term. Award will be made to the responsible and responsive bidder offering the lowest total bid amount.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB 26-070 Q and A.pdf | ||
| IFB 26-070.pdf | ||
| C203166.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KATHY HOCHUL
Governor
ANN MARIE T. SULLIVAN, M.D.
Commissioner
ADDENDUM #1
9/1/2026
IFB 26-070
Snow Removal Services
OMH is issuing Addendum #1 for IFB # 26-070 to hereby amend, add, change, or clarify the sections and documentation outlined in the list below. All deletions are shown as red, strike-through text and all additions are made in blue text. Referenced documents and Exhibits are included as separate files attached with this notice as well as made available through the NYSCR advertisement for this solicitation.
4.1 General Ice Control Specifications
a. The Contractor must have vehicles of suitable size and equipped with salt spreaders.
b. Salt is to be used for ice control unless the Facility specifically requests other ice control products
– including Magic Salt. Calcium-based product should be used on sidewalks while salt will be used on roads and parking lots.
c. Salt should be applied at rates and density in line with industry standards and sufficient enough to maintain roadways, parking areas, driveways, walkways, sidewalks and all other surfaces.
d. Ice buildup must be minimized in order to avoid potentially slippery conditions.
e. The Facility reserves the right to request the use of a combination of salt and sand when ice conditions warrant.
f. Winter sand shall consist of hard clean, screened sand particles, uniformly graded from coarse to fine, and the sand shall be reasonably free from silt, loam, or clay.
f. The exception to the application salt/sand application is when the snow is continually accumulating as the salt/sand can only provide traction when it remains in place.
All other requirements and conditions remain as indicated in the IFB.
All proposals are due by October 1, 2026 no later than 3:00 PM EST.
If submitting a proposal, this Addendum should contain an original signature, be dated, and attached behind Attachment A – Solicitation Cover Sheet as part of your proposal submission.
Company Name: ___________________________________________________________
Proposer’s Name (please print) _______________________________________________
Title: ____________________________________________________________________
Signature: ________________________________________________________________
Date: ________________