IFB_26-018-DN_Drawings.pdf
PDF 20 MB Posted
- Attached to
- Aviation Fuel Facility
- Solicitation number
- IFB 26-018-DN
- Issued by
- Lake County, Florida
About this file
This document consists of architectural and engineering drawings for an aviation fuel facility project in Florida. The drawings package provides detailed civil and utility infrastructure specifications for the new fuel facility, which will include an asphalt taxiway connection, concrete apron areas for aircraft fueling and washing operations, a concrete block public restroom facility, stormwater management infrastructure, and utility systems. The drawings serve as the technical blueprint for bidders to understand the scope of civil site improvements and utility infrastructure required to support the future installation of fuel tanks and fueling equipment, which will be procured separately. These drawings are essential reference documents for contractors preparing bids and establishing accurate cost estimates for the infrastructure components outlined in the solicitation.
The drawings provide the technical specifications and site layout necessary for bidders to assess project complexity, material requirements, and construction sequencing. The document establishes the baseline expectations for all site improvements and utility work, ensuring that all prospective contractors have access to identical technical information for competitive bidding purposes. The drawings indicate that work will be limited to civil and utility infrastructure only, with no procurement or installation of fuel storage tanks or dispensing equipment within this contract scope.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DRAWINGS
FOR THE CONSTRUCTION OF
AVIATION FUEL FACILITY
LEESBURG INTERNATIONAL AIRPORT
LAKE COUNTY, FLORIDA
CITY OF LEESBURG PROJECT NO. 480003
FDOT FM NO.444873-2-94-01
JUNE 2026
BID DOCUMENTS
AIRPORT LOCATION MAP
SHEET NO.
GI001
SCALE = NOT TO SCALE
SILVER LAKE
LAKE HARRIS
CONSERVATION
AREA
LAKE HARRIS
LAKE GRIFFIN
LEESBURG
INTERNATIONAL
AIRPORT
AIRPORT LOCATION MAP
SEAL
DANIEL J. NICKOLS, JR., P.E.
Lic. No. 78634
DJN
AMC, JCW
JUNE 2026
AS SHOWN
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST. SUITE 200 - ORLANDO,
FL 32822-2779
OFFICE: (407) 599-1122
FAX: (407) 599-1133
CORPORATE CERTIFICATE OF
AUTHORIZATION NUMBER: 5057
WWW.AVCONINC.COM
SEAL
SHEET
PROJECT NO./DASH NO.
APPROVED:
CHECKED:
DRAWN:
DATE:
SCALE:
N O
D
AT
E
R
EV
IS
IO
N S
D
ES
C R
IP
TI
O N
AV
IA
TI
O
N F
U
EL
F
AC
IL
IT
Y
LE
ES
BU
R G
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (K
LE
E)
, 8
AI
R
PO
R T
BL
VD
, L
EE
SB
U
R G
, F L
DANIEL J. NICKOLS, JR., P.E.
Lic. No. 78634
2024.236.04
GI002
G
EN
ER
AL
N O
TE
S, A
BB
R
EV
IA
TI
O N
S, A
N D
S H
EE
T
IN
D
EX
1 2 3 4
1 2 3 4
A
B
C
A1 GENERAL NOTES A4
B4 SHEET INDEX
GENERAL NOTES
1. ALL UNDERGROUND UTILITIES MUST BE IN PLACE AND PASS ALL TESTING OR INSPECTION
REQUIREMENTS PRIOR TO ROAD BASE AND/OR SURFACE IMPROVEMENT CONSTRUCTION.
2. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMITS AND INSPECTION REQUIREMENTS SPECIFIED BY THE VARIOUS GOVERNMENTAL AGENCIES AND THE ENGINEER. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION, AND SCHEDULE
INSPECTIONS AND TESTING ACCORDING TO AGENCY REQUIREMENTS.
3. ALL WORK PERFORMED SHALL COMPLY WITH ALL FEDERAL AVIATION ADMINISTRATION (FAA) CODES, STANDARDS, REGULATIONS AND REQUIREMENTS, AS WELL AS THOSE OF THE CITY OF LEESBURG
LAND DEVELOPMENT CODE AND ENGINEERING STANDARDS, PLUS THE CURRENT EDITION OF THE
FDOT STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND UTILITY CONSTRUCTION, PLUS THE
REGULATIONS AND ORDINANCES OF THE VARIOUS OTHER GOVERNMENTAL AGENCIES HAVING
JURISDICTION OVER THE WORK.
4. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS ON ALL PRECAST AND MANUFACTURED ITEMS TO THE ENGINEER FOR APPROVAL. FAILURE TO OBTAIN APPROVAL BEFORE INSTALLATION COULD RESULT IN REMOVAL AND REPLACEMENT AT CONTRACTOR'S EXPENSE. THE ENGINEER'S REVIEW OF THE SHOP
DRAWINGS IS FOR CONFORMITY WITH THE CONTRACT DOCUMENTS AND DOES NOT INCLUDE
IN-DEPTH CHECK FOR THE ABILITY OF THE CONTRACTOR TO PERFORM THE WORK IN A SAFE OR EFFICIENT MANNER. THE ENGINEER'S REVIEW OF THE SHOP DRAWINGS DOES NOT RELIEVE THE
CONTRACTOR OF RESPONSIBILITY FOR DIMENSIONAL ACCURACY TO ENSURE FIELD FIT AND
CONFORMITY OF THE VARIOUS COMPONENTS AND DETAILS.
5. CONTRACTOR SHALL KEEP ENGINEER ADVISED OF CONSTRUCTION SCHEDULE CHANGES SO THAT
ENGINEER CAN PROVIDE CONSTRUCTION CERTIFICATIONS TO JURISDICTIONAL AGENCIES.
6. WORK PERFORMED UNDER THIS CONTRACT SHALL INTERFACE SMOOTHLY WITH OTHER WORK BEING PERFORMED ON OR ADJACENT TO THE SITE BY OTHER CONTRACTORS AND UTILITY COMPANIES. IT WILL BE NECESSARY FOR THE CONTRACTOR TO COORDINATE AND SCHEDULE THIER ACTIVITIES, WHERE NECESSARY, WITH OTHER CONTRACTORS AND UTILITY COMPANIES.
7. SAFETY - DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THIS PROJECT, ALL SAFETY
REGULATIONS ARE TO BE ENFORCED. THE CONTRACTOR OR THEIR REPRESENTATIVE SHALL BE
RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE TRAVELING PUBLIC AND THE SAFETY OF THEIR
PERSONNEL. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY
OSHA IN THE FEDERAL REGISTER OF THE DEPARTMENT OF TRANSPORTATION.
8. CONTRACTOR SHALL PROVIDE ALL EQUIPMENT NECESSARY FOR DEWATERING. DISCHARGE WATER FROM DEWATERING SHALL BE CLEAR WITH NO VISIBLE SOIL PARTICLES. DISCHARGE WATER FROM DEWATERING SHALL BE DISPOSED OF IN SUCH A MANNER THAT IT WILL NOT INTERFERE WITH THE NORMAL DRAINAGE OF THE AREA IN WHICH THE WORK IS BEING PERFORMED, OR CREATE PONDING.
THE OPERATION SHALL NOT CAUSE ANY DAMAGE TO ANY PORTION OF THE WORK COMPLETED, OR IN PROGRESS. THE DEWATERING OPERATION SHALL COMPLY WITH THE REQUIREMENTS OF APPLICABLE
REGULATORY AGENCIES. A PRE-WORK MEETING WILL BE CONDUCTED WITH THE GEOTECHNICAL
FIRM, THE OWNER, THE CONTRACTOR, AND THE ENGINEER PRIOR TO BEGINNING ANY SITE
EXCAVATION.
9. "AS-BUILT" FOR THE PROPOSED CONSTRUCTION SHALL BE PROVIDED UPON COMPLETION OF
CONSTRUCTION, THE CONTRACTOR SHALL FURNISH THE OWNER'S ENGINEER WITH COMPLETE
"AS-BUILT" INFORMATION CERTIFIED BY A FLORIDA REGISTERED PROFESSIONAL SURVEYOR.
10. THESE DRAWINGS HAVE BEEN PREPARED, IN PART, BASED UPON RECORD DRAWINGS AND/OR CAD FILES FURNISHED BY OTHERS. WHILE THIS INFORMATION IS BELIEVED TO BE RELIABLE, THOSE
UTILIZING THE INFORMATION ON THESE DRAWINGS ARE ADVISED TO OBTAIN INDEPENDENT
VERIFICATION OF ITS ACCURACY BEFORE USING IT FOR ANY PURPOSE.
11. ALL AREAS DISTURBED AS A RESULT OF THE CONTRACTOR'S STAGING AND CONSTRUCTION
OPERATIONS SHALL BE RESTORED EQUAL TO OR BETTER THAN ORIGINAL CONDITION AT THE
CONTRACTOR'S EXPENSE. PAYMENT FOR SOD FOR RESTORATION SHALL BE BORNE BY THE
CONTRACTOR FOR ALL AREAS OUTSIDE OF THE PROJECT GRADING LIMITS.
12. DURING THE WORK OF THIS CONTRACT, THE CONTRACTOR SHALL FURNISH, ERECT AND MAINTAIN
WHATEVER TEMPORARY LIGHTING MAY BE NECESSARY TO KEEP THE TAXILANES/TAXIWAYS IN
OPERATING CONDITION WHEN OPEN FOR AIRCRAFT.
13. ALL DIRT, DUST, STONES AND LOOSE DEBRIS SHALL BE CONTINUOUSLY REMOVED FROM ALL PAVED
SURFACES DURING THIS CONTRACT.
14. ALL OF THE CONTRACTOR'S OPERATIONS SHALL REMAIN ON AIRPORT PROPERTY AT ALL TIMES.
UNDER NO CIRCUMSTANCES WILL THE CONTRACTOR BE ALLOWED ON ADJACENT PROPERTY.
15. THE CONTRACT DOES NOT ALLOW FOR PRICE INCREASES DUE TO ESCALATION IN COST OF UNIT BID ITEMS. THE CONTRACTOR SHALL TAKE THIS INTO CONSIDERATION WHEN PREPARING UNIT PRICES
FOR BID.
16. ALL ELEVATIONS REFER TO NAVD 88 VERTICAL DATUM. COORDINATES REFER NAD 83 HORIZONTAL
DATUM.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PAYMENT OF ALL FAILED QA TESTING
REGARDLESS OF THE REASON FOR FAILURE. THE CONTRACTOR SHALL ENSURE AREAS ARE PASSING
OR ABLE TO PASS PRIOR TO REQUESTING QA TESTING.
GRADING NOTES
1. SELECTIVE GRADING SHALL BE REQUIRED AS DIRECTED BY THE ENGINEER. IF SELECTIVE GRADING IS
ORDERED, IT SHALL BE PAID IN ACCORDANCE WITH ITEM P-152 UNCLASSIFIED EXCAVATION.
2. THE QUANTITY OF UNCLASSIFIED EXCAVATION, ITEM P-152, INCLUDES 50 CY OF UNDERCUT
EXCAVATION WHICH WILL BE USED ONLY WHEN DIRECTED BY THE ENGINEER.
3. THE QUANTITY OF LIME ROCK BASE COURSE, ITEM P-211, INCLUDES 50 CY REPLACEMENT OF
UNDERCUT EXCAVATION WHICH WILL BE USED ONLY WHEN DIRECTED BY THE ENGINEER.
4. THE LIMITS OF GRADING ARE SHOWN ON THE GRADING PLANS. ALL AREAS OUTSIDE OF THE GRADING LIMITS WHICH ARE DISTURBED SHALL BE RESTORED WITH SOD, ITEM T-904, BY THE CONTRACTOR AT
THEIR EXPENSE.
5. THE COST OF MEASURES AND PRACTICES FOR COMPLIANCE WITH POLLUTION, EROSION, AND
SILTATION CONTROL SUCH AS AIR POLLUTION PREVENTION, WATER POLLUTION PREVENTION,
TEMPORARY SEEDING, TEMPORARY MULCHING, CONSTRUCTION ROAD STABILIZATION, DUST
CONTROL, PROTECTING VEGETATION, AND EROSION AND SILTATION CONTROL PRACTICES DUE TO THE CONTRACTOR'S MEANS AND METHODS, SHALL BE INCLUDED IN ITEM C-102 UNDER PAYMENT FOR
"TEMPORARY AIR & WATER POLLUTION, SOIL EROSION, & SILTATION CONTROL."
6. ALL SOIL EROSION AND SEDIMENT CONTROL DEVICES AND MATERIALS SHALL BE IN PLACE PRIOR TO
BEGINNING EARTHWORK OPERATIONS AND SHALL BE MAINTAINED UNTIL THE NEW SLOPES ARE
STABILIZED WITH SODDING AND/OR SLOPE PROTECTION.
7. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ENSURE ADEQUATE GROWTH OF SOD FOR ALL AREAS RESTORED WITH SOD. CONTRACTOR SHALL WATER AND MAINTAIN THE SOD AS NECESSARY
TO ENSURE CURRENT AND FUTURE GROWTH. WATERING SHALL BE CONSIDERED INCIDENTAL TO
SODDING, ITEM T-904, AS IT IS A NECESSARY PORTION OF THE WORK.
8. THE CONTRACTOR SHALL BE EQUIPPED WITH THE ABILITY TO UTILIZE GPS MACHINE-CONTROL
SYSTEMS TO EFFICIENTLY PERFORM EARTHWORK IN ACCORDANCE WITH THE PLANS AND
SPECIFICATIONS. THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF RECORD PRIOR TO
CONSTRUCTION IF THERE IS ANY UNDERGROUND UTILITY CONFLICT THAT INTERFERES WITH THE
PROPOSED GRADING PLANS.
PAVING NOTES:
1. ALL AREAS TO BE PAVED SHALL BE PREPARED IN ACCORDANCE WITH ITEM P-101, "COLD MILLING
EXISTING PAVEMENT, DEPTH VARIES."
2. EMULSIFIED ASPHALT TACK COAT, ITEM P-603, SHALL BE APPLIED PRIOR TO PLACING EACH LIFT OF
PAVEMENT, UNLESS OTHERWISE DIRECTED BY THE ENGINEER.THE APPLICATION OF TACK COAT
SHALL BE CONSIDERED INCIDENTAL TO ITEM P-403 AND ALL PAVING OPERATIONS.
3. IN CASES OTHER THAN CENTERLINE JOINTS, LONGITUDINAL PAVING JOINTS IN ONE LAYER SHALL BE OFFSET FROM THAT IN THE PREVIOUS LAYER BY AT LEAST ONE FOOT. THE JOINT AT THE CENTERLINE
OF THE PAVEMENT SHALL LINE UP WITH PREVIOUS LAYER CENTERLINE JOINTS.
STORMWATER SYSTEM NOTES:
1. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY INVERTS AND LOCATIONS OF THE
EXISTING STORM SEWER SYSTEM PRIOR TO SUBMITTAL OF SHOP DRAWINGS AND CONSTRUCTION
AND NOTIFY THE ENGINEER IF ANY DISCREPANCY IN INVERTS AND LOCATIONS EXIST.
2. THE CONTRACTOR SHALL PROVIDE SHOP DRAWINGS, PRODUCT INFORMATION/CUT SHEETS, AND/OR
CERTIFICATIONS FOR ALL STORM WATER STRUCTURES, STORM SEWER PIPES, AND CONCRETE
DESIGN MIX.
3. THE CONTRACTOR SHALL MAKE ALL NECESSARY PROVISIONS TO MAINTAIN EXISTING STORM SEWER
SYSTEM IN SERVICE.
4. SURFACE DRAINAGE SHALL BE DIVERTED FROM EXCAVATIONS, AND STOCKPILE AREAS SUCH THAT PROPER SITE CONDITIONS ARE MAINTAINED AND EROSION DUE TO RAIN RUN-OFF OR SEEPAGE IS
PREVENTED OR MINIMIZED.
5. PRIOR TO THE CONTRACTOR LAYING A SECTION OF PIPE, THE CONTRACTOR SHALL VERIFY IN THE PRESENCE OF THE RPR, THE CORRECT SLOPES AND ELEVATIONS FOR EACH PIPE RUN THROUGH USE
OF STRING LINE, LASER OR ANOTHER APPROVED METHOD.
UTILITY SYSTEM NOTES:
1. CONTRACTOR SHALL NOTIFY ALL PUBLIC AND PRIVATE UTILITY OWNERS AND FLORIDA'S "SUNSHINE
ONE-CALL" SYSTEM 72-HRS PRIOR TO STARTING CONSTRUCTION. COST OF REPLACEMENT AND
REPAIR OF EXISTING UTILITIES DAMAGED AS A RESULT OF THE CONTRACTOR'S OPERATION SHALL BE
CONTRACTOR'S RESPONSIBILITY.
2. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR MAKING ALL NECESSARY ARRANGEMENTS FOR PERFORMING WORK INVOLVED IN CONNECTION WITH THE DISCONTINUANCE OR INTERRUPTION
OF ALL UTILITIES UNDER THE JURISDICTION OF THE UTILITY COMPANIES.
3. EXISTING OUT-OF-SERVICE BURIED UTILITIES ENCOUNTERED WITHIN THE PROPOSED PROJECT SHALL
BE REMOVED WITHIN THE EXCAVATED AREA AFTER THE ENGINEER IS IMMEDIATELY INFORMED.
REMOVAL OF ABANDONED UTILITY LINES/STRUCTURES SHALL BE INCIDENTAL TO ITEM P-152
UNCLASSIFIED EXCAVATION.
4. CONFLICTS BETWEEN UNDERGROUND UTILITIES, I.E. WATER, ELECTRICAL, COMMUNICATIONS, AND STORM OR SANITARY SEWERS SHALL BE RESOLVED BY ADJUSTING THE UNDERGROUND UTILITIES AS
APPROVED BY THE ENGINEER, AND IS INCLUSIVE IN CONTRACTORS COST.
5. CONTRACTOR SHALL MAKE EXPLORATORY EXCAVATIONS AT ALL INTERSECTIONS OF PROPOSED WORK WITH EXISTING UTILITIES. THE EXPLORATORY EXCAVATIONS SHALL BE MADE A MINIMUM OF 72-HRS IN ADVANCE OF THE PROPOSED WORK, AND PRIOR TO SHOP DRAWINGS SUBMITTALS, WHEN APPLICABLE. THE CONTRACTOR SHALL IMMEDIATELY INFORM THE ENGINEER IF THERE IS A CONFLICT.
INFORMATION TO BE FURNISHED BY THE CONTRACTOR SHALL INCLUDE: LOCATION, ELEVATION, UTILITY TYPE, MATERIAL AND SIZE.
6. UTILITY APPURTENANCES SHALL MEET THE FOLLOWING REQUIREMENTS: A) BE AESTHETICALLY ACCEPTABLE. B) IN COMPLIANCE WITH INDUSTRY AND MANUFACTURER'S STANDARDS. C) PLACED IN AREA WITH THE MINIMUM INTERFERENCE TO THE OPERATION AND MAINTENANCE OF THE SITE. D) NOT
IN CONFLICT WITH OTHER FACILITIES.
7. CONTRACTOR SHALL PROVIDE FOR THE TEMPORARY SUPPORT AND PROTECTION OF EXISTING
UTILITIES WITHIN THE WORK AREA. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE
ADEQUACY OF THESE METHODS I.E. ALL SHEETING, SHORING, AND BRACING SYSTEMS.
8. THE CONTRACTOR SHALL PROVIDE APPLICABLE TEST RESULTS FOR THE PURPOSE OF
CERTIFICATIONS REQUIRED BY THE FDEP OR OTHER GOVERNING AGENCY HAVING JURISDICTION.
TESTING AND CERTIFICATION SHALL INCLUDE BUT ARE NOT LIMITED TO: WATER LINE,
COMMUNICATION LINE, POWER/ELECTRICAL LINE, SANITARY SEWERS TRENCH BACKFILL AND
COMPACTION, PAVING MATERIALS.
ELECTRICAL NOTES:
1. ALL ELECTRICAL WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE AND NATIONAL ELECTRICAL
CODES.
2. THE ELECTRICAL CHARACTERISTICS OF PROPOSED EQUIPMENT SHALL BE VERIFIED TO BE
COMPATIBLE WITH EXISTING EQUIPMENT MANUFACTURER PRIOR TO INSTALLATION.
3. ABANDONED CABLES MAY EXIST IN THE VICINITY OF THE PROPOSED WORK. IF ENCOUNTERED, CONTRACTOR SHALL VERIFY THAT THEY ARE ABANDONED PRIOR TO REMOVAL. IF THEY ARE NOT
ABANDONED, CABLES SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
4. ITEMS OF SPECIFIC MANUFACTURE SHALL BE INSTALLED IN STRICT ACCORDANCE WITH
MANUFACTURER'S PRINTED INSTRUCTIONS AND OR MANUFACTURER'S REPRESENTATIVE
DIRECTIONS.
5. ALL GROUND CONNECTIONS SHALL BE MADE USING EXOTHERMIC CONNECTIONS.
6. ALL CABLE CONNECTIONS SHALL BE MADE AT LIGHT UNITS OR AT ENDS OF DUCT BANKS UNLESS
DIRECTED OTHERWISE.
7. ALL ELECTRICAL EQUIPMENT REMOVED WHICH IS DESIRED BY THE OWNER TO BE SALVAGED SHALL
BE TURNED OVER TO THE OWNER. THE EQUIPMENT SHALL BE STOCKPILED AT A LOCATION
DESIGNATED BY THE OWNER IN PROPERTY AT A PROPER DISPOSAL SITE AT THE CONTRACTOR'S
EXPENSE.
8. PROVIDE WATERTIGHT TERMINATION FOR ALL BURIED CONDUIT ENDS.
9. ALL RUNWAY AND TAXIWAY EDGE LIGHTS SHALL BE LOCATED 5 FEET OFF OF THE DEFINED PAVEMENT EDGE UNLESS OTHERWISE NOTED OR DIRECTED. THE CONTRACTOR SHALL ALIGN ALL LIGHTS ON
TANGENT SECTIONS SUCH THAT THEY FORM A STRAIGHT LINE.
FIRE PROTECTION AND ACCESS NOTES:
1. THIS PROJECT SHALL INCLUDE ACCESS VIA AN UNMANNED GATE. THE CONTRACTOR SHALL
COORDINATE WITH THE AIRPORT, ENGINEER AND CITY STAFF TO PROVIDE THE NECESSARY
CLICK-2-ENTER SYSTEM AT THE EXISTING ACCESS GATE AS REQUIRED BY THE CITY OF LEESBURG
FOR EMERGENCY PURPOSES.
2. THE CONTRACTOR SHALL ENSURE THAT ALL APPLICABLE NATIONAL FIRE PROTECTION ASSOCIATION AND FLORIDA FIRE PROTECTION CODES AND STANDARDS ARE MET DURING THE COURSE OF THIS
PROJECT.
3. PROJECTS THAT MEET THE REQUIREMENTS UNDER "COMPLIANCE WITH FLORIDA FIRE PREVENTION CODE CHAPTER 11, SECTION 11.10 TWO-WAY RADIO COMMUNICATION" MUST HAVE A MINIMUM RADIO SIGNAL TEST COMPLETED AND VERIFED FOR ACCEPTABLE TWO-WAY RADIO COMMUNICATION. SIGNAL STRENGTH SHALL BE RECORDED AND PROVIDED TO THE AHJ. IF NEEDED BASED ON THE FAILURE OF
A TEST AN ENHANCEMENT SYSTEM MUST BE INSTALLED. AT THE START OF THE PROJECT, THE
CONTRACTOR SHALL VERIFY WITH THE ENGINEER IF THE PROPOSED PROJECT MEETS THE
NECESSARY REQUIREMENTS.
ABAN. - ABANDONED
ADA - AMERICANS WITH DISABILITIES ACT
APPROX.. - APPROXIMATE
ASPH. - ASPHALT
AST - ABOVE GROUND STORAGE TANK
AVGAS - AVIATION GASOLINE
BL - BASELINE
BLDG. - BUILDING
BM - BENCHMARK
CL - CENTERLINE
CCR - CONSTANT CURRENT REGULATOR
CIP - CAST IRON PIPE
CMP - CORRUGATED METAL PIPE
CONC. - CONCRETE
CSP - CORRUGATED STEEL PIPE
D - DIAMETER
E - EASTING
ELEV. - ELEVATION
FND. - FOUNDATION
HP - HIGH POINT
INV. - INVERT
JCP - JUNCTION CAN PLAZA
LT- LEFT
LP - LOW POINT
MAX. - MAXIMUM
MES - MITERED END SECTION
MIN. - MINIMUM
N - NORTHING
NA - NOT ACCEPTABLE
NFPA - NATIONAL FIRE PROTECTION ASSOCIATION
OFA - OBJECT FREE AREA
O.C - ON CENTER
PAV'T - PAVEMENT
PC - POINT OF CURVATURE
PCC - PORTLAND CEMENT CONCRETE PAVEMENT
PI - POINT OF INTERSECTION
P - PROPERTY LINE
PVI - POINT OF VERTICAL INTERSECTION
PVC - POLYVINYL CHLORIDE PIPE
PVT - POINT OF TANGENCY (VERTICAL CURVE)
R - RADIUS
RCP - REINFORCED CONCRETE PIPE
RGS - RIGID GALVANIZED STEEL
ROFA - RUNWAY OBJECT FREE AREA
RSA - RUNWAY SAFETY AREA
ROW - RIGHT OF WAY
RPZ - RUNWAY PROTECTION ZONE
RT - RIGHT
RWY - RUNWAY
SHDR. - SHOULDER
SICPP - SMOOTH INTERIOR CORRUGATED
POLYETHYLENE PIPE
STA. - STATION
TLOFA - TAXILANE OBJECT FREE AREA
TOFA - TAXIWAY OBJECT FREE AREA
TSA - TAXIWAY SAFETY AREA
TWY - TAXIWAY
TYP. - TYPICAL
UG - UNDERGROUND
ABBREVIATIONS
SHEET INDEX TABLE
SHEET
NUMBER SHEET TITLE
GI001 COVER SHEET
GI002 GENERAL NOTES, ABBREVIATIONS, AND SHEET INDEX
GC101 ULTIMATE PROJECT BUILD-OUT PLAN
GC102 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA A1
GC103 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA A2
GC104 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA B
GC105 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA C
GC501 CONSTRUCTION SAFETY AND PHASING PLAN DETAILS
CE101 EXISTING CONDITIONS PLAN
CD101 CIVIL DEMOLITION PLAN
CD102 STORMWATER POLLUTION & PREVENTION PLAN
CD501 SWPPP DETAILS
CS101 GEOMETRY AND MARKING PLAN
CS501 GEOMETRY AND MARKING PLAN DETAILS
CG101 GRADING, DRAINAGE AND SOIL EROSION CONTROL PLAN
CG201 VERTICAL PROFILES
CG301 TYPICAL GRADING SECTIONS
CG501 GRADING AND DRAINAGE DETAILS
CG502 GRADING AND DRAINAGE DETAILS
CU101 UTILITY PLAN
CU501 UTILITY PLAN DETAILS
CU502 UTILITY PLAN DETAILS
CU503 UTILITY PLAN DETAILS
ED101 ELECTRICAL DEMOLITION PLAN
EL101 ELECTRICAL LAYOUT AND CIRCUITRY PLAN
EL501 ELECTRICAL LAYOUT AND CIRCUITRY PLAN DETAILS
EL502 ELECTRICAL LAYOUT AND CIRCUITRY PLAN DETAILS
LS
TOFA
TOFA
TOFA
ROFZ
CB
S
W M
CB
W
A
A
W
W M
A W
W
W
W M
S
S
E
E
E
E
E
T T
TT
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TLOFA
TLOFA
TL
OFA
TLOFA
TLOFA
TLOFA
W
WWW
WWW
LS
W W W W W
W M
W
W
W
W
TL
O
FA
TL
O
FA
TL
O
FA
TL
O
FA
TLOFA
TLOFA
TLO
FA
TLO
FA
TLO
FA
TLOFA
TLOFA
TLOFA
TLOFA
TL
O
FA
TL
O
FA
TL
O
FA
TLOFA
TLOFA
TL
O
FA
TL
OFA
TLOFA
TLOFA TL
O
FA
TL
O
FA
LS
LS
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E E
E
E
E
E
DJN
DJN
AMC, JCW
JUNE 2026
AS SHOWN
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST. SUITE 200 - ORLANDO,
FL 32822-2779
OFFICE: (407) 599-1122
FAX: (407) 599-1133
CORPORATE CERTIFICATE OF
AUTHORIZATION NUMBER: 5057
WWW.AVCONINC.COM
SEAL
SHEET
PROJECT NO./DASH NO.
APPROVED:
CHECKED:
DRAWN:
DATE:
SCALE:
N O
D
AT
E
R
EV
IS
IO
N S
D
ES
C R
IP
TI
O N
AV
IA
TI
O
N F
U
EL
F
AC
IL
IT
Y
LE
ES
BU
R G
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (K
LE
E)
, 8
AI
R
PO
R T
BL
VD
, L
EE
SB
U
R G
, F L
DANIEL J. NICKOLS, JR., P.E.
Lic. No. 78634
2024.236.04
FO
GC101
U
LT
IM
AT
E
PR
O
JE
C T
BU
IL
D -O
U T
PL
AN
1 2 3 4
1 2 3 4
A
B
C
A
B
C
A1 ULTIMATE PROJECT BUILDOUT PLAN A4 KEY PLAN
B4 SHEET NOTES
30' 60'30'
GRAPHIC SCALE
0' NORTH
KEYED NOTES:
1. NEW TAXIWAY OBJECT FREE AREA, (TYP.).
2. NEW TAXILANE OBJECT FREE AREA, (TYP.).
3. PROPOSED DRAINAGE INFRASTRUCTURE TO BE INSTALLED, (TYP.).
4. PROPOSED UTILITY INFRASTRUCTURE TO BE INSTALLED, (TYP.). SEE CU SERIES FOR MORE
INFORMATION.
5. PROPOSED FUEL FARM LOCATION. TANK CONFIGURATION AND CARD READER TO BE INSTALLED IN
FUTURE PHASE II OF THE PROJECT.
6. PROPOSED 10' X 10' ADA PUBLIC USE BATHROOM TO BE CONSTRUCTED IN ACCORDANCE WITH THE
PROVIDED ARCHITECTURAL PERFORMANCE SPECIFICATIONS
7. PROPOSED UNLIT AIRFIELD SIGN AND PAD TO BE INSTALLED ON NEW CONCRETE BASE, SEE CS
SERIES FOR MORE INFORMATION.
8. PROPOSED STORMWATER DRY RETENTION POND, SEE CG SERIES FOR MORE INFORMATION.
9. EXISTING UTILITY LINES AND STRUCTURES TO BE PROTECTED IN PLACE, (TYP.).
10. PROPOSED BROAD-CRESTED TRAPEZOIDAL WEIR FOR THE PROPOSED DRY POND.
11. PROPOSED AIRFIELD ELECTRICAL FIXTURES OR GUIDANCE SIGNS TO BE INSTALLED. SEE EL SERIES
FOR MORE INFORMATION.
#C4 KEYED NOTES AND SHEET LEGEND
EXISTING TREE
LINE, (TYP.)
EXISTING HANGAR
TAXIWAY A
NE
W
T
AX
IL
AN
E A5
AIRPORT BLVD
EXISTING ROADWAY
TAXIWAY OBJECT
FREE AREA, (TYP.)
TAXILANE OBJECT
FREE AREA, (TYP.)
EXISTING
HANGAR
EXISTING AIRPORT
FENCELINE, (TYP.)
EXISTING CONCRETE
AIRCRAFT PARKING APRON
EXISTING CATCH
BASIN, (TYP.)
GOPHER TORTOISE RESPONSIBILITIES NOTES:
1. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL COMPLETE A GOPHER TORTOISE SURVEY PAID UNDER ITEM, "GOPHER TORTOISE SURVEY/PROTECTION." SURVEY RESULTS SHALL BE
PROVIDED TO THE ENGINEER ONCE COMPLETED. GOPHER TORTOISE SURVEY BOUNDARY SHALL
EXTEND 15' PAST THE WORK AREA LIMITS.
2. CONTRACTOR SHALL PROTECT ALL DISCOVERED BURROWS IN ACCORDANCE WITH THE FLORIDA FISH
AND WILDLIFE REQUIREMENTS.
3. CONTRACTOR SHALL BE REQUIRED TO OBTAIN THE NECESSARY GOPHER TORTOISE RELOCATION
PERMITS. THIS WORK WILL BE PAID UNDER ITEM, "GOPHER TORTOISE PERMIT".
4. ALL COSTS FOR DIGGING, RELOCATION OF GOPHER TORTOISES, BACKFILLING, AND PERMITS FOR THE
RECIPIENT SITE SHALL BE PAID UNDER THE ALLOWANCE, ITEM, "GOPHER TORTOISE BURROW
EXCAVATION AND RELOCATION".
5. THE CONTRACTOR SHALL TRACK TIME AND MATERIALS FOR THE EFFORT NECESSARY TO EXCAVATE
ALL IDENTIFIED BURROWS.
6. THE GOPHER TORTOISE SURVEY SHALL BE COMPLETED AS SOON AS POSSIBLE AND RELOCATIONS
SHALL BE COMPLETED BEFORE ANY WORK BEGINS. GOPHER TORTOISE EXCAVATIONS AND
RELOCATION WORK COMPLETED PRIOR TO THE CONTRACT BEGINNING SHALL NOT COUNT AGAINST
OVERALL CONTRACT TIME.
ULTIMATE BUILDOUT PROJECT NOTES
1. THE ULTIMATE BUILD-OUT DEPICTED IN THE PLAN VIEW IS REPRESENTATIVE OF THE FULL COMPLETION OF THE AVIATION FUEL FACILITY PROJECT. SEE THE CSPP SHEETS FOR THE METHODOLOGY OF PHASE I
OF THE PROJECT.
2. THE AVIATION FUEL FACILITY - PHASE I SHALL INCLUDE DEMOLITION OF EXISTING PAVEMENT, DRAINAGE INFRASTRUCTURE, UTILITY INSTALLATION, PAVING AND GRADING OPERATIONS, AND
PAVEMENT MARKING INSTALLATION.
TA
XI
LA
NE
A
EXISTING AIRPORT
PROPERTY LINE, (TYP.)
NORTH
PROPOSED ASPHALT PAVEMENT,
SEE CS SERIES FOR MORE
INFORMATION
PROPOSED CONCRETE PAVEMENT,
SEE CS SERIES FOR MORE
INFORMATION
EX
IS
TI
NG
H
AN
G
AR
ACCESS ROAD NEW TAXILANE
TAXIWAY A
EXISTING
CONCRETE
APRON
EXISTING
CONCRETE
APRON
EXISTING
CONCRETE
APRON
EXISTING
HANGAR
EXISTING
CONCRETE
APRON
PROPOSED DRY
RETENTION POND
NE
W
T
AX
IL
AN
E A611
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
RSA
RSA
RSA
RSA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
CB
E
E
S
CB
ROFZ
ROFZ
TL
O
FA
TL
O
FA
CB
S
CB
A
A
A
S
S
TL
O
FA
S
S S
S
S
CB
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TL
O
FA
TL
O
FA
TL
O
FA
TL
O
FA
TLOFA
TL
O
FA
TL
O
FA
TL
O
FA
TLOFA
TLOFA
TLOFA
TL
OFA
TLOFA
TOFA
LS
LS
LS
DJN
DJN
AMC, JCW
JUNE 2026
AS SHOWN
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST. SUITE 200 - ORLANDO,
FL 32822-2779
OFFICE: (407) 599-1122
FAX: (407) 599-1133
CORPORATE CERTIFICATE OF
AUTHORIZATION NUMBER: 5057
WWW.AVCONINC.COM
SEAL
SHEET
PROJECT NO./DASH NO.
APPROVED:
CHECKED:
DRAWN:
DATE:
SCALE:
N O
D
AT
E
R
EV
IS
IO
N S
D
ES
C R
IP
TI
O N
AV
IA
TI
O
N F
U
EL
F
AC
IL
IT
Y
LE
ES
BU
R G
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (K
LE
E)
, 8
AI
R
PO
R T
BL
VD
, L
EE
SB
U
R G
, F L
DANIEL J. NICKOLS, JR., P.E.
Lic. No. 78634
2024.236.04
FO
GC102
C O
N
ST
R U
C
TI
O N
S
AF
ET
Y
AN
D
P H
AS
IN
G P
LA
N
W
O R
K
AR
EA
A
1 2 3 4
1 2 3 4
A
B
C
A
B
C
B1 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA A
A4 KEY PLANA2SHEET LEGEND & KEYED NOTES
50' 100'50'
GRAPHIC SCALE
0' NORTH
CONTRACTOR ACCESS ROUTE,
(TYP.)
LOW-PROFILE
BARRICADES INTENDED
FOR WORK AREA A, SEE
DETAIL C4/GC501.
AIRCRAFT TAXI ROUTES,
(TYP.)
KEYED NOTES:
1. PROJECT WORK AREA LIMITS, (TYP.).
2. CONTRACTOR AND CONSTRUCTION EQUIPMENT SHALL ACCESS THE SITE VIA WILCO DR. AND
THE AIRPORT SECURITY GATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
COORDINATE ACCESS THROUGH THIS POINT WITH THE OWNER.
WORK AREA A
CONTRACTOR STAGING,
LAY-DOWN, STOCKPILE, AND
PERSONAL VEHICLE PARKING
AREA
A1 CONSTRUCTION SAFETY AND PHASING PLAN NOTES
EXISTING TREE
LINE, (TYP.)
EXISTING HANGAR
EXISTING
HANGAR
TAXIWAY A
EX
IS
TI
NG
TA
XI
W
AY
A
5 AIRPORT BLVD
EXISTING ROADWAY
EXISTING TAXIWAY
OBJECT FREE AREA,
(TYP.)
EXISTING TAXILANE
OBJECT FREE AREA,
(TYP.)
EXISTING HANGAR
EXISTING AIRPORT
FENCELINE, (TYP.)
EXISTING CONCRETE
AIRCRAFT PARKING APRON
EXISTING CATCH
BASIN, (TYP.)
W
IL
C O
D R
W
IL
CO
D
R
EXISTING HANGAR
EXISTING CANTILEVER GATE
EX
IS
TI
NG
T
AX
IW
AY
A
TA
XI
LA
N
E A7
TAXIWAY A
EXISTING AIRPORT
PROPERTY LINE, (TYP.)
SHEET NOTES:
1. THIS WORK AREA IS LOCATED OUTSIDE OF THE MOVEMENT AREA. THE CONTRACTOR SHALL NOT, UNDER ANY CIRCUMSTANCES, ENTER THE MOVEMENT AREA WITHOUT APPROVAL FROM THE OWNER
AND ENGINEER AND A DESIGNATED ESCORT.
2. ANY DAMAGE TO EXISTING STRUCTURES OR PAVEMENT OTHERWISE NOT INCLUDED IN THE PLANS OR
DIRECTED BY THE ENGINEER SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR.
3. WHEN WORKING ADJACENT TO ACTIVE AIRFIELD PAVEMENTS, WORK SHALL BE COMPLETED ON A PULL BACK BASIS IF AIRCRAFT PASSAGE IS REQUIRED TO MAINTAIN AIRPORT OPERATIONS. THE WORK AREAS SHOWN SHALL BE COORDINATED WITH THE ATCT, THE OWNER, AND THE ENGINEER TO ENSURE
A SAFE AND CONSTANT SEPARATION OF CONTRACTOR ACTIVITIES AND AIRCRAFT MOVEMENTS.
4. THE CONTRACTOR SHALL KEEP ALL ACTIVE PAVEMENT SURFACES (AIRSIDE AND LANDSIDE) CLEAN AND FREE OF DEBRIS. NO DIRECT PAYMENT SHALL BE MADE FOR THE CLEANING AND MAINTAINING OF EXISTING PAVEMENT SURFACES, AS IT IS A NECESSARY AND INCIDENTAL PORTION OF THE WORK. THE CONTRACTOR SHALL HAVE SWEEPERS OR BLOWERS AVAILABLE AT ALL TIMES TO REMOVE TRACKED DIRT/FOD/DEBRIS FROM HARD SURFACES IF TRACKED OR LEFT INADVERTENTLY. FOD REMOVAL SHALL
BE AT THE DISCRETION OF THE RPR.
5. ALL TURF AREAS DISTURBED BY WORK ACTIVITIES SHALL BE RESTORED BY SODDING, UNLESS APPROVED OTHERWISE BY THE ENGINEER. RESTORATION WITH SEEDING OR HYDROSEEDING MAY BE
ACCEPTED FOR LIMITED AREAS OF DISTURBANCE.
6. CONTRACTOR SHALL REMAIN CLEAR OF THE EXISTING TAXILANE/TAXIWAY OBJECT FREE AREAS
THROUGH THE DURATION OF WORK AREA A.
7. IF FOR ANY REASON THERE ARE CONSTRUCTION VEHICLES/EQUIPMENT OTHER THAN CONTRACTOR VEHICLES, A FLAGGER SHALL BE REQUIRED TO ENSURE THAT CONSTRUCTION EQUIPMENT/VEHICLES
YIELD TO AIRCRAFT TRAFFIC AT ALL TIMES.
8. HALF-RATE PAVEMENT MARKINGS SHALL BE PLACED PRIOR TO THE START OF THE SUBSEQUENT
WORK AREA.
CONSTRUCTION SAFETY AND PHASING PLAN NOTES:
WORK AREA A:
1. WORK AREA A SHALL CONSIST OF ALL CIVIL SCOPE INCLUDING BUT NOT LIMITED TO ASPHALT MILLING, CONCRETE PAVEMENT DEMOLITION, EXCAVATION, GRADING, LIME ROCK BASE COURSE, ASPHALT PAVING, CONCRETE INSTALLATION, AIRFIELD PAVEMENT MARKING, INSTALLATION OF DRAINAGE INFRASTRUCTURE, INSTALLATION OF NEW UTILITIES, BUILDING CONSTRUCTION, AND ALL THE
CONSTRUCTION NECESSARY FOR PROJECT COMPLETION.
2. ACCESS TO THE EXISTING TAXILANE A6 AND TAXILANE A5 SHALL BE CLOSED TO AIRCRAFT TRAFFIC.
PRIOR TO REOPENING ANY AIRFIELD PAVEMENT SURFACES TO AIRCRAFT TRAFFIC, PAVEMENT
SURFACES SHALL BE SWEPT CLEAN, F.O.D CHECKED, AND CLEARED FOR USED BY BOTH THE OWNER
AND THE ENGINEER.
3. TAXIWAY A, THE CONCRETE PARKING APRON, AND THE ACCESS ROAD TO TAXIWAY A SHALL REMAIN
OPEN, IN FULL CAPACITY, FOR THE DURATION OF WORK AREA A.
4. WORK IN WORK AREA A SHALL BE LIMITED TO 120 CONSECUTIVE CALENDAR DAYS AND
CONCURRENT WITH WORK AREA B.
5. THE CONTRACTOR SHALL PROVIDE A WATER TRUCK AS NEEDED, AND AS DIRECTED BY THE ENGINEER FOR DUST CONTROL. NO DIRECT PAYMENT SHALL BE MADE FOR CONSTRUCTION SITE DUST CONTROL, AS IT IS A NECESSARY AND INCIDENTAL PORTION OF THE WORK.
6. CONTRACTOR SHALL REMAIN CLEAR OF EXISTING TAXIWAY/TAXILANE OBJECT FREE AREA LIMITS THROUGHOUT THE DURATION OF THE WORK AREA. BARRICADES SHALL BE PLACED 5 FEET OUTSIDE
OF THE MOST STRICT CLEARANCE TO PROVIDE CLEAR DELINEATION.
U.S. HWY 441
NORTH
EXISTING
STOCKPILE
EXISTING ASPHALT
MILLINGS ACCESS
ROAD
EXISTING POND
FLAGPERSON LOCATION
EXISTING
AIRPORT
ADMINISTRATION
BUILDING
EXISTING CAR
DEALERSHIP
EXISTING CAR
DEALERSHIP
EXISTING
PARKING LOT
AIRPORT BLVD
EXISTING
PARKING LOT
EXISTING HANGAR
EX
IS
TI
NG
H
AN
G
AR
EXISTING ACCESS ENTRANCE.
CONTRACTOR SHALL MAINTAIN THE
ENTRANCE THROUGHOUT THE DURATION
OF THE PROJECT AND RESTORE TO ITS
EXISTING CONDITION AT THE END OF THE
PROJECT. SEE DETAIL A3/CD501.
EXISTING ACCESS ROAD
CONSTRUCTION
ACCESS ROAD
EXISTING
CONCRETE
APRON
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
CB
E
E
S
CB
ROFZ
ROFZ
CB
CB
A
A
A
S
S
E
E
E
E
E
CB
T T
TT
LS
W W W
W M
W
TLOFA
TL
O
FA
TL
OFA
TLO
FA
TLOFA
TL
O
FA
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
DJN
DJN
AMC, JCW
JUNE 2026
AS SHOWN
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST. SUITE 200 - ORLANDO,
FL 32822-2779
OFFICE: (407) 599-1122
FAX: (407) 599-1133
CORPORATE CERTIFICATE OF
AUTHORIZATION NUMBER: 5057
WWW.AVCONINC.COM
SEAL
SHEET
PROJECT NO./DASH NO.
APPROVED:
CHECKED:
DRAWN:
DATE:
SCALE:
N O
D
AT
E
R
EV
IS
IO
N S
D
ES
C R
IP
TI
O N
AV
IA
TI
O
N F
U
EL
F
AC
IL
IT
Y
LE
ES
BU
R G
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (K
LE
E)
, 8
AI
R
PO
R T
BL
VD
, L
EE
SB
U
R G
, F L
DANIEL J. NICKOLS, JR., P.E.
Lic. No. 78634
2024.236.04
FO
GC103
C O
N
ST
R U
C
TI
O N
S
AF
ET
Y
AN
D
P H
AS
IN
G P
LA
N
W
O R
K
AR
EA
B
1 2 3 4
1 2 3 4
A
B
C
A
B
C
B1 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA B
A4 KEY PLANA2 CONSTRUCTION SAFETY AND PHASING PLAN NOTES
50' 100'50'
GRAPHIC SCALE
0' NORTH
CONTRACTOR
ACCESS ROUTE,
(TYP.)
LOW-PROFILE
BARRICADES INTENDED
FOR WORK AREA B, SEE
DETAIL C4/GC501.
AIRCRAFT TAXI
ROUTES, (TYP.)
KEYED NOTES:
1. PROJECT WORK AREA LIMITS, (TYP.).
2. CONTRACTOR AND CONSTRUCTION EQUIPMENT SHALL ACCESS THE SITE VIA WILCO DR. AND THE
AIRPORT SECURITY GATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE
ACCESS THROUGH THIS POINT WITH THE OWNER.
3. PROPOSED TAXILANE OBJECT FREE AREA, (TYP.).
4. PROPOSED UTILITY INFRASTRUCTURE TO BE INSTALLED (TYP.), SEE CU SERIES FOR MORE
INFORMATION.
5. PROPOSED 10'X10' ADA PUBLIC USE BATHROOM, SEE ARCHITECTURAL PLANS FOR MORE
INFORMATION.
6. PROPOSED DRAINAGE INFRASTRUCTURE,(TYP.), SEE CG SERIES FOR MORE INFORMATION.
7. PROPOSED PAVEMENT MARKINGS, (TYP.), SEE CS SERIES FOR MORE INFORMATION.
8. PROPOSED STORMWATER DRY RETENTION POND, SEE CG SERIES FOR MORE INFORMATION.
WORK AREA B
CONTRACTOR
STAGING, LAY-DOWN,
STOCKPILE, AND
PERSONAL VEHICLE
PARKING AREA
A1 SHEET LEGEND & KEYED NOTES
EXISTING TREE
LINE, (TYP.)
EXISTING HANGAR
EXISTING
HANGAR
TAXIWAY A
EX
IS
TI
NG
TA
XI
W
AY
A
AIRPORT BLVD
EXISTING ROADWAY
EXISTING TAXILANE
OBJECT FREE AREA,
(TYP.)
EXISTING HANGAR
EXISTING AIRPORT
FENCELINE, (TYP.)
EXISTING CONCRETE
AIRCRAFT PARKING APRON
EXISTING CATCH
BASIN, (TYP.)
W
IL
C O
D R
W
IL
CO
D
R
EXISTING HANGAR
EXISTING CANTILEVER GATE
TA
XI
W
AY
A
TA
XI
LA
N
E A7
TAXIWAY A
EXISTING AIRPORT
PROPERTY LINE, (TYP.)
SHEET NOTES:
1. ANY DAMAGE TO EXISTING STRUCTURES OR PAVEMENT OTHERWISE NOT INCLUDED IN THE PLANS OR
DIRECTED BY THE ENGINEER SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR.
2. WHEN WORKING ADJACENT TO ACTIVE AIRFIELD PAVEMENTS, WORK SHALL BE COMPLETED ON A PULL BACK BASIS IF AIRCRAFT PASSAGE IS REQUIRED TO MAINTAIN AIRPORT OPERATIONS. THE WORK AREAS SHOWN SHALL BE COORDINATED WITH THE ATCT, THE OWNER, AND ENGINEER TO ENSURE A
SAFE AND CONSTANT SEPARATION OF CONTRACTOR ACTIVITIES AND AIRCRAFT MOVEMENTS.
3. THE CONTRACTOR SHALL KEEP ALL ACTIVE PAVEMENT SURFACES (AIRSIDE AND LANDSIDE) CLEAN AND FREE OF DEBRIS. NO DIRECT PAYMENT SHALL BE MADE FOR THE CLEANING AND MAINTAINING OF EXISTING PAVEMENT SURFACES, AS IT IS A NECESSARY AND INCIDENTAL PORTION OF THE WORK. THE CONTRACTOR SHALL HAVE SWEEPERS OR BLOWERS AVAILABLE AT ALL TIMES TO REMOVE TRACKED DIRT/FOD/DEBRIS FROM HARD SURFACES IF TRACKED OR LEFT INADVERTENTLY. FOD REMOVAL SHALL
BE AT THE DISCRETION OF THE RPR.
4. ALL TURF AREAS DISTURBED BY WORK ACTIVITIES SHALL BE RESTORED BY SODDING, UNLESS APPROVED OTHERWISE BY THE ENGINEER. RESTORATION WITH SEEDING OR HYDROSEEDING MAY BE
ACCEPTED FOR LIMITED AREAS OF DISTURBANCE.
5. CONTRACTOR SHALL REMAIN CLEAR OF THE EXISTING TAXILANE/TAXIWAY OBJECT FREE AREAS
THROUGH THE DURATION OF WORK AREA B.
6. IF FOR ANY REASON THERE ARE CONSTRUCTION VEHICLES/EQUIPMENT OTHER THAN CONTRACTOR VEHICLES, A FLAGGER SHALL BE REQUIRED TO ENSURE THAT CONSTRUCTION EQUIPMENT/VEHICLES
YIELD TO AIRCRAFT TRAFFIC AT ALL TIMES.
7. HALF-RATE PAVEMENT MARKINGS SHALL BE PLACED PRIOR TO THE START OF THE SUBSEQUENT
WORK AREA.
CONSTRUCTION SAFETY AND PHASING PLAN NOTES:
WORK AREA B:
1. WORK AREA B SHALL CONSIST OF ALL CIVIL SCOPE INCLUDING BUT NOT LIMITED TO ASPHALT MILLING, EXCAVATION, GRADING, LIME ROCK BASE COURSE, ASPHALT PAVING, AIRFIELD GUIDANCE SIGN
INSTALLATION AND AIRFIELD PAVEMENT MARKING.
2. DIRECT ACCESS FROM TAXIWAY A TO TAXILANES A5, A6 , AND THE ACCESS ROAD SHALL BE CLOSED.
ACCESS TO PRIOR TO REOPENING ANY AIRFIELD PAVEMENT SURFACES TO AIRCRAFT TRAFFIC,
PAVEMENT SURFACES SHALL BE SWEPT CLEAN, F.O.D CHECKED, AND CLEARED FOR USED BY BOTH
THE OWNER AND THE ENGINEER.
3. THE REMAINDER OF TAXIWAY A, ACCESS TO THE AIRCRAFT PARKING APRON AND THE ACCESS TO
TAXILANE A6 VIA THE NEWLY CONSTRUCTED TAXILANE SHALL REMAIN OPEN THROUGHOUT THE
DURATION OF THIS WORK AREA.
4. WORK IN WORK AREA B SHALL BE LIMITED TO 20 CONSECUTIVE CALENDAR DAYS AND SHALL BE
CONCURRENT TO WORK AREA A.
5. THE CONTRACTOR SHALL PROVIDE A WATER TRUCK AS NEEDED, AND AS DIRECTED BY THE ENGINEER FOR DUST CONTROL. NO DIRECT PAYMENT SHALL BE MADE FOR CONSTRUCTION SITE DUST CONTROL, AS IT IS A NECESSARY AND INCIDENTAL PORTION OF THE WORK.
6. BARRICADES SHALL BE PLACED 5 FEET OUTSIDE OF THE MOST STRICT CLEARANCE TO PROVIDE
CLEAR DELINEATION.
PROPOSED ASPHALT
PAVEMENT, SEE CS
SERIES FOR MORE
INFORMATION
PROPOSED CONCRETE
PAVEMENT, SEE CS
SERIES FOR MORE
INFORMATION
U.S. HWY 441
NORTH
EXISTING POND
FLAGPERSON LOCATION
EXISTING
AIRPORT
ADMINISTRATION
BUILDING
EXISTING CAR
DEALERSHIP
EXISTING CAR
DEALERSHIP
EXISTING
PARKING LOT
AIRPORT BLVD
EXISTING
PARKING LOT
EXISTING HANGAR
EX
IS
TI
NG
H
AN
G
AR
EXISTING ACCESS ENTRANCE. CONTRACTOR
SHALL MAINTAIN THE ENTRANCE THROUGHOUT
THE DURATION OF THE PROJECT AND RESTORE
TO ITS EXISTING CONDITION AT THE END OF THE
PROJECT. SEE DETAIL A3/CD501.
EXISTING ACCESS ROAD
EXISTING
CONCRETE
APRON
CONSTRUCTION
ACCESS ROAD
TOFA
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
CB
E
E
S
CB
ROFZ
ROFZ
CB
S
W M
CB
W
A
A
W
W M
A W
W
W
W M
S
S
E
E
E
E
E
S
S S
S
S
CB
T T
TT
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
W
WWW
WWW
LS
W W W
W M
W
TLOFA
TLOFA
TL
O
FA
TL
OFA
TLO
FA
TLOFA
TL
O
FA
LS
LS
LS
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
DJN
DJN
AMC, JCW
JUNE 2026
AS SHOWN
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST. SUITE 200 - ORLANDO,
FL 32822-2779
OFFICE: (407) 599-1122
FAX: (407) 599-1133
CORPORATE CERTIFICATE OF
AUTHORIZATION NUMBER: 5057
WWW.AVCONINC.COM
SEAL
SHEET
PROJECT NO./DASH NO.
APPROVED:
CHECKED:
DRAWN:
DATE:
SCALE:
N O
D
AT
E
R
EV
IS
IO
N S
D
ES
C R
IP
TI
O N
AV
IA
TI
O
N F
U
EL
F
AC
IL
IT
Y
LE
ES
BU
R G
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (K
LE
E)
, 8
AI
R
PO
R T
BL
VD
, L
EE
SB
U
R G
, F L
DANIEL J. NICKOLS, JR., P.E.
Lic. No. 78634
2024.236.04
FO
GC104
C O
N
ST
R U
C
TI
O N
S
AF
ET
Y
AN
D
P H
AS
IN
G P
LA
N
W
O R
K
AR
EA
C
1 2 3 4
1 2 3 4
A
B
C
A
B
C
B1 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA C
A4 KEY PLANA2
50' 100'50'
GRAPHIC SCALE
0' NORTH
CONTRACTOR
ACCESS ROUTE,
(TYP.)
LOW-PROFILE
BARRICADES INTENDED
FOR WORK AREA C, SEE
DETAIL C4/GC501.
AIRCRAFT TAXI
ROUTES, (TYP.)WORK AREA C
CONTRACTOR
STAGING, LAY-DOWN,
STOCKPILE, AND
PERSONAL VEHICLE
PARKING AREA
A1
EXISTING TREE
LINE, (TYP.)
EXISTING HANGAR
EXISTING
HANGAR
TAXIWAY A TA
XI
LA
NE
A
AIRPORT BLVD
EXISTING ROADWAY
EXISTING TAXIWAY
OBJECT FREE AREA,
(TYP.)
EXISTING TAXILANE
OBJECT FREE AREA,
(TYP.)
EXISTING HANGAR
EXISTING AIRPORT
FENCELINE, (TYP.)
EXISTING CONCRETE
AIRCRAFT PARKING APRON
EXISTING CATCH
BASIN, (TYP.)
W
IL
C O
D R
W
IL
CO
D
R
EXISTING HANGAR
EXISTING CANTILEVER GATE
TA
XI
LA
NE
A
TA
XI
LA
N
E A7
TAXIWAY A
EXISTING AIRPORT
PROPERTY LINE, (TYP.)
SHEET NOTES:
1. ANY DAMAGE TO EXISTING STRUCTURES OR PAVEMENT OTHERWISE NOT INCLUDED IN THE PLANS OR
DIRECTED BY THE ENGINEER SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR.
2. WHEN WORKING ADJACENT TO ACTIVE AIRFIELD PAVEMENTS, WORK SHALL BE COMPLETED ON A PULL BACK BASIS IF AIRCRAFT PASSAGE IS REQUIRED TO MAINTAIN AIRPORT OPERATIONS. THE WORK AREAS SHOWN SHALL BE COORDINATED WITH THE ATCT, THE OWNER, AND ENGINEER TO ENSURE A
SAFE AND CONSTANT SEPARATION OF CONTRACTOR ACTIVITIES AND AIRCRAFT MOVEMENTS.
3. THE CONTRACTOR SHALL KEEP ALL ACTIVE PAVEMENT SURFACES (AIRSIDE AND LANDSIDE) CLEAN AND FREE OF DEBRIS. NO DIRECT PAYMENT SHALL BE MADE FOR THE CLEANING AND MAINTAINING OF EXISTING PAVEMENT SURFACES, AS IT IS A NECESSARY AND INCIDENTAL PORTION OF THE WORK. THE CONTRACTOR SHALL HAVE SWEEPERS OR BLOWERS AVAILABLE AT ALL TIMES TO REMOVE TRACKED DIRT/FOD/DEBRIS FROM HARD SURFACES IF TRACKED OR LEFT INADVERTENTLY. FOD REMOVAL SHALL
BE AT THE DISCRETION OF THE RPR.
4. ALL TURF AREAS DISTURBED BY WORK ACTIVITIES SHALL BE RESTORED BY SODDING, UNLESS APPROVED OTHERWISE BY THE ENGINEER. RESTORATION WITH SEEDING OR HYDROSEEDING MAY BE
ACCEPTED FOR LIMITED AREAS OF DISTURBANCE.
5. CONTRACTOR SHALL REMAIN CLEAR OF THE EXISTING TAXILANE/TAXIWAY OBJECT FREE AREAS
THROUGH THE DURATION OF WORK AREA B.
6. IN ANY INSTANCE THERE SHALL BE CONSTRUCTION VEHICLES/EQUIPMENT OTHER THAN CONTRACTOR VEHICLES, A FLAGGER SHALL BE REQUIRED TO ENSURE THAT CONSTRUCTION EQUIPMENT/VEHICLES
YIELD TO AIRCRAFT TRAFFIC AT ALL TIMES.
7. HALF-RATE PAVEMENT MARKINGS SHALL BE PLACED PRIOR TO THE START OF THE SUBSEQUENT
WORK AREA.
CONSTRUCTION SAFETY AND PHASING PLAN NOTES
WORK AREA C:
1. WORK AREA C SHALL CONSIST OF ALL CIVIL SCOPE INCLUDING BUT NOT LIMITED TO CONCRETE
REMOVAL, EXCAVATION, GRADING, PAVING, LIME ROCK BASE COURSE, AIRFIELD PAVEMENT
MARKINGS.
2. ACCESS TO TAXILANE A5 VIA TAXIWAY A AND THE AIRCRAFT PARKING APRON SHALL BE CLOSED.
ACCESS TO PRIOR TO REOPENING ANY AIRFIELD PAVEMENT SURFACES TO AIRCRAFT TRAFFIC,
PAVEMENT SURFACES SHALL BE SWEPT CLEAN, F.O.D CHECKED, AND CLEARED FOR USED BY
BOTH THE OWNER AND THE ENGINEER.
3. TAXIWAY A, THE PROPOSED TAXILANE, FUELING APRON AND TAXILANE A6 SHALL BE OPEN
THROUGHOUT THE DURATION OF THIS WORK AREA.
4. WORK IN WORK AREA C SHALL BE LIMITED TO 35 CONSECUTIVE CALENDAR DAYS. WORK IN AREA C
SHALL COMMENCE AFTER WORK IN WORK AREA B HAS BEEN COMPLETED.
5. THE CONTRACTOR SHALL PROVIDE A WATER TRUCK AS NEEDED, AND AS DIRECTED BY THE ENGINEER FOR DUST CONTROL. NO DIRECT PAYMENT SHALL BE MADE FOR CONSTRUCTION SITE DUST CONTROL
AS IT IS A NECESSARY AND INCIDENTAL PORTION OF THE WORK.
6. BARRICADES SHALL BE PLACED 5 FEET OUTSIDE OF THE MOST STRICT CLEARANCE TO PROVIDE
CLEAR DELINEATION.
PROPOSED ASPHALT
PAVEMENT, SEE CS
SERIES FOR MORE
INFORMATION
PROPOSED CONCRETE
PAVEMENT, SEE CS
SERIES FOR MORE
INFORMATION
U.S. HWY 441
NORTH
EXISTING POND
AIRPORT
ADMINISTRATION
EXISTING CAR
DEALERSHIP
EXISTING CAR
DEALERSHIP
PARKING LOT
AIRPORT BLVD
PARKING LOT
EXISTING HANGAR
EX
IS
TI
NG
H
AN
G
AR
EXISTING ACCESS ENTRANCE. CONTRACTOR
SHALL MAINTAIN THE ENTRANCE THROUGHOUT
THE DURATION OF THE PROJECT AND RESTORE
TO ITS EXISTING CONDITION AT THE END OF THE
PROJECT. SEE DETAIL A3/CD501.
ACCESS ROAD
KEYED NOTES:
1. PROJECT WORK AREA LIMITS, (TYP.).
2. CONTRACTOR AND CONSTRUCTION EQUIPMENT SHALL ACCESS THE SITE VIA WILCO DR. AND THE
AIRPORT SECURITY GATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE
ACCESS THROUGH THIS POINT WITH THE OWNER.
3. PROPOSED TAXIWAY OBJECT FREE AREA, (TYP.).
4. PROPOSED TAXILANE OBJECT FREE AREA, (TYP.).
5. PROPOSED UTILITY INFRASTRUCTURE TO BE INSTALLED (TYP.), SEE CU SERIES FOR MORE
INFORMATION.
6. PROPOSED 10'X10' ADA PUBLIC USE BATHROOM, SEE ARCHITECTURAL PLANS FOR MORE
INFORMATION.
7. PROPOSED DRAINAGE INFRASTRUCTURE,(TYP.), SEE CG SERIES FOR MORE INFORMATION.
8. PROPOSED PAVEMENT MARKINGS, (TYP.), SEE CS SERIES FOR MORE INFORMATION.
9. PROPOSED STORMWATER DRY RETENTION POND, SEE CG SERIES FOR MORE INFORMATION
10. PROPOSED TAXIWAY EDGE LIGHT, (TYP.), SEE EL SERIES FOR MORE INFORMATION.
EXISTING
CONCRETE
APRON
EXISTING
CONCRETE
APRON
EXISTING
CONCRETE
APRON
CONSTRUCTION SAFETY AND PHASING PLAN NOTESSHEET LEGEND & KEYED NOTES #
CONSTRUCTION
ACCESS ROAD
NE
W
T
AX
IW
AY
A6 C
O
NN
EC
TO
R
TOFA
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UGC
UG
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
ROFA
CB
E
E
S
CB
ROFZ
ROFZ
ROFZ
CB
S
W M
CB
W
A
A
W
W M
A W
W
W
W M
S
S
E
E
E
E
E
S
S S
S
S
S
CB
T T
TT
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TOFA
TLOFA
TLOFA
TLOFA
TLOFA
TL
OFA
TLOFA
W
WWW
WWW
LS
W W W
W M
W
TL
O
FA
TL
O
FA
TLOFA
TLO
FA
TLO
FA
TLOFA
TLOFA
TL
O
FA
TL
OFA
TLO
FA
TLOFA
TL
O
FA
LS
LS
LS
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
DJN
DJN
AMC, JCW
JUNE 2026
AS SHOWN
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST. SUITE 200 - ORLANDO,
FL 32822-2779
OFFICE: (407) 599-1122
FAX: (407) 599-1133
CORPORATE CERTIFICATE OF
AUTHORIZATION NUMBER: 5057
WWW.AVCONINC.COM
SEAL
SHEET
PROJECT NO./DASH NO.
APPROVED:
CHECKED:
DRAWN:
DATE:
SCALE:
N O
D
AT
E
R
EV
IS
IO
N S
D
ES
C R
IP
TI
O N
AV
IA
TI
O
N F
U
EL
F
AC
IL
IT
Y
LE
ES
BU
R G
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (K
LE
E)
, 8
AI
R
PO
R T
BL
VD
, L
EE
SB
U
R G
, F L
DANIEL J. NICKOLS, JR., P.E.
Lic. No. 78634
2024.236.04
FO
GC104
C O
N
ST
R U
C
TI
O N
S
AF
ET
Y
AN
D
P H
AS
IN
G P
LA
N
W
O R
K
AR
EA
D
1 2 3 4
1 2 3 4
A
B
C
A
B
C
B1 CONSTRUCTION SAFETY AND PHASING PLAN - WORK AREA D
A4 KEY PLANA2
50' 100'50'
GRAPHIC SCALE
0' NORTH
CONTRACTOR
ACCESS ROUTE,
(TYP.)
LOW-PROFILE
BARRICADES INTENDED
FOR WORK AREA C, SEE
DETAIL C4/GC501.
AIRCRAFT TAXI
ROUTES, (TYP.)WORK AREA D
CONTRACTOR
STAGING, LAY-DOWN,
STOCKPILE, AND
PERSONAL VEHICLE
PARKING AREA
A1
SHEET NOTES:
1. ANY DAMAGE TO EXISTING STRUCTURES OR PAVEMENT OTHERWISE NOT INCLUDED IN THE PLANS OR
DIRECTED BY THE ENGINEER SHALL BE REPAIRED AT THE EXPENSE OF THE CONTRACTOR.
2. WHEN WORKING ADJACENT TO ACTIVE AIRFIELD PAVEMENTS, WORK SHALL BE COMPLETED ON A PULL BACK BASIS IF AIRCRAFT PASSAGE IS REQUIRED TO MAINTAIN AIRPORT OPERATIONS. THE WORK AREAS SHOWN SHALL BE COORDINATED WITH THE ATCT, THE OWNER, AND ENGINEER TO ENSURE A
SAFE AND CONSTANT SEPARATION OF CONTRACTOR ACTIVITIES AND AIRCRAFT MOVEMENTS.
3. THE CONTRACTOR SHALL KEEP ALL ACTIVE PAVEMENT SURFACES (AIRSIDE AND LANDSIDE) CLEAN AND FREE OF DEBRIS. NO DIRECT PAYMENT SHALL BE MADE FOR THE CLEANING AND MAINTAINING OF EXISTING PAVEMENT SURFACES, AS IT IS A NECESSARY AND INCIDENTAL PORTION OF THE WORK. THE CONTRACTOR SHALL HAVE SWEEPERS OR BLOWERS AVAILABLE AT ALL TIMES TO REMOVE TRACKED DIRT/FOD/DEBRIS FROM HARD SURFACES IF TRACKED OR LEFT INADVERTENTLY. FOD REMOVAL SHALL
BE AT THE DISCRETION OF THE RPR.
4. ALL TURF AREAS DISTURBED BY WORK ACTIVITIES SHALL BE RESTORED BY SODDING, UNLESS APPROVED OTHERWISE BY THE ENGINEER. RESTORATION WITH SEEDING OR HYDROSEEDING MAY BE
ACCEPTED FOR LIMITED AREAS OF DISTURBANCE.
5. CONTRACTOR SHALL REMAIN CLEAR OF THE EXISTING TAXILANE/TAXIWAY OBJECT FREE AREAS
THROUGH THE DURATION OF WORK AREA C.
6. IN ANY INSTANCE THERE SHALL BE CONSTRUCTION VEHICLES/EQUIPMENT OTHER THAN CONTRACTOR VEHICLES, A FLAGGER SHALL BE REQUIRED TO ENSURE THAT CONSTRUCTION EQUIPMENT/VEHICLES
YIELD TO AIRCRAFT TRAFFIC AT ALL TIMES.
CONSTRUCTION SAFETY AND PHASING PLAN NOTES
WORK AREA D:
1. WORK AREA D SHALL CONSIST OF INSTALLING FINAL PAVEMENT MARKINGS. WORK IN WORK AREA D
SHALL COMMENCE AFTER WORK IN WORK AREA D HAS BEEN COMPLETED.
2. ACCESS TO TAXILANE A5, A6, AND THE ACCESS ROAD VIA TAXIWAY A AND THE AIRCRAFT PARKING APRON SHALL BE CLOSED TO AIRCRAFT TRAFFIC. TAXIWAY A EAST OF TAXILANE A7 AND WEST OF
CONCRETE AIRCRAFT PARKING APRON SHALL BE CLOSED THROUGHOUT THE DURATION OF THIS
WORK AREA. ACCESS TO PRIOR TO REOPENING ANY AIRFIELD PAVEMENT SURFACES TO AIRCRAFT TRAFFIC, PAVEMENT SURFACES SHALL BE SWEPT CLEAN, F.O.D CHECKED, AND CLEARED FOR USED
BY BOTH THE OWNER AND THE ENGINEER.
3. WORK IN WORK AREA D SHALL BE LIMITED TO 2 CONSECUTIVE CALENDAR DAYS.
4. THE CONTRACTOR SHALL PROVIDE A WATER TRUCK AS NEEDED, AND AS DIRECTED BY THE ENGINEER FOR DUST CONTROL. NO DIRECT PAYMENT SHALL BE MADE FOR CONSTRUCTION SITE DUST CONTROL
AS IT IS A NECESSARY AND INCIDENTAL PORTION OF THE WORK.
5. BARRICADES SHALL BE PLACED 5 FEET OUTSIDE OF THE MOST STRICT CLEARANCE TO PROVIDE
CLEAR DELINEATION.
NORTH
KEYED NOTES:
1. PROJECT WORK AREA LIMITS, (TYP.).
2. CONTRACTOR AND CONSTRUCTION EQUIPMENT SHALL ACCESS THE SITE VIA WILCO DR. AND THE
AIRPORT SECURITY GATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE
ACCESS THROUGH THIS POINT WITH THE OWNER.
3. PROPOSED TAXIWAY OBJECT FREE AREA, (TYP.).
4. PROPOSED TAXILANE OBJECT FREE AREA, (TYP.).
5. PROPOSED UTILITY INFRASTRUCTURE TO BE INSTALLED (TYP.), SEE CU SERIES FOR MORE
INFORMATION.
6. PROPOSED 10'X10' ADA PUBLIC USE BATHROOM, SEE ARCHITECTURAL PLANS FOR MORE
INFORMATION.
7. PROPOSED DRAINAGE INFRASTRUCTURE,(TYP.), SEE CG SERIES FOR MORE INFORMATION.
8. PROPOSED PAVEMENT MARKINGS, (TYP.), SEE CS SERIES FOR MORE INFORMATION.
9. PROPOSED STORMWATER DRY RETENTION POND, SEE CG SERIES FOR MORE INFORMATION
10. PROPOSED UNLIT AIRFIELD GUIDANCE SIGN ON NEW CONCRETE BASE, SEE CS SERIES FOR MORE
INFORMATION.
PROPOSED ASPHALT
PAVEMENT, SEE CS
SERIES FOR MORE
INFORMATION
PROPOSED CONCRETE
PAVEMENT, SEE CS
SERIES FOR MORE
INFORMATION
EXISTING TREE
LINE, (TYP.)
EXISTING HANGAR
EXISTING
HANGAR
TAXIWAY A NE
W
T
AX
IL
AN
E A5
AIRPORT BLVD
EXISTING ROADWAY
EXISTING TAXIWAY
OBJECT FREE AREA,
(TYP.)
EXISTING TAXILANE
OBJECT FREE AREA,
(TYP.)
EXISTING HANGAR
EXISTING AIRPORT
FENCELINE, (TYP.)
EXISTING CONCRETE
AIRCRAFT PARKING APRON
EXISTING CATCH
BASIN, (TYP.)
W
IL
C O
D R
W
IL
CO
D
R
EXISTING HANGAR
EXISTING CANTILEVER GATE
TA
XI
LA
NE
A
TA
XI
LA
N
E A7
TAXIWAY A
EXISTING AIRPORT
PROPERTY LINE, (TYP.)
U.S. HWY 441
EXISTING POND
AIRPORT
ADMINISTRATION
EXISTING CAR
DEALERSHIP
EXISTING CAR
DEALERSHIP
PARKING LOT
AIRPORT BLVD
PARKING LOT
EXISTING HANGAR
EX
IS
TI
NG
H
AN
G
AR
EXISTING ACCESS ENTRANCE. CONTRACTOR SHALL
MAINTAIN THE ENTRANCE THROUGHOUT THE DURATION OF
THE PROJECT AND RESTORE TO ITS EXISTING CONDITION AT
THE END OF THE PROJECT. SEE DETAIL A3/CD501.
ACCESS ROAD
CONSTRUCTION
ACCESS ROAD
CONSTRUCTION SAFETY AND PHASING PLAN NOTESSHEET LEGEND & KEYED NOTES #
NE
W
T
AX
IW
AY
A
CO
NN
EC
TO
R
AMC, JCW
JUNE 2026
AS SHOWN
AVCON, INC.
ENGINEERS & PLANNERS
5555 E. MICHIGAN ST. SUITE 200 - ORLANDO,
FL 32822-2779
OFFICE: (407) 599-1122
FAX: (407) 599-1133
CORPORATE CERTIFICATE OF
AUTHORIZATION NUMBER: 5057
WWW.AVCONINC.COM
SEAL
SHEET
PROJECT NO./DASH NO.
APPROVED:
CHECKED:
DRAWN:
DATE:
SCALE:
N O
D
AT
E
R
EV
IS
IO
N S
D
ES
C R
IP
TI
O N
AV
IA
TI
O
N F
U
EL
F
AC
IL
IT
Y
LE
ES
BU
R G
IN
TE
R N
AT
IO
N
AL
A
IR
PO
R
T (K
LE
E)
, 8
AI
R
PO
R T
BL
VD
, L
EE
SB
U
R G
, F L
DANIEL J. NICKOLS, JR., P.E.
Lic. No. 78634
2024.236.04
GC501
C O
N
ST
R U
C
TI
O N
S
AF
ET
Y
PH
AS
IN
G
P
LA
N N
O
TE
S
AN
D D
ET
AI
LS
1 2 3 4
1 2 3 4
A
B
C
A
B
C
A1 CONSTRUCTION SAFETY PHASING NOTES
C4 HDPE LOW PROFILE BARRICADE
CONSTRUCTION SAFETY AND PHASING NOTES:
A. IF THE EXISTING TAXIWAYS ARE USED FOR SITE ACCESS, THE CONTRACTOR SHALL YIELD TO AIRCRAFT AT ALL TIMES, WITHOUT EXCEPTION. FLAGGERS SHALL BE UTILIZED AS NEEDED OR
REQUESTED BY THE ENGINEER/RPR TO FACILITATE TRAFFIC IN THESE AREAS.
B. WHEN WORK IN THE TAXIWAY OBJECT FREE AREA IS NECESSARY, THE CONTRACTOR SHALL NOTIFY THE OWNER 48 HRS PRIOR TO THE START OF WORK. TOFA WIDTH 85.5 FT OFF OF CENTERLINE.
C. THE CONTRACTOR SHALL PULL BACK FROM THE TAXIWAY OBJECT FREE AREA AS NEEDED TO ALLOW
TENANTS ACCESS TO EXISTING HANGARS. TOFA WIDTH 85.5 FT OFF OF CENTERLINE.
D. THE CONTRACTOR SHALL ADVISE THE AIRPORT MANAGER AND RPR AT LEAST ONCE A WEEK IN
ADVANCE OF SCHEDULE TO BEGIN CONSTRUCTION. AIRPORT WILL INITIATE THE ISSUANCE OF
PROPER CONSTRUCTION NOTAM(S).
PROJECT WORK AREAS:
A. THIS PROJECT SHALL BE COMPLETED WITHIN THE FOLLOWING STIPULATIONS:
a. AIRFIELD SAFETY AND SECURITY IS, AT ALL TIMES, THE HIGHEST PRIORITY.
b. AT NO TIME SHALL THE AIRFIELD PERIMETER SECURITY FENCE BE LEFT OPEN AND UNSECURED.
B. THE CONTRACTOR, OWNER ESCORT OR RPR SHALL COORDINATE CONSTRUCTION ACTIVITY WITH THE ATCT TO ENSURE THAT AIRCRAFT TRAFFIC IS KEPT CLEAR OF CONSTRUCTION ACTIVITIES.
C. AIRFIELD PAVEMENT AND ADJACENT ROADWAYS SHALL BE KEPT CLEAN OF DIRT/DEBRIS AT ALL TIMES. THE CONTRACTOR SHALL HAVE EQUIPMENT ON SITE AT ALL TIMES CAPABLE OF CLEANING THESE SURFACES. CLEANING OF AIRFIELD PAVEMENTS AND ADJACENT ROADWAYS SHALL BE DONE AS NEEDED OR AS DIRECTED BY THE OWNER OR ENGINEER. THIS SHALL BE INCIDENTAL AS IT IS A
NECESSARY PORTION OF THE WORK.
D. CONSTRUCTION ENTRANCES AND ACCESS ROADS SHALL BE CONTINUALLY MAINTAINED
THROUGHOUT THE DURATION OF THE PROJECT.
E. CONSTRUCTION ENTRANCES, ACCESS ROADS, ACCESS GATES, AND FENCE LINE SHALL BE
DELIVERED TO THE OWNER AT THE COMPLETION OF THE PROJECT IN LIKE-NEW CONDITION. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY AND ALL DAMAGE INFLICTED UPON
THESE FACILITIES AND INFRASTRUCTURE OVER THE DURATION OF THE PROJECT. THE
ENGINEER/OWNER SHALL DOCUMENT THE EXISTING CONDITION AND POST-CONDITION OF ALL
INFRASTRUCTURE AND FACILITIES. ANY MEASURABLE DAMAGE SHALL BE REPAIRED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
F. RESTORATION OF DISTURBED SURFACES SHALL BE COMPLETED AS SOON AS PRACTICAL TO
PREVENT EXCESSIVE EROSION.
GENERAL NOTES:
A. ALL VEHICLES IN THE CONSTRUCTION AREA MUST BE EQUIPPED WITH AN ORANGE AND WHITE
CHECKERED FLAG ON THE HIGHEST POINT OR A FLASHING/ROTATING AMBER CONSTRUCTION
BEACON.
B. THE CONTRACTOR SHALL CONDUCT ALL WORK IN ACCORDANCE WITH FAA ADVISORY CIRCULAR AC
150/5370-2G, OPERATIONAL SAFETY ON AIRPORTS DURING CONSTRUCTION.
C. THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR CONTACT INFORMATION OF KEY AIRPORT
PERSONNEL.
D. THE CONTRACTOR IS REQUIRED TO SUBMIT A SAFETY PLAN COMPLIANCE DOCUMENT (SPCD) IN
ACCORDANCE WITH THE FAA STANDARD OPERATION PROCEDURES FOR CONSTRUCTION SAFETY
PHASING PLANS. THE SPCD SHOULD BE WRITTEN FOLLOWING THE FORMAT OF ADVISORY CIRCULAR 150/5370-2G, CHAPTER 2, PAR. 2.4.2. A NOTICE TO PROCEED (NTP) WILL NOT BE ISSUED UNTIL THE
SPCD IS SUBMITTED.
INSPECTION REQUIREMENTS:
A. AT THE END OF EACH DAY, THE CONSTRUCTION AREA SHALL BE INSPECTED FOR ANY FOREIGN OBJECT DEBRIS (FOD) ON AIRFIELD OR NON AIRFIELD PAVEMENTS AND EXCESS CONSTRUCTION
MATERIALS LEFT IN THE TLOFA/TOFA.
B. AT THE BEGINNING OF EACH CONSTRUCTION DAY, THE CONTRACTOR AND RPR SHALL COORDINATE
WITH THE OWNER AND ATCT TO ENSURE THAT THE AIRCRAFT TRAFFIC HAS BEEN DIVERTED TO
PORTIONS OF THE AIRFIELD THAT WILL NOT BE AFFECTED BY THE CONSTRUCTION ON THAT DAY.
SAFETY REQUIREMENTS:
A. THE WORK OF THIS PROJECT REQUIRES WORKING IN THE VICINITY OF AND ADJACENT TO EXISTING TAXIWAYS. THE CONTRACTOR SHALL YIELD TO AIRCRAFT TRAFFIC AT ALL TIMES, AND SHALL MAKE
ALL NECESSARY ARRANGEMENTS TO PREVENT IMPACTS TO EXISTING TENANTS WITHOUT
PROPER/EXTENDED NOTICE.
B. DURING PERFORMANCE OF THIS CONTRACT, THE AIRPORT RUNWAYS AND TAXIWAYS SHALL REMAIN IN USE BY AIRCRAFT TO THE MAXIMUM EXTENT POSSIBLE. AIRCRAFT USE OF AREAS NEAR THE
CONTRACTOR'S WORK WILL BE CONTROLLED TO MINIMIZE DISTURBANCE TO THE CONTRACTOR'S
OPERATION. THE CONTRACTOR SHALL NOT ALLOW EMPLOYEES, SUBCONTRACTORS, SUPPLIERS OR ANY OTHER UNAUTHORIZED PERSON TO ENTER OR REMAIN IN ANY AIRPORT AREA WHICH WOULD BE
HAZARDOUS TO PERSONS OR TO AIRCRAFT OPERATIONS.
C. ALL WORK WHICH IS TOO CLOSE TO AN ACTIVE TAXIWAY TO BE PERFORMED UNDER OPERATIONAL CONDITIONS SHALL BE PERFORMED WHEN NOT IN USE. SUCH WORK SHALL NOT BE ACCOMPLISHED
WITHOUT PRIOR PERMISSION FROM THE OWNER OR ENGINEER.
D. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONS NECESSARY TO ENSURE THE SAFETY OF
OPERATING AIRCRAFT AS WELL AS THAT OF THEIR OWN EQUIPMENT AND PERSONNEL. THE
CONTRACTOR SHALL OBEY ALL INSTRUCTIONS AS TO ROUTES TO BE TAKEN BY EQUIPMENT
TRAVELING WITHIN THE AIRPORT AREA. THE CONTRACTOR SHALL MAKE THEIR OWN ESTIMATE OF
ALL DIFFICULTIES TO BE ENCOUNTERED.
E. THE CONTRACTOR OR THEIR PROJECT REPRESENTATIVE SHALL NOTIFY THE AIRPORT
REPRESENTATIVE PRIOR TO STARTING WORK EACH DAY AND WHEN WORK HAS BEEN COMPLETED
FOR THE DAY. IT SHALL ALSO BE THE CONTRACTOR OR THEIR REPRESENTATIVE'S RESPONSIBILITY
TO MAKE A THOROUGH CHECK OF THE WORK AREAS, TO SEE THAT ALL EQUIPMENT HAS BEEN
RETURNED AND PARKED IN THE PARKING AREAS DESIGNATED BY THE ENGINEER.
F. EQUIPMENT NOT ACTUALLY IN OPERATION SHALL BE KEPT CLEAR OF ACTIVE OPERATIONAL AREAS;
PERSONNEL SHALL NOT ENTER OR OPERATE EQUIPMENT WITHIN ACTIVE OPERATIONAL AREAS OF THE AIRPORT WITHOUT SPECIFIC PERMISSION FROM THE OFFICE OF THE AIRPORT REPRESENTATIVE.
G. WHEN ANY VEHICLE OTHER THAN THOSE APPROVED FOR USE IN THE AIRCRAFT MOVEMENT AREA IS REQUIRED TO TRAVEL OVER ANY PORTION OF THAT AREA, IT SHALL BE ESCORTED BY A VEHICLE PROPERLY IDENTIFIED TO OPERATE IN THE AREA AND BE PROVIDED WITH A FLAG ON A STAFF ATTACHED TO THE VEHICLE. A FLAG OR ESCORT VEHICLE IS NOT REQUIRED FOR VEHICLES WHICH HAVE BEEN PAINTED, MARKED AND LIGHTED FOR ROUTING USE ON AIRCRAFT MOVEMENT AREAS.
ANY VEHICLE OPERATING ON THE MOVEMENT AREA DURING THE HOURS OF DARKNESS SHALL BE
EQUIPPED WITH A FLASHING LIGHT IN ACCORDANCE WITH PARAGRAPH H BELOW.
H. ALL CONSTRUCTION EQUIPMENT AND VEHICLES WILL BE REQUIRED TO HAVE A FLAG ON STAFF OR A YELLOW/AMBER LENS ROTATING/FLASHING LIGHT MOUNTED ON THE ROOF OR SO ATTACHED TO THE VEHICLE THAT THE FLAG OR LIGHT WILL BE READILY VISIBLE. THE FLAG SHOULD BE NO LESS THAN 3
FEET SQUARE CONSISTING OF A CHECKERED PATTERN OF INTERNATIONAL ORANGE AND WHITE
SQUARES OF NOT LESS THAN ONE FOOT ON EACH SIDE.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .