U. S. Highway 27 Water Main Replacement
Solicitation number
IFB 26-016-HG
Issued by
Lake County, Florida

About this file

This is an Itemized Price Schedule document for the City of Leesburg, Florida's U.S. Highway 27 Water Main Replacement project (IFB 26-016-HG). The project involves replacing 5.5 miles of existing 10-inch water main pipe with 12-inch C900 pipe along U.S. Highway 27 from Middlesex Road to Highland Lake Boulevard. The base bid (Phase 1) encompasses 26 line items including mobilization, maintenance of traffic, construction staking, pressure testing, density testing, disinfection and bacteriological sampling, erosion control and silt fence installation (15,000 linear feet), open cut and repair of parking lot (3,200 square yards), installation of various PVC and directional bore pipes totaling approximately 18,270 linear feet, gate valves and boxes across multiple diameters (3 to 35 units), air release valves and vaults (9 units), water service connections (8 units), new fire hydrant assemblies (14 units), connections to existing water main (18 units), restoration with Bahia sod (15,000 square yards), and NPDES permit compliance. An additive alternate (Phase 2) includes similar work categories with reduced quantities, featuring 12,000 linear feet of silt fence, approximately 11,220 linear feet of pipe installation, 23 total valve and appurtenance units, and 12,000 square yards of sod restoration.

Bidders are required to complete the itemized price schedule by providing unit prices and total prices for all line items in both the base bid and additive alternate phases, with the final totals calculated for each phase and the combined project cost. The schedule requires the contractor to clearly identify their company name and provide an authorized bidder signature. Pricing should reflect all labor, equipment, tools, materials, supplies, and incidentals necessary to complete the work in accordance with the City's engineering design plans and associated specifications. The contractor must be a qualified, Florida-licensed Certified Contractor responsible for restoring any disturbed fencing, structures, or private property to original condition upon project completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Highway 27 Water Main Replacement

IFB 26-016-HG

ITEMIZED PRICE SCHEDULE

Item # Description Quantity Unit Unit Price Total Price

Phase 1 1 Mobilization 1 LS $ $

2 Maintenance of Traffic 1 LS $ $ 3 Construction Staking/As-Built 1 LS $ $ 4 Pressure Test Water Line 1 LS $ $ 5 Density Testing 1 LS $ $

6 Disinfection/Bac-T Sampling 1 LS $ $

7 Erosion Control/Silt Fence 15,000 LF $ $

8 Open Cut & Repair Parking Lot 3,200 SY $ $ 9 6" C900 PVC Pipe 180 LF $ $ 10 6" Gate Valve & Box 3 EA $ $ 11 8" C900 PVC Pipe 230 LF $ $ 12 8" Gate Valve & Box 9 EA $ $ 13 10" C900 PVC Pipe 110 LF $ $

14 10" Gate Valve & Box 3 EA $ $

15 10" Tapping Sleeve and Valve 1 EA $ $

16 12" C900 PVC Pipe 12,210 LF $ $ 17 12" Gate Valve & Box 35 EA $ $ 18 12" DIP Fittings 1 LS $ $ 19 14" PE 4710 Directional Bore 5,640 LF $ $ 20 2" Air Release Valve and Vault 9 EA $ $

21 Water Service Connection 8 EA $ $

22 New Fire Hydrant Assembly - Complete 14 EA $ $

23 Connect to Existing WM 18 EA $ $ 24 Temporary Jumper Connection 1 EA $ $ 25 Restoration - Bahia Sod 15,000 SY $ $ 26 NPDES Permit 1 LS $ $

Total Project Costs (Base Bid) $

Additive Alternate 1 (Phase 2) Item # Description Quantity Unit Unit Price Total Price

1 Mobilization 1 LS $ $ 2 Maintenance of Traffic 1 LS $ $ 3 Construction Staking/As-Built 1 LS $ $ 4 Pressure Test Water Line 1 LS $ $ 5 Density Testing 1 LS $ $ 6 Disinfection/Bac-T Sampling 1 LS $ $ 7 Erosion Control/Silt Fence 12,000 LF $ $ 8 10" C900 PVC Pipe 24 LF $ $ 9 10" Gate Valve & Box 3 EA $ $

10 10" Tapping Sleeve and Valve 2 EA $ $ 11 12" C900 PVC Pipe 9,182 LF $ $ 12 12" Gate Valve & Box 20 EA $ $ 13 12" DIP Fittings 1 LS $ $ 14 14" PE 4710 Directional Bore 2,014 LF $ $ 15 2" Air Release Valve and Vault 7 EA $ $ 16 Water Service Connection 8 EA $ $ 17 New Fire Hydrant Assembly - Complete 11 EA $ $ 18 Connect to Existing WM 3 EA $ $ 19 Temporary Jumper Connection 1 EA $ $ 20 Restoration - Bahia Sod 12,000 SY $ $ 21 NPDES Permit 1 LS $ $

Total Costs (Additive Alternate Bid 1) $

Total Cost (Base Bid + Additive Alternate Bid)

Company Name: ______________________________________________________

Bidder Signature: ______________________________________________________

File details come from the government source that posted it. Updated .