IFB_26-010-HG_Attachment_B_-_Itemized_Price_Schedule.pdf
PDF 123 KB Posted
- Attached to
- Carver Heights Stormwater Improvement Project
- Solicitation number
- IFB 26-010-HG
- Issued by
- Lake County, Florida
About this file
This is an Itemized Price Schedule attachment for Invitation for Bid 26-010-HG, issued by the City of Leesburg, Florida, for the Carver Heights Stormwater Improvement Project. The schedule details eleven base bid line items and two additive alternate options that bidders must price. Base bid work includes mobilization, maintenance of traffic, installation of 1,760 linear feet of staked turbidity barrier, clearing and grubbing of 0.42 acres, regular excavation of 208 cubic yards, embankment of 100 cubic yards, installation of 787 linear feet of Miami curb, 710 square yards of concrete sidewalk, 317 linear feet of six-foot chainlink fence, one fourteen-foot fence gate, and 1,623 square yards of performance turf. The additive alternates include pricing for 787 linear feet of Miami curb and 710 square yards of concrete sidewalks. Specification questions must be submitted by 5:00 p.m. on Monday, February 16, 2026, with bids due by 11:00 a.m. on Wednesday, March 4, 2026, followed by public bid opening via Zoom. Project completion is required within 90 calendar days from receipt of the Notice to Proceed. No pre-bid conference or mandatory site visit is required.
Bidders must complete all line items with unit prices and calculate total prices for base bid items, apply a 30 percent contingency, and provide a grand total bid figure. The successful bidder will be determined by the total base bid figure, excluding additive alternates. Bidders must submit the completed form with their proposal, including business name, contact person, email address, and authorized signature. A bid bond equal to five percent of the total bid price is required, and upon award, a performance and payment bond of not less than 100 percent of the total bid amount must be provided. No specific budget range or award value is published; however, the contractor will receive 95 percent of invoiced amounts upon completion, with final payment contingent upon proof that all labor, materials, and claims have been satisfied. Liquidated damages are assessed at $904 per day for project delays. The contractor must maintain a 10 percent maintenance bond following project completion and guarantee work for two years after acceptance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Carver Heights Stormwater Improvement Project
IFB 26-010-HG
Itemized Price Schedule
Item # Description Quantity Unit Unit Price Total Price
1 MOBILIZATION 1 LS $
2 MAINTENANCE OF TRAFFIC 1 LS $
3 STAKED TURBIDITY BARRIER – NYLON REINFORCED
PVC 1760 LF $
4 CLEARING AND GRUBBING 0.42 AC $
5 REGULAR EXCAVATION 208 CY $
6 EMBANKMENT 100 CY $
7 MIAMI CURB 787 LF $
8 CONCRETE SIDEWALK 710 SY $
9 6’ CHAINLINK FENCE 317 LF $
10 6’ FENCE GATE 14’ 1 EA $
11 PERFORMANCE TURF (SOD)(BAHIA) 1623 SY $
TOTAL $
CONTINGENCY
CONTINGENCY @ 30% TOTAL $
TOTAL BASE BID (In Figures) Added Alternate(s) Item # Description Quantity Unit Unit Price Total Price
1 MIAMI CURB 787 LF $
2 CONCRETE SIDEWALKS 710 SY $
TOTAL
GRAND BID TOTAL (In Figures)
NAME OF BUSINESS: ________________________________________
CONTACT PERSON: _________________________________________
EMAIL ADDRESS: ___________________________________________
AUTHORIZED SIGNATURE: ____________________________________
***Note: Successful bidder will be determined by the total base bid figure.
THIS FORM MUST BE COMPLETED AND RETURN WITH THE PROPOSAL BID FORM