IFB_26-002-HG_Attachment_C_-_US-27_Utility_Relocation_Itemized_Price_Schedule.pdf
PDF 125 KB Posted
- Solicitation number
- IFB 26-002-HG
- Issued by
- Lake County, Florida
About this file
This document is an Itemized Price Schedule (Attachment C) for Invitation for Bid (IFB) 26-002-HG involving a utility gas relocation project at US-27 and Florida's Turnpike. The price schedule outlines 10 separate line items for project activities, including mobilization/demobilization, maintenance of traffic, construction staking, density testing, pressure testing of gas main, erosion control, trench safety, connecting to existing gas main, grout filling of pipes, and restoration with Bahia sod. Most items are listed with a "Lump Sum" (LS) unit, with "Connects to Existing Gas Main" measured in each (EA) and "Grout Fill" measured in linear feet (LF) and square yards (SY).
The price schedule is designed for bidders to complete by filling in unit prices and total amounts for each line item, with a final total calculated at the bottom. The document provides a structured template for contractors to propose pricing for the gas utility relocation project, allowing for precise cost breakdown and comparison between potential bidders. While specific pricing details are not filled in on this template, it serves as a standardized mechanism for soliciting competitive bids for the utility relocation work along the Florida's Turnpike corridor.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAME OF BIDDER: ________________________________________________________________________________
00300 - 4
IFB 26-002-HG ATTACHMENT C - ITEMIZED PRICE SCHEDULE
Item Description Quantity Unit Unit Price Amount
1 Mobilization/Demobilization LS 2 Maintenance of Traffic LS 3 Construction Staking/As Built LS 4 Density Testing LS 5 Pressure Test Gas Main LS 6 Erosion Control/Silt Fence LS 7 Trench Safety & Temporary Shoring LS
8 Connect to Existing Gas Main EA
9 Grout Fill 6”, 8”, or 12” Pipe LF
10 Restoration – Bahia Sod SY
Total:
Project Name: US-27 Utility (Gas) Relocation at Florida’s Turnpike