INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION
Solicitation number
IFB 25/26-05
Issued by
Seminole County, Florida

About this file

Summary of IFB 25/26-05: Interior & Exterior Signage Fabrication & Installation

This Invitation for Bid (IFB) is issued by the City of Sanford, Florida, Purchasing Division, seeking qualified vendors to fabricate and install interior and exterior signage citywide on a term contract basis. The City requires a comprehensive range of signage products including standard traffic signs, parking and trespassing notices, handicapped violation signs, park identification signs, and various posts and mounting hardware. Bidders must submit sealed bids by July 2, 2026, at 2:00 P.M. Local Time to the Purchasing Division at 300 N. Park Avenue, Suite 243, Sanford, Florida 32771. The contract term is one year from the award date, with the opportunity for one additional one-year renewal period, with a maximum total contract length not to exceed one year as initially stated, although language regarding renewals suggests potential flexibility. No pre-bid conference will be held, though the City reserves the right to make one mandatory if deemed necessary. Written questions must be submitted electronically via VendorLink no later than June 25, 2026, at 2:00 P.M. Local Time. The project timeline includes one week for kickoff and planning following the Notice to Proceed, three to four weeks for equipment procurement and delivery, five to seven business days for on-site installation, and one to two days for system testing and turnover. Delivery coordination with Project Manager Robert Beall (Parks and Ground Division, 407.688.5000 ext. 5423) is required with 24-hour advance notice.

Bidders must be registered with the State of Florida (Sunbiz), have minimum three consecutive years of verifiable experience servicing commercial accounts equal in size and scope to the project, and currently serve at least three commercial accounts of similar magnitude. Pricing shall be firm and fixed, with all delivery and service call charges included in proposed prices; cost-plus pricing applies only to unspecified miscellaneous items with documentation of costs. A 5% Bid Bond is required, payable to the City of Sanford, issued by a surety rated "A-" or better by A.M. Best Company, or an alternative security such as certified check or money order. Upon award, a 100% Performance and Payment Bond or alternative security (certified check, irrevocable letter of credit, or cash) must be provided within ten calendar days. The contractor must respond to work orders within three business days with written quotes or estimates, provide service within two days of purchase order receipt unless otherwise agreed, and must respond within two hours for emergency requests. The contractor warrants all goods and services for no less than one year from acceptance date, with labor warranted for one year from completion, covering all defects in material and workmanship at no cost to the City. Contractor is responsible for all miscellaneous installation items (screws, bolts, caulk, cleaning materials), job site cleanup and debris disposal at an authorized landfill, and protection of the work area; damage to City property resulting from contractor performance shall be repaired at contractor expense. No minimum order requirement is stated, and the City reserves the right to solicit competitive quotes from other vendors for large quantity purchases while giving the awarded vendor first opportunity to quote.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Sanford | Finance Department | Purchasing Division

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

Issuance | Release Date: Tuesday, June 9, 2026

Legal Advertisement Date: Tuesday, June 9, 2026 (Orlando Sentinel)

To: All Prospective Bidders

From: Marisol Ordoñez – Purchasing Manager

Dear Potential Bidder:

The City of Sanford, Florida, a City herein after also referred to as the “City”, announces that it is accepting written bids from all qualified firms or individuals interested in providing the services generally described herein and as specified in the “Scope of Services” of this Invitation for Bid (IFB) document. The successful Bidder(s) must demonstrate in their submittal responsible and responsive Bidder to the solicitation with the lowest overall bid which will best meets the specifications and serves the overall needs of the City.

If you are interested in bidding, please read all requirements carefully and complete the bid in the manner as set forth in this IFB document. Your response is considered a binding offer to perform in the manner described in the bid and shall remain a firm offer for a period of one hundred eighty (180) days from public bid opening.

Also, please be aware that, under the competitive process, the stipulations set forth herein are fully binding on the Bidder to the extent that you confirm acceptance by your signature on Attachment “F”, Bid Price Schedule and Acceptance of Bid Terms and Conditions and complete Exhibit “A” Unit Price Sheet Schedule of Values.

There will NOT be a pre-bid conference held for this project. Questions regarding this solicitation must be received in writing at the address above no later than Thursday, June 25, 2026 at 2:00 P.M. Local Time.

Responses to those questions considered material to the solicitation shall be distributed via formal addenda and posted to the City of Sanford website: http://www.sanfordfl.gov

All Bidders are advised that under Chapter 119, Florida Statutes, all responses are deemed a public record and open to the public as provided for in said statute.

The City welcomes your bid. Bids must be prepared in accordance with the IFB instructions and will be evaluated by the City as stated herein. The City reserves the right to waive any formalities, to reject any or all bid submittals, or to re-advertise for bid submittals for these commodities/services. The City may withdraw all or part of this IFB at any time to protect the interests of the City. All bidders are asked to be thorough yet concise in their response. Failure to provide the response in the manner prescribed herein may be grounds for disqualification. Thank you for your interest in doing business with the City.

City of Sanford, Florida | Purchasing Division http://www.sanfordfl.gov/

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

TABLE OF CONTENTS

SECTION TITLE PAGE

NUMBER

I Instructions to Bidders 3 II Scope of Services and Technical Requirements 13 III Special Conditions 15 IV Evaluation, Rejection and Award Process 21 V General Terms and Conditions 27

ATTACHMENT TITLE PAGE

NUMBER

A Statement of No Proposal Submittal 50 B Conflict of Interest Statement 51 C Addendum Receipt Acknowledgement Certification 53 D Organizational Information 54 E Proposed Schedule of Subcontractor Participation 55 F Bid Price Schedule and Acceptance of Terms and Conditions 56 G References 57 H Compliance with the Public Record Law 58 I Solicitation Response Identification Label 60

Section 00618 Insurance Requirement Matrix Form 61 Vendor Package Form ACH/W9 64 Exhibit “A” Unit Price Sign Fabrication & Installation Schedule of Value

Exhibit “B” Signs Size and Dimension 75 Sample Contract 84

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

Section I. Instructions to Bidders

A. Requesting the Solicitation Document.

The IFB documents are available online at no charge at My VendorLink:

http://www.myvendorlink.com. Register as a vendor to download the solicitation documents. The City is not responsible for errors and omissions occurring in the transmission or downloading of any documents. In the event of any discrepancy between information on VendorLink and the hardcopy specifications, the terms of the hardcopy specifications shall prevail. For more information, call the Purchasing Division at (407) 688-5191 or 5030. Important: The desire of the City to pursue bid submittals shall in no way obligate the City to compensate you for your efforts or to execute a contract with your firm.

B. On-Line Service Provider Disclaimer.

VendorLink has no affiliation with the City other than as a service that facilitates communication between the City and its potential vendors. VendorLink is an independent entity and is not an agent or representative of the City.

The City of Sanford (City) Purchasing professionals provides, from time to time, for online bidding or the response to other forms of solicitation by means of online submissions such as by the specific means of the City using VendorLink (and Internet portal where vendors can register and receive electronic email notifications of upcoming solicitations as they become available) to accomplish an array of actions during the course of City procurement activities. The City does not accept any responsibility for the failure or inability of any vendor to engage in online bidding or the submission of any response to a City procurement activity or for any loss which may arise from the online activities of the City or a vendor’s reliance on information contained on the VendorLink website. Also, untimely submissions will be deemed to be inherently non-responsive and will not be considered in evaluating the competitive bids or responses submitted during the course of a City procurement activity.

C. Solicitation Documents from Third Party Providers.

The City Purchasing Division and its service provider My VendorLink https://www.myvendorlink.com/common/login.aspx are the only authorized sources of solicitation documents/forms. Solicitation documents/forms obtained from any other third party source may be an incomplete set of documents. Bidders using solicitation documents/forms obtained from any other third party source are advised to contact the City’s Purchasing Division to provide a contact name, mailing address, phone number, fax number, and email address to obtain a complete set of solicitation documents and to enable notification of required addenda.

D. Americans with Disabilities Act.

Persons with disabilities needing a special accommodation to participate in this bid should contact the Administration at Public Works Department, City Hall, 300 N. Park Avenue 2nd Floor, Sanford, Florida 32771, telephone 407.688.5080, not later than seven (7) days prior to the date on which the accommodation is requested.

https://www.myvendorlink.com/common/login.aspx

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

E. Office of Record.

The City of Sanford Purchasing Division shall be the official “office of record” for all information transactions and data disbursements associated with this solicitation. The Purchasing Division may be reached Monday through Thursday between 7:00 A.M. to 5:30 P.M., Local Time, via phone at

407.688.5028 or 5030 or via fax at 407.688.5021.

F. Public Records.

Under Chapter 119, Florida Statutes, all responses to this solicitation shall be considered public record subject to distribution pursuant to the request for records by any interested party in accordance with controlling law.

G. The Contractor must retain sufficient documentation to substantiate claims for payment under the Contract and all other records, electronic files, papers and documents that were made in relation to this Contract. Contractor must retain all documents related to the Contract for five years after expiration of the Contract, or, if longer, the period required by the General Records Schedules maintained by the Florida Department of State available at: http://dos.myflorida.com/library-archives/records-management/general-records-schedules/

H. IFB and/or Performance and Payment Bond.

Bonds are NOT required for this project.

1. IFB Security Bond: The IFB response shall be accompanied by a Bid Bond equaling five percent (5%) of the total IFB price. Failure to do so shall automatically render the Bidder as non-responsive.

a. The Bid Bond shall be made payable to the City of Sanford, issued by a Surety firm and through a reputable and responsible surety bond agency licensed to do business in the State of Florida.

i. The Surety must be rated as "A-”® or better as to strength by Best’s Insurance Guide, published by A. M. Best Company, Inc., located at 1 Ambest Road, Oldwick, New Jersey 08858. For the latest ratings and Insurance Guide, access www.ambest.com.

b. In lieu of a Bid Bond, the Bidder may request the deposit of another type of security, which may be acceptable in the sole discretion of the City (i.e., money order, certified or cashier’s check) drawn from a national or state bank whose deposits are insured by the Federal Deposit Insurance Corporation (FDIC), in the amount of five percent (5%) of the total Bid price. Checks must be made payable to the City of Sanford and shall accompany your bid submittal.

c. The terms of the IFB Security Bond shall be:

i. The Bidder shall enter into an Agreement if awarded a contract;

ii. The Surety (or alternate form of security forfeit) shall be responsible for the costs resulting from the failure of the Bidder to enter into an Agreement if awarded to the Bidder; including the increased costs associated with awarding to the next http://dos.myflorida.com/library-archives/records-management/general-records-schedules/ http://dos.myflorida.com/library-archives/records-management/general-records-schedules/

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

most responsive, responsible Bidder and costs associated with conducting the IFB process and letting the Agreement;

iii. To promptly enter into an Agreement to perform the work and furnish the required Performance and Payment Bond, if applicable;

iv. Any interest earned as a result of the City depositing the accepted Bid Bond into an interest-bearing account shall be retained by the City; and

d. Return of Bid Bond: As soon as the IFB responses have been evaluated, the City may, at its sole discretion, return or release the Bid Bonds, which in its sole judgment, would not likely be considered for award. All other Bid Bonds will be held until award of this project and the agreement has been executed by the successful Bidder; after which any remaining Bid Bonds will be returned to the respective Bidders. It shall be the sole responsibility of the Bidder to request in writing from the City the return of the Bid Bond or alternative form of security used.

2. Performance and Payment Bond: Upon award of this project, the successful Bidder shall furnish a Performance and Payment Bond, or alternative form of performance and payment security such as; a money order, certified or cashier’s check, cash (U.S. currency only), letter of credit;

equaling one hundred percent (100%) of the total amount awarded under this project. Receipt of said Performance and Payment Bond or alternative form of security; shall occur no later than ten

(10) calendar days after award of this project. No commencement of work shall be authorized by the City without receipt of the Performance and Payment Bond or alternative security.

a. The Performance and Payment Bond shall be submitted in the form of a Payment and Performance Bond; in the amount of one hundred percent (100%) of the total amount awarded under this project, made payable to the City of Sanford, issued by a Surety firm and through a reputable and responsible surety bond agency licensed to do business in the State of Florida.

i. The Surety must be rated as "A-”® or better as to strength by Best’s Insurance Guide, published by A. M. Best Company, Inc., located at 1 Ambest Road, Oldwick, New Jersey 08858. For the latest ratings and Insurance Guide, access www.ambest.com

b. In lieu of a Payment and Performance Bond, the successful Bidder may select one (1) of the below-listed alternative methods to provide the required security:

i. A certified or cashier’s check drawn from a national or state bank whose deposits are insured by the Federal Deposit Insurance Corporation (FDIC), in the amount of one hundred percent (100%) of the total amount awarded under this project, made payable to the City of Sanford;

ii. An irrevocable Letter of Credit drawn from a national or state bank whose deposits are insured by the Federal Deposit Insurance Corporation (FDIC), in the amount of one hundred percent (100%) of the total amount awarded under this project, made payable to the City of Sanford. The irrevocable Letter of Credit shall contain the following:

The “Beneficiary” shall be stated as:

City of Sanford

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

300 N. Park Avenue Sanford, Florida 32771

The Letter of Credit shall also contain the following language:

“It is a condition of this letter of credit that it shall be deemed automatically extended without amendment for one (1) year from the present or any future expiration date of this letter of credit unless at least forty-five (45) days prior to such expiration date we notify the beneficiary by certified mail that we elect not to consider this letter of credit renewed for such additional period.”

iii. Cash (U.S. currency only).

c. The terms of the Payment and Performance Bond or alternative form of security used shall be:

i. The successful Bidder shall assure faithful performance of this project;

ii. The successful Bidder shall assure timely payments to all persons providing labor, materials and/or supplies used in the performance of the work associated with this project;

iii. Any interest earned as a result of the City depositing the accepted certified or cashier’s check received into an interest-bearing account shall be retained by the City; and,

iv. Nothing in this section shall be construed to limit the authority of the City Commission, the City Manager, or the Purchasing Manager to require other security in addition to, or in lieu of, those bonds or in circumstances other than those specified herein, when in the best interest of the City.

d. Return of Payment and Performance Bond or alternative form of security used. It shall be the sole responsibility of the successful Bidder to request in writing from the City the return of the Payment and Performance Bond or alternative form of security used. The request shall be considered no earlier than thirty (30) calendar days upon completion and final acceptance of the City, or expiration in a satisfactory manner of the awarded Agreement associated with this project. Payment and Performance Bonds or alternative form of security used shall not be returned unless requested by the successful Bidder in writing.

I. Cone of Silence/Lobbying Black-Out Period; Questions Regarding the IFB

1. Lobbying is defined as any action taken by an individual, firm, association, joint venture, partnership, syndicate, corporation, and/or all other groups who seek to influence the decision of a City Commission Member, the City Manager, any requesting or evaluating City personnel during the black-out period.

2. A lobbying black-out period commences upon the issuance of this solicitation document.

a. For awards requiring City Commission approval concludes at the beginning of the meeting at which the City Commission will be presented the award(s) for approval or a request to provide authorization to negotiate an agreement(s). However, if the City

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

Commission refers the item back to the City Manager for further review or otherwise does not take action on the item, the Cone of Silence / Lobbying Black-out Period will be reinstated until such time as the City Commission meets to consider the item for action.

b. For awards requiring City Manager approval concludes upon issuance of a Notice of Intent to Award.

3. Bidders, Respondents, potential vendors, service providers, lobbyists, consultants, or vendor representatives shall not contact any City Commission member, the City Manager, any requesting or evaluating City personnel concerning an active Solicitation during the Cone of Silence / Lobbying Black-out Period.

4. All questions and inquiries concerning procedural matters shall be directed to the Purchasing Division. Any questions relating to the interpretation of specifications or any aspect of the solicitation process shall be addressed to the Purchasing Division, in writing, at least ten (10) calendar days before the proposed opening date or prior to the specific date and time specified in this solicitation for questions.

5. Contact or communications by Bidders to any City Commission member, the City Manager, any City personnel initiated during the Cone of Silence / Lobbying Black-Out Period, may result in disqualification from the Solicitation process by the Purchasing Division.

J. Pre-Bid Conference.

There will be no pre-bid conference for this project.

IMPORTANT NOTE: It is imperative that all Bidders have a clear understanding of the scope of services requirements. As such, the City reserves the right to change the non-mandatory pre-bid conference/to a mandatory pre-bid conference/or to schedule a mandatory pre-bid conference/non-mandatory pre-bid conference. Therefore, in the event a mandatory pre-bid conference is required and/or subsequently scheduled, attendance will be a pre-requisite for a bid submittal; and bid submittals will only be accepted from those who are represented at a mandatory pre-bid conference. Attendance at the pre-bid conference will be evidenced by the Bidder’s/representative’s signature on the attendance roster. In the event of a mandatory pre-bid conference, the time, date, and location of the meeting will be noted in the released Addendum notifying such requirements. Please plan your travel time accordingly.

K. Interpretation, Questions and Addenda.

All questions relating to this IFB document must be in writing on VendorLink electronically https://www.myvendorlink.com/common/login.aspx no later than 2:00 P.M. Local Time on Thursday, June 25, 2026.

1. It is the Bidder’s responsibility to become familiar with and fully informed regarding the terms, conditions, and specifications of this solicitation. Lack of understanding and/or misinterpretation of any portions of this solicitation document shall not be cause for withdrawal of bid after opening or for subsequent protest of award. Bidders must contact the Purchasing Division prior to bid opening, should clarification be required.

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

2. Any interpretations, clarifications, or changes will be made in the form of written addenda issued by the Purchasing Division.

3. Any oral communications will not be authoritative and will not be binding on the City.

4. It is the sole responsibility of the Bidder to contact the Purchasing Division prior to submitting a bid submittal to ascertain if any addenda have been issued, to obtain all such addenda, and to return executed addenda with each bid submittal.

5. Addenda will be available to all Bidders on http://www.myvendorlink.com

L. Preparation and Format.

Bid submittals must be prepared in a clear and concise manner to be responsive. Emphasis should concentrate on conformance to the IFB instructions, responsiveness to the requirements, as well as completeness and clarity of content.

M. Bid Completeness and Compliance.

Bid submittals shall contain the information as required in this solicitation. Failure to submit all information as requested, substantially incomplete or lack key information may be rejected by the City.

The following list details the appropriate proposal format:

1. All items contained in the bid must be in total compliance with the specifications of this solicitation.

2. Alternate bids will not be considered unless specifically called for in this solicitation.

3. Bidders’ attention is specifically called to the terms and conditions of this solicitation. As witnessed by the Bidder’s signature on Attachment “F”, Bid Price Schedule and Acceptance of Bid Terms and Conditions. All Bidders, without exception, will be solely responsible for all aspects of the terms, conditions, and special provisions of this solicitation.

N. Joint Ventures.

All Bidders intending to submit a bid response as a joint venture are required to have filed proper documents with the Florida Department of State, the Division of Professions, Construction Licensing Board and/or any other State or local licensing Agency prior to submitting a bid response. Please refer to Section 489.119 Florida Statutes.

Joint venture firms must provide an affidavit attesting to the formulation of a joint venture and provide either proof of incorporation as a joint venture or a copy of the formal Joint Venture Agreement between all joint venture parties, indicating their respective roles, responsibilities and levels of participation for the project.

O. Legal Entity States and Authorized Signatory.

The Bidder must demonstrate that the he/she/it is in good standing and authorized to conduct business in the State of Florida that the person signing this bid submittal is an Authorized Signatory on behalf of the Bidder to sign bid submittals, negotiate and agreements and related documents to which the Bidder will be duly bound. The Bidder must provide a printout of the status of the business whether sole proprietor, corporation, etcetera from the state of organization and its management personnel. In addition to the aforementioned documents, the Bidder must include necessary information to verify the individual http://www.myvendorlink.com/

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

signing this bid and or any contract document has been authorized to bind the corporation. Examples include:

Please be sure the bid is signed, properly witnessed, and sealed. Failure to so may result in disqualification.

P. Proprietary Information.

1. In accordance with Chapter 119 Florida Statutes (Public Records Law); and except as it may be provided by other applicable State and Federal Law, all Bidders should be aware the Bid documents are public records. Bidders must identify specifically any information contained in the bid submittals which they consider confidential or proprietary which are assertion to be exempt from disclosure, citing the applicable exempting law.

2. A generic notation that information is “confidential” is not sufficient. Failure to provide the Purchasing Division with a detailed explanation and justification including statutory cites and specific reference to your bid submittal assertion what provisions, if any, you believe are exempt from disclosure, may result in all documents being subject to disclosure in accordance with Chapter 119, Florida Statutes.

Q. Certification of Independent Price Determination.

By submission of a response, the Bidder certifies that in connection with this bid submittal:

1. The pricing associated with this bid submittal have been arrived at independently, without consultation, collusion, communication, or agreement for the purpose of restricting competition, as to any matter relating to such prices with any other Bidder or with any competitor.

2. Unless otherwise required by law, the prices which have been quoted on this bid have not been knowingly disclosed by the Bidder, and will not knowingly be disclosed by the Bidder, prior to opening, directly or indirectly to any other Bidder or to any competitor.

3. No attempt has been made or shall be made by the Bidder to induce any other person or Bidder to submit or not submit a bid for the purpose of restricting competition.

R. Bid Submittal Forms and Reproduction.

1. Bid Forms: All bids must be submitted on the City’s forms and must include all applicable completed attachments included herein. Bids on Bidder’s quotation forms shall not be accepted.

Please ensure all applicable required submittal documents are included with your bid response.

2. Reproduction: Please submit two (2) copies of the bid submittal package, one (1) unbound original and one (1) bound copy. The submittal MUST also include a single CD-ROM or memory stick containing the entire bid submittal formatted to be read with Microsoft® software products or Adobe® PDF software.

S. Cost of Submittal.

A cost related to the submittals are an operational cost of the Bidder and shall not be passed on to or be borne by the City. Any and all costs associated with the preparation of the bid will be the sole

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

responsibility of the Bidder. The City shall bear no responsibility for any costs associated with the preparation of the bid including, but not limited to, any administrative or judicial proceedings resulting from the solicitation process.

T. Improper Identification and Timeliness.

The City is not responsible for the failure of a Bidder or the Bidder’s agent to submit responses in a timely manner or for a bid submittal that is not properly addressed or identified. Bid submittals by email, telephone or fax shall be rejected as non-responsive regardless of where it is received.

U. Bid Submittal and Delivery.

1. Sealed bid submittals must be received in the City’s Purchasing Division no later than 2:00 P.M.

Local Time on Thursday, July 2, 2026. Bid submittals received after the stated date and time will not be accepted and will be returned unopened. Under no circumstances shall bids delivered after the time specified be considered. The City shall not be responsible for any occurrence for bid submittals delivered incorrectly or to the wrong address or location. No exceptions will be made. The decision to refuse to consider a bid that was received beyond the date/time established in the solicitation shall not be the basis of a protest. Bid submittals shall be delivered to the below address in a sealed, opaque envelope or packaging material, plainly marked on the outside with the following:

City of Sanford Purchasing Division 300 N. Park Avenue Suite 243 Sanford, Florida 32771 RE: Solicitation IFB 25/26-05 Solicitation Title: Interior & Exterior Signage Fabrication & Installation Date and time bid submittal is due.

Attention: Marisol Ordoñez, Purchasing Manager

For your convenience, Attachment “K”, Solicitation Response Identification Label has been provided to properly identify and affix to your IFB response.

2. If submitted by mail, the bid submittal shall be enclosed in a sealed envelope addressed as above.

Bids submitted by mail must be received by the Purchasing Division by the time specified herein for the opening thereof.

a. Please be advised that United States Postal Service (USPS) Express and Priority service class; are delivered to the City in accordance with their own schedule. Each Bidder is responsible for ensuring that their submittal is transmitted in such manner as necessary for deliver to the City as required.

b. The City only collects other USPS mail onetime (1) per day upon opening of the local Post Office branch, which is then sorted by the City for delivery to the Purchasing Division and other City departments. Submissions arriving at the USPS after the initial pick-up by the City will be placed in the City’s callbox for pick-up and will not be delivered to or received by the Purchasing Division until the next business day.

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

c. When using the USPS or any other mail delivery services, it is the sole responsibility of the Bidder to ensure that Proposals are received in the Purchasing Division by the due date and time. The City shall not be responsible for delays caused by any occurrence.

V. Public Opening of Bid Submittals.

Bid submittals will be announced publicly by the Purchasing Division on the due date and time or as soon thereafter as possible. The bidders’ name, their bid amounts and verification of bond submittal, if applicable, will be publicly announced. Sealed bids, proposals, or replies received by an agency pursuant to a competitive solicitation are exempt from public disclosure such time as the agency provides notice of an intended decision or until thirty (30) days after opening the bids, proposals, or final replies, whichever is earlier. All other information will be subject to Florida’s Open Government Laws.

W. Sub-Contractors.

Bidders must list any sub-contractors that are proposed to be used to accomplish the scope of services.

Please complete and submit Attachment “E”, Schedule of Proposed Subcontractor Participation. If no subcontractors are going to be used, check the box for “No Subcontracting (of any kind) will be utilized on this project” at the top of the form. The proposed subcontractors must be responsible in their own xxx.

X. W-9 Form.

Bidders that have not done business with the City or have not provided a W-9 within the last two (2) years must submit a W-9 with their bid submittal.

Y. Withdrawal of Bid Submittals.

Bid submittals may not be withdrawn for a period of one hundred eighty days (180) days after the public opening date. In the event an award is not made by the City within one hundred eighty days (180) from the public opening date, the Bidder may withdraw their bid submittal or provide a written extension of their bid submittal.

Z. Ownership of Documents.

All documents resulting from this IFB solicitation shall become the sole property of the City. All bid submittals received from Bidders in response to the IFB solicitation will become the property of the City and will not be returned to Bidders. In the event of an award, all documentation produced as part of the Contract will become the exclusive property of the City.

AA. Failure to Comply with Bid Instructions.

Failure to comply with any of the bid instructions in a manner prescribe herein or failure to adhere to the City’s purchasing policy and procedures may be grounds for disqualification of your bid submittal.

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

THIS PAGE LEFT INTENTIONALLY BLANK

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

Section II. Scope of Services and Technical Requirements

a. The City is pleased to process a formal sealed bid for the interior & exterior signage fabrication & installation for citywide signs. The City seeks to establish a term contract.

In addition, the City is seeking a highly qualified registered vendor with the State of Florida (sunbiz). The scope is fabricating and installing the signs citywide, as detailed below.

2.01 Scope of Work Services

2.01.1 CITY OF SANFORD is seeking Bids from experienced and qualified vendors interested in providing the goods and services referenced herein. The provision of the goods and services herein include, but is not limited to, purchasing and installing various signs throughout the district and the provision of all related labor, materials, supervision, equipment, incidentals, and related items necessary to complete the requests in accordance with the specifications herein.

2.01.2 This section identifies CITY OF SANFORD’ desired goods and services and levels of performance. The Bidder shall indicate a response to all service requirements and specifications contained herein. CITY OF SANFORD’ specifications herein are designed to enable a Bidder to satisfy the requirements for the goods and services herein. CITY OF SANFORD may express a specification as a standard, a part of a standard, or independent of a standard.

2.01.3 No specification shall not unnecessarily limit competition by eliminating items capable of satisfactorily meeting CITY OF SANFORD’ actual needs and preferences. The fact that a manufacturer or supplier chooses not to produce or supply equipment, supplies, or services to meet these specifications will not be enough cause to adjudge these specifications as restrictive.

2.01.4 The Bidder must acknowledge agreement and understanding with the requirements of the intent of the Scope of Services of this solicitation and provide reports or samples, as applicable. The Bidder must note any deviations from the specifications.

2.01.5 Detailed descriptions and/or illustrations, if applicable, are required with your Bid for consideration. Clearly indicate any exceptions to the Scope of Work of the solicitation or provide an alternative.

2.02 Equipment Supplied and Installed by Vendor

The following signage is required.

2.02.1 Authorized Vehicles/Personnel Only (Black on White) 18"x24"

2.02.2 Do Not Enter (Red on White) 30"x30"

2.02.3 Handicapped Violators will be fined $250.00 (White on Blue) 12"x18"

2.02.4 Stop Sign (White on Red) 30"x30"

2.02.5 No Parking (Black on White) 18'x24"

2.02.6 No Trespassing (Red on White) 18'x24"

2.02.7 Keep Gates Closed at All Times (Black on White) 18"x24"

2.02.8 Sign Base Only

2.02.9 City Park Sign Blade Only 54"

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

2.02.10 City Park Sign Blade Only 64"

2.02.11 City Park Sign and Base Single Sided 54"

2.02.12 City Park Sign and Base Double Sided 54"

2.02.13 City Park Sign and Base Single Sided 54" w/ Install

2.02.14 City Park Sign and Base Double Sided 54" w/ Install

2.02.15 City Park Sign and Base Single Sided 64"

2.02.16 City Park Sign and Base Double Sided 64"

2.02.17 City Park Sign and Base Single Sided 64" w/ Install

2.02.18 City Park Sign and Base Double Sided 64" w/ Install

2.02.19 Do Not Enter (Red on White) 24"x24"

2.02.20 Pets Must Be Leashed at All Times 18'x24"

2.02.21 U-Channel Galvanized Post 21 Gauge 10'x2"x2"

2.02.22 U-Channel Galvanized Post 21 Gauge 12'x2"x2"

2.02.23 2X2 OD, 14 Gauge, .083 Thickness Square Posts With 7/16” Die Cut Knockouts 2x2x10

2.02.24 Channel Galvanized Anchor Post-Break Away 30"x2-1/2"x2-1/2"

2.03 Estimate Project Timeline

2.03.1 Project Kickoff & Planning: 1 week after Notice to Proceed

2.03.2 Equipment Procurement & Delivery: 3–4 weeks

2.03.3 On-site Installation: 5–7 business days (weather permitting)

2.03.4 System Testing & Turnover: 1–2 days following installation.

2.04 Contact Information

The delivery of the products is critical; please notify the Project Manager (PM), Robert Beall Parks and Ground Division at 407.688.5000 ext. 5423. This project is on a time frame; therefore, the PM must be notified 24 hours before delivering the products to coordinate the delivery.

2.05 Changes In the Scope

CITY OF SANFORD may order changes in the products or services consisting of additions, deletions, or other revisions within the general scope of the solicitation. Unless accepted by a mutually signed written amendment, Contractor may make no changes related to the scope of the project, amount of compensation, or any other adjustments to the contract.

2.06 Projects Over $10,000 in Total Cost

The primary scope of this solicitation is for projects identified as having a total value not exceeding Ten Thousand ($10,000) Dollars. CITY OF SANFORD reserves the authority to use the contract for requirements exceeding $10,000 and may obtain competitive quotes from non-awarded participating Bidders for this solicitation deemed to be responsive and responsible or to seek competitive quotes via posting on www.myVendorLink.com, as deemed to be in the best interest of CITY OF SANFORD.

2.07 Services

2.07.1 The required services are listed herein, including necessary resources, deliverables, quality of performance and project requirements that the Contractor must comply with during the provision of goods and services. Specific Requirements. • The Contractor must be capable of

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

supplying signs in a variety of quantities and colors and must be able to deliver them to any designated District location.

2.07.2 All traffic signs are to comply with current Department of Transportation (DOT) standards.

In addition, all signs must meet applicable governmental regulations, including but not limited to code compliance, permits, and health, safety, fire, and environmental compliance, as well as any current Federal, State, or County requirements.

2.07.3 The scope of work includes the fabrication, painting, lettering, and delivery of the specified sign type to the appropriate Maintenance Department or District site.

2.07.4 CITY OF SANFORD will provide Contractors with a specification sheet containing the required drawings and details for any specialty signs, which are defined as signs with unique or non-standard lettering. Prior to fabrication, the vendor must submit a detailed drawing to the requesting Maintenance Department or District site for approval. No specialty sign may be fabricated without proper approval from the requested site.

2.07.5 All materials used in the production of signs must be free from defects and must have a smooth, clean finish. • All services shall be approved by a CITY OF SANFORD authorized representative or Project Coordinator.

2.07.6 Materials used shall be free from defects, smooth, and clean.

2.07.7 Where required, paint all surfaces in accordance with specifications and manufacturer instructions to ensure a clean, smooth finish before placing lettering.

2.07.8 For all vinyl lettering, install in accordance with specifications and manufacturer instructions on clean, painted surfaces only. All spacing and layout locations shall match the approved proof sheet and be level and straight.

2.07.9 For all requested installations, the Contractor shall have the ability to pick up all signs from various Maintenance locations and install signs within three (3) days of receiving the purchase order from the department. Pick-up times are the same as delivery times: Monday through Friday, 8:00 a.m. to 3:00 p.m., excluding weekends and holidays. Lettering: Apply vinyl lettering according to specifications on clean, painted surfaces only. All spacing and layout locations shall match the approved proof sheet and be level and straight.

2.07.10 The Contractor shall have the ability to research and procure signs (including bilingual or specialty signs) for special circumstances. The Contractor is also required to stay informed about new products relevant to CITY OF SANFORD, as well as any items that have been discontinued. For discontinued items, the Contractor will have to provide the department with an equal substitute.

2.07.11 CITY OF SANFORD reserves the right to add items to this bid as permanent items at a fixed price if the department determines a need to stock them in its warehouses.

2.07.12 CITY OF SANFORD also reserves the right to solicit quotes for items listed in this bid from other vendors when purchasing in large quantities, as determined by the department.

However, the District will first seek a quote from the awarded vendor(s) before pursuing options outside the bid. Wall-Mounted Panel Signs: Attach panel signs to wall surfaces using the methods indicated below:

2.07.13 Mechanical Fasteners: Use tamper-proof, flush-mounted, stainless steel (SS) mechanical fasteners placed through predrilled holes. Attach signs with fasteners and anchors suitable for secure attachment to the substrate, as recommended in writing by the sign manufacturer.

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

2.07.14 Midpoint Fasteners (for signs 14” wide or greater): Fasteners shall align with block coursing where applicable. Tolerance shall be less than or equal to 1/32". Panel signs must be mounted flush with the wall surface.

2.07.15 Sealant: Mount signs in a bed of sealant.

2.07.16 Silicone-Adhesive Mounting (when mounting on glass): Use liquid silicone adhesive, when recommended in writing by the manufacturer, to attach signs to irregular, porous, or vinyl-covered surfaces. Use double-sided vinyl tape, when recommended by the manufacturer, to hold the sign in place until the adhesive has fully cured. Where panel signs are scheduled or indicated to be mounted on glass, provide a matching plate on the opposite side of the glass to conceal mounting materials. Traffic Signs/Directional: All traffic signs must be standard Department of Transportation (DOT) signs and must fully comply with current DOT standards. These signs are to be aluminum with reflective lettering. Preferred sign sizes are noted below; however, in the event of a discrepancy, DOT size regulations are to be followed. Signs are to be mounted on 11-foot posts, with the bottom of the sign positioned 7 feet 2 inches above grade unless otherwise specified. Refer to the Manual on Uniform Traffic Control Devices (MUTCD), available online, for DOT standards. Lettering shall be 3-inch capital letters, and the sign color will be determined by the Supervisor of Sites and Utilities prior to ordering. School Signs: Exterior and interior signs are to be made of 1/8-inch thick, one-piece plastic laminate with raised, chemically welded type. Signs are to be mounted beside doors in a bed of sealant using tamperproof, stainless steel (SS), recessed screws.

2.07.17 All signs containing Braille will be raised copy routed from a solid surface; glued BBs will not be permitted.

2.07.18 Corners shall have a ½-inch radius.

2.07.19 Edges shall be beveled.

2.07.20 Fonts shall comply with applicable Building Code requirements.

2.07.21 Colors shall be selected by the Maintenance Department or the requesting District site owner from an approved color palette.

2.07.22 Signs shall be modular (as related to exposed block construction).

2.07.23 All room numbers shall comply with the City of Sanford Building Code number assigned by the CITY OF SANFORD.

2.07.24

2.08 Necessary Resources

2.08.1 CITY OF SANFORD will supply all signs and posts required for installation. The Contractor is responsible for providing all miscellaneous items necessary for installation, including screws, rivets, nuts, bolts, cleaning materials, glue, caulk, etc. The Departments will determine the installation method, including how signs are to be mounted and/or secured. If paint is needed following the installation or removal of signs, it will be supplied by the Department.

2.08.2 Signs must be installed at level, plumb, and at the specified heights. All sign surfaces must be free from distortion and other visible defects.

2.08.3 Where required, paint all surfaces in accordance with specifications and the manufacturer’s instructions to ensure a clean, smooth finish before placing lettering.

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

2.08.4 Wall Signs: Install signs on walls adjacent to the latch side of the door where applicable.

When a location is not indicated or possible, such as with double doors, install signs on the nearest adjacent walls. Locate to allow a person to approach within three (3) inches of the sign without encountering protruding objects or standing within the swing of the door.

2.08.5 Panel Signs: Provide panel signs that comply with the specified requirements for materials, thicknesses, finishes, colors, designs, shapes, sizes, and construction details. Ensure panel sign surfaces are smooth and constructed to remain flat under installed conditions, within a tolerance of ±1/16 inch when measured diagonally.

2.08.6 Anchors and Inserts: Provide nonferrous metal or hot-dip galvanized anchors and inserts for exterior installations and wherever corrosion resistance is required. Use toothed steel or lead expansion bolt devices for drilled-in-place anchors. Furnish inserts as required to be set into concrete or masonry work. Use stainless steel where required. After installation, clean soiled sign surfaces according to the manufacturer’s written instructions. Protect signs from damage until acceptance by the Owner.

2.08.7 Cast Acrylic Sheet: Use manufacturer’s standard materials and fabrication methods, incorporating the following requirements:

2.08.7.1.1 Plastic Laminate: Provide high-pressure laminate engraving stock with face and core plies in sharply contrasting colors, as selected by the Owner from the manufacturer’s full range.

2.08.7.1.2 Unframed Panel Signs: Fabricate signs with mechanically and smoothly finished, beveled edges and ½- inch radius corners.

2.08.8 Laminated Panels: Permanently laminate face panels to backing sheets using the manufacturer’s standard process.

2.08.9 Graphic Content and Style: Provide sign copy that complies with the requirements indicated in the Sign Schedule, including size, style, spacing, content, mounting height and location, materials, finishes, and colors.

2.08.10 Textile and Braille Copy: o Produce copy in accordance with ADA Accessibility Guidelines and ICC/ANSI A117.1. o Text shall be accompanied by Grade 2 Braille. o Characters must be precisely formed, with square-cut edges free from burrs and tool marks.

2.08.11 Panel Material: Use opaque acrylic sheet. o Raised copy shall have a thickness of not less than 1/32 inch. o Raised Braille copy shall be integral with the sign panel and chemically welded. o Glued Braille “BBs” are not permitted.

2.09 Deliverables

2.09.01 Below, CITY OF SANFORD identifies project deliverables required for the services to be successfully completed, including any time-sensitive milestones or deliverables: For all requested installations, the Contractor is to have the ability to pick up all signs from various Maintenance locations and install the signs within three (3) days of receiving the purchase order from the District. Pick up times are the same as delivery times: Monday through Friday, 8:00 a.m. to 3:00 p.m., excluding weekends and holidays. Quality Assurance:

2.09.02 All signs must comply with the Americans with Disabilities Act (ADA) and applicable code provisions as adopted by authorities having jurisdiction.

2.09.03 Examine substrates, areas, and conditions, with the Installer present, for compliance with installation tolerances and other conditions affecting the performance of the work.

300 N. Park Avenue 2nd Floor Suite 236 Sanford, Florida 32771 Phone: 407.688.5028 or 5030 | Fax: 407.688.5021

Solicitation Number

IFB 25/26-05

INVITATION FOR BID (IFB)

TERM CONTRACT

Due Date:

July 2, 2026

TITLE: INTERIOR & EXTERIOR SIGNAGE FABRICATION & INSTALLATION

2.09.04 Verify that items, including anchor inserts, are properly sized and correct to accommodate signs.

2.09.05 Examine supporting members to ensure that surfaces are at the elevations indicated or required to comply with authorities having jurisdiction, and that they are free from dirt and other deleterious materials.

2.09.06 Proceed with installation only after all unsatisfactory conditions have been corrected. • For signs supported by or anchored to permanent construction, advise installers of anchorage devices about specific placement requirements.