YARD PROGRAM – GROUP 16 SA/TAC
Solicitation number
IFB 2511 TCP
Issued by
Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington

About this file

This is an Invitation for Bid (IFB) 2511 TCP issued by the Washington State Department of Ecology for the Tacoma Smelter Plume Yard Program – Group 16 SA/TAC project. The project involves remediating soils contaminated with arsenic and lead at twenty single-family residential properties in Tacoma, Pierce County, Washington. The work includes implementing temporary construction controls, excavating contaminated soils, transporting and disposing of soil in a Subtitle D landfill, importing clean fill, installing geotextile fabric, grading and compacting fill, and restoring properties to pre-construction conditions. The virtual bid opening is scheduled for June 17, 2025, at 1:00 PM local time, with a voluntary pre-bid Zoom meeting on May 13, 2025. The project has a 220-day timeline for substantial completion and an additional 60 days for final completion.

The estimated bid range is $1,085,000.00 to $1,200,000.00, with voluntary participation goals of 10% Minority Business Enterprise (MBE), 6% Women Business Enterprise (WBE), 5% Washington Small Business, and 5% Veteran Owned Business. The project has a mandatory 15% apprenticeship utilization requirement as per RCW 39.04.320. Bidders must submit subcontractor lists within specified timeframes and provide certifications regarding nondiscrimination and wage laws. The bid documents can be accessed electronically through the Department of Ecology's Box.com page, with any amendments to be posted on the Washington Electronic Business Solution (WEBS) website. The project also includes a 60-day contractor landscape maintenance period for lawns and plantings.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

INVITATION FOR BIDS IFB 2511 TCP

SITE: TACOMA SMELTER PLUME

PROJECT: YARD PROGRAM – GROUP 16 SA/TAC

LOCATION: TACOMA, PIERCE COUNTY, WASHINGTON

VIRTUAL BID OPENING TIME: 1:00 P.M. (local time in Lacey, WA)

VIRTUAL BID OPENING DATE: Tuesday, June 17, 2025

ECOLOGY DIRECTOR: Casey Sixkiller

ECOLOGY PROGRAM: Toxics Cleanup Program

CONTRACTS OFFICER: James Petersen, P.E.

PROJECT MANAGER: Joe Rauzi

DATE: March 2025

This page left intentionally blank.

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 01 05 – CERTIFICATIONS PAGE

IFB 2511 TCP Certifications Page 00 01 05 - 1

TSP YP GROUP 16 SA/TAC

MARCH 2025

SECTION 00 01 05

CERTIFICATIONS PAGE

Technical Specifications in this document were prepared by the design professionals listed below. The names and stamps of the professional engineers and the specific sections for which they are responsible are presented below.

A. Registrant responsible for:

1. Sections 01 10 00; 01 50 00 of Division 01

2. All Sections of Division 02

3. All Sections of Division 31

4. All Sections of Division 32

Brett E. Larabee, P.E., License No. 53210 GeoEngineers, Inc.

1101 S. Fawcett Ave, Suite 200 Tacoma, WA 98402

END OF SECTION 00 01 05

SECTION 00 01 05 – CERTIFICATIONS PAGE

IFB 2511 TCP Certifications Page 00 01 05 - 2

This page left intentionally blank.

SECTION 00 01 10 – TABLE OF CONTENTS

IFB 2511 TCP Table of Contents 00 01 10 - 1

SECTION 00 01 10

TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 05 – Certification of Technical Specifications 00 01 10 – Table of Contents 00 11 16 – Invitation to Bid 00 21 13 – Instructions to Bidders 00 22 13 – Supplemental Bidder Responsibility Criteria 00 41 00 – Bid Forms 00 41 43 – Summary of Pay Items and Quantities 00 43 43 – Wage Rates Form 00 72 00 – General Conditions 00 73 00 – Supplementary Conditions 00 73 05 – Supplemental Federal Conditions for Owner Public Works Projects Funded with

Federal Assistance 00 73 19 – Health and Safety Requirements

DIVISION 01 – GENERAL REQUIREMENTS

01 10 00 – Summary 01 20 00 – Price and Payment Procedures 01 26 13 – Request for Interpretation (RFI) 01 31 00 – Project Management and Coordination 01 33 00 – Submittal Procedures 01 35 29.13 – Health, Safety, and Emergency Response Procedures for Contaminated Sites 01 35 43.10 – Green Construction Practices 01 40 00 – Quality Requirements 01 41 00 – Regulatory Requirements 01 42 00 – References 01 45 00 – Quality Control 01 50 00 – Temporary Facilities and Controls 01 57 13 – Temporary Erosion and Sediment Control 01 60 00 – Product Requirements 01 74 19 – Construction Waste Management and Disposal 01 77 00 – Closeout Procedures

DIVISION 02 – EXISTING CONDITIONS

IFB 2511 TCP Table of Contents 00 01 10 - 2

02 21 13 – Site Surveys 02 41 00 – Demolition 02 61 13 – Excavation and Handling of Contaminated Material 02 61 13.13 – Removal of Contaminated Soils Around Trees

DIVISION 31 – EARTHWORK

31 05 19.13 – Geotextiles for Earthwork 31 23 23.13 – Backfill

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 84 23 – Underground Sprinklers 32 91 13.16 – Mulching 32 92 19 – Seeding 32 92 23 – Sodding 32 93 00 – Plants 32 94 13 – Landscape Edging 32 96 00 – Transplanting

APPENDICES

APPENDIX A: ARSENIC AND LEAD RULES

A01 ARSENIC RULE (WAC 296-848)

A02 LEAD RULES (WAC 296-155-176, WAC 296-62-07521)

A03 TACOMA SMELTER PLUME CONSTRUCTION WORK IN ARSENIC AND LEAD

CONTAMINATED SOILS, OCTOBER 2016

APPENDIX B: TREE PROTECTION GUIDELINES

B01 TREE PROTECTION ON CONSTRUCTION AND DEVELOPMENT SITES

APPENDIX C: PERMITS

C01 YARD CLEANUP AND RESTORATION PLAN AGREEMENT

C02 SEPA - MITIGATED DETERMINATION OF NONSIGNIFICANCE (MDNS)

C03 STORMWATER POLLUTION PREVENTION PLAN (SWPPP)

APPENDIX D: SCHEDULES AND FORMS

D01 RFI FORM

D02 CLOSE OUT SCHEDULE

IFB 2511 TCP Table of Contents 00 01 10 - 3

APPENDIX E: NOISE ORDINANCE

E01 TACOMA MUNICIPAL CODE, CHAPTER 8.122 NOISE ENFORCEMENT

APPENDIX F: PROPERTY INFORMATON

F01 PROPERTY SPECIFIC CHEMICAL ANALYTICAL RESULTS

F02 PROPERTY SPECIFIC SUMMARY OF QUANTITIES

F03 PROPERTY SPECIFIC PHOTOGRAPHIC DOCUMENTATION

APPENDIX G: CONSTRUCTION DRAWINGS

G01 CONSTRUCTION DRAWINGS

END OF SECTION 00 01 10

SECTION 00 11 16 – INVITATION FOR BID

IFB 2511 TCP Invitation for Bid 00 11 16 - 1

SECTION 00 11 16

INVITATION FOR BID

PART 1 – GENERAL

1.01 BID INFORMATION

A. INVITATION FOR BID (IFB) NUMBER: IFB 2511 TCP

B. PROJECT TITLE: Tacoma Smelter Plume Yard Program – Group 16 SA/TAC

C. PROJECT LOCATION: Tacoma, Pierce County

D. ESTIMATED BID RANGE: $1,085,000.00 – $1,200,000.00

1.02 BID DOCUMENTS / PROJECT MANUAL

A. Bidders can access bid documents including the Project Manual as fully useable electronic documents thru the Department of Ecology’s Box.com page. The Project Manual includes bid specifications, appendices, plans, and addenda. Download all files in the Box.com folder:

https://app.box.com/s/fn5p7hiwt0rzrg9ftwtjmmbco7j8gs0c/folder/311187040612

B. In the event it becomes necessary to revise any part of the Project Manual, amendments will be placed as addenda on the Department of Enterprise Service’s Washington's Electronic Business (WEBS) Solution, WEBS for Vendors website.

1.03 PROJECT SCOPE/SUMMARY OF WORK

A. This project remediates soils contaminated with arsenic and lead by operations at the former Tacoma Asarco Smelter at twenty (20) single family residential properties located in Tacoma, Pierce County, Washington. In general, the work at each property includes:

implementing temporary construction controls for safety and environmental protections;

https://app.box.com/s/fn5p7hiwt0rzrg9ftwtjmmbco7j8gs0c/folder/311187040612 https://app.box.com/s/fn5p7hiwt0rzrg9ftwtjmmbco7j8gs0c/folder/311187040612 https://pr-webs-vendor.des.wa.gov/

IFB 2511 TCP Invitation for Bid 00 11 16 - 2 excavating arsenic and lead contaminated soils; transporting and disposing of excavated contaminated soil in a Subtitle D landfill; importing clean fill materials;

installing a geotextile fabric barrier; placing, grading and compaction of fill; restoring the properties to preconstruction conditions; and restoration of site features including landscape and lawn restoration and landscape maintenance, all in accordance with the requirements of the Project Manual.

B. The project requires a 60-day contractor landscape maintenance period for lawns (sod or hydroseed) and landscape plantings, which begins after completion of seeding or sod installation for lawns and after completion of landscape shrub and plant installation on each property.

C. SCHEDULE: The schedule for the Project is as follows:

1. The number of days to achieve Substantial Completion = 220

2. The number of days to achieve Final Completion = 60

The number of days the Project shall achieve Substantial Completion are calendar days from the date of the Notice to Proceed. The number of calendar days to achieve Final Completion are from the date of Substantial Completion.

1.04 VIRTUAL PRE-BID MEETING

A. A voluntary virtual pre-bid walk-through will be presented via Zoom.

When: May 13, 2025, 01:00 PM Pacific Daylight Time (US and Canada)

Join Zoom Meeting: Group 16 SA/TAC Pre-Bid Zoom Meeting

Zoom Meeting ID: 863 7767 3399

Passcode: 980924

One tap mobile: +12532050468,,86377673399#,,,,*980924#US +12532158782,,86377673399#,,,,*980924#US (Tacoma)

Dial by your location: +1-253-205-0468 US +1-253-215-8782 US (Tacoma)

Find your local number: https://waecy-wa-gov.zoom.us/u/ko373RvH3 https://waecy-wa-gov.zoom.us/j/86377673399?pwd=qqf1aJtUOwebAcM0bsATtY6tBjUexo.1 https://waecy-wa-gov.zoom.us/u/ko373RvH3

IFB 2511 TCP Invitation for Bid 00 11 16 - 3

B. While the virtual pre-bid walk-through meeting is voluntary, it is highly recommended that all prospective bidders attend this meeting. Bidders who do not attend the voluntary pre-bid walk- through meeting must rely solely on the bid documents describing the work to prepare their bid. Note: Please contact the project manager listed in SECTION 00 11 16, 1.09 A. at least five working days prior to the scheduled pre-bid date if special accommodations are required for your attendance.

C. Questions asked at the pre-bid meeting and the list of pre-bid meeting attendees will be posted on the Department of Ecology’s Box.com page at the link listed in SECTION 00 11 16, 1.02 A.

1.05 BID SUBMITTAL TIME / DATE / LOCATION

A. Ecology will be accepting mailed-in or hand-delivered bids. Ecology will accept hand delivered bids only on the day of bid opening following the directions below. Electronic bids (e-submission) will NOT be accepted. Bidders should allow sufficient time to ensure timely receipt of their bid.

B. SEALED BIDS will be accepted for IFB 2511 TCP “Tacoma Smelter Plume Yard Program – Group 16 SA/TAC" by the State of Washington Department of Ecology (Ecology) until 1:00 p.m. (local time in Lacey, WA), Tuesday, June 17, 2025.

Clearly identify it is a “SEALED BID” on the outside of the envelope and identify the Project Title and IFB number to ensure that the bid is routed correctly.

C. MAILED-IN BID PROPOSALS must be received by Ecology prior to the date and time specified in SECTION 00 11 16, 1.05 B above.

Mailed-in proposals shall be addressed as follows:

U.S. Postal Service Regular Mail UPS, FEDEX

Department of Ecology Toxics Cleanup Program Attn: Jim Petersen, P.E.

PO BOX 47600

Olympia, Washington 98504-7600

Department of Ecology Toxics Cleanup Program Attn: Jim Petersen, P.E.

300 Desmond Drive SE Lacey, Washington 98503

D. HAND DELIVERED BID PROPOSALS will only be accepted at Ecology’s Headquarters on the day listed above in SECTION 00 11 16, 1.05 B between the hours of 9:00 a.m.

and 1:00 p.m. (local time in Lacey, WA). Hand delivered bid proposals must be given to the Ecology Headquarters front desk staff.

IFB 2511 TCP Invitation for Bid 00 11 16 - 4

Hand delivered bids shall be addressed as follows:

Department of Ecology Toxics Cleanup Program Attn: Jim Petersen, P.E.

300 Desmond Drive SE Lacey, Washington 98503

1.06 SUBCONTRACTOR LISTING SUBMITTAL(S)

A. The subcontractor listing requirements are described below in Notice to Bidders, Item E., and if applicable include two submittals as follows:

1. Form A, (HVAC, Plumbing, Electrical): Within one hour after bid submittal time/date, submit Form A by email to: tcphqpwcontracts@ECY.WA.GOV.

2. Form B (Structural Steel Install, Rebar Install): Within 48 hours of bid submittal time, submit Form B by email to: tcphqpwcontracts@ECY.WA.GOV.

B. Forms A and B are located in the Project Manual (SECTION 00 41 00 – BID FORMS), which can be downloaded at the link presented in SECTION 00 11 16, 1.02 A.

1.07 VIRTUAL AND IN-PERSON PUBLIC BID OPENING

A. All Ecology Public Works Bid Openings will be conducted in person and via a live stream through Zoom. A link to the live stream for bid opening is provided below. If you have questions, please contact us using Ecology’s Point of Contact information provided at the end of this invitation.

When: June 17, 2025, 01:00 PM Pacific Time (US and Canada)

Join Zoom Meeting: Group 16 SA/TAC Bid Opening Zoom Meeting

Zoom Meeting ID: 846 8375 9538

Passcode: 163353

One tap mobile: +12532050468,,84683759538#,,,,*163353# US +12532158782,,84683759538#,,,,*163353# US (Tacoma)

Dial by your location: +1-253-205-0468 US +1-253-215-8782 US (Tacoma)

Find your local number: https://waecy-wa-gov.zoom.us/u/ko373RvH3 mailto:tcphqpwcontracts@ECY.WA.GOV mailto:tcphqpwcontracts@ECY.WA.GOV https://waecy-wa-gov.zoom.us/j/84683759538?pwd=vVAp1ostPor5FXRG4xxu84TC6rcOxH.1 https://waecy-wa-gov.zoom.us/u/ko373RvH3

IFB 2511 TCP Invitation for Bid 00 11 16 - 5

1.08 NOTICE TO BIDDERS

A. PRE-BID SITE ACCESS: The sites are residential properties with occupied single-family homes and Prospective Bidders will only have access to the sites from the rights-of-way.

B. GENERAL: Upon contract award, the construction and successful completion of this project as defined in the Project Manual shall be the responsibility of the awarded Contractor, which is registered in the State of Washington.

This responsibility extends to work accomplished by subcontractors, vendors, and material and equipment suppliers through agreements with the Contractor. The Contractor shall assure that all personnel performing work in connection with this contract are familiar with the Project Manual including applicable procedures (including payment procedures), instructions, and technical requirements of this contract to ensure that construction proceeds to Final Completion and Final Acceptance in an orderly manner.

All work shall be done in accordance with the best modern construction practices and under the supervision of capable superintendents, foremen, and workmen fully experienced in their field of work.

C. VOLUNTARY MWBE AND VETERAN OWNED BUSINESS PARTICIPATION GOALS:

Voluntary participation goals of 10% MBE, 6% WBE, 5% Washington Small Business and 5% Veteran Owned Business have been established for this project. Achievement of these goals is encouraged. However, unless required by federal statutes, regulations, grants, or contract terms referenced in the contract documents, no preferences will be included in the evaluation of bids, and no minimum level of participation shall be required as a condition for receiving an award or completion of the contract work, and bids will not be rejected or considered non-responsive on that basis. Bidders may contact the Office of Minority and Women’s Business Enterprise to obtain information on certified MWBE firms and the Washington Department of Veteran’s Affairs for information on certified Veteran owned businesses.

Bidders may contact the Office of Minority and Women's Business Enterprise (OMWBE) at http://OMWBE.wa.gov/ to obtain information on certified firms. Bidders may also utilize Washington Small Businesses registered in WEBS at https://pr-webs-vendor.des.wa.gov/ and Veteran-owned Businesses at https://www.dva.wa.gov/veterans-their-families/veteran-owned-businesses/vob-search.

D. APPRENTICESHIP UTILIZATION REQUIREMENTS: The apprenticeship utilization requirement for this project is a percent of the total labor hours.

http://omwbe.wa.gov/ https://pr-webs-vendor.des.wa.gov/ https://www.dva.wa.gov/veterans-their-families/veteran-owned-businesses/vob-search

IFB 2511 TCP Invitation for Bid 00 11 16 - 6

1. The Mandatory Apprenticeship Utilization Requirement is 15%

RCW 39.04.320 requires 15% Apprenticeship Participation for all projects estimated to cost one million dollars or more. Bidders may contact the Department of Labor and Industries, Specialty Compliance Services Division, Apprenticeship Section, P.O. Box 44530, Olympia, WA 98504-4530, by phone (360) 902-5320, and e-mail at apprentice@lni.wa.gov, to obtain information on available apprenticeship programs.

E. SUBCONTRACTOR LISTS FOR THIS PROJECT: In accordance with RCW 39.30.060, if the base bid and the sum of the additive alternates is one million dollars or more, the Bidder is required to provide the names of the Subcontractors with whom the Bidder will directly subcontract for the performance of heating, ventilation and air conditioning (HVAC), plumbing and electrical for this project on Subcontractor List Form A within one hour of the bid submittal time via email to tcphqpwcontracts@ECY.WA.GOV. The Bidder shall also provide names of the Subcontractors with whom the Bidder will subcontract for structural steel installation and rebar installation on Subcontractor List Form B within 48 hours of the bid submittal time via email to tcphqpwcontracts@ECY.WA.GOV. Form A and B are located in the Project Manual as an attachment to SECTION 00 41 00 – BID FORMS.

Note: The requirement for submitting both Form A and Form B applies regardless if there is NO performance of heating, ventilation and air conditioning (HVAC), plumbing and electrical (Form A Work): NOR any structural steel installation and rebar installation (Form B work) on this project. In such cases, where there is no Form A Work and no Form B work on the project, the Bidder shall indicate “not applicable” as appropriate on the forms. Ecology reserves the right not to VOID bids in cases were Form A Work and Form B Work are not part of the project, and when a Bidder failed to submit Form A and Form B within the time frames identified above.

F. NONDESCRIMINATION REQUIREMENT: During the term of this Contract, Bidder, including any subcontractor, shall not discriminate on the bases enumerated at RCW 49.60.530(3). Pursuant to legislative enactment, Bidder shall certify it has not willfully violated Washington’s nondiscrimination law, RCW 49.60.530(3), 9 RCW. Refer to RCW 39.26.160 (2) (f) for requirements. Bidder is to submit a completed Nondiscrimination Certification form in section 00 41 00.

G. WAGE LAWS AND WORKERS’ RIGHTS CERTIFICATIONS: Pursuant to legislative enactment, Bidder shall certify it has not willfully violated Washington’s wage laws.

Bidder is to submit the completed Workers Rights Certification form in Section 00 41 00.

Pursuant to the Washington State Governor’s Executive Order 18-03, the Washington mailto:apprentice@lni.wa.gov mailto:tcphqpwcontracts@ECY.WA.GOV mailto:tcphqpwcontracts@ECY.WA.GOV

IFB 2511 TCP Invitation for Bid 00 11 16 - 7

State Department of Ecology is seeking to contract with qualified entities and business owners who certify that their employees are not, as a condition of employment, subject to mandatory individual arbitration clauses and class or collective action waivers.

H. BIDDER RESPONSIBILITY CRITERIA WILL BE EVALUATED FOR THIS PROJECT:

See SECTION 00 21 13 – INSTRUCTIONS TO BIDDERS and SECTION 00 22 13 – SUPPLEMENTAL BIDDER RESPONSIBILITY CRITERIA for the mandatory and supplemental bidder responsibility criteria for this project.

I. Ecology reserves the right to accept or reject any or all bid proposals and to waive as informality any minor irregularities of any bid received.

1.09 OWNER POINT(S) OF CONTACT

A. Project Technical Questions or Comments: Direct all questions to the Ecology project team by email. The email should include all members of the Ecology Project team.

These members are listed in the following table.

Team Member Email Phone Jim Petersen, P.E.

TCP Contracts Officer jimp461@ecy.wa.gov 509-601-9779

Joe Rauzi Project Manager Southwest Regional Office jrau461@ecy.wa.gov 564-669-3114

B. Bidding Questions for Owner’s Contract Officer: Bidders with bidding questions and/or experiencing trouble accessing the TCP Public Share site can contact the TCP Contracts Officer listed above for assistance.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

END OF SECTION 00 11 16

mailto:jimp461@ecy.wa.gov mailto:jrau461@ecy.wa.gov

PROJECT MANUAL
SECTION 00 01 05 CERTIFICATIONS PAGE
A. Registrant responsible for:
1. Sections 01 10 00; 01 50 00 of Division 01
2. All Sections of Division 02
3. All Sections of Division 31
4. All Sections of Division 32
SECTION 00 01 10 TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
DIVISION 01 – GENERAL REQUIREMENTS
DIVISION 02 – EXISTING CONDITIONS
DIVISION 31 – EARTHWORK
DIVISION 32 – EXTERIOR IMPROVEMENTS
APPENDICES
APPENDIX A: ARSENIC AND LEAD RULES
APPENDIX B: TREE PROTECTION GUIDELINES
APPENDIX C: PERMITS
APPENDIX D: SCHEDULES AND FORMS
APPENDIX E: NOISE ORDINANCE
APPENDIX F: PROPERTY INFORMATON
APPENDIX G: CONSTRUCTION DRAWINGS
SECTION 00 11 16 INVITATION FOR BID
PART 1 – GENERAL
1.01 BID INFORMATION
A. INVITATION FOR BID (IFB) NUMBER: IFB 2511 TCP
B. PROJECT TITLE: Tacoma Smelter Plume Yard Program – Group 16 SA/TAC
C. PROJECT LOCATION: Tacoma, Pierce County
D. ESTIMATED BID RANGE: $1,085,000.00 – $1,200,000.00
1.02 BID DOCUMENTS / PROJECT MANUAL
A. Bidders can access bid documents including the Project Manual as fully useable electronic documents thru the Department of Ecology’s Box.com page. The Project Manual includes bid specifications, appendices, plans, and addenda. Download all files in...
https://app.box.com/s/fn5p7hiwt0rzrg9ftwtjmmbco7j8gs0c/folder/311187040612
B. In the event it becomes necessary to revise any part of the Project Manual, amendments will be placed as addenda on the Department of Enterprise Service’s Washington's Electronic Business (WEBS) Solution, WEBS for Vendors website.
1.03 PROJECT SCOPE/SUMMARY OF WORK
A. This project remediates soils contaminated with arsenic and lead by operations at the former Tacoma Asarco Smelter at twenty (20) single family residential properties located in Tacoma, Pierce County, Washington. In general, the work at each proper...
B. The project requires a 60-day contractor landscape maintenance period for lawns (sod or hydroseed) and landscape plantings, which begins after completion of seeding or sod installation for lawns and after completion of landscape shrub and plant ins...
C. SCHEDULE: The schedule for the Project is as follows:
1. The number of days to achieve Substantial Completion = 220
2. The number of days to achieve Final Completion = 60

The number of days the Project shall achieve Substantial Completion are calendar days from the date of the Notice to Proceed. The number of calendar days to achieve Final Completion are from the date of Substantial Completion.

1.04 VIRTUAL PRE-BID MEETING
A. A voluntary virtual pre-bid walk-through will be presented via Zoom.
B. While the virtual pre-bid walk-through meeting is voluntary, it is highly recommended that all prospective bidders attend this meeting. Bidders who do not attend the voluntary pre-bid walk- through meeting must rely solely on the bid documents desc...
C. Questions asked at the pre-bid meeting and the list of pre-bid meeting attendees will be posted on the Department of Ecology’s Box.com page at the link listed in SECTION 00 11 16, 1.02 A.
1.05 BID SUBMITTAL TIME / DATE / LOCATION
A. Ecology will be accepting mailed-in or hand-delivered bids. Ecology will accept hand delivered bids only on the day of bid opening following the directions below. Electronic bids (e-submission) will NOT be accepted. Bidders should allow sufficient ...
B. SEALED BIDS will be accepted for IFB 2511 TCP “Tacoma Smelter Plume Yard Program – Group 16 SA/TAC" by the State of Washington Department of Ecology (Ecology) until 1:00 p.m. (local time in Lacey, WA), Tuesday, June 17, 2025.
Clearly identify it is a “SEALED BID” on the outside of the envelope and identify the Project Title and IFB number to ensure that the bid is routed correctly.
C. MAILED-IN BID PROPOSALS must be received by Ecology prior to the date and time specified in SECTION 00 11 16, 1.05 B above.
D. HAND DELIVERED BID PROPOSALS will only be accepted at Ecology’s Headquarters on the day listed above in SECTION 00 11 16, 1.05 B between the hours of 9:00 a.m. and 1:00 p.m. (local time in Lacey, WA). Hand delivered bid proposals must be given to t...
1.06 SUBCONTRACTOR LISTING SUBMITTAL(S)
A. The subcontractor listing requirements are described below in Notice to Bidders, Item E., and if applicable include two submittals as follows:
1. Form A, (HVAC, Plumbing, Electrical): Within one hour after bid submittal time/date, submit Form A by email to: tcphqpwcontracts@ECY.WA.GOV.
2. Form B (Structural Steel Install, Rebar Install): Within 48 hours of bid submittal time, submit Form B by email to: tcphqpwcontracts@ECY.WA.GOV.

B. Forms A and B are located in the Project Manual (SECTION 00 41 00 – BID FORMS), which can be downloaded at the link presented in SECTION 00 11 16, 1.02 A.

1.07 VIRTUAL AND IN-PERSON PUBLIC BID OPENING
A. All Ecology Public Works Bid Openings will be conducted in person and via a live stream through Zoom. A link to the live stream for bid opening is provided below. If you have questions, please contact us using Ecology’s Point of Contact information...
1.08 NOTICE TO BIDDERS
A. PRE-BID SITE ACCESS: The sites are residential properties with occupied single-family homes and Prospective Bidders will only have access to the sites from the rights-of-way.
B. GENERAL: Upon contract award, the construction and successful completion of this project as defined in the Project Manual shall be the responsibility of the awarded Contractor, which is registered in the State of Washington.
This responsibility extends to work accomplished by subcontractors, vendors, and material and equipment suppliers through agreements with the Contractor. The Contractor shall assure that all personnel performing work in connection with this contract a...
All work shall be done in accordance with the best modern construction practices and under the supervision of capable superintendents, foremen, and workmen fully experienced in their field of work.
C. VOLUNTARY MWBE AND VETERAN OWNED BUSINESS PARTICIPATION GOALS: Voluntary participation goals of 10% MBE, 6% WBE, 5% Washington Small Business and 5% Veteran Owned Business have been established for this project. Achievement of these goals is encour...
Bidders may contact the Office of Minority and Women's Business Enterprise (OMWBE) at http://OMWBE.wa.gov/ to obtain information on certified firms. Bidders may also utilize Washington Small Businesses registered in WEBS at https://pr-webs- vendor.des...
D. APPRENTICESHIP UTILIZATION REQUIREMENTS: The apprenticeship utilization requirement for this project is a percent of the total labor hours.
1. The Mandatory Apprenticeship Utilization Requirement is 15%
RCW 39.04.320 requires 15% Apprenticeship Participation for all projects estimated to cost one million dollars or more. Bidders may contact the Department of Labor and Industries, Specialty Compliance Services Division, Apprenticeship Section, P.O. Bo...
E. SUBCONTRACTOR LISTS FOR THIS PROJECT: In accordance with RCW 39.30.060, if the base bid and the sum of the additive alternates is one million dollars or more, the Bidder is required to provide the names of the Subcontractors with whom the Bidder wi...
Note: The requirement for submitting both Form A and Form B applies regardless if there is NO performance of heating, ventilation and air conditioning (HVAC), plumbing and electrical (Form A Work): NOR any structural steel installation and rebar insta...
F. NONDESCRIMINATION REQUIREMENT: During the term of this Contract, Bidder, including any subcontractor, shall not discriminate on the bases enumerated at RCW 49.60.530(3). Pursuant to legislative enactment, Bidder shall certify it has not willfully ...
G. WAGE LAWS AND WORKERS’ RIGHTS CERTIFICATIONS: Pursuant to legislative enactment, Bidder shall certify it has not willfully violated Washington’s wage laws. Bidder is to submit the completed Workers Rights Certification form in Section 00 41 00. Pur...
H. BIDDER RESPONSIBILITY CRITERIA WILL BE EVALUATED FOR THIS PROJECT: See SECTION 00 21 13 – INSTRUCTIONS TO BIDDERS and SECTION 00 22 13 – SUPPLEMENTAL BIDDER RESPONSIBILITY CRITERIA for the mandatory and supplemental bidder responsibility criteria f...
I. Ecology reserves the right to accept or reject any or all bid proposals and to waive as informality any minor irregularities of any bid received.
1.09 OWNER POINT(S) OF CONTACT
A. Project Technical Questions or Comments: Direct all questions to the Ecology project team by email. The email should include all members of the Ecology Project team. These members are listed in the following table.
B. Bidding Questions for Owner’s Contract Officer: Bidders with bidding questions and/or experiencing trouble accessing the TCP Public Share site can contact the TCP Contracts Officer listed above for assistance.
PART 2 – PRODUCTS (NOT USED)
PART 3 – EXECUTION (NOT USED)
SECTION 00 21 13 INSTRUCTIONS TO BIDDERS
PART 1 – GENERAL
1.01 BIDDERS – GENERAL DEFINITIONS
A. “Bidder” is an entity or person who submits a bid proposal for the work stipulated in the contract documents.
The Bidder must be registered by the Washington State Department of Labor and Industries in accordance with RCW 18.27.020. Insert the contractor registration number, expiration date, Uniform Business Identifier (UBI) number, and federal tax identifica...
B. "Employee" means an individual who is employed in the business of his employer whether by way of manual labor or otherwise.
C. “Physical Office” is the space that a bidder owns or rents in conducting the business of the services required for completing the work described in these documents. The “physical office” is staffed by employees of the bidder. The “physical office” ...
1.02 EXPLANATION TO PROSPECTIVE BIDDERS
A. In accordance with RCW 39.04.380 effective March 30, 2012, the State of Washington is enforcing a Reciprocal Preference for Resident Contractors. Any public works bid received from a nonresident contractor from a state that provides an in- state pe...
A nonresident contractor from a state that provides a percentage bid preference means a contractor that:
1. Is from a state that provides a percentage bid preference to its resident contractors bidding on public works contracts.
2. At the time of bidding on a public works project, does not have a physical office located in Washington.
3. The state of residence for a nonresident contractor is the state in which the contractor was incorporated or, if not a corporation, the state where the contractor's business entity was formed.
All nonresident contractors will be evaluated for out of state Bidder preference. If the state of the nonresident contractor provides an in- state contractor preference, a comparable percentage disadvantage will be applied to their bid prior to contra...
This section does not apply to public works procured pursuant to RCW 39.04.155, 39.04.280, or any other procurement exempt from competitive bidding.
B. Any prospective Bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit a request in writing to Ecology no later than seven (7) calendar days before the bid due date. SECTION 00 11 00 – INVI...
C. In accordance with the legislative findings and policies set forth in RCW 39.19 the State of Washington encourages participation in all of its contracts by MWBE firms certified by the Office of Minority and Women’s Business Enterprises (OMWBE). Par...
D. The State of Washington encourages participation in all of its contracts by Veteran-owned businesses (defined in RCW 43.60A.010) and located at https://www.dva.wa.gov/veterans-their-families/veteran-owned-businesses/vob-search and Small, Mini and M...
1. In order to report payment detail, the Contractor must create an account in the DES Public Works Diversity Tracking & Management System powered by B2GNow or verify if an account has already been created on behalf of the Contractor: https://des.dive...
2. Every month for the duration of the contract, and while the contract is active in the Ecology fiscal system, submit and accurately maintain the following payment information with the A-19 payment application:
a. Payments received by the prime contractor from the Agency
b. Payments paid to each first tier subcontractor
c. Payments paid to each first tier supplier
3. The Contractor must also ensure the following information is reported to Ecology by first tier subcontractors and suppliers for the duration of the contract:
a. Confirmation of payments from the prime contractor to the subcontractor
b. Payment reporting to each supplier
E. In accordance with RCW 39.04.320, for all public works estimated to cost one million dollars or more, the State of Washington requires no less than 15% of the labor hours be performed by apprentices. A contractor or subcontractor may not be require...
1. Incentives - The Contractor who meets or exceeds this utilization requirement on eligible contracts, will be awarded a monetary incentive described in the Apprentice Utilization Requirements section of the Bid Form.
2. Penalties - The Contractor who fails to meet the utilization requirement and fails to demonstrate a Good Faith Effort, as outlined below, is subject to penalties described in the Apprentice Utilization Requirements section of the contract Bid Form....
3. Cost Value - The expected cost value associated with meeting the goal is included in the Base Bid as described on the Bid Form.
4. Utilization Plan - The Contractor shall provide an Apprentice Utilization Plan (Plan) demonstrating how and when they intend to achieve the Apprenticeship Utilization Requirement. The Plan shall have enough information to track the Contractor’s pro...
a. The Plan shall be uploaded to the Department of Labor & Industries’ (L&I) Prevailing Wage Intents and Affidavit (PWIA) system on L&I’s website (Contractor Portal).
b. The Plan is not submitted for approval.
c. It is expected that the Contractor will actively seek out opportunities to meet the Apprentice Utilization Requirement during construction even if the Plan indicates a shortfall in meeting the requirement.
d. If the Plan indicates that the Contractor will not attain the Apprentice Utilization Requirement, then Contractor must submit “Good Faith Effort” (GFE) documentation with their Plan to L&I’s PWIA system.
5. Good Faith Effort (GFE)
a. GFE documentation shall describe in detail why the Contractor is not or was not able to attain the Apprentice Utilization Requirement.
1) Contractors may submit GFE documentation at any time during the construction.
2) All GFE documentation must be submitted no later than 30 days before substantial completion.
b. GFE documentation must be in signed letter format uploaded to the PWIA system and include:
1) The contract number, title and the apprentice utilization requirements,
2) The amount of apprentice labor hours the contract can or did attain along with the percentage of labor hours,
3) Contractors may receive a GFE credit for graduated Apprentice hours through the end of the calendar year for all projects worked on as long as the Apprentice remains continuously employed with the same Contractor they were working for when they gra...
4) Anticipated or actual shortfall (in apprentice labor hours and percentage) and the reason(s) for not attaining the required apprentice labor hours,
5) Information from one or more of the following areas:
a) Names of any State-Approved Apprentice Training Programs contacted with the name(s) of person(s)contacted and dates of contacts, and a copy of each response from the Training Program(s),
b) Reference Contract Specifications or documents that affected the Contractor’s ability to attain apprentice utilization,
c) Discuss efforts the Contractor has taken to require Subcontractors to solicit and employ apprentices,
6) Backup documentation to the letter consisting of the following:
d) Letters, emails, phone logs including names dates and outcomes, posters, photos, payrolls, timecards, schedules, copies or references to other contract specifications or documents.
6. Additional Resource Information
a. For questions regarding how to complete the Apprentice Utilization Plan template or Good Faith Effort documentation, please contact the Ecology TCP Contracts Officer listed in the Bid Advertisement.
b. Step-by-step instructions on how to access and navigate the L&I’s PWIA system, including uploading required documents can be found on the L&I website.
c. Additional information about apprentice utilization on Public Works Project can be found on the L&I website.
1.03 PREPARATION OF BIDS – CONSTRUCTION
A. Bids must be: (1) submitted on the Bid Forms, or copies of forms, furnished by Ecology or Ecology’s agent, and (2) signed in ink. The person signing a bid must initial each change appearing on any Bid Forms. If the bid is made by a corporation, it ...
B. The Bid Forms may require Bidders to submit bid prices for one or more items on various bases, including: (1) lump sum base bid; (2) lump sum bid alternate prices; (3) unit prices; or (4) any combination of items 1 through 3 above.
C. If the solicitation includes alternate bid items, failure to bid on the alternates may disqualify the bid. If bidding on all items is not required, Bidders should insert the words “no bid” in the space provided for any item on which no price is sub...
D. Substitute bid forms will not be considered unless this solicitation authorizes their submission.
1.04 BID GUARANTEE
A. When the sum of the base bid plus all additive bid alternates is $35,000.00 or less, bid security is not required.
B. When the sum of the base bid plus all additive alternates is greater than $35,000.00, a bid guarantee in the amount of 5% of the base bid amount is required. Failure of the Bidder to provide bid guarantee when required shall render the bid non-resp...
C. Acceptable forms of bid guarantee are: A bid bond or postal money order, or certified check or cashier’s check made payable to the Washington State Treasurer.
D. Ecology will return bid guarantees (other than bid bond) to unsuccessful Bidders as soon as practicable, but not sooner than the execution of a contract with the successful Bidder. The successful Bidder’s bid guarantee will be returned to the succe...
E. The Bidder will allow 60 days from bid opening date for acceptance of its bid by Ecology.
F. The Bidder will return to Ecology a signed contract, insurance certificate and bond or bond waiver within 15 days after receipt of the contract. If the apparent successful Bidder fails to sign all contractual documents or provide the bond and insur...
G. In the event a Bidder discovers an error in its bid following the bid opening, the Bidder may request to withdraw its bid under the following conditions:
1. Written notification is received by Ecology within 24 hours following bid opening.
2. The Bidder provides written documentation of the claimed error to the satisfaction of Ecology within 72 hours following the bid opening.
3. Ecology will approve or disapprove the request for withdrawal of the bid in writing. If the Bidder’s request for withdrawal of its bid is approved, the Bidder will be released from further obligation to Ecology without penalty. If it is disapproved...
1.05 ADDITIVE OR DEDUCTIVE BID ITEMS
A. The low Bidder, for purposes of award, shall be the responsive Bidder offering the low aggregate amount for the base bid item, plus additive or deductive bid alternates selected by Ecology, and within funds available for the project.
B. The Bidder agrees to hold all bid alternate prices for sixty (60) days from date of bid opening.
1.06 ACKNOWLEDGEMENT OF ADDENDA
A. Bidders shall acknowledge receipt of all addenda to this solicitation by identifying the addenda numbers in the space provided for this purpose on the Bid Form. Failure to do so may result in the bid being declared non-responsive.
1.07 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK
A. The Bidder acknowledges that it has taken steps necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including bu...
1. Conditions bearing upon transportation, disposal, handling, and storage of materials;
2. The availability of labor, water, electric power, and road;
3. Uncertainties of weather, river stages, tides, or similar physical conditions at the site;
4. The conformation and conditions of the ground; and
5. The character of equipment and facilities needed preliminary to and during the work.

B. The Bidder also acknowledges that it has satisfied itself as to character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the si...

1.08 BID AMOUNTS
A. The bid prices shown for each item on the Bid Form shall include all labor, material, equipment, overhead and compensation to complete all of the work for that item.
B. The actual cost of building permit (only) and the public utility hookup fees will be a direct reimbursement to the Contractor or paid directly to the permitting agency by Ecology. Fees for these permits should not be included by the Bidder in the b...
C. The Bidder agrees to hold the base bid prices for sixty (60) days from date of bid opening.
1.09 TAXES
A. The bid amounts shall not include Washington State Sales Tax (WSST). All other taxes imposed by law shall be included in the bid amount. Ecology will include WSST in progress payments. The Contractor shall pay the WSST to the Department of Revenue ...
1.10 SUBMISSION OF BIDS
A. Bids must be submitted on or before the time specified in SECTION 00 11 16, 1.05.
B. The Bid Form shall be submitted in a sealed envelope addressed to the office specified in the Invitation for Bids. The envelope shall have printed on the outside:
1. The Invitation for Bid number and project title.
2. The name and address of the Bidder.
3. Identification as Bid Proposal.
C. Prior to the bid opening, Ecology’s representative will designate the official bid clock. Any part of the Bid Form, or in the rare situation of a bid modification, not received prior to the times specified, per the designated bid clock, will not be...
D. A bid may be withdrawn in person by a Bidder’s authorized representative before the opening of the bids. Bidder(s) representative will be required to show ID and sign on bid summary sheet before it will be released.
E. People with disabilities who wish to request special accommodation, (e.g., sign language interpreters, braille, etc.) need to contact Ecology’s project manager ten (10) working days prior to the scheduled bid opening.
1.11 SUBCONTRACTOR LISTING
A. Pursuant to RCW 39.30.060, if the base bid and the sum of the additive alternates is one million dollars or more, the Bidder shall comply with the following requirements:
1. WITHIN ONE HOUR OF BID SUBMITTAL TIME: The Bidder shall provide names of the Subcontractors with whom the Bidder will subcontract for performance of heating, ventilation and air conditioning (HVAC), plumbing, and electrical on Subcontractor List Fo...
2. WITHIN 48 HOURS OF BID SUBMITTAL TIME: The Bidder shall also provide names of the Subcontractors with whom the Bidder will subcontract for structural steel installation and rebar installation on Subcontractor List Form B via email.
3. The Bidder can name itself for the performance of the work. Bidders who name themselves to perform the work are expected to perform the work and the Ecology reserves the right to reject substitution of the bidder with a subcontractor unless the bid...
4. Substitution of a listed subcontractor (at any tier) before or after the award of the prime contract is prohibited except for the following reasons:
a. Refusal of the listed subcontractor to sign a contract with the prime contractor;
b. Bankruptcy or insolvency of the listed subcontractor;
c. Inability of the listed subcontractor to perform the requirements of the proposed contract or the project;
d. Inability of the listed subcontractor to obtain the necessary license, bonding, insurance, or other statutory requirements to perform the work detailed in the contract;
e. Refusal or inability to provide a letter of bondability from a surety company; or
f. The listed subcontractor is barred from participating in the project as a result of a court order
5. The Bidder shall not list more than one Subcontractor for each category of work identified UNLESS Subcontractors vary with bid alternates, in which case the Bidder must indicate which Subcontractor will be used for which alternate.
6. Ecology reserves the right not to VOID bids in cases where Form A Work and Form B Work are not part of the project, and when a Bidder failed to submit Form A and Form B within the time frames identified above.
7. The Subcontractor List Form A is intended to discourage bid shopping, not to verify subcontractor qualifications. Ecology does not use the Subcontractor List Form A as a tool to disqualify or qualify bidders.
1.12 BID RESULTS
A. After the Bid Opening, Bidders may obtain bid results from Ecology at the Box.com hyperlink provided in SECTION 00 11 16, 1.02 A, where results will be posted as a file named with the information specific to this Invitation for Bid.
1. Withdrawal for Reasons Other Than Errors: In the event a bidder requests or notifies Ecology of their intent to withdraw a bid for reasons other than an error, Ecology will call in the bid guarantee. In the event that a request does not include a r...
1.13 BID PROTESTS
A. Bidders may submit a bid protest to Ecology at tcphqpwcontracts@ECY.WA.GOV within two business days of the Bid Opening. Ecology will provide copies of bids received if they are requested within two business days after the Bid Opening.
1. Ecology will not acknowledge or accept any bid protest received more than two business days after the Bid Opening date.
2. Ecology will not accept bid protests from non-bidders.
B. Ecology will review any bid protest received and shall maintain sole discretion on the merits of and resolution of any bid protest.
C. Ecology will provide written notice to protesting bidders of an intent to enter a Public Works Contract with anyone other than the protesting bidder as follows:
1. Not less than 2 business days following the Bid Opening, if no bidders requests copies of bids received, or
2. Not less than 2 business days following the date on which Ecology provided copies of the bids received to those bidders requesting copies of bids received.
1.14 LOW RESPONSIBLE BIDDER
A. Mandatory Responsibility Criteria: Before award of a public works contract, a Bidder must meet the following mandatory responsibility criteria under RCW 39.04.350 (1) & (2) to be considered a responsible Bidder and qualified to be awarded a public ...
1. At the time of bid submittal, have a certificate of registration in compliance with RCW 18.27;
2. Have a current state unified business identifier number;
3. If applicable, have industrial insurance coverage for the Bidder’s employees working in Washington as required in RCW 51; an employment security department number as required in RCW 50; and a state excise tax registration number as required in RCW 82;
4. Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3);
5. If bidding on a public works project subject to the apprenticeship utilization requirements in RCW 39.04.320, not have been found out of compliance by the Washington State Apprenticeship and Training Council for working apprentices out of ratio, wi...
6. Public Works and Prevailing Wage Training/Exemption. Bidders shall have received training on the requirements related to public works and prevailing wage under this chapter and chapter 39.12 RCW. The bidder must designate a person or persons to be ...
7. Within the three year period immediately preceding the date of the bid solicitation, not have been determined by a final and binding citation and notice of assessment issued by the Department of Labor and Industries or through a civil judgement ent...
B. Supplemental Responsibility Criteria: In addition to the mandatory Bidder responsibility criteria, Ecology may adopt relevant supplemental criteria for determining Bidder responsibility applicable to a particular project that the Bidder must meet (...
1. If applicable, Ecology shall consider an overall accounting of the attached supplemental criteria for determining Bidder responsibility found in SECTION 00 22 13 – SUPPLEMENTAL BIDDER RESPONSIBILITY CRITERIA.
2. At least seven (7) days prior to the bid submittal deadline, a potential Bidder may request that Ecology modify the supplemental responsibility criteria. Ecology will evaluate the information submitted by the potential Bidder and respond before the...
3. Upon Ecology’s request, the apparent low Bidder must supply the requested responsibility information within two (2) business days of request by Ecology. Withholding information or failure to submit all the information requested within the time prov...
4. If Ecology determines that the apparent low Bidder is not responsible:
a. Ecology will notify the Bidder of its preliminary determination in writing.
b. Within three (3) business days after receipt of the preliminary determination, the Bidder may withdraw its bid, or the Bidder may appeal the preliminary determination and present additional information to Ecology.
c. Ecology will review the additional information within two (2) weeks of the date of the receipt of the Bidder’s request.
d. Ecology will issue a Final Determination after reviewing the additional information.
e. If Ecology determines a Bidder to be not responsible, Ecology will provide, in writing, the reasons for the determination. If the final determination affirms that the Bidder is not responsible, Ecology will not execute a contract with any other Bid...
f. Ecology’s Final Determination is specific to this project and will have no effect on other or future projects.
1.15 BID EVALUATION AND CONTRACT AWARD
A. Ecology will evaluate bids for responsiveness and responsibility.
1. A bid will be considered responsive if it meets the following requirements:
a. It is received at the proper time and place.
b. It meets the stated requirements of the Bid Form, is complete, and is signed by an authorized representative of the Bidder.
c. It is submitted by a licensed/registered contractor within the state of Washington at the time of bid opening and is not banned from bidding by the Department of Labor and Industries.
d. It includes signed acknowledgements of any bid addenda issued during bidding.
e. It is accompanied by a bid guarantee, if required.
f. It is accompanied by the contractor certification for wage theft prevention and, when required, certifications for a federally assisted project as provided in the bid proposal form.
2. A bid will be considered responsible if it meets the following requirements:
a. It meets the mandatory responsibility criteria established in RCW 39.04.350 and an overall accounting of the supplemental responsibility criteria established for the project.
b. The bidder completes, signs, and submits the “Contractor Certification Wage Theft Prevention – Responsible Bidder Criteria” form with their bid or within two (2) business days of request by Ecology
B. Ecology reserves the right to accept or reject any or all bid proposals and to waive as informality any minor irregularities of any bid received.