IFB 24-31-SD Gordon Road - Ni Reservoir Drainage Repairs Addendum 1.pdf

PDF 363 KB Posted

Attached to
IFB 24-31-SD GORDON ROAD – NI RESERVOIR DRAINAGE REPAIRS
Solicitation number
57235
Issued by
Spotsylvania County, Fredericksburg City, Virginia

About this file

This document is an Addendum #1 to the Invitation for Bid (IFB) No. 24-31-SD for the Gordon Road - Ni Reservoir Drainage Repairs project in Spotsylvania County, Virginia. The project consists of furnishing and installing approximately 44 linear feet of 16-inch, 233 linear feet of 22-inch, and 136 linear feet of 24-inch diameter steel drainage pipe and associated appurtenances. The addendum provides clarifications and additional information, including responses to questions from potential bidders regarding the use of larger diameter pipes, zinc coating requirements, and testing allowances. It also lists the pre-bid meeting attendees from the County staff, engineering firm, and contractor representatives.

The IFB specifies that the work must adhere to Spotsylvania County's Design and Construction Standards Manual, with the contractor responsible for obtaining necessary permits, coordinating with utility companies, and ensuring the protection of existing underground utilities during construction. The County will provide initial stakeout, with the contractor responsible for any additional stakeout. The contractor is also required to provide "redline" markups of the construction drawings for the as-built survey plans.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum 1 IFB No. 24-31-SD Page 1 of 2

Addendum #1 to

Spotsylvania County

IFB 24-31-SD

GORDON ROAD – NI RESERVOIR DRAINAGE REPAIRS

February 9, 2024

Addendum #1 to Invitation for Bid (IFB) No. 24-31-SD is issued in accordance with the IFB Terms & Conditions and is intended to provide additional information and clarification to Respondents.

Addendum #1 consists of three (3) items which are listed below, attached hereto and made a part hereof to IFB No. 24-31-SD.

ITEM 1 – CHANGES TO IFB

1. Add Attachment E “Project Summary” attached hereto.

ITEM 2 – Q&A

1. There are plans for residential structure being built in the project area. Which driveway belongs to the future development?

ANSWER: The future development will use the existing road as construction entrance #2. Access will have to remain open if construction is started during this project.

2. Is it possible to use 24-inch pipe for the entire project?

ANSWER: Spotsylvania County does not have objections to larger diameter steel casing pipes as long as it does not affect the existing conditions with the roadway. Casing #2 is shown as 24”. Casing # 4 can be increased to 24. Casing #1 and #3 are within 18 inches of the roadway. The bidder will assume all risks of acquiring approval and installation of larger casings.

3. Regarding zinc pipes, is the zinc required only on the outside of the pipe?

ANSWER: Zinc coating is only required on the outside of the pipe.

4. Are check valves only required on the reservoir side?

ANSWER: Yes.

5. Was the lump sum amount for testing only added for budgetary purposes?

ANSWER: The County has allotted up to $10,000 for testing. Compaction testing will be

Addendum 1 IFB No. 24-31-SD Page 2 of 2 paid for out of this allowance.

6. Is there a requirement for flowable fill testing?

ANSWER: No.

ITEM 3 – PRE-BID ATTENDEES

1. County Staff:

Ronnie Baker, Utilities Lisa Bailey, Utilities Sylvia Dyson, Procurement

2. Engineer Zeke Moore, SDI

3. Contractor Representatives:

Dave Kruckenberg, Kruckenberg Service Ryan Wells, William W. Wells Excavating Federico Tersoglio, IMEG Survey

ATTACHMENTS:

Attachment A titled “Attachment E - Project Summary”

Respondents shall acknowledge receipt of this Addendum with Quote submission.

February 9, 2024 Sylvia Dyson Date Sr. Procurement Officer

ATTACHMENT E to IFB 24-31-

SD

Spotsylvania County Specifications for

Gordon Road – Ni Reservoir Drainage Repairs Project November 2023

I. SUMMARY

The project consists of furnishing and installing approximately 44 linear feet of 16-inch, 233 linear feet of 22-inch, and 136 linear feet of 24-inch diameter of steel drainage pipe, and all necessary appurtenances on the Gordon Road – Ni Reservoir Drainage Repairs Project located on Gordon Road near the Ni River Reservoir in Spotsylvania County, VA.

II. WORK COVERED BY THE CONTRACT DOCUMENTS

A. Work under this contract includes furnishing and installing drainage pipe associated appurtenances as follows:

i. Furnish, erect, maintain, and remove erosion and sediment control measures including silt fencing, construction entrances, and other items as required by the Regulator Authority and stated on the plans.

ii. Clear and grub the area of construction of the new drainage pipes.

iii. Furnish and install 16-inch, 22-inch, and 24-inch diameter steel drainage pipe, fittings, and connections at locations and grades shown on the plans.

iv. Furnish and install all other appurtenances shown or required to complete the work.

B. Contingent Items – If contingent items are included in the project, they shall not be performed without written direction and authorization by ENGINEER, if agreed to by the OWNER.

C. Work consists of providing labor, materials, equipment, services and administration required in conjunction with or properly incidental to construction of the project. All work shall be performed in accordance with Federal, State and Local regulations and OSHA requirements.

Attachment A to Addendum 1

ATTACHMENT E

III. SPOTSYLVANIA COUNTY SPECIFICATIONS – General information

A. Use Spotsylvania County Department of Water and Sewer Design & Construction Standards Manual for construction specifications and details. All construction must adhere to the 2018 Design and Construction Standards Manual. https://www.spotsylvania.va.us/917/2018-DSM-by-Chapter

B. All excavation is considered Unclassified. Spotsylvania County has not conducted an underground investigation of the site.

C. The County shall provide initial stakeout of the project. Any stakeout after the initial one will be the responsibility of the contractor.

D. Existing underground utility lines shown or indicated are those known as of the design of the project and are shown for supplemental information. Not all underground utility lines may be shown on the plans. The Contractor is responsible for ensuring all underground utility lines are marked and bid accordingly.

E. Underground utility lines that are not at the same elevation as the new water or sewer infrastructure will not be considered as conflicts. The Contractor shall be responsible for the safety and protection of the underground facilities during installation of the new water and sewer infrastructure.

F. The County will perform the as-built survey plans for the project. The

Contractor shall provide the County with "redline" markups of the Construction drawings showing specific changes and locations of features that cannot be located by a land surveyor.

G. The Contractor is required to obtain a Land Disturbance permit from

Spotsylvania County.

H. The Contractor is required to obtain a VDOT construction permit.

I. Spotsylvania County Land Disturbance permit and VDOT permit to be obtained by the Contractor.

J. All existing utilities shown are located according to the information available to the Engineer at the time the drawings were prepared and have not been independently verified by the Owner or the Engineer. Guarantee is not made that all existing underground utilities are shown or that the location of those shown are accurate. The locations shown are for bidding purposes only.

Finding the actual location of any existing utilities is the Contractor’s responsibility and shall be done before he commences any work in the vicinity. Furthermore, the Contractor shall be fully responsible for any and all https://www.spotsylvania.va.us/917/2018-DSM-by-Chapter damages due to the Contractor’s failure to exactly locate and preserve any and all underground utilities. The Owner or Engineer will assume no liability for any damages sustained or cost incurred because of the operations in the vicinity of existing utilities or structures. Nor for temporary bracing and shoring of same. If it is necessary to shore, brace, swing, or relocate a utility, the utility company or department affected shall be contacted by the Contractor and their permission obtained regarding the method to use for such work.

K. This plan does not guarantee the existence, non-existence, size, type, location, alignment or depth of any or all underground utilities or other facilities.

Where surface features (manholes, catch basins, valves, etc.) are unavailable or inconclusive, information shown may be from utility owner’s records and/or electronic line tracing, the reliability of which is uncertain. The Contractor shall perform whatever test excavation or other investigation is necessary to verify tie-in inverts, locations and clearances, and shall report immediately any discrepancies to the Engineer. Utility companies shall be notified 48 hours in advance of any excavation in the proximity of their utilities. The Contractor shall be responsible for repairing at his expense any existing utilities damaged during construction.

L. It is the Contractor’s responsibility to contact the various utility companies which may have buried or aerial utilities within or near the construction area before commencing work. The Contractor shall provide 48 hours minimum notice to all utility companies prior to beginning construction. The indicated existence, or non-existence, of a particular utility should in no way limit the utility companies which the Contractor may wish to notify.

M. The Contractor is responsible for coordinating relocations and installations of franchise utilities necessary for on- and off-site construction. Prior to any construction, the Contractor shall contact the appropriate representative for each franchise utility company to ensure that all conduits, service lines, pads, etc. are installed and constructed to meet or exceed all requirements and standard specifications of each franchise utility company. Franchise utility items shown on the following plans are meant to represent general franchise utility requirements and to assist in the contractor bidding process.

N. Contractor shall coordinate with franchise/private utility companies such as gas, electric, telephone, cable & tv for services.

O. Contractor shall conform to the "Overhead High Voltage Line Safety Act” (effective July 1, 1989 and as amended) and shall contact the necessary authorities prior to start of construction.

P. Remove and/or plug existing utilities such as sanitary sewer, water, gas, electric, and/or telephone as shown. The Contractor is responsible for contacting each utility company to coordinate removal of all utilities and for determining horizontal and vertical locations of utilities prior to commencing work.

Q. The Contractor is responsible for the protection of all utilities to remain in place.

R. All utilities are to remain unless designated to be removed. Existing and proposed franchise utility tops shall be adjusted to final grade.

S. The Contractor is responsible for determining the exact location of all utilities prior to commencing work and for any damages that occur by his failure to locate and protect these utilities. If during construction the Contractor should encounter utilities other than those shown on the plans, he shall notify the Owner's representative and take necessary and proper steps to protect the utility and assure the continuance of service.

T. Utility service shall be maintained throughout construction. Service interruptions shall only be allowed with prior approval from the utility company.

IFB 24-31-SD Addendum 1_FINAL
IFB 24-31-SD
GORDON ROAD – NI RESERVOIR DRAINAGE REPAIRS

Att E Project Summary