DOCX document 138 KB Posted

Attached to
IFB 2015-01911 Next Generation 9-1-1 Systems and Services (Pre-Solicitation)
Solicitation number
2015-01911
Issued by
California

About this file

This is a Statement of Work (SOW) for Next Generation 9-1-1 (NG9-1-1) Systems and Services issued by the California Governor's Office of Emergency Services (Cal OES), Public Safety Communications (PSC), CA 9-1-1 Emergency Communications Branch. The SOW outlines requirements for contractors to provide NG9-1-1 core services to California Public Safety Answering Points (PSAPs), enabling voice contact between 9-1-1 emergency callers and telecommunicators, with potential evolution to include text, multimedia and other data modalities. The initial contract term is three years with four one-year extension options for a maximum term of seven years. The contract covers 443 PSAPs across California and requires system implementation within 180 calendar days after receipt of order. Key requirements include 99.999% core service availability, 24x7x365 maintenance coverage, and comprehensive training programs.

The SOW establishes technical Service Level Agreement (SLA) requirements with specific financial remedies for non-compliance, including rebates of 15-100% of monthly recurring costs for missed performance targets. Contractors must maintain an inventory of critical spare components and provide monthly SLA compliance reports. The contract requires contractors to facilitate carrier transition to Emergency Services IP Network (ESInet) and NG9-1-1 services, following California Public Utilities Commission practices and NENA standards. Funding comes from the State Emergency Telephone Number Account (SETNA), which provides funding to California PSAPs for 9-1-1 systems and services. All purchases must be authorized and approved by the CA 9-1-1 Branch.

View the file

Other files

File Type Posted
9_1_1_NEXT_GEN_PRE_SOLICITATION_COVER_LETTER_FINAL.docx DOCX document
IFB_2015-01911_FINAL_031516.docx DOCX document
2015-01911_IFB_EXHIBITS_FINAL_031516.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NEXT GENERATION 9-1-1 (NG9-1-1) SYSTEMS AND SERVICES

Appendix A, STATEMENT OF WORK (SOW)

1.1. Background and Purpose

The California Governor’s Office of Emergency Services (Cal OES), Public Safety Communications (PSC), CA 9-1-1 Emergency Communications Branch (CA 9-1-1 Branch) is responsible for administering the State Emergency Telephone Number Account (SETNA) which provides funding to California Public Safety Answering Points (PSAPs) for 9-1-1 systems and services. The CA 9-1-1 Branch will use the Contract to purchase NG9-1-1 services. The main function of the NG9-1-1 core services are to provide PSAPs with voice contact with a 9-1-1 emergency calling party and Telecommunicators (Telecommunicators are located at the PSAP to answer the 9-1-1 calls). NG9-1-1 core services may evolve to include text, multi-media and other data modalities. All NG9-1-1 services will be provided to PSAPs.

1.2. OBJECTIVE

The California Governor’s Office of Emergency Services (Cal OES), Public Safety Communications (PSC) (hereto referred as “State”) CA 9-1-1 Branch will oversee and approve all purchases made under this agreement. The California Public Safety Answering Points (PSAPs) will use this agreement to purchase NG9-1-1 core services with State Emergency Telephone Number Account (SETNA) funding as authorized and approved by the CA 9-1-1 Branch.

1.3. PSAP LOCATIONS

PSAPs may be added or removed from time to time by the State for a variety of reasons. Not all PSAPs request/receive funding from the CA 9-1-1 Branch, therefore, the PSAPs List is not inclusive of all PSAPs in California.

Table 1.1 PSAPs CURRENTLY FUNDED BY SETNA

#
PSAP NAME
STATUS
LOCATION
1.
Alameda County Regional Fire/LLNL

Livermore

2.
Alameda County Sheriff’s Department

San Leandro

3.
Alameda Police Department

Alameda

4.
Albany Police Department

Albany

5.
Alhambra Police/Fire Department
EP, CP
Alhambra
6.
Amador County Sheriff’s Department

Jackson

7.
Anaheim Police Department

Anaheim

8.
Antioch Police Department

Antioch

9.
Arcadia Police Department
EP, CP
Arcadia
10.
Arcata Police Department

Arcata

11.
Arvin Police Department

Arvin

12.
Atascadero Police Department

Atascadero

13.
Atherton Police Department

Atherton

14.
Atwater Police Department

Atwater

15.
Auburn Police Department

Auburn

16.
Avalon Fire Department

Avalon

17.
Azusa Police Department

Azusa

18.
Bakersfield Police Department

Bakersfield

19.
Baldwin Park Police Department

Baldwin Park

20.
Banning Police Department

Banning

21.
Barstow Police Department

Barstow

22.
Bay Area Rapid Transit (BART) Police Department

Oakland

23.
Bear Valley Police Department

Tehachapi

24.
Beaumont Police Department

Beaumont

25.
Bell Gardens Police Department

Bell Gardens

26.
Bell Police Department

Bell

27.
Belmont Police Department

Belmont

28.
Benicia Police Department

Benicia

29.
Berkeley Police/Fire Communications Center

Berkeley

30.
Beverly Hills Police Department
EP, CP
Beverly Hills
31.
Bishop Police Department

Bishop

32.
Blythe Police Department

Blythe

33.
Brawley Police Department

Brawley

34.
Brea Police Department

Brea

35.
Buena Park Police Department

Buena Park

36.
Burbank Police Department
EE, CP
Burbank
37.
Burlingame Police Department

Burlingame

38.
Butte County Sheriff’s Department
CE
Oroville
39.
Calaveras County Sheriff’s Department

San Andreas

40.
Calexico Police Department

Calexico

41.
CAL-FIRE Camino (Amador/El Dorado Unit)

Camino

42.
CAL-FIRE El Cajon (San Diego Unit)

El Cajon

43.
CAL-FIRE Felton (San Mateo/Santa Cruz Unit)

Felton

44.
CAL-FIRE Fortuna (Humboldt/Del Norte Unit)

Fortuna

45.
CAL-FIRE Fresno (Fresno/Kings Unit)

Fresno

46.
CAL-FIRE Grass Valley (Nevada/Yuba/Placer Unit)

Grass Valley

47.
CAL-FIRE Mariposa (Madera/Mariposa/Merced Unit)

Mariposa

48.
CAL-FIRE Monterey (San Benito/Monterey Unit)

Monterey

49.
CAL-FIRE Morgan Hill (Santa Clara Unit)

Morgan Hill

50.
CAL-FIRE Oroville (Butte Unit)
CE
Oroville
51.
CAL-FIRE Perris (Riverside Unit)

Perris

52.
CAL-FIRE Red Bluff (Tehama/Glenn Unit)
CE
Red Bluff
53.
CAL-FIRE Redding (Shasta/Trinity Unit)
CE
Redding
54.
CAL-FIRE San Andreas (Tuolumne/Calaveras Unit)

San Andreas

55.
CAL-FIRE San Bernardino (San Bernardino Unit)

San Bernardino

56.
CAL-FIRE San Luis Obispo (San Luis Obispo Unit)

San Luis Obispo

57.
CAL-FIRE St Helena (Sonoma/Lake/Napa Unit)

St Helena

58.
CAL-FIRE Susanville (Lassen/Modoc Unit)
CE
Susanville
59.
CAL-FIRE Visalia (Tulare Unit)

Visalia

60.
CAL-FIRE Willits (Mendocino Unit)

Willits

61.
CAL-FIRE Yreka (Siskiyou Unit)
CE
Yreka
62.
California City Police Department

California City

63.
Calistoga Police Department

Calistoga

64.
Campbell Police Department

Campbell

65.
Carlsbad Police Department

Carlsbad

66.
Carmel Police Department

Carmel

67.
Cathedral City Police Department

Cathedral City

68.
Ceres Police Department

Ceres

69.
Cerritos College Police Department

Norwalk

70.
Chico Police Department
CE
Chico
71.
Chino Police Department

Chino

72.
Chowchilla Police Department

Chowchilla

73.
CHP Atwater (Merced)

Atwater

74.
CHP Bakersfield (Kern)

Bakersfield

75.
CHP Barstow (San Bernardino)

Barstow

76.
CHP Bishop (Inyo)

Bishop

77.
CHP Border Comm Center

San Diego

78.
CHP Capitol Communications Center

Sacramento

79.
CHP Chico (Butte)
CE
Chico
80.
CHP El Centro (Imperial)

Imperial

81.
CHP Eureka (Humboldt)

Arcata

82.
CHP Fresno

Fresno

83.
CHP Indio (Riverside)

Indio

84.
CHP Inland (San Bernardino)

Fontana

85.
CHP Irvine (Orange)

Irvine

86.
CHP Los Angeles

Los Angeles

87.
CHP Rancho Cordova (Sacramento)

Rancho Cordova

88.
CHP Redding (Shasta)
CE
Redding
89.
CHP Salinas (Monterey)

Salinas

90.
CHP San Luis Obispo

San Luis Obispo

91.
CHP Stockton (San Joaquin)

Stockton

92.
CHP Susanville (Lassen)
CE
Susanville
93.
CHP Truckee (Nevada)

Truckee

94.
CHP Ukiah (Mendocino)

Ukiah

95.
CHP Vallejo/Golden Gate (Solano)

Vallejo

96.
CHP Ventura

Ventura

97.
CHP Yreka (Siskiyou)
CE
Yreka
98.
Chula Vista Police Department

Chula Vista

99.
Citrus Heights Police Department

Citrus Heights

100.
Claremont Police Department

Claremont

101.
Cloverdale Police Department

Cloverdale

102.
Clovis Police Department

Clovis

103.
Coalinga Police Department

Coalinga

104.
Colma Police Department

Colma

105.
Colton Police Department

Colton

106.
Colusa County Sheriff’s Department
CE
Colusa
107.
Concord Police Department

Concord

108.
CONFIRE - San Bernardino County Fire (Rialto)

Rialto

109.
Contra Costa County Fire Protection District

Pleasant Hill

110.
Contra Costa County Sheriff’s Department

Martinez

111.
Corcoran Police Department

Corcoran

112.
Corning Fire Department
CE
Corning
113.
Corning Police Department
CE
Corning
114.
Corona Police Department

Corona

115.
Coronado Police Department

Coronado

116.
Costa Mesa Police Department

Costa Mesa

117.
Cotati Police Department

Cotati

118.
Covina Police Department
EP,CP
Covina
119.
CSU Channel Island Police Department

Camarillo

120.
CSU Chico Police Department
CE
Chico
121.
CSU Dominguez Hills Police Department

Carson

122.
CSU East Bay Police Department

Hayward

123.
CSU Fresno Police Department

Fresno

124.
CSU Fullerton Police Department

Fullerton

125.
CSU Humboldt Police Department

Arcata

126.
CSU Long Beach University Police

Long Beach

127.
CSU Los Angeles Police Department

Los Angeles

128.
CSU Northridge University Police

Northridge

129.
CSU Pomona (Cal Poly) Police Department

Pomona

130.
CSU San Bernardino Police Department

San Bernardino

131.
CSU San Diego Police Department

San Diego

132.
CSU San Francisco Police Department

San Francisco

133.
CSU San Jose Police Department

San Jose

134.
CSU San Luis Obispo (Cal Poly) Police Department

San Luis Obispo

135.
CSU San Marcos Police Department

San Marcos

136.
CSU Sonoma Police Department

Rohnert Park

137.
Culver City Police/Fire Department
EP,CP
Culver City
138.
Daly City Police Department

Daly City

139.
Davis Police Department

Davis

140.
Del Norte County Sheriff’s Department

Crescent City

141.
Delano Police Department

Delano

142.
Dinuba Police Department

Dinuba

143.
Dos Palos Police Department (Westside Regional CCommComm)

Dos Palos

144.
Downey Fire Department

Downey

145.
Downey Police Department

Downey

146.
East Bay Regional Park District

Castro Valley

147.
El Cajon Police Department

El Cajon

148.
El Camino Community College District Police

Torrance

149.
El Centro Police Department

El Centro

150.
El Dorado County Sheriff’s Department

Placerville

151.
El Monte Police Department

El Monte

152.
Elk Grove Police Department

Elk Grove

153.
Emeryville Police Department

Emeryville

154.
Escondido Police Department

Escondido

155.
Eureka Police Department

Eureka

156.
Fairfax Police Department

Fairfax

157.
Fairfield Police Department

Fairfield

158.
Firebaugh Police Department

Firebaugh

159.
Folsom Police Department

Folsom

160.
Fontana Police Department

Fontana

161.
Fortuna Police Department

Fortuna

162.
Foster City Police Department

Foster City

163.
Fountain Valley Police Department

Fountain Valley

164.
Fremont Police Department

Fremont

165.
Fresno County EMS

Fresno

166.
Fresno County Sheriff’s Department

Fresno

167.
Fresno Police Department

Fresno

168.
Fullerton Police Department

Fullerton

169.
Galt Police Department

Galt

170.
Garden Grove Police Department

Garden Grove

171.
Gilroy Police Communications

Gilroy

172.
Glendale Police Department
EE,CP
Glendale
173.
Glendora Police Department

Glendora

174.
Glenn County Sheriff’s Department
CE
Willows
175.
Gridley Police Department
CE
Gridley
176.
Grover Beach Police Department

Grover Beach

177.
Hanford Police Department

Hanford

178.
Hayward Police Department

Hayward

179.
Healdsburg Police Department

Healdsburg

180.
Heartland Communications Facility Authority - Fire

El Cajon

181.
Hemet Police Department

Hemet

182.
Hillsborough Police Department

Hillsborough

183.
Humboldt County Sheriff’s Department

Eureka

184.
Huntington Beach Police Department

Huntington Beach

185.
Huntington Park Police Department

Huntington Park

186.
Huron Police Department

Huron

187.
Imperial County Sheriff’s Department

El Centro

188.
Indio Police Department

Indio

189.
Inglewood Police/Fire Department Communications

Inglewood

190.
Inyo County Sheriff’s Department

Independence

191.
Irvine Police Department

Irvine

192.
Irwindale Police Department

Irwindale

193.
Kern County Fire Department

Bakersfield

194.
Kern County Sheriff’s Department

Bakersfield

195.
Kings County Sheriff’s Department

Hanford

196.
Kingsburg Police Department

Kingsburg

197.
La Habra Police Department

La Habra

198.
La Mesa Police Department

La Mesa

199.
La Palma Police Department

La Palma

200.
La Verne Police/Fire Department
EP,CP
La Verne
201.
Laguna Beach Police Department

Laguna Beach

202.
Lake County Sheriff’s Department

Lakeport

203.
LASD Carson Sheriff’s Station

Carson

204.
LASD - Century Sheriff’s Station

Lynwood

205.
LASD – Cerritos Sheriff’s Station

Cerritos

206.
LASD - Compton Sheriff’s Station

Compton

207.
LASD - Crescenta Valley Sheriff’s Station

La Crescenta

208.
LASD - East Los Angeles Sheriff’s Station

Los Angeles

209.
LASD - Industry Sheriff’s Station

City of Industry

210.
LASD - Lakewood Sheriff’s Station

Lakewood

211.
LASD - Lancaster Sheriff’s Station

Lancaster

212.
LASD - Lomita Sheriff’s Station

Lomita

213.
LASD - Lost Hills/Malibu Sheriff’s Station (Agoura)

Calabasas

214.
LASD - Marina Del Rey Sheriff’s Station

Marina Del Rey

215.
LASD - Metro Transportation Authority

Los Angeles

216.
LASD - Norwalk Sheriff’s Station

Norwalk

217.
LASD - Palmdale Sheriff’s Station

Palmdale

218.
LASD - Pico Rivera Sheriff’s Station

Pico Rivera

219.
LASD - San Dimas Sheriff’s Station

San Dimas

220.
LASD - Santa Clarita Valley Sheriff’s Station

Valencia

221.
LASD - South Los Angeles Sheriff’s Station

Los Angeles

222.
LASD - Temple City Sheriff’s Station

Temple City

223.
LASD - Walnut/Diamond Bar Sheriff’s Station

Walnut

224.
LASD - West Hollywood Sheriff’s Station

Los Angeles

225.
Lassen County Sheriff’s Department
CE
Susanville
226.
Lincoln Police Department

Lincoln

227.
Lindsay Police Department

Lindsay

228.
Livermore Police Department

Livermore

229.
Livingston Police Department

Livingston

230.
Lodi Police Department

Lodi

231.
Lompoc Police Department

Lompoc

232.
Long Beach Fire Department

Long Beach

233.
Long Beach Police Department

Long Beach

234.
Los Altos Police Department

Los Altos

235.
Los Angeles City Fire Department

Los Angeles

236.
Los Angeles County Fire

Los Angeles

237.
Los Angeles Police Department

Los Angeles

238.
Los Banos Police Department

Los Banos

239.
Los Gatos Police Communications

Los Gatos

240.
Madera County Sheriff

Madera

241.
Madera Police Department

Madera

242.
Manteca Police Department

Manteca

243.
Marin County Fire Department

Woodacre

244.
Marin County Sheriff’s Department

San Rafael

245.
Mariposa County Sheriff’s Department

Mariposa

246.
Martinez Police Department

Martinez

247.
Marysville Police Department
CE
Marysville
248.
McFarland Police Department

McFarland

249.
Mendocino County Sheriff’s Department
EE,CP
Ukiah
250.
Menlo Park Police Department

Menlo Park

251.
Merced County Sheriff’s Department

Merced

252.
Merced Emergency Medical Services

Merced

253.
Merced Police Department

Merced

254.
MetroNet - Metro Cities Fire Authority Comm. Center

Anaheim

255.
Milpitas Police Department

Milpitas

256.
Modoc County Sheriff’s Department
CE
Alturas
257.
Mono County Sheriff’s Department

Bridgeport

258.
Monrovia Police Department
EP,CP
Monrovia
259.
Montclair Police Department

Montclair

260.
Montebello Police Department
EP,CP
Montebello
261.
Montecito Fire Protection District

Montecito

262.
Monterey County Emergency Communications

Salinas

263.
Monterey Park Police/Fire Department
EP,CP
Monterey Park
264.
Morgan Hill Police Communications

Morgan Hill

265.
Mountain View Police/Fire Department

Mountain View

266.
Mt. Shasta Police Department
CE
Mt Shasta
267.
Murrieta Police Department

Murrieta

268.
Napa County Communications

Napa

269.
NASA AMES Police Department

Moffett Field

270.
National City Police Department

National City

271.
Nevada County Sheriff’s Department

Nevada City

272.
Newark Police/Fire Department

Newark

273.
Newport Beach Police Department

Newport Beach

274.
North County Dispatch

Rancho Santa Fe

275.
Novato Police Department

Novato

276.
Oakdale Police Department

Oakdale

277.
Oakland Fire Department

Oakland

278.
Oakland Police Department

Oakland

279.
Oceanside Police Department

Oceanside

280.
Ontario Fire Department

Ontario

281.
Ontario Police Department

Ontario

282.
Orange County Fire Authority

Irvine

283.
Orange County Sheriff’s Department (Harbor Patrol/Newport Beach)

Corona Del Mar

284.
Orange County Sheriff’s Department

Silverado

285.
Orange Police Department

Orange

286.
Oroville Police Department
CE
Oroville
287.
Oxnard Police/Fire Department
CP
Oxnard
288.
Palm Springs Police/Fire Department

Palm Springs

289.
Palo Alto Police Department

Palo Alto

290.
Palos Verdes Estates Police/Fire Department

Palos Verdes

291.
Paradise Police Department
CE
Paradise
292.
Pasadena Police Department
EE,CP
Pasadena
293.
Paso Robles Police Department

Paso Robles

294.
Petaluma Police Department

Petaluma

295.
Piedmont Police Department

Piedmont

296.
Pinole Police Department

Pinole

297.
Pismo Beach Police Department

Pismo Beach

298.
Placentia Police Department

Placentia

299.
Placer County Sheriff’s Department

Auburn

300.
Placerville Police Department

Placerville

301.
Pleasant Hill Police Department

Pleasant Hill

302.
Pleasanton Police Department

Pleasanton

303.
Plumas County Sheriff’s Department
CE
Quincy
304.
Pomona Police Department
EP,CP
Pomona
305.
Port Hueneme Police Department

Port Hueneme

306.
Porterville Police Department

Porterville

307.
Red Bluff Police Department
CE
Red Bluff
308.
Redlands Police Department

Redlands

309.
Redondo Beach Police/Fire Department

Redondo Beach

310.
Redwood City Police Department

Redwood City

311.
Reedley Police Department

Reedley

312.
Rialto Police Department

Rialto

313.
Richmond Police Department

Richmond

314.
Ridgecrest Police Department

Ridgecrest

315.
Ripon Police Department

Ripon

316.
Riverside County Sheriff’s Department

Blythe

317.
Riverside County Sheriff’s Department

Palm Desert

318.
Riverside County Sheriff’s Department

Riverside

319.
Riverside Police Department

Riverside

320.
Rocklin Police Department

Rocklin

321.
Rohnert Park Police Department

Rohnert Park

322.
Roseville Police Department

Roseville

323.
Sacramento City Police Department

Sacramento

324.
Sacramento County Sheriff’s Department

Elk Grove

325.
Sacramento Regional Fire Emergency Comm. Center - SRFECC

Sacramento

326.
San Bernardino County Sheriff’s Department (Rialto/Valley)

Rialto

327.
San Bernardino County Sheriff’s Department (Victorville/Desert)

Hesperia

328.
San Bernardino Police Department

San Bernardino

329.
San Bruno Police Department

San Bruno

330.
San Diego County Lifeguards

San Diego

331.
San Diego County Sheriff’s Department

San Diego

332.
San Diego Fire Communications

San Diego

333.
San Diego Harbor Police Department

San Diego

334.
San Diego Police Department

San Diego

335.
San Fernando Police Department
EP,CP
San Fernando
336.
San Francisco Dept. Emergency Management

San Francisco

337.
San Francisco International Airport Police

South San Francisco

338.
San Gabriel Police Department
EP,CP
San Gabriel
339.
San Joaquin County Sheriff’s Department (Stockton/French Camp)

French Camp

340.
San Jose Police/Fire Communications

San Jose

341.
San Leandro Police Department

San Leandro

342.
San Luis Obispo County Sheriff’s Department

San Luis Obispo

343.
San Luis Obispo Police Department

San Luis Obispo

344.
San Marino Police Department
EP,CP
San Marino
345.
San Mateo County Communications

Redwood City

346.
San Mateo Police Department

San Mateo

347.
San Rafael Police Department

San Rafael

348.
San Ramon Valley Fire Protection District

San Ramon

349.
Santa Ana Police Department

Santa Ana

350.
Santa Barbara County Sheriff’s Department

Santa Barbara

351.
Santa Barbara Police Department

Santa Barbara

352.
Santa Clara County Sheriff’s Department Communications

San Jose

353.
Santa Clara Police Department

Santa Clara

354.
Santa Cruz Regional 9-1-1

Santa Cruz

355.
Santa Maria Police Department

Santa Maria

356.
Santa Monica Police Department

Santa Monica

357.
Santa Paula Police Department

Santa Paula

358.
Santa Rosa Police Department

Santa Rosa

359.
Scotts Valley Police Department

Scotts Valley

360.
Sebastopol Police Department

Sebastopol

361.
Selma Police Department

Selma

362.
Shafter Police Department

Shafter

363.
Shasta County Comm. Center - SHASCOM
CE
Redding
364.
Sierra County Sheriff’s Department
CE
Downieville
365.
Sierra Madre Police/Fire Department
EE,CP
Sierra Madre
366.
Signal Hill Police Department

Signal Hill

367.
Simi Valley Police Department
CP
Simi Valley
368.
Siskiyou County Sheriff’s Department

Yreka

369.
Solano County Sheriff

Fairfield

370.
Sonoma County REDCOM Fire & EMS

Santa Rosa

371.
Sonoma County Sheriff’s Department

Santa Rosa

372.
Sonora Police Department

Sonora

373.
South Bay Regional Public Comm. Authority

Hawthorne

374.
South Gate Police Department

South Gate

375.
South Lake Tahoe Police Department

South Lake Tahoe

376.
South Pasadena Police/Fire Department
EP,CP
South Pasadena
377.
South San Francisco Police Department

South San Francisco

378.
St. Helena Police Department

St. Helena

379.
Stanislaus Regional 9-1-1

Modesto

380.
Stockton Fire Department

Stockton

381.
Stockton Police Department

Stockton

382.
Suisun City Police Department

Suisun

383.
Sunnyvale Police Department

Sunnyvale

384.
Sutter County Sheriff’s Department
CE
Yuba City
385.
Taft Police Department

Taft

386.
Tehama County Sheriff’s Department
CE
Red Bluff
387.
Torrance Police Department

Torrance

388.
Tracy Police Department

Tracy

389.
Trinity County Sheriff’s Department
CE
Weaverville
390.
Tulare County Consol. Ambulance Dispatch - TCCAD

Tulare

391.
Tulare County Fire Department

Farmersville

392.
Tulare County Sheriff’s Department

Visalia

393.
Tulare Police Department

Tulare

394.
Tuolumne County Sheriff’s Department

Sonora

395.
Turlock Police Department

Turlock

396.
UC Berkeley Police Department

Berkeley

397.
UC Davis Police Department

Davis

398.
UC Irvine Police Department

Irvine

399.
UC Los Angeles Police Department

Los Angeles

400.
UC Merced Police Department

Merced

401.
UC Riverside Police Department

Riverside

402.
UC San Diego Police Department

La Jolla

403.
UC San Francisco Police Department

San Francisco

404.
UC Santa Barbara Police Department

Santa Barbara

405.
UC Santa Cruz Police Department

Santa Cruz

406.
Ukiah Police Department
EE,CP
Ukiah
407.
Union City Police Department

Union City

408.
Upland Police Department

Upland

409.
US Air Force Beale AFB SFCC

Beale AFB *

410.
US Air Force Edwards AFB Fire Department

Edwards AFB

411.
US Air Force Travis AFB

Travis AFB

412.
US Air Force Vandenberg AFB Police/Fire Department

Vandenberg AFB

413.
US Army Fort Hunter Liggett Police Department

Ft Hunter Liggett

414.
US Army Fort Irwin Provost Marshall (MP)

Fort Irwin

415.
US Army Presidio of Monterey Dispatch Center

Presidio of Monterey

416.
US Park Police Golden Gate NRA

San Francisco

417.
US Sequoia National Park

Three Rivers

418.
US Yosemite National Park

El Portal

419.
USMC Camp Pendleton JECC

Camp Pendleton

420.
USMC Logistics Base Barstow - NEBO Provost Marshall

Barstow

421.
USMC Miramar Air Station Police/Fire Dept.

San Diego

422.
USMC Twenty-Nine Palms Combat Center - Fire

Twenty-Nine Palms

423.
Vacaville Police Department

Vacaville

424.
Vallejo Police Department

Vallejo

425.
Valley Regional Emergency Communications Center

Modesto

426.
Ventura County Fire Protection District

Camarillo

427.
Ventura County Sheriff’s Department
CP
Ventura
428.
Ventura Police Department

Ventura

429.
Verdugo Fire Department
EE,CP
Glendale
430.
Vernon Police Department

Vernon

431.
Visalia Police Department

Visalia

432.
Walnut Creek Police Department

Walnut Creek

433.
Weed Police Department
CE
Weed
434.
West Covina Police/Fire Department
EP,CP
West Covina
435.
WEST-COMM - West Cities Police Comm Center

Seal Beach

436.
Westminster Police Department

Westminster

437.
Whittier Police Department

Whittier

438.
Willits Police Department
EE,CP
Willits
439.
Willows Fire Department
CE
Willows
440.
Yolo Emergency Communications Agency YECA

Woodland

441.
Yreka Police Department
CE
Yreka
442.
Yuba City Police Department
CE
Yuba City
443.
Yuba County Sheriff’s Department
CE
Marysville

CE – Core Existing CP – Core Planned EE – Evergreen Existing EP – Evergreen Planned

1.4. TERM/PERIOD OF PERFORMANCE

1) Effective upon approval of the California Department of Technology (CDT), Statewide Technology Procurement Division (STPD), the initial Term of the contract will be three (3) years.

2) The State, at its sole discretion, may exercise its option to execute four (4), one (1)-year extensions to continue NG 9-1-1 core services for a maximum contract term of seven (7) years.

3) The Contractor shall not be authorized to deliver goods or commence the performance of services as described in this SOW until written approval has been obtained from all entities. Any delivery or performance of service that is commenced prior to the signing of the Agreement shall be considered voluntary on the part of the Contractor and non-compensable.

4) This contract may be amended, consistent with the terms and conditions of the contract and by mutual consent of both parties, subject to approval by the Statewide Technology Procurement Division under PCC 12100.

1.5. PROJECT REPRESENTATIVES

The project representatives during the term of this Agreement will be:

Table 1-2, Project Representatives

State:
California Governor’s Office of Emergency Services, Public Safety Communications
Contractor:
Name:
TBD
Name:
Address
601 Sequoia Pacific Blvd.

Sacramento, CA 95811 Address:

Phone:
(916) 657 -XXXX
Phone:
Fax:
(916) XXX-XXXX
Fax:

e-mail:

e-mail:

Direct all contract inquiries to:

State:
CA Governor’s Office of Emergency Services
Contractor:
Unit:
Procurement and Logistics Services Branch
Attention:
Attention:
TBD
Address:
Address:
3650 Schriever Ave

Mather, CA 95655

Phone:
(916) 845-XXXX
Phone:
Fax:
(916) 845-8303
Fax:

e-mail:

e-mail:

1.6. CONTRACTOR KEY STAFF AND RESPONSIBILITIES

The Contractor will be responsible for providing all necessary staff to implement all NG9-1-1 Core Services and Evergreen Network Based Turn-Key Solution (if Contractor bid on Section 6.4 of IFB 2015-01911). Please refer to Exhibit 22, Deliverable Expectation Document for additional details regarding Contractor staff responsibilities.

1) The Contractor will provide its own equipment and software necessary to perform the required duties.

2) The Contractor shall designate a primary contact person to whom all project communications may be addressed and who has the authority to act on all aspects of the services.

3) The Contractor will notify the State, in writing, of any changes in the personnel assigned to the tasks. If a Contractor employee is unable to perform due to illness, resignation, or other factors beyond the Contractor’s control, the Contractor will make every reasonable effort to provide suitable substitute personnel. The substitute personnel shall meet all requirements and must be approved in advance of any performance under the Agreement by the State via an approved Amendment.

4) The Contractor personnel shall perform their duties on any of the premises of the PSAP facilities located within California area during core business hours, and at all other times as required to successfully provide the services.

5) The Contractor shall comply with the PSAP’s requirements that restrict deliveries to non-peak commute hours in specific locations, or require delivery within defined time frames due to site policies. When applicable, the PSAP will provide the information regarding these policies/or requirements.

6) As part of the SOW associated with each transaction under the MPA resulting from this IFB, Contractor shall provide the PSAP with a copy of the manufacturer’s recommended preventive maintenance process and schedule. Preventive (scheduled) maintenance shall be performed in accordance with the manufacturer’s recommended preventive maintenance requirements and be consistent with the PSAP's operating requirements.

1.6.1. Labor Classifications

Contractor shall make available each of the labor classifications listed below. Pricing for these classifications shall be provided in Exhibit 16 Cost Worksheet #2, Labor Rates. For each labor classification any individual used by the Bidder through teaming agreements or sub-contracting arrangements shall meet these requirements:

1) Factory-Trained Technician - The definition of a Factory-Trained Technician is a technician who has passed a certification/training course taught by factory or factory approved personnel for the system he/she must install and maintain. Any training courses provided by other than the manufacturer’s own personnel must be recognized and approved by the manufacturer, if the Contractor asserts that an employee is factory-trained. A Factory-Trained Technician is able to diagnose all Major and Minor system alarms, provide hardware and software repairs, provide to the PSAP recommendations regarding user defined software and make changes to the user defined software. Contractor shall provide proof of Factory-Trained Technician certification upon use of this labor classification to the State.

2) Technician - The definition of Technician is a person who has basic telephone skills that has been provided instruction by a Certified Factory-Trained Technician for the system he/she must maintain at a level that the Technician is able to view all Major and Minor system alarms, provide hardware replacements and software repairs and provide to the PSAP recommendations regarding user defined software, under the direction of a Certified Factory-Trained Technician. Bidders shall detail the training that will be provided to a Technician.

3) System Engineer – For the purposes of the resulting Contract, a System Engineer is a person that has at least three (3) years’ experience in 9-1-1 applications for call-taking solutions or 9-1-1 networking. A System Engineer shall be capable of engineering any of the systems that that the Bidder proposes or sells through the resulting Contract.

4) Project Manager – A Project Manager will have provided project management support on behalf of a 9-1-1 emergency call processing solution provider for at least three (3) distinct installations. Full time support of another Project Manager on an installation may be considered to meet this experience requirement. The Project Manager will act as the single point of contact to the PSAP manager (or their designee) and will be available to the PSAP manager during the implementation of a new system and will be on-site during cutover to the new system.

1.7. Ordering Process

Consideration for selected Contractor will be based on:

1. Geographical location

2. Size and Scope of Project

3. Number of PSAP’s associated

4. Type of System Upon selection, a Contractor will thoroughly document the operational needs of the PSAPs and produce a Contractor’s Statement of Work (SOW). A sample SOW is provided in IFB 2015-01911, IFB Attachments and Exhibits Document, Appendix A, Statement of Work Attachment 3.0 Contractor’s Sample Statement of Work NG9-1-1 Core (SOW) Format and Attachment 3.1 Contractor’s Sample Statement of Work Evergreen Turn-key Format.

1.7.1 Certification of Facility Readiness

If required, the State and/or PSAP will modify PSAP site facilities to meet the Contractor’s specifications. Upon completion the Contractor will be required to certify in writing that the modifications have been completed and satisfy the Contractor’s requirements.

1.7.2 Certification of Equipment Readiness

Any equipment must be installed and certified ready for acceptance testing by the agreed to installation date between the Contractor and PSAP. Such certification must be in writing and presented to the individual specified in the SOW.

1.8. Unplanned Down-Time Disclosure and Root Cause Analysis

In the event any individual core service component is impacted by unplanned downtime, (such as a failure), the Contractor shall provide the CA 9-1-1 Branch and PSAPs with a disclosure statement within two (2) calendar weeks which shall include but not be limited to:

1) The component that failed;

2) The duration the component was impacted;

3) Impact to the overall system due to the component failure – including impacted PSAPs by Federal Communications Commission (FCC) Identification (ID);

4) Corrective action taken to recover the component.

The disclosure statement shall be provided by the Contractor proactively without request from the State and/or the Local Agency/Agencies.

In addition to the above disclosure the Contractor shall provide a root cause analysis to the CA 9-1-1 Branch and Local Agency/Agencies within fifteen (15) business days. If a complete root cause analysis cannot be provided the Contractor shall provide an initial root cause analysis within fifteen (15) business days and then update the CA 9-1-1 Branch and PSAPs every five (5) business days until root cause is determined.

Root cause analysis shall identify the root cause of failure and corrective action to prevent a like failure in the future.

1.9. Installation Date

A PSAP is any Public Agency authorized under Government Code Section 53102 to perform the functions of a PSAP. Orders from the State must be completely installed and ready-for-use within one-hundred-eighty (180) calendar days After Receipt of Order (ARO) as indicated on the Purchase Order (PO).

The installation date may be changed by mutual consent of the Contractor and the PSAP; however, the System Installation Schedule must be completed/updated with the revised dates. Such deferment shall not exceed sixty (60) calendar days, except by mutual agreement. In the event of an agreed change to the installation date, the Contractor will provide a revised Contractor SOW to the PSAPs and to the CA 9-1-1 Branch.

1.10. Need for Equipment Due to Emergency

The Contractor shall make every reasonable effort to assist the PSAP in procuring the use of equipment compatible with that provided under this Contract to meet emergencies such as a Major outages or unforeseen peak loads.

The PSAP may accept or reject the offer of use of emergency equipment. If accepted, the charge for such use, if any, shall be a separate PO arrangement between the State and the Contractor.

1.11. Site Survey

The Contractor shall prepare a floor plan of the Communications Operations room showing the location of each item of equipment and detailing the current electrical power, common ground and environmental control facilities. The Contractor shall prepare a floor plan of the equipment room showing the location of each item of back-room equipment and detailing the current electrical power and environmental control facilities. The Contractor shall review and comment on the adequacy of the PSAP’s facility, including but not limited to, the adequacy of the furniture, lighting, floor plan, environmental control, cabling, demarcation room and equipment room to support the installation of the 9-1-1 system. The PSAP shall permit free access, subject to security restrictions at the site, for the purpose of reviewing facility readiness.

Specifications shall include the operating voltage required, maximum current under peak conditions (in amperes), power consumed (expressed in watts), temperature range within which the equipment is designed to operate, the humidity range within which the equipment offered is designed to operate, the equipment heat producing pattern under normal operating conditions (expressed in British Thermal Units (BTUs) for each specific Model Cluster), and the type and number of power receptacles required. All modifications specified to prepare the facilities must be detailed in the Contractor’s SOW.

The Contractor shall provide a pre-installation checklist to insure that the PSAP has met all installation obligations prior to the Contractor installing the equipment. Absence of a pre-installation checklist shall mean that the Contractor is offering equipment that has no Minimum or maximum environmental specifications.

On or before the Facility Readiness Date, the PSAP shall cause the site to be prepared in accordance with the Contractor’s site preparation specifications unless the Contractor has agreed to be responsible for such site preparation. The Contractor will provide a written certification that the modifications detailed on the pre-installation checklist have been completed in accordance with the Contractor’s requirements.

Any subsequent alterations or modifications to the site which are directly attributable to incomplete or erroneous specifications provided by the Contractor and which involve additional expense shall be made at the expense of the Contractor, to the extent that such costs would not have been incurred had the complete and/or correct specifications been initially provided. If any such site alterations cause a delay in the installation, the provisions in Appendix A, Statement of Work (SOW) Section 1.30, Core Services SLA Charts and Section 1.31, Technical SLA Charts Evergreen Network Based Turn-Key Solution Reporting SLAs shall apply.

1.12. Documentation

The Contractor shall provide copies of all non-proprietary manuals and other printed materials, including updated versions, which are useful and necessary to the PSAP in its use of the equipment or software provided at prices listed in the Price List.

1.13. Transportation

Shipments to and from the installation site shall be the responsibility of the Contractor and shall be made by commercial carrier, or Contractor owned carrier, in padded van or airfreight. If air shipment by commercial carrier is not specified in the PO, shipment shall be made by padded van, or Contractor may, at its option, use a premium method of transportation (e.g., air freight). Equipment shall be preserved, packed and marked in accordance with the Contractor’s standard practice. All deliveries of purchased equipment and software shall be F.O.B. - DESTINATION.

Notwithstanding the above requirement, the PSAP reserves the option, with concurrence from the Contractor (such concurrence not to be unreasonably withheld), to arrange for and to pay all transportation, rigging and drayage costs, at the time of the discontinuance of rental and purchase. The PSAP agrees that such transportation shall be by commercial carrier, using padded van properly constructed and equipped for shipment of electronic equipment.

When the PSAP elects to specify air shipment by commercial carrier, written authorization for such method shall be furnished to the Contractor at least thirty (30) calendar days prior to the scheduled shipping date and the PSAP shall pay the airfreight charges. In this event, the Contractor shall furnish copies of the freight bills to substantiate transportation charges billed by the Contractor to the PSAP.

The Contractor shall pay transportation charges for the shipment of empty packing cases, except when the equipment is moved from one PSAP location to another.

The Contractor shall bear the cost of transportation, rigging, and/or drayage whenever equipment is shipped or moved for mechanical replacement purposes unless the replacement was due to fault or negligence of the PSAP.

The PSAP shall pay only those rigging costs incurred at the PSAP’s location unless otherwise agreed to between the PSAP and the Contractor.

Upon notification the PSAP shall arrange and pay for all transportation, rigging and drayage charges for such relocation.

1.14. Packing and Unpacking

Supervision of packing, unpacking and placement of equipment shall be furnished by the Contractor during the Contractor’s normal working hours without additional charge to the PSAP.

Rearrangement of equipment on the same site for PSAP convenience shall be at PSAP expense.

1.15. Risk of Loss or Damage

The PSAP shall be relieved from all risk of loss or damage to the equipment purchased under this Contract during periods of transportation, installation and during the entire time the equipment is in the possession of the Contractor, except when such loss or damage is due to the fault or negligence of the PSAP. Loss or damage not due to the fault or negligence of the PSAP shall be verified through a legal claims record such as a police or fire report. The PSAP assumes risk of loss or damage for equipment after formal Acceptance of installed systems.

1.16. Restricted Delivery Hours

The Contractor shall comply with the PSAP’s requirements that restrict deliveries to non-peak commute hours in specific locations, or require delivery within defined time frames due to site policies. When applicable, the PSAP will provide the information regarding these policies/or requirements.

1.17. Acceptance Testing Criteria

The Contractor shall issue a certificate of system readiness to the PSAP when equipment and software are installed and ready for acceptance testing. Acceptance testing shall commence on a date and time mutually agreed upon by the PSAP, within ten (10) business days, following receipt of the certificate of system readiness and shall end when the equipment and software have met the standard of performance Acceptance Testing Criteria for a period of two-hundred-forty (240) consecutive hours. Operation of the equipment and software to confirm proper installation shall be considered to be a part of the acceptance test. It is not required that the two-hundred-forty (240) consecutive hour period expire in order to begin a subsequent acceptance testing period.

Equipment and software shall not be accepted by the PSAP and no charges will be paid by the PSAP or the CA 9-1-1 Branch until all of the items on the Appendix A, Statement of Work, Attachment 4, Core System Acceptance and Authorization Checklist are met. Upon the successful completion of the acceptance testing period and within five (5) business days, the PSAP shall execute the System Acceptance and Authorization Checklist and provide copies to the Contractor and the CA 9-1-1 Branch.

The standard of performance for acceptance testing is defined as the operation of equipment and/or software at an average level of effectiveness of ninety-nine point nine percent (99.9%) for a period of two-hundred-forty (240) consecutive hours. For acceptance testing purposes, the average effectiveness level is a percentage figure determined by dividing the Scheduled Operational Hours (SOH) minus down-time by the SOHs. In addition, the equipment shall operate in at least minimal conformance with the Manufacturer’s official published specifications applicable to such equipment on the date of this Contract. The Contractor shall provide the published specifications applicable to each piece of equipment, if requested by the PSAP.

Down-Time, for acceptance testing purposes is that period of time when the system installed at any one location is incapable of performing all of the functions for which the installation was intended (during SOH), due to a malfunction of the system or its operating software, excluding all external factors. During a period of system down-time, all equipment and software that are part of the system shall be made available to the Contractor to facilitate prompt repair. During this time the PSAP may use operable equipment and software where such use does not interfere with the Contractor’s efforts to restore service and where Contractor’s permission for such use is given (such permission not to be unreasonably denied). In the event that the system is required by the Contractor for testing or exercising of failed equipment but is not made available by the PSAP when requested, system down-time shall not accrue during the interval between the time of Contractor’s request and the time that the system is made available to the Contractor.

The required effectiveness level shall apply separately to a system and to each Contractor’s supplied remote equipment unless the PSAP and the Contractor agree otherwise. The effectiveness level of the system supplied by the Contractor shall be computed to exclude Down-Time attributable to equipment, cables and wires not supplied by the Contractor.

If the PSAP uses the system when the system or subsystem is down, as Down-Time is defined above, use of the system shall be excluded from the level of effectiveness computation, as will any down time resulting from system failure during such use.

The PSAP shall maintain appropriate records to validate that all requirements of this section concerning acceptance testing are met. SOHs and down-time shall be measured in hours and whole minutes. If meters are used to record the time, the meter readings will be converted into hours and whole minutes on a daily basis.

When a system involves on-line equipment that is remote to the basic installation, the required effectiveness level shall apply separately to the system and to the remote equipment.

During the acceptance testing period, all the preventative maintenance time shall be excluded from the acceptance testing period hours. System failure down-time shall be measured by those intervals during the acceptance testing period between the time that the Contractor is notified of the system failure and shall end when the system is returned to the PSAP in operating condition.

During the acceptance testing period, if the Contractor is notified that the system is not performing as intended, Contractor shall adhere to the response time requirements specified in Remedial Maintenance. All maintenance service and parts shall be furnished by the Contractor without charge during an unsuccessful period of acceptance testing on the same basis as set forth herein concerning maintenance unless such maintenance service and parts are required as a result of the fault or negligence of the PSAP.

The PSAP may, upon written notice to the Contractor and the CA 9-1-1 Branch that is at least fifteen (15) calendar days prior to the scheduled start of the acceptance testing, delay the start of the acceptance testing period, but such delay may not exceed thirty (30) consecutive calendar days. Delays that exceed thirty (30) days shall be referred to the CA 9-1-1 Branch for dispute resolution.

If the system does not meet the standard of performance within ninety (90) consecutive calendar days after the start of the acceptance testing, the PSAP shall have the option to request a replacement system, extend the performance period or terminate the order (or portions thereof) and seek relief as provided by the Rights and Remedies of State for Default provision in the contract. The PSAP's option shall remain in effect until such time as the system meets the performance criteria, or one-hundred-eighty (180) consecutive calendar days after the start of the acceptance testing, whichever occurs first. If the system has not met the standard of performance by one-hundred-eighty (180) calendar days after installation the PO order under which the defective system is being installed may be cancelled. If the CA 9-1-1 Branch determines the same type of system has not met the standard of performance at more than three (3) planned installations the system or affected components of the system may be removed from the Contract at the discretion of the CA 9-1-1 Branch.

1.18. System Acceptance Testing

Acceptance testing is intended to ensure that the system acquired operates in substantial accord with the Manufacturer’s technical specifications, is adequate to perform as warranted by Contractor's response to the requirements of this Contract and evidences a satisfactory level of performance reliability, prior to its acceptance by the PSAP. If the system to be installed includes operating software as listed in the PO, such operating software shall be present for the acceptance test unless substitute operating software acceptable to the PSAP is provided. Acceptance testing is required for all newly installed technology systems, subsystems and individual equipment which are added, or field modified (modification of equipment from one model to another) after a successful performance period.

The PSAP shall begin acceptance testing on a mutually agreed date and time within ten (10) business days of a Contractor issuing a certificate of system readiness to the PSAP. If the system fails any portion of acceptance testing, the Contractor shall be notified by the PSAP immediately of the failure, with written confirmation to be provided in not more than five (5) business days. Control of the system shall immediately be given to the Contractor if the system performs so poorly that it poses a potential threat to public safety and the original 9-1-1 system being replaced is still functional. If the system performs in compliance with this Contract and does not pose a threat to public safety, but does not operate as intended by the manufacturer, the PSAP will continue using the system while the Contractor affects repairs. The system shall not be deemed to be accepted until the Contractor re-certifies such installation and the above referenced test is successfully completed.

In the event the system does not meet the standard of performance during the initial ten (10) days, the acceptance tests shall continue on an hour-to-hour basis until the standards of performance are met for ten (10) days. The acceptance-testing period shall not be delayed due to any PSAP request to make a change within a system’s featured functionality. Any problem that occurs during the acceptance testing period that can be quickly remedied by making a change to the system shall only delay the acceptance testing the amount of time from when the problem was first reported to the Contractor to the time the adjustment successfully remedies the problem. Failures during acceptance testing period caused by sources outside of the Contractor’s control shall not be deemed as cause to delay the acceptance testing period.

At the request of the Contractor, the PSAP shall make available not only the failed system, but also the equipment that must be utilized by the Contractor to identify the cause of failure and to accomplish the repair.

Systems shall not be accepted by the PSAP or CA 9-1-1 Branch, and no charges associated with such system shall be paid by the PSAP or CA 9-1-1 Branch, until the Contractor has demonstrated that the Contractor has satisfactorily provided all of the equipment and functionality on the System Acceptance and Authorization Checklist as provided in IFB 2015-01911 IFB Attachments and Exhibits Document, Appendix A, Statement of Work, Attachment 4, Core System Acceptance and Authorization Checklist..

1.19. Acceptance Testing for Software (other than Operating System Software) Acceptance testing is required for all Contractor-supplied software supplied under this Contract including all software initially installed, improved versions (new repurchases) of this software, any such software which has been altered (modified) by the Contractor to satisfy PSAP requirements, and any substitute software provided by the Contractor in lieu thereof, unless otherwise provided herein. The purpose of the acceptance test is to ensure that the software operates in substantial accord with the Manufacturer’s technical specifications and meets the PSAPs performance specifications. The specific procedures for the accomplishment of such tests are as stated in Acceptance Testing Criteria.

Following certification by the Contractor that programming aids, program products and applications listed in the PO have been delivered ready for PSAP use, the PSAP shall test each such programming aid, program product or application, in accordance with the Acceptance Testing Criteria.

If the Contractor has written application programs, the PSAP will provide test data and the Contractor will provide a test master and all output formats for such programs. The PSAP will process input transactions against the master file and produce the updated old and new master files to ensure that all transactions were applied correctly. All outputs will be checked for accuracy, format and quality, and the programs will be accepted when the PSAP confirms that the application programs meet the specifications to which they were written.

1.20. System Replacement and Participation

If, during a thirty (30) consecutive day period following PSAP acceptance testing period, the system does not achieve the required level(s) of availability, the PSAP will notify the Contractor in writing.

If the Contractor fails to bring the system to the required average availability level during the succeeding thirty (30) consecutive days after notification by the CA 9-1-1 Branch, the PSAP may require the Contractor to replace the equipment failing to meet the standard of performance. Replaced equipment must also meet acceptance testing following installation as set forth in Acceptance.

During the term of the Contract if three (3) or more purchased installations are cancelled or are replaced for failing to meet this continuing standard of performance, the CA 9-1-1 Branch, at their sole discretion, may remove the identified system or affected components of the system from this Contract.