IFB 15A00025B00000113.pdf
PDF 191 KB Posted
- Attached to
- Range Custom Test Fabrication, Onsite Support, SQRL IV Federal contract opportunity
- Solicitation number
- 15A00025B00000113
About this file
This is a Solicitation, Offer, and Award (Standard Form 1442) for a construction contract issued by the Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF). The project, titled "Range Custom Test Fabrication and Onsite Support," is a small business set-aside contract with a NAICS code of 238910 and a small business size standard of $19 million. The contract is valued between $250,000 and $500,000 and will involve site preparation, demolition, fabrication, onsite labor support, and testing at the National Center for Research, Explosives and Research in Redstone Arsenal, Alabama.
Key solicitation details include a bid due date of September 12, 2025, at 5:00 PM ET, with a bid guarantee required. The contract has three contract line items (CLINs): CLIN 0001 for Site Prep, Demolition, and Fabrication; CLIN 0002 for Onsite Labor Support and Testing Phase; and CLIN 0003 for Demolition and Rebuild. Bidders must submit two-volume proposals: a Technical Bid (Volume I) and a Price Bid (Volume II), with specific page limits and requirements for each volume. A mandatory site visit is scheduled for September 9, 2025, at the NCETR Main Lobby, and interested bidders must have access to Redstone Arsenal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| IFB 15A00025B00000113 Amendment 0002.pdf | ||
| IFB 15A00025B00000113 Amendment 0001.pdf | ||
| DBA - Madison County AL.pdf | ||
| Statement of Work.pdf | ||
| Past Performance Questionnaire.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15A00025B00000113 Page 1 of 53
SOLICITATION,OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER
15A00025B00000113
X SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
2. TYPE OF SOLICITATION 3. DATE ISSUED
09/04/2025
PAGE OF PAGES
1 53
IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
N/A
CODE 15A000
ATF - ACQUISITIONS MANAGEMENT DIVISION
Brian Wilkins
99 NEW YORK AVE. NE
WASHINGTON, DC 20226
7. ISSUED BY 8. ADDRESS OFFER TO
9. FOR
INFORMATION CALL:
a. NAME
Brian.Wilkins@ATF.gov
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
(O) 2026489120 (F) 2026489654
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
Project Title: Range Custom Test Fabrication and Onsite Support See the Scope of Work and Specifications for additional descriptions. The NAICS Code is 238910 and the Small Business Size Standard is $19 Million.
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving3 60 award, X notice to proceed. This performance period is X mandatory negotiable. (See 52.211-10.)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).
X YES NO
12b. CALENDAR DAYS
Sealed offers in original and copies to perform the work required are due at the place specified in item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
05:00CSTa.
09/12/2025
b. An offer guarantee X is, is not required.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.
5d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
15A00025B00000113 Page 2 of 53
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ___________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
17.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE
UNITED STATES CODE AT
26. ADMINISTERED BY 15A000
ATF - ACQUISITION BRANCH
99 New York Ave. NE, #3.S-125 Washington, DC 20226
(O) 2026487480
(F) 2026489654
ATF - Finance Branch 99 New York Avenue NE, #4.S-288 Washington, DC 20226
(O) (202) 648-7860 Finance.Branch@ATF.gov
27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
X 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
Brian K. Wilkins
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
15A00025B00000113 Page 3 of 53
Table of Contents
Section Description Page Number
1 Solicitation, Offer and Award 2 Commodity or Services Schedule
Section C Descriptions and Specifications 3 Special Contract Requirements
2852.222-70 Domestic Violence, Sexual Assault, and Stalking (DEC 2014) ATF-04 Personnel Security Requirements (FEB 2024) ATF-10 CONTRACTOR-ACQUIRED INSURANCE REQUIREMENTS (July 19, 2007) ATF-14 Electronic Invoicing (APRIL 2025) ATF-17 Notice to the Government of Delays (APRIL 2025) ATF-19 Authority to Obligate the Government (APRIL 2025) DOJ-05 Security of Department Information and Systems DOJ-05 (OCT 2023)
4 Contract Clauses 52.246-1 Contractor Inspection Requirements (Apr 1984) 52.246-12 Inspection of Construction (Aug 1996) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.242-14 Suspension of Work (Apr 1984) 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) 52.203-6 Restrictions on Subcontractor Sales to the Government (Jun 2020) 52.203-12 Limitation On Payments to Influence Certain Federal Transactions (Jun 2020) 52.203-13 Contractor Code of Business Ethics and Conduct (Nov 2021) 52.203-14 Display of Hotline Poster(s) (Nov 2021) 52.203-15 Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (June 2010) 52.203-16 Preventing Personal Conflicts of Interest (Jun 2020) 52.203-17 Contractor Employee Whistleblower Rights (Nov 2023) 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (Jan 2017) 52.204-4 [Reserved] 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) 52.204-12 Unique Entity Identifier Maintenance (Oct 2016) 52.204-13 System for Award Management Maintenance (Oct 2018) 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.204-27 Prohibition on a ByteDance Covered Application (Jun 2023) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) 52.219-28 Postaward Small Business Program Rerepresentation (Jan 2025) 52.222-1 Notice to the Government of Labor Disputes (Feb 1997) 52.222-3 Convict Labor (June 2003) 52.222-4 Contract Work Hours and Safety Standards--Overtime Compensation (May 2018) 52.222-6 Construction Wage Rate Requirements (Aug 2018) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction (Feb 1999) 52.225-10 Notice of Buy American Requirement-Construction Materials (May 2014) 52.228-3 Workers' Compensation Insurance (Defense Base Act) (July 2014) 52.228-5 Insurance-Work on a Government Installation (Jan 1997) 52.228-13 Alternative Payment Protections (July 2000) 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) 52.233-1 Disputes (May 2014) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984)
15A00025B00000113 Page 4 of 53
52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-10 Operations and Storage Areas (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Accident Prevention (Nov 1991) 52.236-21 Specifications and Drawings for Construction (Feb 1997) 52.242-5 Payments to Small Business Subcontractors (Jan 2017) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form) (Apr 1984) 52.249-8 Default (Fixed-Price Supply and Service) (Apr 1984) 52.203-5 Covenant Against Contingent Fees (May 2014) 52.203-7 Anti-Kickback Procedures (Jun 2020) 52.214-29 Order of Precedence-Sealed Bidding (Jan 1986) 52.225-9 Buy American-Construction Materials (Oct 2022) 52.236-1 Performance of Work by the Contractor (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.236-17 Layout of Work (Apr 1984) DOJ-02 Contractor Privacy Requirements (JAN 2022) Section I Contract Clauses (FAR Clauses Required Depending on Solicitation/Contract)
5 Attachments 6 Solicitation Provisions
52.215-1 Instructions to Offerors-Competitive Acquisition (Nov 2021) 52.222-5 Construction Wage Rate Requirements - Secondary Site of the Work (May 2014) 52.214-3 Amendments to Invitations for Bids (Dec 2016) 52.214-4 False Statements in Bids (Apr 1984) 52.214-5 Submission of Bids (Dec 2016) 52.214-6 Explanation to Prospective Bidders (Apr 1984) 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999) 52.214-12 Preparation of Bids (Apr 1984) 52.214-15 Period for Acceptance of Bids (Apr 1984) 52.214-18 Preparation of Bids-Construction (Apr 1984) 52.214-19 Contract Award-Sealed Bidding-Construction (Aug 1996) 52.214-34 Submission of Offers in the English Language (Apr 1991) 52.214-35 Submission of Offers in U.S. Currency (Apr 1991) 52.228-1 Bid Guarantee (Sept 1996) 52.236-27 Site Visit (Construction) (Feb 1995) Section L Instructions, Conditions and Notices to Bidders Section M Evaluation Factors for Award
7 Representations and Certifications 52.203-11 Certification And Disclosure Regarding Payments to Influence Certain Federal Transactions (Sept 2024) 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation (Jan 2017) 52.204-8 Annual Representations and Certifications (Jan 2025) 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) 52.204-26 Covered Telecommunications Equipment or Services-Representation (Oct 2020) 52.209-5 Certification Regarding Responsibility Matters (Aug 2020) 52.209-7 Information Regarding Responsibility Matters (Oct 2018) 52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law (Feb 2016) 52.214-16 Minimum Bid Acceptance Period (Apr 1984)
15A00025B00000113 Page 5 of 53
Section 2 - Commodity or Services Schedule
Project Title: Range Custom Test Fabrication and Onsite Support
See the Scope of Work and Specifications for additional descriptions.
The NAICS Code is 238910 and the Small Business Size Standard is $19 Million.
Magnitude; $250,000.00 - $500,000.00.
SCHEDULE OF SUPPLIES/SERVICES
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Site Prep, Demolition, Fabrication
Firm Fixed Price
PSC: Y299
1 JB $________ $_________________
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0002 Onsite Labor Support, Testing Phase
Labor Hours
PSC: Y299
1 JB $________ $_________________
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 Demolition and Rebuild
Firm Fixed Price
PSC: Y299
1 JB $________ $_________________
Section C Descriptions and Specifications
SEE ATTACHED STATMENT OF WORK AND ASSOCIATED
DRAWINGS
15A00025B00000113 Page 6 of 53
Section 3 - Special Contract Requirements
Clauses By Reference
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov
Clause Title Fill-ins (if applicable)
2852.222-70 Domestic Violence, Sexual Assault, and Stalking (DEC
2014)
ATF-04 Personnel Security Requirements (FEB 2024)
Clauses By Full Text
ATF-10 CONTRACTOR-ACQUIRED INSURANCE REQUIREMENTS (July 19, 2007)
In accordance with the clause entitled "Insurance - Work on a Government Installation" in Section I, insurance of the following kinds and minimum amounts shall be provided and maintained during the period of performance of this contract:
(a) Worker's compensation and employer's liability. The contractor shall, as a minimum, meet the requirements specified at FAR 28.307-2(a).
(b) General liability. The contractor shall, as a minimum, meet the requirements specified at FAR 28.307-2(b).
(c) Automobile liability. The contractor shall as a minimum, meet the requirements specified at FAR 28.307-2(c).
(End of Clause)
ATF-14 Electronic Invoicing (APRIL 2025)
(a) The Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF) and the Federal Acquisition Regulation (FAR) encourage contractors to invoice electronically. Invoicing electronically saves time, money, and physical storage space for both the Government and the contractor.
(b) Each invoice must be a proper invoice in accordance with Federal Acquisition Regulations (FAR) 32.905(b). The contractor may submit a combined invoice with each ATF contract/order number. The invoice must clearly identify the specific contract-line-item number (CLIN) or line number for which the contractor is seeking payment under the contract/order. If the invoice covers multiple CLINs or line items, the invoice must clearly identify specific amounts and activity applicable to each.
(c) Electronic invoices must be submitted to the ATF Contracting Officer's Representative or Point of Contact (COR/POC) named in Section G/3.3 of this contract and Financial Management Division (FMD), FinanceBranch@ATF.gov. Electronic invoices will serve as the official original copy. The e-mail subject line must contain the contract/purchasing vehicle's #, name of the ATF COR/ POC named in Section G of this contract and/or purchasing vehicle (e.g., 15A00025AAQA000XX | John Doe - Invoice #xxx). ATF will return to the contractor any invoices that do not contain the correct subject line information.
15A00025B00000113 Page 7 of 53
(d) Contractors who are unable to submit electronic invoices may mail their invoices to the COR/POC named in Section G/3.3 of this contract and FMD address provided below:
Bureau of Alcohol, Tobacco, Firearms & Explosives Attn: Finance Branch - EXPEDITE CONTRACT INVOICE 99 New York Avenue, NE Mail Drop 4S-288 Washington, DC 20226
(End of Clause)
ATF-17 Notice to the Government of Delays (APRIL 2025)
In the event the Contractor: 1) encounters difficulty in meeting performance requirements; 2) anticipates difficulty in complying with the contract-delivery schedule or completion date; or 3) has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of the contract, the Contractor shall immediately notify the Contracting Officer and the CO's Representative(s), in writing, giving pertinent details. However, this notice shall not be construed as a waiver by the Government of any required contractual-delivery schedule or date or any rights or remedies provided by law or under this contract; instead, this notice shall be information only in character.
(End of Clause)
ATF-19 Authority to Obligate the Government (APRIL 2025)
The Contracting Officer (CO) is the only individual who can legally commit or obligate the Government to the expenditure of public funds. No cost chargeable to the contract can be incurred before receipt of a fully signed and awarded contract unless specific authorization from the CO is provided.
DOJ-05 Security of Department Information and Systems DOJ-05 (OCT 2023)
I. Applicability to Contractors and Subcontractors Section 2839.102 of the Justice Acquisition Regulation (JAR), (48 C.F.R. § 2839.102), applies to this contract. Accordingly, all contractors are obligated to comply with all applicable DOJ security policies, directives, or guidance documents, including the security requirements in the provisions in this contract clause. This contract clause applies to all contractors and subcontractors, including cloud service providers (“CSPs”), and personnel of the contractors and subcontractors (hereinafter collectively, “Contractor”) that may access, collect, store, process, maintain, use, share, retrieve, disseminate, transmit, or dispose of DOJ Information. The security requirements set forth herein are in addition to those required by the Federal Acquisition Regulation (“FAR”), and any other applicable laws, mandates, contract clauses, DOJ policies, directives or guidance documents and Executive Orders pertaining to the development and operation of Information Systems and/or the protection of Government Information. This clause does not alter or diminish any existing rights, obligations, or liability under any other civil and/or criminal law, rule, regulation, or mandate.
II. General Definitions The following general definitions apply to this clause. Specific definitions also apply as set forth in other paragraphs.
A. Authorization to Operate (“ATO”), as defined in National Institute of Standards and Technology (“NIST”) Special Publication (“SP”) 800-37 Revision 2, is the official management decision given by a senior Federal official or officials to authorize operation of an information system and to explicitly accept the risk to agency operations (including mission, functions, image, or reputation), agency assets, individuals, other organizations, and the Nation based on the implementation of an agreed-upon set of security and privacy controls.
B. Cloud Computing, as defined in DOJ Order 0904 Cybersecurity Program, is a model for enabling ubiquitous, convenient, on-demand network access to a shared pool of configurable computing resources (e.g., networks, servers, storage, applications, and services) that can be rapidly provisioned and released with minimal
15A00025B00000113 Page 8 of 53 management effort or service provider interaction. This cloud model is composed of five essential characteristics, three service models, and four deployment models in accordance with NIST SP 800-145.
C. Covered Contract is any contract, order or other agreement under which the contractor, or a subcontractor at any tier, including a cloud service provider, may access, collect, store, process, maintain, use, share, retrieve, disseminate, transmit, or dispose of DOJ Information (as defined below) in the course of providing a product or service to the Department, with the exception of acquisitions under the micro-purchase threshold.
D. Covered Information System means any information system used for, involved with, or allowing, the processing, storing, or transmitting of DOJ Information under a Covered Contract.
E. Data means recorded information, regardless of form or the media on which it may be recorded. The term includes technical data, computer software, and personally identifiable information (PII) (defined below). The term does not include information incidental to contract administration, such as financial, administrative, cost or pricing, or management information.
F. DOJ Information, as defined in DOJ Order 0904, means any Information that is owned, produced, controlled, protected by, or otherwise within the custody or responsibility of the DOJ, including, without limitation, information related to DOJ programs or personnel. It includes, without limitation, Information (1) provided by or generated for the DOJ, (2) managed or acquired by the Contractor for the DOJ in connection with the performance of the contract, and/or (3) acquired to perform the contract.
G. Information, as defined in DOJ Order 0904, is any communication or representation of knowledge such as facts, data, or opinions, in any form or medium, including textual, numerical, graphic, cartographic, narrative, or audiovisual. This includes any communication or representation of knowledge in an electronic format that allows it to be stored, retrieved, or transmitted.
H. Information System, means a discrete set of information resources organized for the collection, processing, maintenance, use, sharing, dissemination, or disposition of information (44 U.S.C. 3502(8)).
I. Personally Identifiable Information (“PII”), as defined in the FAR 24.101, means information that can be used to distinguish or trace an individual's identity, either alone or when combined with other information that is linked or linkable to a specific individual. It includes but is not limited to common data elements such as names, addresses, dates of birth, and places of employment, to identity documents, Social Security numbers or other government-issued identifiers, precise location information, medical history, and biometric records.
This definition covers all PII that is created by or becomes available to the contractor, including its employees, subcontractors, or affiliates, as a result of performing under this contract. PII, as supplementally defined in DOJ Order 0904, also includes information about an individual maintained by an agency, including, but not limited to, information related to education, financial transactions, medical history, and criminal or employment history and information, which can be used to distinguish or trace an individual’s identity.
J. Private Cloud, as defined in NIST SP 800-145, is the deployment model for cloud infrastructure provisioned for exclusive use by a single organization comprising multiple consumers (e.g., business units). It may be owned, managed, and operated by the organization, a third party, or some combination of them, and it may exist on or off premises.
K. Security Breach means any security incident (as defined below) that directly relates to the loss of control, compromise, exfiltration, manipulation, unauthorized disclosure, unauthorized acquisition, unauthorized exposure or unauthorized access or any similar occurrence of any Covered Information System or any DOJ Information or any PII accessed by, retrievable from, processed by, stored on, or transmitted within, to or from any such system. This includes incidents where (1) a person other than an authorized user accesses or potentially accesses PII or DOJ Information or (2) an authorized user accesses or potentially accesses PII or DOJ Information for an unauthorized purpose.
a. Potential Security Breach (hereinafter, “Potential Breach”) means any suspected, but unconfirmed security breach (as defined above).
b. Confirmed Security Breach (hereinafter, “Confirmed Breach”) means any confirmed security breach (as defined above).
15A00025B00000113 Page 9 of 53
L. Security Incident means any occurrence that (1) may actually or imminently jeopardize, without lawful authority, the availability, integrity, authentication, confidentiality, or nonrepudiation of DOJ Information or a Covered Information System; or (2) may constitute a violation or imminent threat of violation of law, security policies, security procedures, or acceptable use policies.
a. Potential Security Incident means any suspected, but unconfirmed security incident (as defined above).
b. Confirmed Security Incident means any confirmed security incident (as defined above).
M. Vulnerability, as defined in DOJ Vulnerability Management Plan, and the OCIO Information Security Management Procedure, means a weakness or flaw discovered in the design of a system that, when exploited, may result in a loss of confidentially, integrity, or availability of DOJ Information or an Information System.
III. Confidentiality and Non-Disclosure of DOJ Information A. Preliminary and final contract deliverables and all associated working papers and material generated by the Contractor developed using DOJ Information, product, source code, and/or methods of operations, are the property of the U.S. Government and must be submitted to the Contracting Officer (“CO”) or the CO’s Representative (“COR”) at the conclusion of the contract. The U.S. Government has unlimited data rights to all such deliverables and associated working papers and materials in accordance with FAR 52.227-14 (Rights in Data-General). The Contractor will define a method of monitoring the development activity to include any activity associated with DOJ Information, product, source code, and methods of operations. The data rights and development details shall be defined within the Contract.
If the Contractor intends to utilize its existing data, for which it has a patent or copyright, to develop a contract deliverable, it is incumbent upon the Contractor to negotiate with the CO the proper FAR Part 27 clauses in the contract to protect its existing data.
B. Pursuant to FAR 52.227-14(d)(2), all documents and data produced in the performance of this contract containing DOJ Information, product code, source code, and/or methods of operations are the property of the U.S. Government and, without the prior written permission of the CO, the Contractor shall neither reproduce nor release such information to any third-party at any time, including during performance or following expiration and/ or termination of the contract.
C. Any DOJ Information made available to the Contractor under this contract shall be used only for the purpose of performance of this contract and shall not be divulged or made known in any manner to any persons except as may be necessary in the performance of this contract. In performance of this contract, the Contractor assumes responsibility for the protection of the confidentiality of all DOJ Information processed, stored, or transmitted by the Contractor. The Contractor shall comply with information security responsibilities and duties throughout the contract and after expiration/termination as appropriate per contract close-out activities. When requested by the CO (typically no more than annually), the Contractor shall provide a report to the CO identifying, to the best of the Contractor’s knowledge and belief, the type, amount, and level of sensitivity of the DOJ Information processed, stored, or transmitted under the Contract, including an estimate of the number of individuals for whom PII has been processed, stored or transmitted under the Contract and whether such information includes social security numbers (in whole or in part).
IV. Compliance with Information Technology Security Policies, Procedures and Requirements A. For all Covered Information Systems, in addition to any other applicable requirements, as set forth in Part I, the Contractor shall comply with the security requirements of the Federal Information Security Modernization Act of 2014 (“FISMA”), Privacy Act of 1974, E-Government Act of 2002, National Institute of Standards and Technology (“NIST”) Special Publications (“SP”), including NIST SP 800-37, 800-53, and 800-60 Volumes I and II, Federal Information Processing Standards (“FIPS”) Publications 140-2, 199, and 200, Federal Risk and Authorization Management Program (“FedRAMP”), DOJ IT Security Standards as amended, and OMB Memoranda relating to the security of information and/or Federal Information Systems.
B. In addition, for all Covered Information Systems, the Contractor shall comply with the following requirements, which are listed here only to highlight certain specific applicable requirements from one of the sources identified in the first paragraph of this Section. This is not an exhaustive list of all such requirements with which the
15A00025B00000113 Page 10 of 53
Contractor is obligated to comply, and the omission of a requirement from this list should not be construed as negating the materiality of that requirement. These requirements and those in the authorities in the prior paragraph should be read together.
1. Limiting access to DOJ Information and Covered Information Systems to authorized users and to transactions and functions that authorized users are permitted to exercise.
2. Providing security awareness training at least annually to all Contractor employees and contractors involved with the Covered Contract. Such training shall include, but not be limited to, recognizing and reporting potential indicators of insider threats to users and managers of DOJ Information and Covered Information Systems.
3. Creating, protecting, and retaining, in accordance with applicable requirements but in any event at least until the expiration of the contract, Covered Information System audit records, reports, and supporting documentation to enable reviewing, monitoring, analysis, investigation, reconstruction, and reporting of unlawful, unauthorized, or inappropriate activity related to such Covered Information Systems and/or DOJ Information.
4. Maintaining authorizations to operate any Covered Information System.
5. Performing continuous monitoring on all Covered Information Systems, to include but not be limited to, collecting, reviewing, and analyzing appropriate logs and timely investigating security alerts and potential security incidents.
6. Establishing and maintaining baseline configurations and current inventories of Covered Information Systems, including hardware, software, firmware, and documentation, throughout the Information System Development Lifecycle, and establishing and enforcing security configuration settings for IT products employed in Covered Information Systems.
7. Ensuring appropriate contingency planning has been performed, including DOJ Information and Covered Information System backups.
8. Identifying Covered Information System users, processes acting on behalf of users, or devices, and authenticating and verifying the identities of such users, processes, or devices, using multifactor authentication or HSPD-12 compliant authentication methods as defined by NIST 800-63-3, Digital Identity Guidelines or current revision.
9. Establishing and maintaining an operational incident handling capability for Covered Information Systems that includes adequate and timely development, logging, detection, analysis, containment, recovery, and user response activities, and tracking, documenting, and timely reporting incidents to appropriate officials and authorities within the Contractor’s organization and the DOJ.
10. Performing periodic and timely maintenance on Covered Information Systems, and providing effective controls on tools, techniques, mechanisms, and personnel used to conduct such maintenance.
11. Protecting Covered Information System media containing DOJ Information, including paper, digital and electronic media, and DOJ assets under Contractor control; protecting them from environmental impacts, access, and equipment positioning requirements defined; limiting access to DOJ Information to authorized users; and sanitizing or destroying Covered Information System media containing DOJ Information before disposal, release or reuse of such media.
12. Limiting physical access to Covered Information Systems, equipment, and physical facilities housing such Covered Information Systems to authorized personnel according to DOJ 03.
13. Screening individuals prior to authorizing access to Covered Information Systems to ensure compliance with DOJ Security standards including personnel background checks.
14. Continuously assessing the risk to DOJ Information in Covered Information Systems, including scanning and remediating vulnerabilities, or implementing appropriate mitigation in accordance with DOJ policy, and ensuring the timely removal of assets no longer supported by the Contractor.
15A00025B00000113 Page 11 of 53
15. Continuously monitoring the application of security controls of Covered Information Systems, assessing the efficacy of such controls, and developing and implementing plans of action designed to correct deficiencies and eliminate or reduce vulnerabilities in such Covered Information Systems.
16. Monitoring, controlling, and protecting information transmitted or received by Covered Information Systems at the external boundaries and key internal boundaries of such Covered Information Systems, and employing architectural designs, software development techniques, and systems engineering principles that promote effective security.
17. Identifying, reporting, and correcting Covered Information System security flaws in a timely manner, providing protection from malicious code at appropriate locations, monitoring security alerts and advisories and taking appropriate and timely action in response.
18. Ensuring return of Government Furnished Equipment (“GFE”) and/or PIV card assets within 10 business days of notification for end of use (contract end, staff change, etc.).
19. Complying with rights in data (FAR 52.227-14) as to the development, management, and protection of DOJ Information.
20. Reporting on risks or known issues impacting DOJ Services (staffing, hardware, process, changes, etc.) through the Contractor’s CO or COR, DOJ Service Owner (“SO”), and Government Technical Manager (“GTM”) including risk mitigation activities.
21. Reporting through the Contractor’s CO or COR on any projected or planned changes in corporate ownership, covered information system design, and/or any technical changes that could impact the confidentiality, integrity or availability of DOJ Information, data, or systems. Changes to system design must be updated through the authorization process per NIST SP 800-37 Revision 2, Step 6 (‘Continuous Monitoring”) or current NIST revision.
22. When, as part of operating within the DOJ environment, the Contractor’s covered information system is subject to review, audit, or assessment by third parties, facilitating DOJ access to information system resources, facilities, personnel, and documentation in a timely manner as required by the auditors. Should a third-party organization conduct a review of any Covered Information System, the Contractor must provide a copy of the report to DOJ, through the CO and COR.
23. Completing an attestation that meets OMB Memorandum M-22-18 for software procurements following the template attestation form developed by NIST. The attestation form must be returned to the CO and COR for sharing with the component Chief Information Officer (CIO).
24. Reporting on outages impacting DOJ Services through the Contractor’s CO, COR, and DOJ Service Owner (SO) to include event and mitigation details.
C. The Contractor shall not process, store, or transmit DOJ Information using a Covered Information System without first obtaining an ATO for each Covered Information System. The ATO shall be signed by the Authorizing Official for the DOJ component responsible for maintaining the security, confidentiality, integrity, and availability of the DOJ Information under this contract. (For Cloud Computing Systems, see Section V, below.)
D. The Contractor shall ensure compliance with DOJ-03 (Personnel Security Requirements for Contractor Employees) as to all Covered Information Systems.
E. When requested by the DOJ CO or COR as described below, the Contractor shall provide DOJ, including the Office of Inspector General (“OIG”) and Federal law enforcement components, (1) access to any and all information and records, including electronic information, regarding a Covered Information System, and
(2) physical access to the Contractor’s facilities, installations, systems, operations, documents, records, and databases. Such access may include independent validation testing of controls, system penetration testing, and FISMA data reviews by DOJ or agents acting on behalf of DOJ, and such access shall be provided within 72 hours of the request. Additionally, the Contractor shall cooperate with DOJ’s efforts to ensure, maintain, and safeguard the security, confidentiality, integrity, and availability of DOJ Information.
15A00025B00000113 Page 12 of 53
F. The use of Contractor-owned laptops or other portable digital or electronic media to process or store DOJ Information covered by this clause or access a Covered Information System is prohibited unless the CO approves it in writing after the Contractor has provided a letter certifying compliance with the following requirements. For any requirements which include the use or storage of PII, the Senior Component Official for Privacy must also approve. Any additional requirements set forth for the use or storage of PII under DOJ-02, Contractor Privacy Requirements, are in addition to, not superseded by, the requirements set forth here.
1. Media must be encrypted using a NIST FIPS 140-2 approved product.
2. The Contractor must develop and implement a process to ensure that security and other applications software is kept up to date.
3. Where applicable, media must utilize antivirus software and a host-based firewall mechanism.
4. The Contractor must log all computer-readable data extracts from databases holding DOJ Information and verify that each extract including such data has been erased within 90 days of extraction or that its use is still required. All DOJ Information should be treated by the Contractor as sensitive information unless specifically designated as non-sensitive by the DOJ.
5. A Rules of Behavior (ROB) form must be signed and acknowledged annually by users. These rules must address, at a minimum, authorized, and official use, prohibition against unauthorized users and use, and the protection of DOJ Information. The form also must notify the users that they have no reasonable expectation of privacy regarding any communications transmitted through or data stored on Contractor-owned laptops or other portable digital or electronic media.
6. Cybersecurity Awareness Training (CSAT) shall be provided annually by Contractor for all users of Covered Information System. This training must be submitted to, and approved by, the CO or COR in advance of being provided to users. Users must complete and acknowledge having received CSAT each year. At a minimum, CSAT provided by contractors must include:
a. Insider Threat Detection and Reporting – Importance of detecting, methodologies, indicators, and reporting
b. Privacy Awareness – Privacy Act and PII
c. General Cybersecurity – Information security, trends in advance persistent threats, social engineering/phishing, appropriate use, mobile devices, remote access, basic security best practices
G. Contractors shall not store DOJ information on Contractor-owned removable IT (e.g., media such as a thumb drive or external hard drive) unless expressly authorized in writing by the DOJ CO or COR in the performance of their contract.
H. When no longer needed, all media must be processed (sanitized, degaussed, or destroyed) in accordance with NIST SP 900-88, Guidelines for Media Sanitization.
I. The Contractor must keep an accurate inventory of digital or electronic media used in the performance of DOJ contracts.
J. The Contractor must remove all DOJ Information from Contractor media and return all such information to the DOJ within 10 days of the expiration or termination of the contract, unless otherwise extended by the CO, or waived (in part or whole) by the CO, and all such information shall be returned in a format and form acceptable to DOJ. The Contractor shall provide a written certification certifying the removal and return of all such information to the CO within 10 business days of the removal and return of all DOJ Information.
K. DOJ, at its discretion, may suspend the Contractor’s access to any DOJ Information, or terminate the contract, when DOJ suspects that the Contractor has failed to comply with any security requirement, or in the event of an Information System Security Incident or Security Breach (see definitions above), where the Department determines that either event gives cause for such action. The suspension of access to DOJ Information may last until such time as DOJ, in its sole discretion, determines that the situation giving rise to such action has been corrected or no longer exists. Any termination action taken because of the Contractor’s suspected failure to comply with any security requirement will be conducted in accordance with the applicable termination clause governing the awarded contract. The Contractor understands that any suspension or termination in accordance with this provision shall be at no cost to DOJ, and that upon request by the CO, the Contractor must immediately
15A00025B00000113 Page 13 of 53 return all DOJ Information to DOJ, as well as any media upon which DOJ Information resides, at the Contractor’s expense. The Contractor must comply with FAR 52.227-14 (Rights in Data), FAR 52.245-1 (Government Property), DOJ 2400.3A Chapter 1 (component property procedures), and FAR 4.804-5(a)(6) (Procedures for closing out contract files).
V. Cloud Computing A. The Contractor may not utilize the Cloud system of any Cloud Service Provider (“CSP”) unless:
1. All of the following has occurred: (a) the Cloud system and CSP have been evaluated by a Third Party Assessing Organization (“3PAO”) certified under FedRAMP; (b) the Cloud system received FedRAMP authorization; (c) the Contractor has provided the most current System Security Plan (“SSP”) and Security Assessment Report (“SAR”) to the DOJ CO for consideration, and provides any subsequent SSPs and SARs within 30 days of issuance; and, (d) the Authorizing Official for the DOJ component responsible for maintaining the security confidentiality, integrity, and availability of the DOJ Information under the Covered Contract has issued an ATO; or,
2. In cases where the CSP or its offering is not FedRAMP authorized, the COR approves utilization of the Cloud System after the CSP has worked with the authorizing official, the DOJ OCIO, and the FedRAMP Program Management Office to determine that the CSP is likely to seek and receive Agency/ FedRAMP authorization within 1 year, or DOJ has authorized use as a Private Cloud or Contractor Owned, Contractor Operated system.
B. The Contractor must ensure that the CSP allows DOJ to access and retrieve any DOJ Information processed, stored, or transmitted in a Cloud system under this Contract within a reasonable time of any such request, but in no event less than 48 hours from the request. To ensure that the DOJ can fully and appropriately search and retrieve DOJ Information from the Cloud system, access shall include any schemas, meta-data, and other associated data artifacts.
C. The Contractor must ensure that the CSP provides access and information to support and enable DOJ’s cloud security posture management, to include the current inventory of security management configuration data for services and information to confirm the Contractor has been monitoring accounts for compliance with security requirements. The DOJ Justice Security Operations Center (JSOC) must be able to access logs and events to investigate potential security breaches and perform security posture assessments associated with the Security Audit Identity Credential Access Management (ICAM) policies.
D. The Contractor must ensure that the CSP provides evidence of annual recertification of privileged user access management.
E. A Supply Chain Risk Management (SCRM) review is mandatory for specified acquisitions in accordance with established process in EO 14028 and NIST SP 800-161, Cybersecurity Supply Chain Risk Management Practices for Systems and Organizations, or superseding document. All vendor products and solutions to be used on DOJ national security systems, enterprise-wide systems, or new FIPS-199 High and Moderate systems for the purpose of accessing, collecting, storing, processing, maintaining, using, sharing, retrieving, disseminating, transmitting, or disposing of DOJ Information must be submitted to DOJ OCIO for a Supply Chain Risk Management review prior to contract award or ATO signature. Changes in corporate ownership or structure shall be reported to the CO for referral to SCRM. The Contractor shall notify the CO of any confirmed Supply Chain compromise affecting the Contractor’s products or services within 1 hour of discovery.
X The following SCRM requirements for acquisition of systems, hardware, or software which will be used in systems that are mission critical or process sensitive data apply to this award. (CO check as appropriate in coordination with the Program Manager and/or System Owner)
1. The Contractor shall develop and deliver a SCRM Plan. The SCRM Plan shall meet the format described in NIST SP 800-161, Appendix E. The SCRM plan shall address the following security controls from NIST SP 800-53 Rev 5: SR-2, SR-3, SR-4, SR-5, SR-6, SR-7, SR-8, SR-9, SR-10, and SR-11. Equivalent ISO 27000 series controls may be used if they are mapped to the NIST control(s).
2. The Contractor shall implement the required security controls as documented in the SCRM Plan.
The requirements of the SCRM plan shall flow down to all subcontractors. Evidence of the certification and compliance is required.
15A00025B00000113 Page 14 of 53
3. The Contractor shall provide evidence of compliance with the documented SCRM Plan. (CO select which applies)
X Self-assessment by a contractor security team __ External assessment by an independent auditor
VI. Information System Security Incident or Security A. Confirmed Security Incident. The Contractor shall immediately (and in no event later than 1 hour of discovery) report any Confirmed Security Incident to the DOJ CO and COR. If the Confirmed Security Incident occurs outside of regular business hours and/or neither the DOJ CO nor the COR can be reached, the Contractor must call JSOC at 1-202-357-7000 immediately (and in no event later than within 1 hour of discovery of the Confirmed Security Incident) and shall notify the CO and COR as soon as practicable.
B. Potential Security Incident.
1. If the Contractor suspects that DOJ information has been potentially disclosed or impacted, the Contractor shall promptly investigate to determine if a Security Incident has occurred. If the Contractor has not determined within 24 hours (i.e., 24 hours from detection of potential security incident and/or security breach) whether the Potential Security Incident was in fact a Security Incident, then it must immediately report the Potential Security Incident to the DOJ CO and the COR. If the time by which to report the Potential Security Incident occurs outside of regular business hours and/or neither the DOJ CO nor the COR can be reached, the Contractor must call or e-mail the JSOC Team at 1-202-357-7000 or JSOC@USDOJ.GOV and contact the DOJ CO and COR as soon as practicable. If the contract involves PII, the Contractor must comply with the notification requirements of DOJ-02 and Executive Order M-17-12 (Memorandum on Preparing for and Responding to a Breach of Personally Identifiable Information), Contractor Privacy Requirements, Section B.5, for an actual or suspected Security Incident.
2. The Contractor must limit sharing of Security Incident details to only those individuals involved in responding to the potential Security Incident. Any provisions of the Covered Contract regarding the citizenship or location of individuals working on the Covered Contract apply equally to individuals involved in responding to any potential Security Incidents. The Contractor may request assistance from the JSOC for advice, incident response, or FBI coordination. The Contractor must provide weekly updates to CO, COR and JSOC during the course of a Security Incident investigation.
C. Any report submitted in accordance with paragraphs (B) and (C), above, shall identify:
1. Both the Covered Information Systems and DOJ Information involved or at risk, including the type, amount, and level of sensitivity of the DOJ Information and, if the DOJ Information contains PII, the estimated number of unique instances of PII.
2. All steps and processes being undertaken by the Contractor to minimize, remedy, and/or investigate the Security Incident.
3. Any and all other information as required by the CISA Federal Incident Notification Guidelines, including the functional impact, information impact, impact to recoverability, threat vector, mitigation details, and all available incident details; and
The Contractor may request assistance from the JSOC Team for advice, incident response, or FBI coordination, and must provide weekly updates to CO, COR, and JSOC during the course of an Incident investigation.
D. Except as otherwise required by Federal, State and local laws, executive orders, rules and regulations, all determinations regarding whether and when to notify other individuals and/or federal agencies potentially affected by a Security Incident will be made by DOJ senior officials, the DOJ Core Management Team, or the COR at DOJ’s discretion.
E. The Contractor must provide to DOJ full access to any facility and/or Covered Information System affected or potentially affected by any potential or confirmed Security Incident, including access by the DOJ OIG and federal law enforcement organizations, and undertake any and all response actions DOJ determines are required to ensure the protection of DOJ…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .