IFB No. 132815 Headquarters Hill Parking Lot Repair, Camp Roberts
Solicitation number
0000040296
Issued by
Monterey County, San Luis Obispo County, Monterey Park City, Monterey City, Monterey Park Tract CDP, California

About this file

This is a Design Basis document prepared for the State of California Military Department detailing the design requirements for the replacement of the parking lot at Headquarters Hill, Camp Roberts in Monterey County, California. The project encompasses the demolition and removal of the existing pavement and replacement with new parking infrastructure, lighting, and underground utility upgrades. Cannon, serving as the prime design contractor with subconsultants Earth Systems Pacific (geotechnical engineering), will provide Type A and B phased design services over a 276-calendar-day period commencing September 29, 2020, and concluding July 30, 2021. The design schedule includes five review phases (A-I through B-III) with corresponding submittal milestones at 10%, 35%, 65%, 95%, and 100% design completion, scheduled between November 2020 and July 2021. A mandatory pre-bid job walk is required on September 14, 2026, at 10:00 AM at Camp Roberts; prospective bidders must arrive 15 minutes early and remain for the entire walk or risk disqualification. Questions must be submitted by September 17, 2026, at 5:00 PM, with bid submissions due September 24, 2026, at 2:00 PM and bid opening at 2:15 PM the same day.

The design must comply with Unified Facilities Criteria (UFC) standards including UFC 3-201-01 (Civil Engineering), UFC 3-220-01 (Geotechnical Engineering), UFC 3-250-01 through 3-250-11 (Pavement Design), and Army National Guard design guides. Key project requirements include replacing approximately 5.0 to 8.5 inches of existing asphalt concrete using full-depth reclamation with cement and adding 3.0 inches of hot-mix asphalt, with a 25-year design life and traffic index of 4.0. The project includes replacement of existing asbestos waterlines and sewer laterals, addition of storm drainage infrastructure, ADA-accessible parking spaces, new electrical lighting with LED conversion, and preservation of the existing southern flagpole island. Prime contractors must possess either a Type A General Engineering Contractor license or Type B General Building Contractor license plus a C-22 Asbestos Abatement License. All submittals prior to final design require four copies sent to specified state offices, with final design deliverables including three sets of full-sized drawings, three copies of specifications and construction estimates, and one compact disc with CADD and PDF files.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

[Type text]

BIII DESIGN BASIS

The State of California Military Department intends to replace the parking lot on Headquarters Hill at Camp Roberts. Cannon’s team will provide Type A and B services to design the pertinent improvements.

State of California Military Department

Camp Roberts Headquarters Hill Parking

Design Basis Documentation State of California – Military Department Camp Roberts Headquarters Hill Parking Last Submitted: 7/15/2021

Project #: 150117.22 Printed: 8/5/2021

Background and General Description:

The existing parking lot serving Camp Robert’s Headquarters Hill is nearing the end of its useful life and needs to be replaced. The intent of this project is to design plans for the demolition and removal of the existing pavement and the replacement of such, with the addition of new lighting and other features.

Furthermore, the project will take advantage of the pavement removal to perform upgrades to underground utilities, such as the replacement of the existing asbestos water pipes and the addition of lines for future fire water service.

Cannon will provide type A and B phased services to investigate the existing conditions and design a parking lot replacement, including the upgrading of the underground utilities. The existing southerly island in the parking lot that contains the flagpole was recently renovated and will need to be preserved as part of the plan.

Project Details:

Client:

o California Military Department Project Address:

o Buildings 101 thru 109 (Headquarters Hill), Camp Roberts, Monterey County, California Points of Contact:

o Project Manager:

CPT Myles Colendich – 916-666-3518 o Contracting Officer:

CW4 Tom Clarke – 916-854-3690 o Contracting Officer’s Representative:

Katherine Miliani – 916-854-3681

Contractors:

o Civil engineering, electrical engineering, survey, and project management:

Cannon – John Evans, PE, LEED AP – 805-544-7407 o Geotechnical engineering:

Earth Systems Pacific – Robert Down, PE – 805-544-3276

Design Basis Decisions & Assumptions:

(SOW) – Scope of Work, (KM) – Kickoff Meeting, (RFI) – Request for Information, (A-I) – Phase A-I Review Meeting, (A-II) – Phase A-II Review Meeting, (B-I) – Phase B-I Review Meeting, (B-II) – Phase B-II Review Meeting

Administrative (SOW) All submittals prior to final design will be in four copies: two to Facilities and Engineering, J9 Joint Forces Headquarters, Sacramento and one each to Camp Roberts and Contracting Office J8, Joint Forces Headquarters, Sacramento.

Type B-III, 100% final design, will include three sets of the final full-sized drawings, three copies of the specifications, three copies of the construction estimates, and one compact disc including both the final design drawings in CADD and PDF and the assembled specifications in PDF.

The scope timeline is set for 276 calendar days.

Construction will not be done in phases.

Schedule Start of Contract September 29, 2020 o Design planning meeting and site visit (KM) October 6, 2020 Phase A-I – 10% concept plans submittal November 11, 2020 o Design concept meeting January 12, 2021 Phase A-II – 35% design development submittal April 7, 2021 o Design review meeting April 12, 2021 Phase B-I – 65% design development submittal May 14, 2021 o Design review meeting May 21, 2021 Phase B-II – 95% pre-final design development submittal June 11, 2021 o Design review meeting June 25, 2021 Phase B-III – 100% final design submittal July 15, 2021 End of Contract July 30, 2021

Design Criteria

(SOW) Design must comply with the following Unified Facilities Criteria (UFC) at minimum:

o UFC 3-201-01, Civil Engineering, with Change 3 o UFC 3-220-01, Geotechnical Engineering o UFC 3-250-01, Pavement Design for Roads and Parking Areas o UFC 3-250-03, Standard Practice Manual for Flexible Pavements o UFC 3-250-04, Standard Practice for Concrete Pavements, with Change 2 o UFC 3-250-11, Soil Stabilization and Modification for Pavements o UFGS, United Facilities Guide Specifications

Design must comply with Army National Guard Criteria DG 415-4, Training Site Facilities Design Guide, and DG 415-5, General Facilities Information Design Guide.

Request for Information from Cannon (RFI 2021-1-14) Are we to replace the parking lot extending down Headquarters Hill east of the main access road and around Building 113?

o No. (RFI Response 2021-3-11)

Should the northern island in the existing parking lot be removed, made solid concrete, and/or have a picnic area added?

o Remove island at north end which will allow for the addition of additional parking spots.

Is there any more information on the locations of the existing waterlines behind and between

Buildings 105 and 104?

o No.

Are we to replace the existing sewer laterals?

o Yes.

Geotechnical (A-I) The geotechnical engineering report from Earth Systems dated December 30, 2020, contains recommendations for the design of new pavement and utility trenches.

The existing pavement consists of 5.0 to 8.5 inches of asphalt concrete in two layers and no aggregate base.

The R-value of the existing soil is 32.

(B-I) Client asks for a 25-year design life with a traffic index of 4.0.

Full depth reclamation with cement (FDR-C) will be applied. 3.0 inches of hot-mix asphalt will be added on top of the FDR-C.

Civil (KM) Collect storm runoff with additional drain inlets and convey it to existing storm systems.

Add curb, gutter, and sidewalk with provisions for future installation of ADA access to buildings.

Add signs to designate who can park where (i.e., privately-owned vehicle versus tactical). Non-standard signage will be provided by the base.

Designate ADA accessible parking, including van-sized spaces. Possibly four spaces in two sets.

(A-I) Preserve the existing southern island.

The existing asbestos waterlines are to be replaced and abandoned per code.

Stub out waterlines for future fire water such that a loop might be constructed outside of the buildings in the future.

Relocate without replacing the existing fire hydrants.

Add concrete aprons between every other building.

Use thermo-plastic striping for parking spaces, crosswalks, etcetera.

Create a parking area for tactical vehicles southeast of Building 101.

Replace approximately 100’ of the road leading behind Building 101 from the main road.

The main road to Headquarters Hill will not be replaced where it has been recently resurfaced.

(A-II) For tactical vehicle parking, cut an entrance in the existing curb, add an apron, a sign, and one light, and make the area gravel.

Fortify the outlet of the drainage with riprap.

Adjust manholes to grade without replacement.

(B-I) Replace existing sewer laterals and mains up until the manhole in front of Building 109.

Electrical (A-I) Add masted lights, with the possibility for electric vehicle charging stations.

Replace the existing flagpole lights with LED and add electrical outlets.

(B-I) Interior electrical room photos in Building 109 provided by Vince Hindley.

Existing interior panel is not per code (NEC 110-26, working spaces).

New light connection options: 1) Connect to an existing lighting pull box, with no outlet capabilities and no separate circuit protection. 2) New exterior panel with design for outlets and individual circuit capabilities.

Miscellaneous Notes (A-II) Separate costs into sustainment versus modernization.

File details come from the government source that posted it. Updated .