Mac Hill Training Site #122800 – Invitation for Bids Summary
This Invitation for Bids (IFB) is issued by the Virginia Department of General Services (DGS) on behalf of the Commonwealth of Virginia for construction upgrades at the Mac Hill Driver's Training Site located within the Regional Training Institute (RTI) at Fort Pickett in Blackstone, Virginia. The project scope includes providing heavy-duty asphalt concrete surfaces for heavy truck and trailer training operations across approximately 100,280 square feet. Work encompasses removal of existing asphalt and sidewalk; regrading and compacting the parking lot and entrances to specified elevations with positive drainage; placement of asphalt concrete base mix (5 inches) and surface course (3 inches of SM-19.0 with 76-22 binder); installation of an After-Action Review (AAR) shed with foundation, receptacles, switch-operated fans, overhead lighting, and a Lightning Protection System; replacement of culverts at east parade entrances; installation of new underground electrical service to light poles and the AAR shed; installation of four new light poles with foundations per VDOT LF-1 standard; and installation of bollards and dual light fixtures around the perimeter per Army regulation UFGS 26 55 53. A mandatory pre-bid conference is scheduled for 1:00 PM on August 17, 2026, at Building T0229 within the DPW Compound at Fort Pickett, with attendance required for all prospective bidders. Sealed bids must be submitted electronically through eVA by 2:00 PM on September 9, 2026, with public opening and reading at 2:00 PM on September 10, 2026. The contract shall be awarded on a lump sum basis, with a completion timeframe of 120 calendar days to substantial completion and 30 additional days to final completion.
The project requires a 5% bid bond (form DGS-30-090 CO-10.2) from all bidders. For contracts exceeding $250,000, a Commonwealth of Virginia Standard Performance Bond (DGS-30-084, form CO-10) and Standard Labor and Material Payment Bond (DGS-30-088, form CO-10.1) will be required upon award, along with prevailing wage rate compliance. All bidders must obtain a certificate of builder's risk insurance equal to the contract value plus any change orders. Contractor registration per Section 54.1-1103 of the Code of Virginia and eVA vendor registration are mandatory. Questions must be submitted by 4:00 PM on August 20, 2026, with Addendum Number 1 to be issued by close of business August 25, 2026. The contractor shall assume responsibility for all permits except building permits, coordinate with Miss Utility services no later than 7 days prior to mobilization, and adhere to facility work schedules (Monday through Friday, 7:00 AM to 4:30 PM, with alternate hours permissible with one week notice). No building permit is required, and the project is not subject to DEB submission. The Notice of Award will be posted on eVA at https://eva.virginia.gov.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DGS-30-256
(Rev. 03/20)
Notice of Invitation for Bids
NOTICE OF INVITATION
FOR BIDS (IFB)
Sealed bids are invited for the Mac Hill Training Site # 122800 at Fort Pickett Blackstone, VA.
The general work description of the project can be generally described as:
The primary intent is to provide heavy duty asphalt concrete surface for heavy truck and trailer training at the Mac Hill Driver’s Training Site located within the Regional Training Institute (RTI) on Fort Pickett.
The existing improved lot is +/- 100,280 SF. Roughly 30 % has an old asphalt surface. The rest in covered with 12”-18” of compacted stone. This Scope of Work will remove asphalt and sidewalk (south side) that is currently in place and re-grade parking lot and entrances to elevations provided and compacted ensuring positive drainage and eliminating the drastic grade change. Contractor will place Asphalt Concrete as specified (Base Mix and Surface course) and provide markings per provided RTI drawings. Contractor to provide and install specified AAR shed with foundation, (1) receptacle at each corner approximately 48” from the deck, (2) switch operated fans in the back corners, (2) switch operated overhead lighting and LPS (Lightning Protection System). Culverts at either entrance on East Parade to be replaced and graded to drain. New underground electrical (to each pole and to new installed AAR Shed), (4) new light poles, light pole foundations per VDOT LF-1 Standard, bollards and dual fixtures to be installed around perimeter to illuminate training area parking lot per provided drawing and Army regulation UFGS 26 55 53 Security Lighting.
Sealed bids will be received electronically through eVA only. The deadline for submitting bids is 2:00 PM sharp, as determined by the Bid Officer, on September 9, 2026. The bids will be opened publicly and read aloud beginning at 2:00 PM on September 10, 2026, inside the conference room of Building T0229 within the DPW Compound – Fort Pickett, Blackstone VA 23824.
Bid must reach the bid officer by the date and time specified or the bids will be marked “LATE” and shall not be considered.
A 5% Bid Bond is required (DGS-30-090 CO-10.2). No other forms of security, including certified checks, will be accepted.
A Commonwealth of Virginia Standard Performance Bond (DGS-30-084, form CO-10) and a Commonwealth of Virginia Standard Labor and Material Payment Bond (DGS-30-088, form CO-10.1) WILL be required for bids over $250,000 upon award of the project.
The contractor, shall however, provide certificate of builder’s risk insurance equal to the value of the contract plus any change orders.
eVA Vendor Registration: The bidder or offeror shall be a registered vendor in eVA. See the attached eVA Vendor Registration Requirements
Notice of Invitation for Bids
Procedures for submitting a bid, claiming an error, withdrawal of bids and other pertinent information are contained in the Instructions to Bidders, which is part of the Invitation for Bids. Withdrawal due to error(s) in bid shall be permitted in accord with Section 9 of the Instructions to Bidders and § 2.2-4330, Code of Virginia. The Owner reserves the right to reject any or all bids.
A Mandatory pre-bid conference will be held at the conference room of Building T0229 within the DPW Compound, at 1:00 PM Sharp, on August 17, 2026. Attendance SHALL BE MANDATORY for those submitting a bid. Anyone arriving to the prebid conference late will not be allowed to enter the meeting nor sign the attendee list. Following sign-in and reading of the pre-bid conference agenda we will visit the job site to be constructed. RECORD OF ATTENDEES: All attendees present must sign the Pre-Bid Conference Record of Attendees sign in sheet to be considered an eligible bidder. Bid proposals will only be accepted from those bidders who attend this conference. Each attendee may represent only one bidder.
Each attendee shall legibly sign in and provide accurate contract information including a working email address for distribution of future communications regarding the project. All parties must present valid government approved identification (Real ID) when arriving on Fort Pickett and should allow extra time accordingly. This will be the only scheduled time for prospective contractors to review the work areas prior to the bid submission date. Subcontractors, suppliers, and other interested parties are encouraged to attend the pre-bid conference.
Questions will be due NLT 4:00PM on August 20, 2026 by email to allison.s.maddox.nfg@army.mil
Addendum Number 1 (one) will be issued by COB August 25, 2026
The contract shall be awarded on a lump sum basis as follows: the Total Base Bid Amount including any properly submitted and received bid modifications. ‘Notice of Award’ or ‘Notice of Intent to Award’ will be posted on eVA, Virginia Department of General Services’ central electronic procurement website, at https://eva.virginia.gov..
Contractor registration is required in accordance with Section 54.1-1103 of the Code of Virginia. See the Invitation for Bids for additional qualification requirements.
All executive branch agencies are directed to advance Executive Order 35, dated July 3, 2019.
Building Permits: No building permit required. Project is not required to be submitted to DEB. All other permits are the responsibility of the Contractor.
Time for Completion is 120 calendar days to Substantial completion. Final Completion shall be within 30 days after the date of Substantial completion.
Prevailing wage rate requirements WILL be required for bids over $250,000.
Access to work is limited to the work schedule of the facility. Hours of operation are
Monday through Friday 7:00 am to 4:30 pm (alternate work hours can be incorporated with a minimum of one week notification).
Addenda to the project, if any, will be posted in eVA. All Addenda, if any, shall be acknowledged in the designated location on the Bid Form.
Copies of the Invitation for Bids documents, including the statement of work, will also be available for inspection at the following locations:
Owner's office- Building T0234, Fort Pickett
Notice of Invitation for Bids
Authorized Official of Owner/Agency James W. Ring Major General, VaARNG The Adjutant General of Virginia
INVITATION FOR BIDS for
Mac Hill Training Area
WO 122085
TABLE OF CONTENTS
CO Form #
BIDDING INFORMATION
Notice of Invitation for Bids --- Instructions to Bidders CO-7A Standard Bid Bond Form CO-10.2 Prebid Question Form --- Bid Form ---
GENERAL CONDITIONS & FORMS
General Conditions of the Construction Contract CO-7 Supplemental General Conditions --- Listing of Required Structural and Special Inspections CO-6b Contract Between Owner and Contractor CO-9 Workers Compensation Certificate of Insurance CO-9a Standard Performance Bond, CO-10 Standard Labor and Material Payment Bond CO-10.1 Construction Change Order CO-11 Change Order Estimate (General Contractor) GC-1 Change Order Estimate (Subcontractor) SC-1 Change Order Estimate (Sub-subcontractor) SS-1 Schedule of Values and Certificate for Payment CO-12 Affidavit of Payment of Claims CO-13 Contractor's Certificate of Substantial Completion CO-13.2a Contractor's Certificate of Completion CO-13.2 Submittal Register Format ---https://dgs.virginia.gov/search/documents-and-forms/?filter=DEB
SPECIFICATIONS
DIVISION 1 - GENERAL REQUIREMENTS
Section 01 Administrative Requirements Submittal Procedures Quality Requirements Product Requirements Execution and Closeout Requirements Construction Waste Management and Disposal
Appendices
• Scope of work
• Site Plan
• Lighting Plan
• Lighting Specifications
• Fan Specifications
• AAR Shed Pad Drawings
• AAR Shed Drawings https://dgs.virginia.gov/search/documents-and-forms/?filter=DEB
• VDOT LF-1 Standard
MAC HILL
DRIVER’S TRAINING
AREA UPGRADES
PROVIDE AND INSTALL NEW HEAVY
DUTY ASPHALT CONCRETE BASE
The primary intent is to provide heavy duty asphalt concrete surface for heavy truck and trailer training at the Mac Hill Driver’s Training Site located within the Regional Training Institute (RTI) on Fort Pickett.
The existing improved lot is +/- 100,280 SF. Roughly 30 % has an old asphalt surface. The rest in covered with 12”-18” of compacted stone.
This Scope of Work will remove asphalt and sidewalk (south side) that is currently in place and re-grade parking lot and entrances to elevations provided and compacted ensuring positive drainage and eliminating the drastic grade change
MAC HILL DRIVER’S TRAINING SITE
REGIONAL TRAINING INSTITUTE [RTI] MAC HILL DRIVERS TRAINING SITE
Mac Hill training site location
MAP
Ft Pickett Main Gate
MAP2
MAC HILL
REGIONAL TRAINING INSTITUTE [RTI] MAC HILL DRIVERS TRAINING SITE
2 1
1. Remove existing asphalt.
Remove unsuitable soil as required to establish subgrade. (+/- 18”-20”).
2. Asphalt has already been removed. The Stone In this area is already 5”-16” thick. Subgrade is structurally sound.
3. Existing sidewalk to be removed. New Asphalt elevation to match or to be slightly higher than top of new sidewalk
N
E W
S D1
385.50
REMOVE ALL
EXISTING ASPHALT
REMOVE ALL
EXISTING ASPHALT
TO INCLUDE PAVED
PATH AROUND
PERIMETER
REMOVE ALL
EXISTING ASPHALT
TO INCLUDE PAVED
PATH AROUND
PERIMETER
BOX OUT AROUND
ELECTRICAL
SERVICES NO
ASPHALT
WIDEN ENTRANCE
TO 36’
WIDEN ENTRANCE
TO 36’
Pavillion to Remain
REMOVE ALL EXISTING
ASPHALT
TO INCLUDE 3 ENTRANCES
Proposed AAR Shelter
C1
AAR Shelter Electrical Service to come from this pole.
Install new sub-panel on new 4 x 4 Post
C1 What are these?
Stockpile all spoils on site
BOX OUT AROUND
ELECTRICAL
SERVICES NO
ASPHALT
Pavillion to Remain
Proposed AAR Shelter
Soils Stockpile.
Compact and slope to drain for reuse.
Enclose entire pile with silt fenceADDITIVE BID #1
388’ X 3’ X 4” CONC
SIDEWALK
34’-8” X 15 X 4”
CONC APRON
Use excavated spoils to backfill against new asphalt edge as needed
Use excavated spoils to backfill against new asphalt edge as needed.
Slope to existing grade. No steeper than 2:1. Grade and seed
TYPICAL
Use excavated spoils to backfill against new asphalt edge as needed.
If Additional material is needed Fort Pickett has a Borrow Site less than 1 Mile away.
Contractor shall load and haul
C2
385.50
This site currently drops off quickly as you approach the Southeast Corner.
Our Intent is to
RAISE THE
ELEVATION IN
THE Southeast corner by +/- 2.5 Feet (from 383.00 to 385.50)
Match existing grades from the Northwest entrance down to the 387.75 contour line.
From there we will work the elevations into the revised elevation.
Contractor shall be responsible for flatness and no ponding. Slight deviations in elevations [indicated] are permitted if necessary
387.75
387.00
386.85
.386.25
. 386.12
386.50
386.50
386.50
386.12
.386.50
C3
Surface Mix (SM-19.0 W/76-22 binder) – 3”
Base Mix (BM) - 5"
Subbase (21A ) - 8"
MAC HILL PAVEMENT DESIGN PER VDOT RECOMMENDATION
C4
40’ 40’ 40’
11 10
9 8
7 6 5 4 2 40’50’ 50’ 50’
75’ Pavement Width
50’
102’
27’
Rutted area
C5
Mac Hill Site Investigation –Test Pits
*Not to scale.
C5
# Stone Depth (Crusher Run) Pavement Depth Notes 1 4.5” -
2 7.5” - Section of concrete base found under stone.
3 6” - 17” of #3 stone under Crusher Run.
4 5.5” -
5 5.5” -
6 5.5” -
7 5” -
8 1.5” 2.5”
9 1.5” 1.5”
10 1.5” 1.25”
11 1.5” 1.25”
12 1.5” 3”
*Various soil conditions and stone depths present throughout; soil appears well compacted with minimal rutting.
C6
12’ Min
132’
70’
50’70’
70’
12’ Wide 2’ Solid
White Box
435’ 252’
5’ Gaps 4” Red Line For Hardhats Past
This Point
8 ft 8in Wide Yellow Walking
Path
2’ Gap From Lane To Red Line
55’125’
C7
MAC HILL REGIONAL TRAINING INSTITUTE [RTI] MAC HILL DRIVERS TRAINING SITE
PAINTED PARKING LINES
A13
MAC HILL AAR (After Action Review) SHELTER
This is Exactly the Same Plan as Provided
Add a 3’ Sunscreen / Awning Across the Front
Concrete Apron
ASAPHALT TRAINING AREA
EDGE OF ASAPHALT
Proposed AAR Shelter
Proposed Apron 12’
C7
CJ EQ Spacing
These Notes Apply to Conc Apron & ADD BID ITEMS 1 Proposed Concrete Apron 4” Slab on Grade 6Mil Vapor Barrier A3 Concrete Mix W1.4/W1.4 Wire Mesh Reinforcing Radius Edges Medium to Heavy Broom Finish Joints Shall be Tooled, Not Sawn Cover with NLT 6 MIL Black Poly for 7 Days After Curing [Joints In Sidewalk to be Equally Spaced Not to Exceed
10’ OC]
Sidewalk to have Isolation Joints NTE 50’
Install +/- 40’ of 12” 16 GA CMP in swale under Apron
A2
Concrete Apron Electrical Service
AAR Shelter
Concrete Apron
Asphalt Training Area
Existing Electrical Service Entry
JB
E2E1
DEMO EXISTING 200
AMP PANEL.
REPLACE WITH NEW
NEMA 3, 240V, 24
CIRCUIT WITH 200
AMP MAIN
New 12” Culvert
AND Concrete Apron
12’
Proposed AAR Shelter
Proposed Concrete Apron
ASPHALT TRAINING AREA
Concrete Slab NLT 4” Above Grade
These Notes Apply to Conc Apron & ADD BID ITEMS 1 Proposed Concrete Apron 4” Slab on Grade 6Mil Vapor Barrier A3 Concrete Mix W1.4/W1.4 Wire Mesh Reinforcing Radius Edges Medium to Heavy Broom Finish Joints Shall be Tooled, Not Sawn Cover with NLT 6 MIL Black Poly for 7 Days After Curing [Joints In Sidewalk to be Equally Spaced Not to Exceed
10’ OC]
Sidewalk to have Isolation Joints NTE 50’
S1
Slope to Drain
Floor Slab Elev 389.97
Install +/- 40’ of 12” 16 GA CMP in swale under Apron 1.5” Conduit UG Elec
Service From Pole
LPS (Lightning Protection System)
Lightenin g Rod
Lightening Rod
Ground
Ground
Light
Light
FANS
A3L
LPS
PS
LPS
EXISTING UG WATER AND SEWER
P1
All of the buildings shown on this Map have been removed from the inventory (torn down). We try to get all the associated service piping out with the demolition contracts, but we occasionally miss something. It is the Contractors” Responsibility to Call Miss Utility NLT 7 Days Prior to Mobilization. Any questions or concerns with unearthed, unmarked, buried treasures should be brought to the Project Managers (PM) attention Immediately
MAC HILL TRAINING SITE
Thank You for your interest in our Project
T
T
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SD
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
S
S
S
SD
SD
7/
/2
TO
PO
G R
AP
H
IC
S
U R
VE
Y
FO
R
M
AC
H
IL
L D
R
IV
ER
S
TR
AI
N
IN
G
SI
TE
A
T
FO
R T
PI
C
KE
TT
BL
AC
KS
TO
N E, V A
SC
AL
E:
D
AT
E:
JO
B
N U
M
BE
R
D R
AW
N
B Y:
W C
A R
Y
ST
R
EE
T, R
IC
H
M O
N D
, V A
4-
7-ny fe le rs ur ve y.
co m
SHEET NO.: 1 OF 1
1" =3
0'
KA
H
N A
D
V A
S O
U
TH
Z O
N E
7/27/2026
KAREN A.
HUBBARD
Lic. No. 3668
CO
MM
ON
WEALTH OF V IRG
IN
IA
LAND SURVEYOR
S
SD
SS
W
T
E
AutoCAD SHX Text
CARPORT
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
EBOX
AutoCAD SHX Text
SHED
AutoCAD SHX Text
ASPHALT AND CONCRETE IN THIS AREA PARTIALLY BURIED UNDER SEDIMENT
AutoCAD SHX Text
RIM EL.=386.91 INV. EL. 8" RCP NE=380.40 INV. EL. 6" SW=382.02 (ABANDONED)
AutoCAD SHX Text
RIM EL.=386.48 INV. EL. 8" RCP NE=379.11 INV. EL. 8" RCP SW=379.16
AutoCAD SHX Text
RIM EL.=382.00 INV. EL. 8" RCP NE=372.01 INV. EL. 8" RCP SW=372.09
AutoCAD SHX Text
RIM EL.=386.29 INV. EL. 8" RCP NE=375.80 INV. EL. 8" RCP NW=375.88 (ABANDONED)
AutoCAD SHX Text
INV. EL. 12" RCP=383.01
AutoCAD SHX Text
INV. EL. 12" RCP=383.37
AutoCAD SHX Text
INV. EL. 12" RCP=383.35
AutoCAD SHX Text
INV. EL. 12" RCP=383.14
AutoCAD SHX Text
INV. EL. 12" CMP=383.77
AutoCAD SHX Text
INV. EL. 10" RCP=384.34
AutoCAD SHX Text
INV. EL. 10" RCP=384.34
AutoCAD SHX Text
INV. EL. 12" CMP=383.73
AutoCAD SHX Text
INV. EL. 12" CMP=384.93
AutoCAD SHX Text
INV. EL. 12" CMP=385.36
AutoCAD SHX Text
INV. EL. 12" CMP=382.94
AutoCAD SHX Text
INV. EL. 12" CMP=381.89 (BURIED)
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
COMM. VAULT
AutoCAD SHX Text NOTES: 1. THIS TOPOGRAPHIC SURVEY IN NOTTOWAY COUNTY, VA WAS COMPLETED UNDER THE DIRECT SUPERVISION AND THIS TOPOGRAPHIC SURVEY IN NOTTOWAY COUNTY, VA WAS COMPLETED UNDER THE DIRECT SUPERVISION AND RESPONSIBLE CHARGE OF KAREN A HUBBARD FROM AN ACTUAL GROUND SURVEY MADE UNDER MY SUPERVISION;THE IMAGERY AND DATA WAS OBTAINED ON 7/16/2026;AND THIS MAP MEETS MINIMUM ACCURACY STANDARDS UNLESS OTHERWISE NOTED. 2. VERTICAL DATUM: NAVD88, HORIZONTAL DATUM: NAD83, VIRGINIA SOUTH ZONE VERTICAL DATUM: NAVD88, HORIZONTAL DATUM: NAD83, VIRGINIA SOUTH ZONE 3. SITE CONTROL WAS REFERENCED HORIZONTALLY TO THE CURRENT REALIZATION OF THE NORTH AMERICAN DATUM SITE CONTROL WAS REFERENCED HORIZONTALLY TO THE CURRENT REALIZATION OF THE NORTH AMERICAN DATUM 1983(2011) US STATE PLANE COORDINATE SYSTEM (SPC) ZONE VIRGINIA SOUTH (4502). VERTICAL COMPONENTS WERE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM 1988 (NAVD88) UTILIZING RTK GNSS OBSERVATIONS REDUCED TO ORTHOMETRIC HEIGHTS BY APPLYING THE GEOID18 GRAVIMETRIC MODEL. BOTH HORIZONTAL AND VERTICAL COORDINATES ARE EXPRESSED IN US SURVEY FEET. 4. UTILITIES SHOWN ARE FROM FIELD LOCATED EVIDENCE OF SURFACE UTILITIES AND CLIENT PROVIDED MAPPING. UTILITIES SHOWN ARE FROM FIELD LOCATED EVIDENCE OF SURFACE UTILITIES AND CLIENT PROVIDED MAPPING. UTILITY LOCATIONS ARE NOT WARRANTED TO BE EXACTLY LOCATED NOR IS IT WARRANTED THAT ALL UNDERGROUND UTILITIES OR OTHER STRUCTURES ARE SHOWN ON THIS SURVEY. 5. THIS MAP WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT. THIS MAP IS NOT A BOUNDARY SURVEY. NO THIS MAP WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT. THIS MAP IS NOT A BOUNDARY SURVEY. NO BOUNDARY RESEARCH OR FIELD WORK WAS PERFORMED IN THE PREPARATION OF THIS MAP. 6. THIS MAP WAS PREPARED FOR THIS MAP WAS PREPARED FOR COMMONWEALTH OF VIRGINIA - DEPARTMENT OF MILITARY AFFAIRS FORT PICKETT BLACKSTONE, VA 23824
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"=30'
AutoCAD SHX Text LEGEND SURVEY CONTROL POINT SIGN LIGHT POLE POWER POLE GUY WIRE ELECTRIC JUNCTION BOX ELECTRIC METER SANITARY MANHOLE WATER VALVE FIRE HYDRANT TELEPHONE PEDESTAL TREELINE FENCELINE OVERHEAD UTILITY LINE STORM SEWER SANITARY SEWER UNDERGROUND WATER LINE ASPHALT CONCRETE
AutoCAD SHX Text 198.10
AutoCAD SHX Text
WV
AutoCAD SHX Text
FH
AutoCAD SHX Text
EBOX
AutoCAD SHX Text
EM
S ca le
D a te
C o m m e n ts
Revisions
C h ec ke d B y:
D a te :4
/2 0/
F T
P
IC
K
E T
T E
P A
R A
D E
D ra w n
B y:
C H
A S
E A
M M
O N
0.1 0.1 0.1 0.1 0.2 0.4 0.7 0.9 1.0 0.9 0.8 0.7 0.7 0.6 0.6 0.5 0.5 0.5 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.4 0.4 0.5 0.5 0.6 0.7 0.8 0.9 0.9 0.9 0.8 0.6 0.2 0.2 0.1 0.1 0.1 0.1
0.1 0.1 0.1 0.2 0.3 0.7 1.2 1.4 1.4 1.2 1.0 0.9 0.8 0.7 0.7 0.6 0.6 0.6 0.6 0.5 0.5 0.5 0.5 0.4 0.3 0.3 0.4 0.4 0.4 0.5 0.5 0.5 0.6 0.6 0.6 0.7 0.8 0.9 1.1 1.3 1.4 1.4 1.0 0.5 0.2 0.1 0.1 0.1 0.1
0.1 0.1 0.1 0.2 0.5 1.2 2.0 2.1 1.8 1.6 1.4 1.2 1.0 0.9 0.9 0.8 0.8 0.8 0.9 0.9 0.9 0.9 0.8 0.7 0.6 0.4 0.5 0.6 0.7 0.7 0.7 0.7 0.8 0.8 0.8 0.9 1.0 1.2 1.4 1.7 2.0 2.2 1.8 0.9 0.3 0.2 0.1 0.1 0.1
0.1 0.1 0.1 0.3 0.7 2.2 3.1 2.8 2.4 2.0 1.7 1.4 1.2 1.1 1.0 1.0 1.0 1.1 1.3 1.5 1.8 2.0 2.1 1.8 1.4 1.3 1.4 1.5 1.6 1.6 1.5 1.4 1.2 1.1 1.1 1.1 1.3 1.5 1.8 2.2 2.7 3.2 3.3 1.8 0.6 0.3 0.1 0.1 0.1
0.1 0.1 0.1 0.5 1.5 3.9 4.3 3.9 3.2 2.6 2.0 1.7 1.4 1.2 1.1 1.1 1.2 1.3 1.6 2.0 2.6 3.4 4.4 5.0 4.6 3.4 4.4 4.7 4.3 3.4 2.6 2.0 1.6 1.4 1.3 1.4 1.5 1.8 2.2 2.8 3.5 4.3 4.9 3.7 1.1 0.4 0.2 0.1 0.1
0.1 0.1 0.2 0.9 2.7 5.5 6.0 5.1 4.0 3.0 2.3 1.8 1.5 1.3 1.2 1.2 1.3 1.4 1.7 2.1 2.8 3.7 4.7 5.9 7.6 9.0 7.5 5.9 4.8 3.8 2.9 2.3 1.9 1.6 1.5 1.5 1.7 2.0 2.5 3.3 4.4 5.7 6.6 5.9 2.1 0.8 0.2 0.2 0.1
0.1 0.2 0.4 1.3 4.0 8.2 7.9 6.0 4.4 3.2 2.5 1.9 1.6 1.4 1.3 1.3 1.3 1.5 1.7 2.0 2.5 3.2 4.2 5.8 8.2 9.5 8.2 5.7 4.2 3.3 2.7 2.2 1.9 1.7 1.6 1.7 1.8 2.2 2.8 3.7 5.1 7.0 9.1 9.1 3.7 1.3 0.4 0.2 0.2
0.2 0.2 0.7 2.0 6.4 9.4 8.1 6.0 4.3 3.2 2.4 1.9 1.6 1.4 1.3 1.3 1.3 1.4 1.6 1.8 2.2 2.9 3.8 5.3 6.8 7.5 6.8 5.2 3.8 2.8 2.3 2.0 1.8 1.6 1.6 1.7 1.9 2.2 2.8 3.7 5.1 7.0 9.4 10.5 7.1 2.7 0.9 0.3 0.2
0.2 0.4 1.0 3.6 6.7 8.2 7.1 5.4 3.9 2.9 2.3 1.8 1.5 1.4 1.3 1.2 1.2 1.3 1.4 1.6 2.0 2.6 3.4 4.3 5.1 5.5 5.1 4.3 3.3 2.5 2.0 1.7 1.6 1.5 1.6 1.6 1.8 2.2 2.7 3.4 4.5 6.1 7.9 8.8 7.1 4.7 1.4 0.5 0.3
0.3 0.5 1.4 4.0 5.6 6.3 5.7 4.6 3.5 2.7 2.1 1.7 1.5 1.3 1.2 1.2 1.2 1.2 1.3 1.5 1.9 2.3 2.8 3.4 3.9 4.1 3.9 3.5 2.9 2.3 1.9 1.6 1.5 1.4 1.5 1.6 1.7 2.0 2.4 3.0 3.8 4.9 6.1 6.5 5.7 4.7 2.5 0.9 0.4
0.3 0.7 1.8 3.5 4.4 4.6 4.4 3.7 3.0 2.4 2.0 1.6 1.4 1.2 1.2 1.1 1.1 1.1 1.3 1.4 1.7 2.0 2.4 2.8 3.0 3.1 3.0 2.8 2.4 2.0 1.7 1.5 1.4 1.3 1.4 1.5 1.6 1.8 2.1 2.6 3.2 3.9 4.5 4.7 4.3 3.8 2.7 1.3 0.5
0.4 0.9 1.8 2.8 3.3 3.5 3.3 3.0 2.6 2.2 1.8 1.5 1.3 1.2 1.1 1.1 1.1 1.1 1.2 1.4 1.6 1.8 2.1 2.3 2.5 2.5 2.4 2.3 2.1 1.8 1.6 1.4 1.3 1.3 1.3 1.4 1.5 1.7 1.9 2.3 2.7 3.1 3.4 3.4 3.2 2.9 2.3 1.5 0.8
0.5 1.0 1.6 2.2 2.5 2.7 2.6 2.4 2.2 1.9 1.7 1.4 1.3 1.2 1.1 1.0 1.0 1.1 1.2 1.3 1.5 1.7 1.8 2.0 2.1 2.1 2.1 2.0 1.8 1.7 1.5 1.4 1.3 1.2 1.2 1.3 1.4 1.6 1.8 2.0 2.3 2.5 2.7 2.6 2.4 2.3 1.9 1.4 0.8
0.6 1.0 1.4 1.8 2.0 2.2 2.2 2.1 1.9 1.7 1.5 1.4 1.2 1.1 1.0 1.0 1.0 1.1 1.2 1.3 1.4 1.6 1.7 1.8 1.9 1.9 1.9 1.8 1.7 1.6 1.4 1.3 1.2 1.2 1.2 1.3 1.4 1.5 1.7 1.8 2.0 2.1 2.2 2.1 1.9 1.8 1.6 1.3 0.9
0.6 1.0 1.3 1.6 1.8 1.9 2.0 1.9 1.7 1.6 1.4 1.3 1.2 1.1 1.0 1.0 1.0 1.1 1.1 1.2 1.4 1.5 1.7 1.8 1.8 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 1.2 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.9 1.9 1.7 1.6 1.4 1.1 0.8
0.7 1.0 1.3 1.6 1.8 1.9 1.9 1.8 1.6 1.5 1.4 1.2 1.1 1.1 1.0 1.0 1.0 1.0 1.1 1.2 1.4 1.5 1.7 1.8 1.9 1.9 1.8 1.7 1.6 1.5 1.4 1.3 1.2 1.2 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.9 1.8 1.6 1.5 1.3 1.1 0.8
0.7 1.1 1.5 1.8 1.9 2.0 1.9 1.8 1.6 1.5 1.3 1.2 1.1 1.0 1.0 1.0 1.0 1.0 1.1 1.2 1.4 1.6 1.8 1.9 2.0 2.1 2.0 1.8 1.7 1.5 1.4 1.3 1.2 1.2 1.2 1.3 1.4 1.5 1.7 1.8 1.9 2.0 2.0 1.9 1.8 1.6 1.4 1.1 0.8
0.8 1.3 1.7 2.1 2.3 2.3 2.1 1.9 1.7 1.5 1.3 1.2 1.1 1.0 1.0 1.0 1.0 1.0 1.1 1.3 1.5 1.7 1.9 2.2 2.3 2.4 2.2 2.0 1.8 1.6 1.4 1.3 1.3 1.3 1.3 1.4 1.5 1.6 1.8 2.0 2.2 2.3 2.4 2.3 2.1 1.8 1.5 1.1 0.8
0.8 1.5 2.2 2.7 2.9 2.8 2.5 2.2 1.8 1.6 1.4 1.2 1.1 1.0 1.0 1.0 1.0 1.0 1.1 1.3 1.5 1.9 2.2 2.6 2.8 2.9 2.7 2.4 2.1 1.8 1.5 1.4 1.3 1.3 1.3 1.4 1.6 1.8 2.0 2.3 2.6 2.8 2.9 2.9 2.6 2.2 1.7 1.2 0.7
0.7 1.7 2.8 3.6 3.8 3.5 3.0 2.4 2.0 1.7 1.4 1.2 1.1 1.0 1.0 1.0 1.0 1.1 1.1 1.3 1.6 2.1 2.6 3.2 3.6 3.7 3.4 2.9 2.3 1.9 1.6 1.5 1.4 1.4 1.4 1.5 1.7 1.9 2.2 2.6 3.1 3.6 3.9 3.9 3.4 2.7 1.9 1.1 0.6
0.5 1.7 3.7 4.9 5.1 4.4 3.5 2.8 2.2 1.8 1.5 1.3 1.2 1.1 1.0 1.0 1.0 1.1 1.2 1.4 1.7 2.3 3.0 3.9 4.7 4.8 4.3 3.5 2.7 2.1 1.8 1.7 1.6 1.5 1.6 1.7 1.8 2.1 2.5 3.1 3.9 4.7 5.4 5.3 4.6 3.4 1.9 0.9 0.4
0.4 1.4 4.3 6.5 6.8 5.5 4.2 3.1 2.4 1.9 1.6 1.4 1.2 1.1 1.1 1.1 1.1 1.2 1.3 1.5 1.8 2.4 3.4 4.8 6.2 6.6 5.7 4.3 3.2 2.4 2.1 1.9 1.8 1.7 1.7 1.8 2.0 2.3 2.8 3.5 4.7 6.1 7.4 7.5 5.9 3.8 1.5 0.6 0.3
0.3 1.1 4.0 8.1 8.3 6.6 4.8 3.5 2.7 2.1 1.7 1.4 1.3 1.2 1.1 1.1 1.2 1.3 1.4 1.7 2.1 2.6 3.7 5.6 7.9 8.9 7.3 5.1 3.7 3.0 2.6 2.2 2.0 1.8 1.8 1.9 2.1 2.5 3.2 4.1 5.6 7.6 9.8 9.9 6.5 2.9 0.8 0.4 0.2
0.2 0.9 2.4 8.1 9.3 7.4 5.5 3.9 2.9 2.2 1.8 1.5 1.3 1.2 1.2 1.2 1.2 1.4 1.6 1.9 2.4 3.1 4.1 5.7 8.6 10.3 8.1 5.9 4.8 3.8 3.0 2.5 2.1 1.9 1.8 1.9 2.2 2.7 3.4 4.6 6.4 8.9 11.2 10.6 4.8 1.4 0.5 0.3 0.2
0.1 0.6 1.6 5.5 8.5 7.5 5.6 4.1 3.0 2.3 1.8 1.5 1.3 1.2 1.2 1.2 1.3 1.4 1.7 2.1 2.8 3.6 4.8 6.1 7.1 7.6 7.0 6.6 5.6 4.3 3.3 2.5 2.1 1.8 1.8 1.9 2.1 2.6 3.4 4.6 6.4 8.8 10.1 7.3 2.0 0.8 0.3 0.2 0.2
0.1 0.3 1.1 3.3 5.8 6.1 5.0 3.8 2.8 2.2 1.7 1.5 1.3 1.2 1.1 1.1 1.2 1.4 1.7 2.2 2.9 3.8 4.8 5.2 4.2 2.3 3.3 4.5 4.5 3.6 2.8 2.2 1.8 1.6 1.6 1.7 1.9 2.4 3.1 4.1 5.3 6.5 6.7 4.0 1.2 0.4 0.2 0.2 0.1
0.1 0.2 0.6 1.6 3.7 4.2 3.9 3.2 2.5 2.0 1.6 1.4 1.2 1.1 1.0 1.1 1.1 1.3 1.5 1.9 2.3 2.7 2.8 2.0 1.3 0.8 1.1 1.3 1.6 1.7 1.7 1.6 1.4 1.3 1.3 1.5 1.7 2.0 2.5 3.2 4.0 4.7 4.3 1.7 0.6 0.2 0.2 0.1 0.1
0.1 0.1 0.3 0.8 1.9 2.7 2.7 2.4 2.1 1.7 1.4 1.2 1.1 1.0 0.9 0.9 1.0 1.1 1.2 1.3 1.4 1.3 0.9 0.8 0.6 0.4 0.5 0.6 0.7 0.8 0.9 0.9 1.0 1.0 1.1 1.2 1.4 1.6 1.9 2.4 2.9 3.1 2.0 0.7 0.3 0.1 0.1 0.1 0.1
0.1 0.1 0.2 0.4 1.0 1.6 1.8 1.7 1.6 1.4 1.2 1.1 0.9 0.9 0.8 0.8 0.8 0.8 0.8 0.8 0.7 0.6 0.5 0.4 0.4 0.4 0.4 0.4 0.4 0.5 0.6 0.6 0.6 0.7 0.8 0.9 1.0 1.2 1.5 1.8 2.0 1.7 0.9 0.4 0.2 0.1 0.1 0.1 0.1
0.1 0.1 0.2 0.3 0.6 1.0 1.2 1.2 1.1 1.1 1.0 0.9 0.8 0.7 0.7 0.6 0.6 0.6 0.5 0.5 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0.4 0.4 0.4 0.4 0.5 0.5 0.6 0.6 0.7 0.9 1.0 1.1 1.2 1.2 0.9 0.4 0.2 0.1 0.1 0.1 0.1 0.1
0.1 0.1 0.1 0.2 0.3 0.6 0.8 0.8 0.8 0.8 0.7 0.7 0.6 0.6 0.5 0.5 0.5 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.4 0.5 0.5 0.6 0.7 0.8 0.8 0.8 0.7 0.5 0.2 0.2 0.1 0.1 0.1 0.1 0.1
0.1 0.1 0.1 0.1 0.2 0.3 0.5 0.6 0.6 0.6 0.6 0.5 0.5 0.5 0.4 0.4 0.4 0.4 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.3 0.4 0.4 0.4 0.5 0.5 0.5 0.6 0.6 0.5 0.4 0.2 0.2 0.1 0.1 0.1 0.1 0.1 0.1 le
D a te
C o m m e n ts
Revisions
C h ec ke d B y:
D a te :4
/2 0/
F T
P
IC
K
E T
T E
P A
R A
D E
D ra w n
B y:
C H
A S
E A
M M
O N le
D a te
C o m m e n ts
Revisions
C h ec ke d B y:
D a te :4
/2 0/
F T
P
IC
K
E T
T E
P A
R A
D E
D ra w n
B y:
C H
A S
E A
M M le
D a te
C o m m e n ts
Revisions
C h ec ke d B y:
D a te :4
/2 0/
F T
P
IC
K
E T
T E
P A
R A
D E
D ra w n
B y:
C H
A S
E A
M M le
D a te
C o m m e n ts
Revisions
C h ec ke d B y:
D a te :4
/2 0/
F T
P
IC
K
E T
T E
P A
R A
D E
D ra w n
B y:
C H
A S
E A
M M
O N
Luminaire Schedule Symbol Qty Label Arrangement Description Tag LLF Luminaire
Lumens Luminaire Watts
Total Watts
12 x17xfu330-330w-5000k Single 1.000 44892 322.207 3866.484
FXLED300SF
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Ultra high output, high efficiency LED floodlight with NEMA Types: 7H x 6V, 6H x 4V, 4H x 6V, 5H x 5V and 3H x 3V. patent-pending "Air-Flow" technology ensures long LED and driver lifespan. Use for general and security lighting for large areas, building façades, signs and landscapes.
Color: Bronze Weight: 66.1 lbs
Project: Type:
Prepared By: Date:
Driver Info Type Constant Current
120V 2.65A
208V 1.59A
240V 1.38A
277V 1.17A
Input Watts 325.90W
Efficiency 92%
LED Info Watts 300.00W
Color Temp 5000K (Cool)
Color Accuracy 72 CRI
L70 Lifespan 100,000
Lumens 45,171
Efficacy 138.6 LPW
Technical Specifications
Listings
UL Listing:
Suitable for wet locations. Suitable for ground mounting.
IESNA LM-79 & LM-80 Testing:
RAB LED luminaires and LED components have been tested by an independent laboratory in accordance with IESNA LM-79 and LM-80.
DLC Listed:
This product is listed by Design Lights Consortium (DLC) as an ultra-efficient premium product that qualifies for the highest tier of rebates from DLC Member Utilities.DLC Product Code: PF5PMFXJ
Optical
NEMA Type:
NEMA Beam Spread of 7H x 6V
LED Characteristics
Lifespan:
100,000-hour LED lifespan based on IES LM-80 results and TM-21 calculations
LEDs:
Multip-chip, high-output, long-life LEDs
Color Consistency:
7-step MacAdam Ellipse binning to achieve consistent fixture-to-fixture color
Color Stability:
LED color temperature is warrantied to shift no more than 200K in CCT over a 5-year period
Color Uniformity:
RAB's range of CCT (Correlated Color Temperature) follows the guidelines of the American National Standard for Specifications for the Chromaticity of Solid State Lighting (SSL) Products, ANSI C78.377-2017.
Construction
IP Rating:
Ingress Protection rating of IP66 for dust and water
Maximum Ambient Temperature:
Suitable for use in 40°C (104°F)
Effective Projected Area:
EPA = 4
Cold Weather Starting:
Minimum starting temperature is -40°C (-40°F)
Thermal Management:
Superior thermal management with external "Air- Flow" fins
Lens:
Tempered glass lens
Housing:
Die-cast aluminum housing and door frame
Mounting:
Heavy-duty slipfitter for 2 3/8"OD pipe
Reflector:
Specular and semi-specular vacuum-metalized polycarbonate
Gaskets:
High-temperature silicone gaskets
FT PICKETT AF
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Technical Specifications (continued)
Construction
Finish:
Formulated for high durability and long-lasting color
Green Technology:
Mercury and UV free. RoHS-compliant components.
Electrical
Drivers:
Constant Current, 1050mA, 50/60 Hz, 120-277V, 4 kV surge protection, 120V: 2.65A, 208V: 1.59A, 240V: 1.38A, 277V: 1.17A, THD <20%, Power Factor: 99%
THD:
9.26% at 120V, 12.56% at 277V
Power Factor:
99.3% at 120V, 96.6% at 277V
Note:
All values are typical (tolerance +/- 10%)
Other
Warranty:
RAB warrants that our LED products will be free from defects in materials and workmanship for a period of five (5) years from the date of delivery to the end user, including coverage of light output, color stability, driver performance and fixture finish.
RAB's warranty is subject to all terms and conditions found at rablighting.com/warranty.
Equivalency:
Equivalent to 1500W Metal Halide
Buy American Act Compliance:
RAB values USA manufacturing! Upon request, RAB may be able to manufacture this product to be compliant with the Buy American Act (BAA). Please contact customer service to request a quote for the product to be made BAA compliant.
Dimensions Features 300W replaces 1000 MH floodlights
100,000-hour LED lifespan
5-Year, No-Compromise Warranty
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Ordering Matrix
Family Wattage Mounting Color Temp NEMA Type Finish Driver Options Options Other Options
FXLED 300 SF
200 = 200W 300 = 300W
SF = Slipfitter T = Trunnion
Blank = 5000K (Cool)
N = 4000K (Neutral)
Y = 3000K (Warm)
Blank = 7H x 6V
B64 = 6H x 4V
B55 = 5H x 5V
B33 = 3H x 3V
B46 = 4H x 6V
Blank = Bronze
W = White
Blank = 120-277V /480 = 480V
/BL = Bi-Level (Slipfitters only) 1
/D10 = 0-10V Dimming
Blank = No option /PCS = 120V Swivel
/PCS2 = 277V
Swivel
/PCT = 120-277V
Twistlock
/PCT4 = 480V
Twistlock
/PCS4 = 480V
Swivel
/LC = Lightcloud® Controller
USA = BAA
Compliant
Blank = Standard
1 Slipfitter models only
FXLED300SFB55
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Ultra high output, high efficiency LED floodlight with NEMA Types: 7H x 6V, 6H x 4V, 4H x 6V, 5H x 5V and 3H x 3V. patent-pending "Air-Flow" technology ensures long LED and driver lifespan. Use for general and security lighting for large areas, building façades, signs and landscapes.
Color: Bronze Weight: 66.1 lbs
Project: Type:
Prepared By: Date:
Driver Info Type Constant Current
120V 2.65A
208V 1.59A
240V 1.38A
277V 1.17A
Input Watts 321.80W
Efficiency 93%
LED Info Watts 300.00W
Color Temp 5000K (Cool)
Color Accuracy 72 CRI
L70 Lifespan 100,000
Lumens 44,160
Efficacy 137.2 LPW
Technical Specifications
Listings
UL Listing:
Suitable for wet locations. Suitable for ground mounting.
IESNA LM-79 & LM-80 Testing:
RAB LED luminaires and LED components have been tested by an independent laboratory in accordance with IESNA LM-79 and LM-80.
DLC Listed:
This product is listed by Design Lights Consortium (DLC) as an ultra-efficient premium product that qualifies for the highest tier of rebates from DLC Member Utilities.DLC Product Code: PQWZ5Z1L
Optical
NEMA Type:
NEMA Beam Spread of 5H x 5V
LED Characteristics
Lifespan:
100,000-hour LED lifespan based on IES LM-80 results and TM-21 calculations
LEDs:
Multip-chip, high-output, long-life LEDs
Color Consistency:
7-step MacAdam Ellipse binning to achieve consistent fixture-to-fixture color
Color Stability:
LED color temperature is warrantied to shift no more than 200K in CCT over a 5-year period
Color Uniformity:
RAB's range of CCT (Correlated Color Temperature) follows the guidelines of the American National Standard for Specifications for the Chromaticity of Solid State Lighting (SSL) Products, ANSI C78.377-2017.
Construction
IP Rating:
Ingress Protection rating of IP66 for dust and water
Maximum Ambient Temperature:
Suitable for use in 40°C (104°F)
Effective Projected Area:
EPA = 4
Cold Weather Starting:
Minimum starting temperature is -40°C (-40°F)
Thermal Management:
Superior thermal management with external "Air- Flow" fins
Lens:
Tempered glass lens
Housing:
Die-cast aluminum housing and door frame
Mounting:
Heavy-duty slipfitter for 2 3/8"OD pipe
Reflector:
Specular and semi-specular vacuum-metalized polycarbonate
Gaskets:
High-temperature silicone gaskets
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Technical Specifications (continued)
Construction
Finish:
Formulated for high durability and long-lasting color
Green Technology:
Mercury and UV free. RoHS-compliant components.
Electrical
Drivers:
Constant Current, 1050mA, 50/60 Hz, 120-277V, 4 kV surge protection, 120V: 2.65A, 208V: 1.59A, 240V: 1.38A, 277V: 1.17A, THD <20%, Power Factor: 99%
THD:
8.85% at 120V, 11.12% at 277V
Power Factor:
99.4% at 120V, 97.1% at 277V
Note:
All values are typical (tolerance +/- 10%)
Other
Warranty:
RAB warrants that our LED products will be free from defects in materials and workmanship for a period of five (5) years from the date of delivery to the end user, including coverage of light output, color stability, driver performance and fixture finish.
RAB's warranty is subject to all terms and conditions found at rablighting.com/warranty.
Equivalency:
Equivalent to 1500W Metal Halide
Buy American Act Compliance:
RAB values USA manufacturing! Upon request, RAB may be able to manufacture this product to be compliant with the Buy American Act (BAA). Please contact customer service to request a quote for the product to be made BAA compliant.
Dimensions Features 300W replaces 1000 MH floodlights
100,000-hour LED lifespan
5-Year, No-Compromise Warranty
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Ordering Matrix
Family Wattage Mounting Color Temp NEMA Type Finish Driver Options Options Other Options
FXLED 300 SF B55
200 = 200W 300 = 300W
SF = Slipfitter T = Trunnion
Blank = 5000K (Cool)
N = 4000K (Neutral)
Y = 3000K (Warm)
Blank = 7H x 6V
B64 = 6H x 4V B55 = 5H x 5V B33 = 3H x 3V B46 = 4H x 6V
Blank = Bronze
W = White
Blank = 120-277V /480 = 480V
/BL = Bi-Level (Slipfitters only) 1
/D10 = 0-10V Dimming
Blank = No option /PCS = 120V Swivel
/PCS2 = 277V
Swivel
/PCT = 120-277V
Twistlock
/PCT4 = 480V
Twistlock
/PCS4 = 480V
Swivel
/LC = Lightcloud® Controller
USA = BAA
Compliant
Blank = Standard
1 Slipfitter models only
WPLED4T260/D10
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Color: Bronze Weight: 82.1 lbs
Project: Type:
Prepared By: Date:
Driver Info Type Constant Current
120V 2.2A
208V 1.3A
240V 1.1A
277V 1.0A
Input Watts 262.50W
Efficiency 99%
LED Info Watts 260.00W
Color Temp 5000K (Cool)
Color Accuracy 70 CRI
L70 Lifespan 100,000
Lumens 27,428
Efficacy 104.5 LPW
Technical Specifications
Listings
UL Listing:
Suitable for wet locations
IESNA LM-79 & IESNA LM-80 Testing:
RAB LED luminaires and LED components have been tested by an independent laboratory in accordance with IESNA LM-79 and LM-80.
DLC Listed:
This product is on the Design Lights Consortium (DLC) Qualified Products List and is eligible for rebates from DLC Member Utilities. DLC Product Code: PJ27KN6A
Construction
IP Rating:
Ingress Protection rating of IP66 for dust and water
IES Classification:
The Type IV distribution (also known as a Forward Throw) is especially suited for mounting on the sides of buildings and walls, and for illuminating the perimeter of parking areas. It produces a semiCircular distribution with essentially the same candlepower at lateral angles from 90° to 270°.
Maximum Ambient Temperature:
Suitable for use in 40°C (104°F)
Cold Weather Starting:
Minimum starting temperature is -40°C (-40°F)
Thermal Management:
Superior heat sinking with external Air-Flow fins
Housing:
Die-cast aluminum with airflow fins for cooling
Lens:
Tempered glass
Reflector:
Vacuum-metalized polycarbonate
Gaskets:
High-temperature silicone gaskets
Finish:
Formulated for high durability and long-lasting color
Green Technology:
Mercury and UV free. RoHS-compliant components.
LED Characteristics
LEDs:
Multi-chip, high-output, long-life LEDs
Color Consistency:
3-step MacAdam Ellipse binning to achieve consistent fixture-to-fixture color
Color Stability:
LED color temperature is warrantied to shift no more than 200K in CCT over a 5-year period
Color Uniformity:
RAB's range of CCT (Correlated Color Temperature) follows the guidelines of the American National Standard for Specifications for the Chromaticity of Solid State Lighting (SSL) Products, ANSI C78.377-2017.
Electrical
Drivers:
Constant Current, Class 1, 1660mA, 100-277V, 50-60Hz, 120V: 2.2A, 208V: 1.3A, 240V: 1.1A, 277V: 1.0A
WPLED4T260/D10
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Technical Specifications (continued)
Electrical
Dimming Driver:
Driver includes dimming control wiring for 0-10V dimming systems. Requires separate 0-10V DC dimming circuit. Dims as low as 10%.
Surge Protection:
6kV
Other
Warranty:
RAB warrants that our LED products will be free from defects in materials and workmanship for a period of five (5) years from the date of delivery to the end user, including coverage of light output, color stability, driver performance and fixture finish.
RAB's warranty is subject to all terms and conditions found at rablighting.com/warranty.
Patents:
The WPLED design is protected by patents pending in the U.S., Canada, China, Taiwan and Mexico.
Equivalency:
Equivalent to 750W Metal Halide
Buy American Act Compliance:
RAB values USA manufacturing! Upon request, RAB may be able to manufacture this product to be compliant with the Buy American Act (BAA). Please contact customer service to request a quote for the product to be made BAA compliant.
Dimensions Features High output, high efficiency LED
Maintains 70% of initial lumens at 100,000-hours
Weatherproof high temperature silicone gaskets
Superior heat sinking with die cast aluminum housing and external fins
5-Year, No-Compromise Warranty
Ordering Matrix
Family Distribution Wattage Color Temp Mounting Finish Dimming Driver Options Options Other Options
WPLED 4T 260 /D10
4T = Type IV 3T = Type III 2T = Type II
260 = 260W 360 = 360W
Blank = 5000K (Cool)
N = 4000K (Neutral)
Y = 3000K (Warm)
Blank = Arm FX = Flat
Mount
Blank = Bronze
W = White
/D10 = 120-277V, 0-10V Dimming
/480/D10 = 480V, 0-10V Dimming
/LC = Lightcloud Control Installed
Blank = No Option
/PCT = 120-277V
Twistlock Photocell /PCT4 = 480V Twistlock
Photocell /WS4 = Motion
Sensor/Photocell (40' H/60' D)
/WS10 = Motion Sensor/Photocell (40'
H/100' D)
USA = BAA
Compliant Blank = Standard
1 Not available for slipfitter models.
BULL2
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Bullhorn bracket safely supports HID floodlights. Great with Floodzilla, Megaflood and Flexflood models.
Color: Bronze Weight: 21.4 lbs
Project: Type:
Prepared By: Date:
Technical Specifications
Construction
Finish:
Chip and fade resistant bronze polyester powder coating Weather resistant polyester powder, bronze
Bullhorns:
2 tenons for slip fitters. Bullhorns fit 2 3/8" (6cm) O.D. tenons and accommodate 2 3/8" (6cm) slip fitters. Steel tubing.150" and.200" thick welded with
(4) 3/8" bolts for securing to pole.
Slipfitters & Wall Brackets:
3/16" thick steel with 1/2" nuts and bolts
Bracket EPA:
1.35.
Maximum Weight Capacity:
100 lbs per arm
EPA Maximum Capacity:
5.0 per arm.
Other
Patents:
The designs of fixtures are protected under U.S.
and international intellectual property laws.
Buy American Act Compliance:
RAB values USA manufacturing! Upon request, RAB may be able to manufacture this product to be compliant with the Buy American Act (BAA). Please contact customer service to request a quote for the product to be made BAA compliant.
BULL2
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Dimensions Features Easy, secure floodlight mounting
Double Reinforced weld joints
BULL3
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Bullhorn bracket safely supports HID floodlights. Great with Floodzilla, Megaflood and Flexflood models.
Color: Bronze Weight: 25.6 lbs
Project: Type:
Prepared By: Date:
Technical Specifications
Construction
Finish:
Formulated for high durability and long-lasting color
Bullhorns:
3 tenons for slip fitters. Bullhorns fit 2 3/8" (6cm) O.D. tenons and accommodate 2 3/8" (6cm) slip fitters. Steel tubing.150" and.200" thick welded with
(4) 3/8" bolts for securing to pole.
Slipfitters & Wall Brackets:
3/16" thick steel with 1/2" nuts and bolts
Bracket EPA:
2.0.
Weight:
25.6 lbs
Maximum Weight Capacity:
90 lbs. per arm.
EPA Maximum Capacity:
4.0 per arm
Other
Patents:
The designs of fixtures are protected under U.S.
and international intellectual property laws.
Buy American Act Compliance:
RAB values USA manufacturing! Upon request, RAB may be able to manufacture this product to be compliant with the Buy American Act (BAA). Please contact customer service to request a quote for the
BULL3
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Dimensions Features Easy, secure floodlight mounting
Double Reinforced weld joints
PTR8-07-30WT
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Color: Bronze Weight: 389.1 lbs
Project: Type:
Prepared By: Date:
Technical Specifications
Listings
CSA Listed:
Suitable for wet locations
Construction
Description:
Steel pole 8" taper 7 gauge 30 foot welded tenon square base
Base Shaft Diameter:
8"
Hand Holes:
Reinforced with grounding lug and removable cover
Base Plates:
Slotted base plates 36,000 p.s.i.
Color:
Bronze powder coating
Height:
30 FT
Gauge:
Wall Thickness:
3/16"
Anchor Bolt Templates:
WARNING Template must be printed on 11" x 17" sheet for actual size. CHECK SCALE BEFORE USING. Templates shipped with anchor bolts and available online.
Maximum EPAs/Maximum Weights:
70MPH: 23.1 ft./640 lb.
80MPH: 15.4 ft./630 lb.
90MPH: 10.1 ft./620 lb.
100MPH: 6.4 ft./600 lb.
110MPH: 3.6 ft./600 lb.
120MPH: 1.5 ft./580 lb.
130MPH: 0.1 ft./400 lb.
Accessories:
Base/Cap: BASE-RT8 Anchor Bolts: BOLT5-8
Other
Terms of Sale:
Pole Terms of Sale is available online.
Buy American Act Compliance:
RAB values USA manufacturing! Upon request, RAB may be able to manufacture this product to be compliant with the Buy American Act (BAA). Please contact customer service to request a quote for the
PTR8-07-30WT
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Dimensions
Ordering Matrix
Family Shape Size Gauge Height Drilled/Welded Tenon
P TR 8 7 30 WT
R = Round TR = Taped Round
4 = 4" 5 = 5" 6 = 6" 7 = 7" 8 = 8"
7 = 7 11 = 11
10 = 10' 15 = 15' 20 = 20' 25 = 25' 30 = 30'
D2 = Drilled WT = Welded Tenon
BASE-RT8
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Color: Bronze Weight: 7.2 lbs
Project: Type:
Prepared By: Date:
Technical Specifications
Construction
Finish:
Formulated for high durability and long-lasting color
Other
Buy American Act Compliance:
RAB values USA manufacturing! Upon request, RAB may be able to manufacture this product to be compliant with the Buy American Act (BAA). Please contact customer service to request a quote for the
BOLT5-8
Need help? Tech help line: (888) 722-1000 Email: custserv@rablighting.com Website: www.rablighting.com Copyright © 2019 RAB Lighting All Rights Reserved Note: Specifications are subject to change at any time without notice
Color: Bronze Weight: 30.9 lbs
Project: Type:
Prepared By: Date:
Technical Specifications
Construction
Finish:
Formulated for high durability and long-lasting color
Other
Buy American Act Compliance:
RAB values USA manufacturing! Upon request, RAB may be able to manufacture this product to be compliant with the Buy American Act (BAA). Please contact customer service to request a quote for the
DAYTON Mounted Fan: 24 in Blade Dia, 115V AC, 1/4 hp Motor HP, Ceiling/Wall Mount, Non-Oscillating
Item 1ZCN8 Mfr. Model 1ZCN8
Product Details Catalog Page 2792
Brand DAYTON
Blade Diameter 24 in
Oscillation Non-Oscillating
Watts 320 W
Number of Speeds 1
Voltage 115V AC
Motor HP 1/4 hp
Amps 2.8
Compliance & Restrictions
Documents
Product Categories / HVAC and Refrigeration / Cooling Fans / Industrial Cooling Fans / Industrial Wall-Mount Fans / DAYTON Mounted Fan: 24 in Blade Dia…
Web Price $324.65 / each
This item requires special shipping, additional charges may apply.
Ship to 10001 | Change
Shipping Weight 36.5 lbs Ship Availability Terms
Add to List
Add to Cart1 Qty
Ship Pickup
Expected to arrive Mon. Aug 03.
WARNING: Cancer and Reproductive Harm -www.P65Warnings.ca.gov
Greenhouse Air Circulator Parts Diagram https://www.grainger.com/ https://www.grainger.com/content/general-catalog?pagelabel=2792&search=1ZCN8 https://www.grainger.com/category https://www.grainger.com/category/hvac-and-refrigeration https://www.grainger.com/category/hvac-and-refrigeration/cooling-fans https://www.grainger.com/category/hvac-and-refrigeration/cooling-fans/industrial-cooling-fans https://www.grainger.com/category/hvac-and-refrigeration/cooling-fans/industrial-cooling-fans/industrial-wall-mount-fans https://www.p65warnings.ca.gov/ https://www.grainger.com/ec/pdf/Greenhouse-Air-Circulator-Parts-Diagram.pdf
Fan Mounting Location Ceiling; Wall
Air Velocity @ 10 Ft. 1050 fpm
Air Velocity @ 20 Ft. 500 fpm
Air Velocity @ 40 Ft. 150 fpm
Assembly Required No
Max. Ambient Temp. 104 °F
Hz 60 Hz
Motor Design Permanent Split Capacitor
Motor Enclosure Totally Enclosed Air-Over
Motor Insulation B
Thermal Protection Automatic Reset
Fan Power Source Plug-In
Fan Cord Length 10 ft
NEMA Plug Configuration 5-15P
Height 27 in
Width 27 in
Depth 13-1/4 in
Number of Blades 3
Blade Material Aluminum
Shaft Dia. 1/2 in
Fan Blade Color Silver
Fan Housing Material Steel
Color Gray
Wire Guard Finish Powder Coated
Features AC Motor
Number of Conductors 3
Housing Finish - Fans Powder Coated
Height Adjustment Fixed Height
Max. Mounting Height Unrestricted
Drive Type Direct Drive
Standards cULus
Includes Mounting Chains; S-Hooks
Product Type Circulating Fan
Manufacturer Part Number 1ZCN8
Airflow 6,450 cfm
Application Industrial
Mounting Type Bracket
Sound Level - Maximum 74 dBA
Speed 1,100 RPM
UNSPSC 40101602
Country of Origin China (subject to change)
Compatible Products
Product Description Corrosion-resistant industrial wall-mount fans circulate air in wet or humid environments where floor space is limited. They are made with materials that resist moisture and routine cleaning, and they mount to walls or other elevated surfaces to free up floor space. These fans are commonly used in greenhouses, livestock buildings, and outdoor or high-moisture areas where airflow is needed.
VIRGINIA DEPARTMENT OF TRANSPORTATION
LF-1
REFERENCE
SPECIFICATION
W D
A
4"
6"
2’ 6" 8’ 8 - 8
ANCHOR BOLTS
BOLT CIRCLE 1 " CONDUIT
ANCHOR BOLTS
BOLT PROJECTION AS
REQUIRED BY LIGHTING
POLE MANUFACTURER
GROUNDING ELECTRODE
BARS EVENLY SPACED
W(DIA.)
12" OVERLAP
4 TIE BARS
VERTICAL BARS
LIGHTING POLE FOUNDATION
INSTALLATION DETAILS
TYPE
NOTES:
4 REINFORCING TIE BARS @
12" MAX. (TYP.)
3" COVER
4" MIN.
SEE DETAIL A
OF TIE BAR
PLAN VIEW
SECTION A-A
PLAN VIEW
AA
OR DETAIL C
SEE DETAIL B
FOUNDATION
CONCRETE
CLASS A3
(TYP.)
HEAVY HEX NUT
CONDUCTOR
GROUNDING ELECTRODE
1" MIN. CONDUIT
M
IN
M
IN
D
S
E
T E
D
S
T E
(SEE NOTE 3)
CONDUIT
(SEE NOTE 3)
CONDUIT
SIDEWALK
VERTICAL REINFORCEMENT
(SEE NOTE 3)
CONDUIT(S)
ADJACENT TO THE FOUNDATION.
THE BOTTOM OF THE SIDEWALK OR THE POINT OF LOWEST GRADED ELEVATION
11. D IS THE MINIMUM DISTANCE FROM THE BOTTOM OF THE POLE FOUNDATION TO
THE ANTICIPATED WATER LEVELS.
FOUNDATIONS ADJACENT TO ANY DITCH SHALL BE ABOVE GRADE AND ABOVE
DRAINAGE DITCH, BUT SHALL NOT IMPEDE THE DRAINAGE FLOWS. TOPS OF
DITCH. FOUNDATIONS MAY BE INSTALLED IN THE FRONT OR BACK SLOPE OF A
10. FOUNDATIONS SHALL NOT BE INSTALLED IN THE CENTER OF A DRAINAGE
ALLOWED.
9. ANCHOR BOLTS SHALL BE STRAIGHT. THREADED REINFORCING STEEL IS NOT
COVERINGS.
SEALANT. THE SEALANT SHALL NOT HAVE A DELETERIOUS EFFECT ON CABLE
WITH AN APPROVED SOFT, PLIABLE, AND EASILY REMOVABLE WATERPROOF
8. OPEN ENDS OF CONDUITS WITH CONDUCTORS INSTALLED SHALL BE SEALED
7. BELL ENDS SHALL BE INSTALLED ON EACH END OF PVC CONDUITS.
ENTRY.
6. EMPTY CONDUITS SHALL BE PLUGGED TO PREVENT MOISTURE AND RODENT
5. GROUNDING BUSHINGS SHALL BE INSTALLED ON EACH END OF METAL CONDUITS.
BASE PLATE AND TOP OF FOUNDATION.
4. NO MORTAR, GROUT, OR CONCRETE SHALL BE PLACED BETWEEN BOTTOM OF
MADE PERPENDICULAR TO AND CENTERED ON THIS MARKING.
LOCATIONS OF EMPTY CONDUITS SHALL HAVE AN ADDITIONAL 2" LONG MARK
FINISHING THE CONCRETE AND SHALL BE �" DEEP AND 4" TO 6" LONG.
WHICH CONDUITS PASS. THIS MARK SHALL BE MADE WITH A TROWEL WHEN
FOUNDATION SHALL BE PERMANENTLY MARKED TO INDICATE ALL SIDES FROM
FOUNDATIONS SHALL BE AS SHOWN IN THE CONTRACT DOCUMENTS. EACH
3. THE NUMBER, ORIENTATION AND SIZE OF CONDUITS ENTERING AND EXITING
MANUFACTURER. POLE SHALL BE CENTERED ON FOUNDATION.
2. THE BOLT TEMPLATE SHALL BE FURNISHED BY THE LIGHTING POLE
ACCORDANCE WITH THE N.E.C.
1. CONDUIT ELBOWS SHALL HAVE A 90 BEND. THE BEND RADIUS SHALL BE IN
ROAD AND BRIDGE STANDARDS
REVISION DATE
1310.20
SHEET 1 OF 2
08/14
A COPY OF THE ORIGINAL SEALED AND SIGNED DRAWING IS ON FILE IN THE CENTRAL OFFICE.
LF-1
REFERENCE
SPECIFICATION
VIRGINIA DEPARTMENT OF TRANSPORTATION
LIGHTING POLE FOUNDATION
INSTALLATION DETAILS
NOTES:
SIDEWALK
DETAIL A
BREAKAWAY BASE
DETAIL B
NON-BREAKAWAY BASE
DETAIL C
SIDEWALK
JOINT FILLER
�" PREFORMED
2’-0" MAX.
1’-6" MIN.
SEE NOTE #2
4" MAX. ABOVE GRADE
2" MIN. ABOVE GRADE
�"…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .