IFB 10 4101 27 African American Heritage Trail Comfort Station Bid Set 8.31.2026.pdf
PDF 5 MB Posted
- Attached to
- IFB 10 4101 27 African American Heritage Trail Comfort Station HUD Grant B-23-CP-VA-1478
- Solicitation number
- IFB-128041
- Issued by
- James City County, Virginia
About this file
This is an Invitation for Bid (IFB) document set prepared by the City of Williamsburg, Virginia for the renovation of an abandoned pump station into a unisex comfort station (restroom facility) located at 227 Virginia Avenue, Williamsburg, Virginia. The project scope includes interior renovation to create a single-user restroom with the addition of non-structural walls and plumbing fixtures, along with minor exterior repairs to the existing slate roofing. The facility will be equipped with a sink, faucet, water closet, lighting, toilet tissue and sanitary napkin dispensers, baby changing station, mirror, janitorial closet, new plumbing rough-ins, electrical services, and HVAC systems. This renovation is classified as a Level 2 Alteration under the 2021 Virginia Existing Building Code. The project is a 146-square-foot facility with an occupancy load of two persons, constructed as Type 5B combustible, unprotected construction with a Business occupancy classification. The bid set includes comprehensive architectural, plumbing, mechanical, and electrical drawings prepared by Guernsey Tingle Architects, with supporting engineering services from Terracon, Kimley-Horn, and Infinity Design Group.
The general contractor is responsible for obtaining all necessary permits and the Certificate of Occupancy, conducting site visits and inspections prior to bid submission, coordinating all trades, ensuring compliance with the Virginia Construction Code 2021 Edition and ADA accessibility requirements including ANSI Standard A117.1 2009, and performing final cleaning and documentation upon project completion. The contractor must provide reproducible scaled as-built drawings within 30 days of project completion and written warranty and maintenance documentation within 60 days. All construction must strictly conform to the provided plans and specifications unless a written variance is approved by the owner. The project is funded through a HUD Grant (B-23-CP-VA-1478) and is part of the African American Heritage Trail initiative.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A. G.C. SHALL INSPECT ALL DRAWINGS IMMEDIATELY UPON RECEIPT & REPORT ANY DISCREPANCIES, CONFLICTS, ERRORS, OR OMISSIONS DISCOVERED. THIS INCLUDES COORDINATION WITH
MEP/OTHER TRADES.
B. G.C. IS RESPONSIBLE FOR ENSURING ALL WORK IS DONE IN ACCORDANCE WITH ACCEPTED
CONSTRUCTION STANDARDS & IN COMPLIANCE WITH ALL BUILDING CODES, ORDINANCES &
REGULATIONS OF ALL CONSTITUTED PUBLIC AUTHORITIES HAVING JURISDICTION.
C. ALL CONSTRUCTION SHALL BE IN STRICT ACCORDANCE WITH THESE PLANS & SPECIFICATIONS
UNLESS A WRITTEN VARIANCE IS APPROVED BY THE OWNER.
D. G.C. & ALL SUBCONTRACTORS SHALL VISIT & INSPECT THE PREMISES PRIOR TO SUBMITTING A PROPOSAL. SUBMISSION OF A PROPOSAL CONSTITUTES AN AGREEMENT THAT THE G.C. INCLUDED
ALL ITEMS NECESSARY TO ACCOMMODATE THE EXISTING CONDITIONS. ANY CONDITIONS IN
CONFLICT WITH THESE DRAWINGS & SPECIFICATIONS SHALL BE REPORTED TO THE DESIGNER
IMMEDIATELY UPON DISCOVERY. DESIGNER CANNOT BE HELD RESPONSIBLE FOR ANY HIDDEN
CONDITIONS.
E. G.C .SHALL OBTAIN ALL PERMITS & THE CERTIFICATE OF OCCUPANCY, UNLESS NOTED OTHERWISE.
F. MATERIALS SHALL BE DELIVERED & STORED IN ORIGINAL, UNOPENED PROTECTIVE PACKAGING.
INSPECT LABELS IMMEDIATELY UPON DELIVERY FOR ACCURACY. STORE & INSTALL ACCORDING TO
MANUFACTURER'S INSTRUCTIONS. PREVENT DAMAGE TO MATERIALS & SURROUNDING SURFACES
WHEN HANDLING.
G. G.C. SHALL KEEP A CLEAN & SECURE JOB SITE & TAKE ADEQUATE MEASURES TO PROTECT
BUILDING & SITE OCCUPANTS & ITEMS SALVAGED FOR REUSE & IS RESPONSIBLE FOR RETURNING ANY DAMAGED ITEMS TO "LIKE NEW" CONDITION. OCCUPIED/PUBLIC AREAS SHALL BE KEPT CLEAR OF CONSTRUCTION MATERIALS. SECURITY, NOISE, & DUST BARRIERS SHALL BE MAINTAINED BY G.C.
BETWEEN AREAS OF CONSTRUCTION & OCCUPIED/PUBLIC AREAS.
H. G.C. SHALL PERFORM FINAL CLEANING PRIOR TO END USE OCCUPANCY TO INCLUDE: VACUUMING & REMOVAL OF DUST, DEBRIS, OILS, STAINS, FINGERPRINTS, LABELS & WALLCOVERING ADHESIVE.
I. G.C. IS RESPONSIBLE FOR PROVIDING A COMPLETE & OPERATIONAL SPACE.
J. WITHIN 30 DAYS OF PROJECT COMPLETION, G.C. SHALL PROVIDE REPRODUCIBLE SCALED AS-
BUILTS TO THE OWNER & THE ARCHITECT. THESE AS-BUILTS SHALL REFLECT FINAL FIELD
CONDITIONS AT PROJECT COMPLETION.
K. WITHIN 60 DAYS OF PROJECT COMPLETION, G.C. SHALL PROVIDE THE END USER WRITTEN
DOCUMENTATION OF ALL WARRANTIES & RECOMMENDED MAINTENANCE PROCEDURES FOR ALL
EQUIPMENT & FINISH MATERIALS.
L. TO THE BEST OF OUR KNOWLEDGE & INFORMATION, THESE DRAWINGS HAVE BEEN PREPARED IN CONFORMITY WITH ANSI STANDARD A117.1 2009 & ADA TITLE III FOR MAKING BUILDINGS & FACILITIES
ACCESSIBLE TO & USABLE BY PERSONS WITH DISABILITIES. ALTERATIONS, EXCEPTIONS &
DELETIONS TO THESE RULES BY THE RESIDING JURISDICTION HAVE BEEN ACCOMMODATED TO THE
BEST OF OUR KNOWLEDGE.
M. HOLES & OPENINGS THROUGH WALLS & FLOORS FOR DUCTS, PIPING & VENTILATION SHALL BE
CHECKED BY THE CONTRACTOR WHO SHALL VERIFY SIZES & LOCATIONS OF SUCH HOLES OR
OPENINGS WITH PLUMBING, HEATING, VENTILATING & ELECTRICAL DRAWINGS & CONTRACTORS.
N. PENETRATIONS THROUGH FLOOR/CEILING & ROOF/CEILING ASSEMBLIES SHALL BE FIRE RATED NOT
LESS THAN THE ASSEMBLY BEING PENETRATED. THE CONTRACTOR SHALL PROVIDE
MANUFACTURER TESTED SYSTEMS & DETAILS OR AN ENGINEERED JUDGEMENT FOR EACH TYPE OF
PENETRATION REQ'D TO PERFORM THE WORK.
O. OMISSIONS: IF CERTAIN FEATURES ARE NOT FULLY SHOWN OR CALLED OUT ON THE DRAWINGS OR NOTES, THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS
THAT ARE SHOWN OR CALLED OUT.
P. INSTALLATION OF ALL PRODUCTS SHALL BE AS REQUIRED BY THE MANUFACTURER'S LATEST
WRITTEN INSTRUCTIONS AT THE TIME OF PERMITTING.
Q. CONTROLS & OPERATING MECHANISMS FOR ALL FIXTURES & FURNISHINGS SHALL BE OPERABLE BY A FORCE OF NO GREATER THAN 5 LBF WITH ONE HAND & NOT REQUIRE TIGHT GRASPING, PINCHING
OR TWISTING OF THE WRIST TO ACTIVATE CONTROLS.
R. THE SELECTED CONTRACTOR SHALL SUPPLY ALL MISC. BLOCKING, BRACING, METAL, TRIM, FASTENERS, HARDWARE, ETC AS REQUIRED TO COMPLETE THE WORK HERE-IN.
S. ALL REQUIRED ACCESSIBLE ELEMENTS SHALL BE IDENTIFIED BY ADA/ACCESSIBILITY SIGNAGE HAVING THE INTERNATIONAL SYMBOL OF ACCESSIBILITY, TO BE INSTALLED IN ACCORDANCE WITH IBC SECTIONS 1011, 1109 & 1110 ON THE WALL ADJACENT TO THE LATCH SIDE OF THE DOOR OR NEAREST ADJACENT WALL. G.C. SHALL PROVIDE & INSTALL SAID SIGNAGE, INCLUDING BUT NOT
LIMITED TO: DIRECTIONAL SIGNS, EXIT SIGNS & ACCESSIBLE TOILET FACILITIES.
T. G.C. SHALL REVIEW SPECIFICATIONS & DRAWINGS & VERIFY LEAD TIMES AT TIME OF BID/PRICING SUBMISSION. FAILURE TO ORDER PRODUCTS IN A TIMELY FASHION SHALL REQUIRE ADHERANCE
TO THE SUBSTITUTION REQUIREMENTS DESCRIBED IN THE SPECIFICATIONS.
U. ITEMS INDICATED AS "SALVAGED" SHALL BE RELOCATED FROM THE EXISTING BUILDING &
INSTALLED BY THE CONTRACTOR.
V. G.C. TO PROVIDE REQUIRED FUEL/REFRIGERANT/ELEC./WATER SUPPLY, ROUGH-INS. EXHAUST, INTAKES, DRAINS, ETC. UNDER THE BASE BID FOR ALL EQUIPMENT ITEMS INDICATED IN THE PLANS.
THIS SHALL INCLUDE BUT NOT BE LIMITED TO EQUIPMENT & FIXTURES PROCURED & INSTALLED BY
THE CONTRACTOR, PROVIDED BY OWNER (WHETHER INSTALLED BY CONTRACTOR OR OWNER).
OCCUPANCY CLASSIFICATION: PROPOSED: B, BUSINESS
CONSTRUCTION TYPE: TYPE 5B, COMBUSTIBLE, UNPROTECTED
FIRE SUPPRESSION SYSTEM : NO
ALLOWABLE BUILDING AREA AND HEIGHT:
ALLOWABLE AREA (VCC TABLE 506.2): 9,000 SF
ACTUAL AREA: 146 SF
GROSS AREA: 146 SF < 9,000 SF
ALLOWABLE HEIGHT (VCC TABLES 504.3 & 504.4) : 2 STORIES, 40'-0"
ACTUAL HEIGHT: 1 STORY, 22'-6" < 40'-0"
BUILDING DATA:
OCCUPANCY:
OCCUPANT LOAD:
146 SF @ 1/50 GROSS AREA = 2 OCCUPANTS
STRUCTURAL FRAME:
BEARING EXTERIOR WALLS:
BEARING INTERIOR WALLS:
NON BEARING EXTERIOR WALLS:
NON BEARING INTERIOR WALLS:
FLOOR CONSTRUCTION:
ROOF CONSTRUCTION:
CORRIDOR WALLS:
FIRE RESISTANCE RATINGS:
CORRIDORS: CLASS II FLOORS AND CLASS B WALLS AND CEILINGS
ROOMS AND AREAS: CLASS II FLOORS AND CLASS C WALLS AND CEILINGS
MATERIAL FINISH RATINGS: (REQUIRED)
LIFE SAFETY SYSTEM
EXIT REQUIREMENTS
DESIGN LOADS:
N/A
REQUIRED PLUMBING FIXTURES:
BUSINESS:
DEAD-END LIMIT MAXIMUM: 20'
COMMON PATH OF EGRESS TRAVEL: 75'
MAXIMUM TRAVEL TO EXIT: 200'
ACTUAL (MAXIMUM) TRAVEL TO EXIT: 12'
MINIMUM NUMBER OF EXITS: 1 REQUIRED; 1 PROVIDED
EGRESS WIDTH: 36" DOOR, 32" MINIMUM CLEAR
WIDTH @ 0.2" PER OCCUPANT x 2 OCCUPANTS = 0.4" REQUIRED
EMERGENCY LIGHTING: NOT REQUIRED (VEC SECTION 1008.3); PROVIDED
EXIT SIGNS: NOT REQUIRED (VEC SECTION 1013.1, EXCEPTION 1); NOT PROVIDED
FIRE DETECTION SYSTEM: NOT REQUIRED; NOT PROVIDED
EXISTING TO REMAIN.
0 HOURS
0 HOURS
0 HOURS
0 HOURS
0 HOURS
0 HOURS
0 HOURS
0 HOURS
ALL CONSTRUCTION SHALL COMPLY WITH THE REQUIREMENTS OF THE VIRGINIA EXISTING
BUILDING CODE, 2021 EDITION, AND THE VIRGINIA CONSTRUCTION CODE, 2021 EDITION.
THE EXISTING BUILDING WAS BUILT IN APPROXIMATELY 1933 AND IS CURRENTLY A NON-
FUNCTIONING, ABANDONED PUMP STATION.
THIS IS THE RENOVATION OF THE INTERIOR OF THE BUILDING TO INCLUDE THE ADDITION OF NON-
STRUCTURAL WALLS AND PLUMBING FIXTURES TO CREATE A SINGLE-USER RESTROOM. MINOR
REPAIRS SHALL BE MADE TO THE EXTERIOR. AS SUCH, THIS WILL BE A LEVEL 2 ALTERATION IN
ACCORDANCE WITH SECTION 603 OF THE 2021 VIRGINIA EXISTING BUILDING CODE.
PROJECT SUMMARY:
OWNER
CITY OF WILLIAMSBURG
MUNICIPAL BUILDING, 401 LAFAYETTE ST
WILLIAMSBURG, VA 23185
757-220-6143
ARCHITECT
GUERNSEYTINGLE
4350 NEW TOWN AVENUE, SUITE 101
WILLIAMSBURG, VIRGINIA 23188
757-220-0220
STRUCTURAL ENGINEER
TERRACON (TAM CONSULTANTS)
4350 NEW TOWN AVENUE, SUITE 201
WILLIAMSBURG, VIRGINIA 23188
757-784-0559
CIVIL ENGINEER, LANDSCAPE ARCHITECT
KIMLEY-HORN
4350 NEW TOWN AVENUE, SUITE 203
WILLIAMSBURG, VIRGINIA 23188
757-213-8600
PLUMBING, MECHANICAL, & ELECTRICAL ENGINEER
INFINITY DESIGN GROUP (IDG)
723 THIMBLE SHOALS BLVD, SUITE 604
NEWPORT NEWS, VIRGINIA 23606
804-824-5267
RESTROOM
JAN.
T R
A V
E L D
IS
T
A N
C E
T O
E X
IT
BRACKET/ WALL-
MOUNTED
TYPE ABC FIRE
EXTINGUISHER;
OWNER PROVIDED,
GC TO INSTALL
GENERAL
G-101 COVER SHEET, LIFE SAFETY PLAN
ARCHITECTURAL
A-001 LEGENDS & ABBREVIATIONS
A-002 ACCESSIBILITY DETAILS
A-003 GENERAL SPECIFICATIONS
A-004 GENERAL SPECIFICATIONS
A-005 EXISTING DRAWINGS – FOR REFERENCE ONLY
AD-101 DEMOLITION PLAN AND INFILL DETAIL
A-101 FLOOR PLAN AND REFLECTED CEILING PLAN – NEW WORK
A-201 EXTERIOR ELEVATIONS
A-601 DOOR SCHEDULE & DETAILS
A-602 DOOR & WINDOW INFILL DETAILS
A-701 FINISH PLAN AND INTERIOR ELEVATIONS
PLUMBING
P-1 PLUMBING SCHEDULES AND NOTES
P-2 PLUMBING PLANS
P-3 PLUMBING PLANS
MECHANICAL
M-1 MECHANICAL NOTES AND DETAILS
M-2 MECHANICAL FLOOR PLAN
M-3 MECHANICAL SCHEDULES
M-4 MECHANICAL SPECIFICATIONS
ELECTRICAL
E-1 ELECTRICAL LEGEND AND ABBREVIATIONS
E-2 ELECTRICAL LIGHTING AND POWER FLOOR PLAN
E-3 ELECTRICAL SCHEDULES AND ONE LINE DIAGRAM
E-4 ELECTRICAL SPECIFICATIONS
KRISTIN C. CREASY
Lic. No. 013977
C O
M M
O N
W
E A LTH O F
V
IR
G
I N
A I
I T
T E C A
HCR
Drawn:
Date:
Checked:
Project:
P lo tt e d o n
T h e s e d ra w in g s a n d t h is d e s ig n r e m a in t h e p ro p e rt y o f G u e rn s e y T in g le a n d m a y n o t b e a lt e re d re p ro d u c e d o r b u ilt w it h o u t w ri tt e n p e rm is s io n o f th e A rc h it e c t.
/4
/2
:5
:4
A
M
G-101
COVER SHEET AND LIFE
SAFETY PLAN
08/31/26
222042
KCCBNR
BID SET
V ir g in ia A v e
W ill ia m s b u rg
V ir g in ia
A fr ic a n A m e ri c a n
H e ri ta g e
T ra il C o m fo rt
S ta ti o n
C
IT
Y O
F W
IL
L
IA
M
S B
U R
G
08/31/26
227 Virginia Ave, Williamsburg, Virginia 23185
African American Heritage Trail Comfort Station
A fr ic a n A m e ri c a n
H e ri ta g e
T ra il C o m fo rt
S ta ti o n
GENERAL CONSTRUCTION NOTESBUILDING CODE SUMMARY
R E
V
IS
IO
N
S C
H E
D U
L E
D
E S
C R
IP
T
IO
N
D A
T E
IN
IT
IA
LS
PROJECT TEAM
1/2" = 1'-0"
LIFE SAFETY PLAN
N 1/2" = 1' - 0" 0 1' 5'6" 2' 3' 4'
INDEX OF DRAWINGS
MIN MINIMUM, MINUTE
MIR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
N NORTH
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OH OVERHEAD
OPP OPPOSITE
OTS OPEN TO STRUCTURE
PAR PARALLEL
PART PARTIAL
PC PRECAST
PCT PORCELAIN CERAMIC TILE
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLUMB PLUMBING
PLY PLYWOOD
PREFAB PREFABRCATE, PREFABRICATED
PREFIN PREFINISHED
PREP PREPARE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
QTY QUANTITY
R RADIUS, RISER
RAD RADIUS
RB RESILIENT BASE, RUBBER BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECEPTACLE
REF REFERENCE
REINF REINFORCING
REQD REQUIRED
RH RIGHT HAND
RM ROOM
RO ROUGH OPENING
S SOUTH
SAN SANITARY
SECT SECTION
SF SQUARE FEET
SIM SIMILAR
SND SANITARY NAPKIN DISPOSAL
SPEC SPECIFICATION
SQ SQUARE
SS STAINLESS STEEL, SOLID SURFACE
STC SOURCE TRANSMISSION COEFFICIENT
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYN SYNTHETIC
T TON, TREAD, TOP
T&G TONGUE AND GROOVE
TEMP TEMPERATURE, TEMPERED
TERR TERRAZZO
TG TEMPERED GLASS
THRU THROUGH
TO TOP OF
TOB TOP OF BEAM
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TRTD TREATED
TV TELEVISION
TYP TYPICAL
UL UNDERWRITERS LABORATORY
UNF UNFINISHED
UNO, UON UNLESS NOTED OTHERWISE , UNLESS OTHERWISE NOTED
V VOLT
VCT VINYL COMPOSITION TILE
VEN VENEER
VERT VERTICAL
W WIDTH, WIDE, WEST
WAIN WAINSCOT
WB WOOD BASE
WC WATER CLOSET
WD WOOD
WH WATER HEATER
WT WEIGHT
WWF WELDED WIRE FABRIC
WWM WELDED WIRE MESH
W/ WITH
W/O WITHOUT
° DEGREE
&, + AND
@ AT
±, +/- PLUS OR MINUS
> GREATER THAN
≥ GREATER THAN OR EQUAL TO
< LESS THAN
≤ LESS THAN OR EQUAL TO
A/C AIR CONDITIONING
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AGG AGGREGATE
AHU AIR HANDLING UNIT
ALUM ALUMINUM
ALT ALTERNATE
ANCH ANCHOR, ANCHORAGE
APPROX APPROXIMATE
ARCH ARCHITECT, ARCHITECTURAL
ATTEN ATTENUATION
AVG AVERAGE
BOT BOTTOM
BD BOARD
BFG BELOW FINISHED GRADE
BIT BITUMINOUS
BLDG BUILDING
BLKG BLOCKING
BRG BEARING
CAB CABINET
CJ CONTROL JOINT
CL CLEAR, CENTERLINE
CLO CLOSET
C/L CENTERLINE
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CORD COORDINATE
CORR CORRIDOR, CORRUGATED
CPT CARPET
CT CERAMIC TILE
D DEEP, DEPTH, DRAIN
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG DRAWING
E EAST
EA EACH
EF EXHAUST FAN
EJ EXPANSION JOINT
ELEC ELECTRICAL
ELEV ELEVATION
EQ EQUAL
ETR EXISTING TO REMAIN
EQUIP EQUIPMENT
EX, EXIST EXISTING
EXP JT EXPANSION JOINT
EXT EXTERIOR
FD FLOOR DRAIN, FIRE DAMPER
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FL, FLR FLOOR
FOM FACE OF MASONRY
FOS FACE OF STUD
FP FIREPROOF
FRP FIBERGLASS REINFORCED PLASTIC
FT FOOT, FEET
FUR FURRED, FURRING
GA GAUGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GEN GENERAL
GL GLASS, GLAZING
GOVT GOVERNMENT
GWB GYPSUM WALLBOARD
GYP GYPSUM
H, HT HIGH, HEIGHT
HC HANDICAPPED, HOLLOW CORE
HORIZ HORIZONTAL
HM HOLLOW METAL
IN INCH
INSUL INSULATION, INSULATED
INHM INSULATED HOLLOW METAL
JAN JANITOR
JC JANITOR CLOSET
JT JOINT
L LONG, LENGTH
LED LIGHT EMITTING DIODE
LF LINEAR FOOT
LH LEFT HAND
MAINT MAINTENANCE
MAX MAXIMUM
MECH MECHANICAL
MED MEDIUM
MTL METAL
MFG MANUFACTURER
(CONTINUED NEXT COLUMN)
ROOM
15'-6" 16'-6"
32'-0"
CLO.
ROOM
5 4
7'-0" 7'-0"
A
8'-0" 7'-6" 8'-6" 8'-0"
'-0
'-0
'-0
FRAMED CONSTRUCTION
A
B
DIM FROM STRUCT.
WALL COMPONENT
OVERALL BUILDING WALL
OPENINGS
ALL DIMENSIONS ARE TAKEN FROM FACE OF MASONRY OR FACE OF STUD TO
FACE OF STUD OR CENTERLINE OF COLUMN
6'-0"
M.O.
5'-4" 4'-2" 7'-8"
M.O.
3'-4" 5'-6"
MASONRY CONSTRUCTION
15'-6" 16'-6"
32'-0"
ROOM
ROOM
DIM FROM FACE OF
STUD
CLO.
B
A
B 6
X#.## #
X#.## #
X#.##
X
ROOM
X#.##
BUILDING ELEVATION MARKER
INTERIOR ELEVATION MARKER
BUILDING/WALL SECTION TAG
DETAIL CALLOUT TAG
DOOR TAG
WINDOW TAG
WALL/PARTITION TAG
ROOM NAME & NUMBER
# ARCHITECTURAL KEYNOTE
VIEW NUMBER ON
SHEET
SHEET ON WHICH THE
SECTION OCCURS
VIEW NUMBER ON
SHEET
SHEET ON WHICH THE
DETAIL OCCURS
VIEW NUMBER
ON SHEET
SHEET ON WHICH THE
SECTION OCCURS
VIEW NUMBER
ON SHEET
SHEET ON WHICH THE
SECTION OCCURS
1/8" = 1' - 0" 0 5' 10' 15' 30'
DRAWING SCALE INDICATOR
NORTH ARROW
EGRESS PATH OF TRAVEL AND DISTANCE
REVISION
NUMBER
LIMIT OF
REVISION AREA
REVISION CLOUD AND NUMBER
INDICATOR
GRID LINE INDICATOR
BREAK LINE INDICATOR
ELEVATION/LEVEL INDICATOR
0' - 0"
# VIEW TITLE
Scale: # = #
DRAWING TITLE INDICATORVIEW NUMBER ON
SHEET
X#.##
# DEMOLITION KEYNOTE
X
TOILET ACCESSORY/ PLUMBING
FIXTURE TAG
X FURNITURE TAG
X-X FINISH TAG
TOP OF SLAB
120'
X
WOMEN
10"
7"
8"
8"
1/ 2"
5/
8"
1/ 2"
5/
3/
5/
8"
3/ 4" 1/ 2"
3/4" MIN.
7 1/4"
DIRECTIONAL SIGN
DEMOLITION IN EXISTING:
WALLS SHADED GREY WITH BOLD GREY
OUTLINE, NO WALL LAYERS; OBJECTS TO
BE DEMOLISHED SHOWN AS DASHED WITH
WHITE FILL
NEW OBJECTS IN EXISTING CONSTRUCTION:
WALLS SHADED GREY WITH BOLD GREY
OUTLINE, NO WALL LAYERS; NEW OBJECTS
BOLD BLACK OUTLINES WITH WHITE FILL
TOTAL DEMOLITION:
WHITE FILL; DASHED LINES INDICATING
EXTENT OF DEMOLITION
ALL NEW CONSTRUCTION:
WALLS WHITE FILL WITH BOLD BLACK
OUTLINE, THIN LINES & PATTERNS
SHOWING WALL LAYERS; NEW OBJECTS
BOLD BLACK OUTLINES WITH WHITE FILL
BRICK (PLAN)
GROUT OR GYPSUM
BRICK (ELEVATION)
CMUSTEEL, ALUM, OR
OTHER METAL
EARTH
POROUS FILL SAND
CONT. ROUGH WOOD
FRAMING
WOOD
BLOCKING
PLYWOOD
(ROUGH)
FINISH WOOD FOR
ARCHITECTURAL
FINISH WOOD FOR
ARCHITECTURAL
FINISH WOOD FOR
ARCHITECTURAL
CONCRETE
BATT INSULATIONRIGID INSULATION
KRISTIN C. CREASY
Lic. No. 013977
C O
M M
O N
W
E A LTH O F
V
IR
G
I N
A I
I T
T E C A
HCR
Drawn:
Date:
Checked:
Project:
P lo tt e d o n
T h e s e d ra w in g s a n d t h is d e s ig n r e m a in t h e p ro p e rt y o f G u e rn s e y T in g le a n d m t b e a lt e re d re p ro d u c e d o r b u ilt w it h o u t w ri tt e n p e rm is s io n o f th e A rc h it e c t.
/4
/2
:5
:2
A
M
A-001
LEGENDS &
ABBREVIATIONS
08/31/26
222042
KCCKCC
BID SET
V ir g in ia A v e
W ill ia m s b u rg
V ir g in ia
A fr ic a n A m e ri c a n
H e ri ta g e
T ra il C o m fo rt
S ta ti o n
C
IT
Y O
F W
IL
L
IA
M
S B
U R
G
08/31/26
A fr ic a n A m e ri c a n
H e ri ta g e
T ra il C o m fo rt
S ta ti o n
ABBREVIATIONS
ANNOTATION STANDARDS
SYMBOL LEGENDSIGN DETAILS
NEW/EXISTING LEGEND
PATTERN LEGEND
R E
V
IS
IO
N
S C
H E
D U
L E
D
E S
C R
IP
T
IO
N
D A
T E
IN
IT
IA
LS
TOP OF OPERABLE PART OF SOAP
DISPENSER
TOP OF WORK SURFACE WHEN
OPEN
FINISHED FLOOR
TOP OF OPERABLE PART (IE: THE PULL
WHEN CLOSED AND USABLE
COMPARTMENTS WHEN OPEN)
SENSOR ACTIVATION/
SOAP FLOW
SENSOR ACTIVATION/ HANDLES &
WATER/ SOAP FLOW
FAUCET
SI
D
E
SO
AP
D
IS
PE
N
SE
R
TRANSFER SIDE
TOP OF GRIPPING
SURFACE
CENTER OF BAR
FINISHED FLOOR
BOTTOM OF BAR
(A)
SIDE WALL GRAB BARS AT WATER CLOSET
(APPLIES TO BOTH FLOOR AND WALL MOUNTED
W.C.)
(B)
REAR WALL GRAB BARS AT WATER CLOSET
(APPLIES TO BOTH FLOOR AND WALL MOUNTED
W.C.)
FINISHED FLOOR
TOP OF GRIPPING
SURFACE
OUTLET
O U
TL
ET
OUTLET = LOCATION PAPER DISPENSES OUT
TOP OF TOILET SEAT
NOTE: ENHANCED REACH RANGES ARE REQUIRED AT ROOMS
WITH SIX (6) OR MORE LAVATORIES WITHIN THEM. REFER TO
PLANS FOR LOCATIONS.
S O
A P
ACCESSIBLE MOUNTING HEIGHTS AND CLEARANCES
POSITION OF CLEAR FLOOR SPACE AT FORWARD APPROACH
BABY CHANGING STATION
MOUNTING HEIGHT AND DEPTH OF
BABY CHANGING STATION
REACH DEPTH & POSITION OF SOAP DISPENSER
AT ACCESSIBLE LAVATORY
POSITION OF SOAP DISPENSER (SIDE & REAR MOUNT
OPTIONS) AT ALL ADULT LAVATORIES
WHEELCHAIR ACCESSIBLE
TOILET TISSUE DISPENSER AND
SANITARY NAPKIN DISPOSAL LOCATIONS
ACCESSIBLE TOILET COMPARTMENT GRAB BARS
AND TOILET SEAT HEIGHT
POSITION OF FAUCET AND SOAP DISPENSERS AT ENHANCED
REACH RANGE LAVATORY
NOTES:
1. THE MEASUREMENTS NOTED ON THIS SHEET FOLLOW CURRENT ADA AND 2009 ANSI A117.1 MINIMUM REQUIREMENTS.
2. THE TERM "IDEAL" DENOTES DIMENSIONS NOT NECESSARILY DICTATED BY CODE OR WHERE THE OWNER/ARCHITECT REQUIRE DIMENSIONS THAT EXCEED CODE
REQUIREMENTS. WHERE THE TERM "IDEAL" IS NOTED IT SHALL SUPERCEDE ALL OTHER DIMENSIONS AND THE CONTRACTOR SHALL USE IT AS THEIR BASIS FOR
INSTALLATION.
3. ALL DIMENSIONS ARE "CLEAR" DIMENSIONS AND ARE FROM FINISHED FACE OF ALL ELEMENTS.
CL
CL
TOILET TISSUE
DISPENSER
1.
5"
M
IN
7" MIN. - 9" MAX.
42" MAX.
24" MIN.
1' -6
M
IN
CL
EQ EQ
TO
E
C
LE
A R
A N
C E
M
IN
5"
M A
X
M
IN
M
A X
K
N E
E C
LE
A
R A
N C
E
4' -0
M
IN
2'-6" MIN.
M A
X . W
H E
R E
D E
P
TH
M A
X . W
H E
R E
D E
P T
H
O R
0"
REACH RANGE
25" MAX.
TOE CLEARANCE
17" MIN.
K N
E E
C
LE
A R
A N
C E
M
IN
2' -1
0" M
A X
4'-6" MIN. FROM REAR WALL
1'-0" MAX.
3'-6" MIN.
41" MAX.
3'-3" MIN.
CL
CL
1' -6
M
IN
B O
T T
O M
O F
V E
R
TI
C A
L B
A R
3' -3
M
IN
M A
X . T
O
O F
G R
IP
P
IN
G
S U
R
FA
C E
M
IN
'-0
M A
X . T
O T
O P
TO
P
O F
T O
IL
E
T S
E A
T 1'
-5
M
IN
9" M
A X
. T O
3'-0" MIN.
2'-0" MIN. 1'-0" MIN.
CL
CL CL
4' -0
M
IN
2'-6" MIN.
>10"-24" MAX.(WHERE TOP OF OPERABLE PART IS ≤ 46")
10" MAX. (WHERE TOP OF OPERABLE PART. IS ≤ 48")
M O
U N
T
IN
G H
E
IG
H T
<2
-2 5"
M A
X
C O
O R
D . W
REAR SOAP DISPENSER
SIDE SOAP DISPENSER
CL
6"
ID
E A
L
FOR REACH TO A SIDE DISPENSER:
REAR SOAP DISPENSER LOCATION:
REAR WALL ABOVE BOTH AN ACCESSIBLE &
INACCESSIBLE SINK
SIDE SOAP DISPENSER LOCATION:
SIDE WALL ABOVE BOTH AN ACCESSIBLE &
INACCESSIBLE SINK
M A
X
W H
E R
E A
C C
E S
S D
E P
T H
M A
X . W
H E
R E
A C
C E
S S
D E
P T
H
0"
M
A X
ID
E
A L
6" IDEAL
CL
M A
X
ID
E
A L
CL
SOAP DISPENSER LOCATION:
CL
OPTION 2 - SIDE WALL MOUNT
OPTION 1 - COUNTER MOUNT
COORD. W/ MTG HGT
<20" - 25" MAX.-
ID
E
A L
H E
IG
H
T
SANITARY NAPKIN DISPOSAL
CL
M
IN
'-0
M A
X
R
EA
R S
O
AP
D
IS
PE
N
SE
R
SOAP DISPENSER LOCATION:
6"
SENSOR ACTIVATION/
SOAP FLOW
NOTE: THIS DISPOSAL IS ONLY
REQUIRED TO BE WITHIN
"REACH" FROM A SITTING
POSITION. IT CAN BE TO THE
BACK SIDE OR FORWARD SIDE
OF THE TISSUE DISPENSER. IT IS
RECOMMENDED THEY BE
MOUNTED BELOW GRAB BARS.
HEIGHT OF SINK RIM OR
COUNTER SURFACE
FINISHED FLOOR
FRONT EDGE OF
COUNTERTOP OR
WALL HUNG SINK
M
IR
R O
R
TOE & KNEE CLEARANCES AT ACCESSIBLE ADULT LAVATORIES & SINKS/
HEIGHT OF ACCESSIBLE ADULT LAVATORIES & SINKS/
HEIGHT OF ACCESSIBLE ADULT MIRRORS
POSITION OF CLEAR FLOOR SPACE AT
ACCESSIBLE FORWARD APPROACH
2'-6" MIN.
4' -0
M
IN
EQ EQ
T O
E C
LE
A
R
1' -5
M
IN
BOTTOM OF PANEL SHOULD BE AS HIGH AS
POSSIBLE AND STILL CONCEAL AND PROTECT
PIPES. WHERE A PANEL IS NOT USED,
PROVIDE CODE COMPLIANT PIPE WRAPS.
8" MIN. KNEE CLEARANCE
3' -4
M
A X
BOTTOM OF REFLECTIVE SURFACE
11" MIN. KNEE CLEAR.
WHERE KNEE CLEAR. IS 9"
6" MAX. TOE CLEAR.
K N
E E
C
LE
A R
2' -3
M
IN
K N
E E
C
LE
A R
9"
M
IN
. T O
E
2' -1
0" M
A X
CL
K N
E E
C
LE
A R
M
IN
5" M
A X
17" MIN. - 25" MAX.
COUNTERTOP WITH SINK OR
SINGLE WALL HUNG LAVATORY
NOTE: TOE AND KNEE CLEARANCES ARE
NOT REQUIRED TO APPLY TO MORE THAN
ONE BOWL OF A MULTIBOWL SINK.
WHEELCHAIR ACCESSIBLE
WATER CLOSET LOCATIONS
CL
16" - 18"
COAT HOOKS
S T
A N
D A
R D
: 6 0"
D
A A
C C
E S
S
IB
LE
: 4
8" M
A X
FINISHED FLOOR
NOTE: THE 48" MAX. MOUNTING HEIGHT
APPLIES TO DISPENSERS ACCESSIBLE BY A
30"X48" CLEAR FRONT OR SIDE FLOOR
SPACE WITH AN UNOBSTRUCTED REACH.
FOR DISPENSERS LOCATED WITH ANY
PORTION ABOVE COUNTERTOPS OR OTHER
OBSTRUCTIONS, THE MOUNTING HEIGHT
SHALL BE DETERMINED BY A117.1, TABLE
603.6
PAPER TOWEL DISPENSERS/
AUTOMATIC HAND DRYERS
SPOUT
1'-3" MIN.5" MAX. CL
W H
E E
LC
H
A
IR
A C
C E
S S
M A
X
S T
A N
D
IN
G P
E R
S O
N S
M
IN
M
A X
ID
E A
L)
SPOUT OUTLET
NOTE: ADA COMPLIANT SKIRT
MUST BE PROVIDED ON WATER
COOLERS IF NOT LOCATED IN AN
ALCOVE.
POSITION OF
WATER FOUNTAIN SPOUTS
POSITION OF CLEAR FLOOR SPACE AT ACCESSIBLE WATER
FOUNTAIN
2'-6" MIN.
4' -0
M
IN
EQ EQ
CL
M A
X
A
LC
O V
E S
4"
FINISHED FLOOR
H
IG
H E
S T
O P
E R
A B
LE
P
A R
T
U N
B O
S T
R U
C T
E D
R E
A C
H
M A
X . T
O T
O P
O F
FORWARD APPROACH
REQUIRED AT ACCESSIBLE
FOUNTAINS. SIDE
APPROACH NOT ALLOWED.
KRISTIN C. CREASY
Lic. No. 013977
C O
M M
O N
W
E A LTH O F
V
IR
G
I N
A I
I T
T E C A
HCR
Drawn:
Date:
Checked:
Project:
P lo tt e d o n
T h e s e d ra w in g s a n d t h is d e s ig n r e m a in t h e p ro p e rt y o f G u e rn s e y T in g le a n d m t b e a lt e re d re p ro d u c e d o r b u ilt w it h o u t w ri tt e n p e rm is s io n o f th e A rc h it e c t.
/4
/2
:5
:2
A
M
A-002
ACCESSIBILITY DETAILS
08/31/26
222042
KCCKCC
BID SET
V ir g in ia A v e
W ill ia m s b u rg
V ir g in ia
A fr ic a n A m e ri c a n
H e ri ta g e
T ra il C o m fo rt
S ta ti o n
C
IT
Y O
F W
IL
L
IA
M
S B
U R
G
08/31/26
A fr ic a n A m e ri c a n
H e ri ta g e
T ra il C o m fo rt
S ta ti o n
R E
V
IS
IO
N
S C
H E
D U
L E
D
E S
C R
IP
T
IO
N
D A
T E
IN
IT
IA
LS
KRISTIN C. CREASY
Lic. No. 013977
C O
M M
O N
W
E A LTH O F
V
IR
G
I N
A I
I T
T E C A
HCR
Drawn:
Date:
Checked:
Project:
P lo tt e d o n
T h e s e d ra w in g s a n d t h is d e s ig n r e m a in t h e p ro p e rt y o f G u e rn s e y T in g le a n d m t b e a lt e re d re p ro d u c e d o r b u ilt w it h o u t w ri tt e n p e rm is s io n o f th e A rc h it e c t.
/4
/2
:5
:2
A
M
A-003
GENERAL
SPECIFICATIONS
08/31/26
222042
KCCKCC
BID SET
V ir g in ia A v e
W ill ia m s b u rg
V ir g in ia
A fr ic a n A m e ri c a n
H e ri ta g e
T ra il C o m fo rt
S ta ti o n
C
IT
Y O
F W
IL
L
IA
M
S B
U R
G
08/31/26
A fr ic a n A m e ri c a n
H e ri ta g e
T ra il C o m fo rt
S ta ti o n
R E
V
IS
IO
N
S C
H E
D U
L E
D
E S
C R
IP
T
IO
N
D A
T E
IN
IT
IA
LS
GENERAL REQUIREMENTS
SECTION 01 25 00 - SUBSTITUTION PROCEDURES
Indicated “Basis of Design” manufacturer's standard specifications apply to the extent that fair competing equivalent products can present similar substituting specifications for review. Substitution submittal applications must clearly indicate any significant deviations from the Basis of Design specifications and differences in dimension, quality, configuration, or performance. Other information may be requested to determine if a substitution is "equal."
Basis of Design equipment, manufacturer, model and capacity are listed in schedules on drawings. any other manufacturer or model is considered a substitution. Substitutions are subject to the approval of the Owner/Architect/Engineer.
Basis of Design equipment manufacturer's specifications are considered part of this contract to the extent that the design intended level of quality is invoked when the Contractor considers substitutions.
A. Substitutions: Changes from Contract Documents requirements proposed by Contractor to materials, products, assemblies, and equipment.
1. Substitutions for Cause: Proposed due to changed Project circumstances beyond Contractor's control.
a. Unavailability.
b. Regulatory changes.
2. Substitutions for Convenience: Proposed due to possibility of offering substantial advantage to the Project.
a. Substitution requests offering advantages solely to the Contractor will not be considered.
B. A Substitution Request for products, assemblies, materials, and equipment constitutes a representation that the submitter:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product, equipment, assembly, or system.
2. Agrees to provide the same warranty for the substitution as for the specified product.
3. Agrees to provide same or equivalent maintenance service and source of replacement parts, as applicable.
4. Agrees to coordinate installation and make changes to other work that may be required for the work to be complete, with no additional cost to
Owner.
5. Waives claims for additional costs or time extension that may subsequently become apparent.
6. Agrees to reimburse Owner and Architect for review or redesign services associated with re-approval by authorities.
C. A Substitution Request for specified installer constitutes a representation that the submitter:
1. Has acted in good faith to obtain services of specified installer, but was unable to come to commercial, or other terms.
D. Document each request with complete data substantiating compliance of proposed substitution with Contract Documents. Burden of proof is on proposer.
1. Note explicitly any non-compliant characteristics.
E. Content: Include information necessary for tracking the status of each Substitution Request, and information necessary to provide an actionable response.
1. No specific form is required. Contractor's Substitution Request documentation must include the following:
a. Project Information
b. Substitution Request Information:
• Discrete and consecutive Substitution Request number, and descriptive subject/title.
• Indication of whether the substitution is for cause or convenience.
• Issue date.
• Reference to particular Contract Document(s) specification section number, title, and article/paragraph(s).
• Description of Substitution.
• Reason why the specified item cannot be provided.
• Differences between proposed substitution and specified item.
• Description of how proposed substitution affects other parts of work.
c. Attached Comparative Data: Provide point-by-point, side-by-side comparison addressing essential attributes specified, as appropriate and relevant for the item:
• Physical characteristics.
• In-service performance.
• Expected durability.
• Visual effect.
• Sustainable design features.
• Warranties.
• Other salient features and requirements.
• Include, as appropriate or requested, the following types of documentation:
• a. Product Data.
• b. Samples.
• c. Certificates, test, reports or similar qualification data
• d. Drawings, when required to show impact on adjacent construction elements.
d. Impact of Substitution:
• Savings to Owner for accepting substitution.
• Change to Contract Time due to accepting substitution.
F. Limit each request to a single proposed substitution item.
1. Submit an electronic document, combining the request form with supporting data into single document.
G. Substitution Procedures During Construction:
1. Submit request for Substitution for Cause within 14 days of discovery of need for substitution, but not later than 14 days prior to time required for review and approval by Architect, in order to stay on approved project schedule.
2. Submit request for Substitution for Convenience within 14 days of discovery of its potential advantage to the project, but not later than 14 days prior to time required for review and approval by Architect, in order to stay on approved project schedule.
a. In addition to meeting general documentation requirements, document how the requested substitution benefits the Owner through cost savings, time savings, greater energy conservation, or in other specific ways.
b. Document means of coordinating of substitution item with other portions of the work, including work by affected subcontractors.
c. Bear the costs engendered by proposed substitution of:
• Owner's compensation to the Architect for any required redesign, time spent processing and evaluating the request.
• Other construction by Owner.
• Other unanticipated project considerations.
3. Substitutions will not be considered under one or more of the following circumstances:
a. When they are indicated or implied on shop drawing or product data submittals, without having received prior approval.
b. Without a separate written request.
H. Resolution
1. Architect and/or Owner may request additional information and documentation prior to rendering a decision.
2. Provide this data in an expeditious manner.
3. Architect will notify Contractor in writing of decision to accept or reject request.
a. Architect's decision following review of proposed substitution will be noted on the submitted form.
I. Acceptance
1. Accepted substitutions change the work of the Project. They will be documented and incorporated into work of the project by Change Order, Construction Change Directive, Architectural Supplementary Instructions, or similar instruments provided for in the Conditions of the Contract.
01 30 00 – ADMINISTRATIVE REQUIREMENTS
A. Submittal Procedures: See 01 40 00, 01 60 00, 01 78 00, and product specifications for submittals required.
1. Submittals for Review
a. Shop Drawings, product data: (1) electronic copy.
b. Samples: (2) of each, unless more are specified, one of which will be retained for project record, for review only for aesthetic characteristics or color or finish selection.
c. Submittals for Information: Certificates and certifications, test reports: (1) electronic copy.
2. Preparing Submittals:
a. Submit related information together or in appropriate sequence; submit all information required for an individual review together.
b. If verification of field conditions is required, do not submit until verified.
c. Do not make requests for deviations from contract documents via shop drawings, product data, or samples; deviations will not be valid unless specifically approved under specified modification procedures.
d. Coordinate with other submittals and with construction schedule.
e. For submittals for review, allow minimum of 7 calendar days for review, excluding transit time.
f. Use a standard transmittal form; identify project, entities involved, and relevant contract document drawing, detail, or specification.
g. Number each initial submittal with sequential number; number resubmissions with original number plus sequential alphabetic suffix.
h. Manufacturers' Standard Printed Data: Cross out inapplicable data or otherwise annotate to show applicable products, options, models, etc.
i. Clearly mark changes from previous submissions.
j. Provide space for review/approval stamps.
01 40 00 – QUALITY REQUIREMENTS
A. Reference Standards: Where products or workmanship is specified by reference to a document not included in the contract documents, comply with the requirements of the document, except where more stringent requirements are specified.
B. Quality Control:
1. Certificates: Where specified or required by code, certify in writing that work complies with code and with contract documents.
2. Field Testing and Inspection: Perform all testing, observation, and inspection required by code and as specified.
a. Exception: Tests and inspections indicated to be performed by Colonial Williamsburg Foundation’s agent or other independent agency.
b. Reports: Make written report of each test/inspection; include complete details of conditions, methods, and results.
c. Submittals Required:
1). Design Data: For each assembly specified to be designed or engineered by manufacturer or fabricator, submit calculations or test reports showing compliance with design criteria; or, for engineering design, submit certification by licensed professional engineer; or as specified; submit for review.
2). Reports: On each factory and field test, inspection, or other procedure specified; submit for information.
01 60 00 – PRODUCT REQUIREMENTS
A. Basic Product Requirements:
1. Salvage: Do not use materials or equipment removed from existing premises, unless specifically allowed or required.
2. Multiple Instances of same Item: Use the same brand name product for each instance of the same item.
B. Product Options: Submit equals for approval by A/E.
C. Product Submittals Required:
1. Substantiations: Submittals must be provided to the Architect, Engineer, and Owner in electronic pdf format (e-mail, fileshare, etc.).
Provide dated transmittal letter with Contractor contact information and vendor information. Submittals must be legible and signed by the General Contractor’s project manager certifying the information has been reviewed by them and is ready for review by Owner and Architect/Engineer.
2. Design Data: For each assembly specified to be designed or engineered by manufacturer or fabricator, submit calculations or test reports showing compliance with design criteria; or, for engineering design, submit certification by licensed professional engineer; or as specified;
submit for review.
3. Shop Drawings: As required.
4. Product Data: On each product specified; include manufacturer's catalog data showing compliance and installation instructions.
5. Samples: For each product for which color, pattern, texture, or other optional characteristics must be selected and are not specified.
6. Warranties: Submit specimen warranty for review; submit actual warranty at project closeout.
7. Operation and Maintenance Data: See 01 78 00.
D. Product Delivery Requirements: Transport and handle in accordance with manufacturer's instructions; inspect promptly upon delivery; handle by methods that prevent soiling and damage.
E. Product Storage and Handling Requirements: Store and protect in accordance with manufacturer's instructions, with packaging, seals, and labels intact; store in manner required to prevent damage.
01 70 00 – EXECUTION REQUIREMENTS
A. Examination:
1. Before starting work, verify that substrates are ready for and capable of supporting subsequent work.
2. Verify that utility characteristics of equipment are compatible with utilities installed.
3. Verify that field dimensions that would affect installation are as required.
B. Preparation:
1. Conduct preinstallation meetings to familiarize installers and others affected with procedures for installation and protection after installation.
2. Lay out work precisely, for accurate location, lines, and levels.
3. Before starting work, prepare substrates and surfaces by cleaning and patching, as required, and as recommended by manufacturer of product to be installed.
4. Remove debris from areas of installation.
5. Before starting finishing work, broom and vacuum clean interior spaces and continue cleaning as required to eliminate dust.
C. Execution:
1. Install products in manner specified and as required or recommended by manufacturer; if manufacturer's instructions conflict with contract documents, request clarification before proceeding.
2. Comply with specified standards as minimum quality, except where more stringent tolerances or other specified requirements indicate higher standards or more precise workmanship.
3. Have work performed by persons qualified to produce specified quality.
4. Install products level, straight, plumb, and in correct location, within tolerances specified, if any.
5. Install fixtures and fittings plumb and level and nicely aligned with each other and with finish materials.
6. Where one product covers another, install so covered product is completely concealed.
7. Where a product covers an opening, install so opening is completely covered.
8. Install sequential work in proper order; fit subsequent work to previous work neatly.
9. Where subsequent work alters previous work, replace and refinish previous work to correct condition.
10. Do not permanently enclose waste materials, debris, or rubbish in finished work.
11. In finished areas, conceal pipes, ducts, and wiring within the construction, unless otherwise indicated.
12. Secure products in place with positive anchorage devices designed and sized to withstand reasonably anticipatable loads, stresses, vibration, and distortion.
D. Penetrating Items: Cut holes in previous work as required to fit, unless otherwise indicated.
1. Conceal holes in finished work; use escutcheons unless otherwise indicated.
2. Sound-Rated Assemblies: Pack openings around penetrations with noncombustible material.
3. Other Assemblies: Make airtight seal around openings.
4. If openings have been made too large, patch with matching materials to original condition before sealing or covering.
E. Cleaning:
1. Remove temporary labels, stains, and spots.
2. During construction, keep all project areas and site free of waste materials, debris, and rubbish.
3. Place waste materials, debris, and rubbish in containers provided every day.
4. Final Cleaning:
a. Clean interior and exterior surfaces exposed to view and equipment.
b. Polish transparent and glossy surfaces.
c. Vacuum clean carpet and other soft surfaces; broom clean other floors.
d. Clean equipment, clean filters, and clean strainers.
e. Clean light bulbs and lamps.
f. Broom clean exterior paved areas; rake clean landscaped areas.
F. Starting Equipment and Systems:
1. Before starting, verify that:
a. Equipment or system has been properly installed, lubricated, and adjusted, eliminating conditions that might cause damage.
b. Proper utility connections have been made correctly.
c. Electrical characteristics, meter readings, and test results agree with those required by the equipment or system manufacturer.
2. Execute start-up in accordance with manufacturer's instructions, under supervision of appropriate contractor personnel.
a. Where specified or appropriate, require presence and supervision of manufacturer's representative.
b. Operate for sufficient time to show proper functioning; test and adjust for proper operation.
G. Protecting Installed Construction: Once work is installed, protect from damage due to subsequent construction operations whether or not relevant to installed work.
1. If necessary for complete protection, provide temporary coverings, warning signs, or barriers.
2. Positively protect sensitive finishes with durable materials capable of preventing damage, securely fastened.
3. Where possible avoid the need for traffic over sensitive materials like waterproofing, roofing, plantings, finished floorings, by proper sequencing of work; if traffic is unavoidable follow manufacturer's recommendations for protection, at a minimum.
4. Prohibit storage of materials on finished work.
5. Remove protective materials prior to final cleaning.
01 78 00 – CLOSEOUT SUBMITTALS
A. Operation and Maintenance Data:
1. Provide five copies of all required information.
2. Products, Including Equipment:
a. Manufacturer's catalog sheets, marked to clearly identify products actually used and data applicable to actual installation.
b. Complete operation, adjustment, shut-down, troubleshooting, cleaning, preventative maintenance, inspection, and repair instructions and precautions, prepared especially for project if necessary, incorporating manufacturer's recommendations and diagrams.
c. Original manufacturer's replaceable parts list, with current prices, and recommended quantities to be kept in storage.
d. Name and source of recommended tools, lubricants, and supplies.
3. Operating Equipment, Assemblies, and Systems: Prepare project-specific data, including:
a. Functional description, normal operating characteristics, limiting conditions.
b. System design parameters, flow diagrams, one-line diagrams, and other data prepared during design that shows how systems are intended to operate.
c. Sequence of operation, including but not limited to controls.
d. Commissioning data showing as-adjusted characteristics.
e. As-installed wiring and control diagrams.
f. Valve charts, with location and function of each valve, indexed to functional diagrams.
g. Coordination drawings prepared during construction.
4. Warranties: Minimum of two year warranty. Execute, notarize, and mark with applicable specification number. Provide (5) copies.
SECTION 07 21 00 – THERMAL INSULATION
PART ONE – GENERAL
1.01 SUBMITTALS
A. Product Data: Provide data on product characteristics, performance criteria, and product limitations.
B. Manufacturer's Installation Instructions: Include information on special environmental conditions required for installation and installation techniques.
C. Manufacturer's Certificate: Certify that products meet or exceed specified requirements.
1.02 FIELD CONDITIONS
A. Do not install insulation adhesives when temperature or weather conditions are detrimental to successful installation.
PART TWO - PRODUCTS
2.01 APPLICATIONS
A. Insulation in Wood Framed Walls: Batt insuation with no vapor retarder.
B. Insulation above Gypsum Wallboard Ceilings: Batt insulation with no vapor retarder.
2.02 BATT INSULATION MATERIALS
A. Where batt insulation is indicated, either glass fiber or mineral fiber batt insulation may be used, at contractor’s option.
B. Glass Fiber Batt Insulation: Flexible preformed batt or blanket, complying with ASTM C 665; friction fit.
1) Flame Spread Index: 25 or less, when tested in accordance with ASTM E 84.
2) Smoke Developed Index: 450 or less, when tested in accordance with ASTM E 84.
3) Combustibility: Non-combustible, when tested in accordance with ASTM E 136, except for facing, if any.
4) Facing: Unfaced.
C. Mineral Fiber Batt Insulation: Flexible preformed batt or blanket, complying with ASTM C 665; friction fit; unfaced flame spread index of 0 (zero) when tested in accordance with ASTM E 84.
1) Smoke Developed Index: 0 (zero), when tested in accordance with ASTM E 84.
PART THREE – EXECUTION
3.01 EXAMINATION
A. Verify that substrate, adjacent materials, and insulation materials are dry and that substrates are ready to receive insulation and adhesive.
B. Verify substrate surfaces are flat, free of honeycomb, fins, irregularities, or materials or substances that may impede adhesive bond.
3.02 BATT INSTALLATION
A. Install insulation in accordance with manufacturer's instructions.
B. Install in exterior wall and roof spaces without gaps or voids. Do not compress insulation.
C. Trim insulation neatly to fit spaces. Insulate miscellaneous gaps and voids.
D. Fit insulation tightly in cavities and tightly to exterior side of mechanical and electrical services within the plane of the insulation.
3.03 PROTECTION
A. Do not permit installed insulation to be damaged prior to its concealment.
SECTION 07 62 00 – SHEET METAL FLASHING AND TRIM
PART ONE - GENERAL
1.01 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Shop Drawings: Indicate material profile, jointing pattern, jointing details, fastening methods, flashings, terminations, and installation details.
C. Samples: Submit two samples 4x4 inch in size illustrating metal finish color.
1.02 QUALITY ASSURANCE
A. Perform work in accordance with SMACNA Architectural Sheet Metal Manual requirements and standard details, except as otherwise indicated.
2.01 SHEET MATERIALS
A. Pre-Finished Galvanized Steel: ASTM A 653/A 653M, with G90/Z275 zinc coating; minimum 0.02 inch thick base metal, shop pre-coated with modified silicone coating.
1. Modified Silicone Polyester Coating: Pigmented Organic Coating System, AAMA 2603; baked enamel finish system; color to match adjoining material as approved by A/E.
2.02 FABRICATION
A. Form sections true to shape, accurate in size, square, and free from distortion or defects.
B. Fabricate cleats of same type sheet metal, minimum 6 inches wide, interlocking with sheet.
C. Form pieces in longest possible lengths.
D. Hem exposed edges on underside 1/2 inch; miter and seam corners.
E. Form material with flat lock seams, except where otherwise indicated. At moving joints, use sealed lapped, bayonet-type or interlocking hooked seams.
F. Fabricate corners from one piece with minimum 18 inch long legs; seam for rigidity, seal with sealant.
G. Fabricate vertical faces with bottom edge formed outward 1/4 inch (6 mm) and hemmed to form drip.
PART THREE - EXECUTION
3.01 INSTALLATION
A. Secure flashings ure flashings in place using concealed fasteners. Use exposed fasteners only where permitted.
B. Apply plastic cement compound between metal flashings and felt flashings.
C. Fit flashings tight in place. Make corners square, surfaces true and straight in planes, and lines accurate to profiles.
D. Seal metal joints watertight.
SECTION 07 90 05 – JOINT SEALERS
PART ONE – GENERAL
1.01 SUBMITTALS
A. See Section 01 30 00 - Administrative Requirements, for submittal procedures.
B. Product Data: Provide data indicating sealant chemical characteristics.
C. Samples: Submit two samples, illustrating sealant colors for selection.
1.02 FIELD CONDITIONS
A. Maintain temperature and humidity recommended by the sealant manufacturer during and after installation.
1.03 WARRANTY
A. See Section 01 78 00 - Closeout Submittals, for additional warranty requirements.
B. Correct defective work within a two-year period after Date of Substantial Completion.
C. Warranty: Include coverage for installed sealants and accessories which fail to achieve airtight seal, exhibit loss of adhesion or cohesion, or do not cure.
PART TWO - PRODUCTS
2.01 SEALANTS
A. Type 1 - General Purpose Exterior Sealant: Polyurethane; ASTM C 920, Grade NS, Class 25, Uses M, G, and A; single component.
1) Color: Standard colors matching finished surfaces.
B. Type 2 - Exterior Expansion Joint Sealer: Precompressed foam sealer; urethane with water-repellent.
1) Size as required to provide weathertight seal when installed.
2) Applications: Use for exterior wall expansion joints.
C. Type 3 - Exterior Metal Lap Joint Sealant: Butyl or polyisobutylene, nondrying, nonskinning, noncuring.
D. Type 4 - General Purpose Interior Sealant: Acrylic emulsion latex; ASTM C 834, Type OP, Grade NF single component, paintable.
1) Color: Standard colors matching finished surfaces.
E. Type 5 - Tile Sealant: White silicone; ASTM C 920, Uses I, M and A; single component, mildew resistant.
1) Applications: Use for:
a. Joints between plumbing fixtures and floor and wall surfaces.
b. Joints between countertops and wall surfaces.
2.02 ACCESSORIES
A. Primer: Non-staining type, recommended by sealant manufacturer to suit application.
B. Joint Backing: Round foam rod compatible with sealant; ASTM D 1667, closed cell PVC; oversized 30 to 50 percent larger than joint width.
C. Bond Breaker: Pressure sensitive tape recommended by sealant manufacturer to suit application.
PART THREE – EXECUTION
3.01 EXAMINATION
A. Verify that substrate surfaces are ready to receive work.
B. Verify that joint backing and release tapes are compatible with sealant.
3.02 PREPARATION
A. Remove loose materials and foreign matter that could impair adhesion of sealant.
B. Clean and prime joints in accordance with manufacturer's instructions.
C. Perform preparation in accordance with manufacturer's instructions and ASTM C 1193.
D. Protect elements surrounding the work of this section from damage or disfigurement.
3.03 INSTALLATION
A. Perform work in accordance with sealant manufacturer's requirements for preparation of surfaces and material installation instructions.
B. Perform installation in accordance with ASTM C 1193.
C. Install bond breaker where joint backing is not used.
D. Install sealant free of air pockets, foreign embedded matter, ridges, and sags.
E. Apply sealant within recommended application temperature ranges. Consult manufacturer when sealant cannot be applied within these temperature ranges.
F. Tool joints concave.
G. Precompressed Foam Sealant: Do not stretch; avoid joints except at corners, ends, and intersections; install with face 1/8 to 1/4 inch below adjoining surface.
3.04 CLEANING
A. Clean adjacent soiled surfaces.
3.05 PROTECTION
A. Protect sealants until cured.
3.06 SCHEDULE
A. Exterior Joints for Which No Other Sealant Type is Indicated: Type 1; colors as selected.
B. Exterior Wall Expansion Joints: Type 1 and 2.
C. Control, Expansion, and Soft Joints in Masonry, and Between Masonry and Adjacent Work: Type 1.
D. Lap Joints in Exterior Sheet Metal Work: Type 3.
E. Joints Between Exterior Metal Frames and Adjacent Work (except masonry): Type 1.
F. Under Exterior Door Thresholds: Type 1.
G. Interior Joints for Which No Other Sealant is Indicated: Type 4; colors as shown on the drawings.
H. Joints Between Plumbing Fixtures and Walls and Floors, and Between Countertops and Walls: Type 5.
C O
M M
O N
W
E A LTH O F
V
IR
G
I N
A I
I T
T E C A
HCR
Drawn:
Date:
Checked:
Project:
P lo tt e d o n
T h e s e d ra w in g s a n d t h is d e s ig n r e m a in t h e p ro p e rt y o f G u e rn s e y T in g le a n d m t b e a lt e re d re p ro d u c e d o r b u ilt w it h o u t w ri tt e n p e rm is s io n o f th e A rc h it e c t.
/4
/2
:5
:2
A
M
A-004
GENERAL
SPECIFICATIONS
08/31/26
222042
KCCKCC
BID SET
V ir g in ia A v e
W ill ia m s b u rg
V ir g in ia
A fr ic a n A m e ri c a n
H e ri ta g e
T ra il C o m fo rt
S ta ti o n
C
IT
Y O
F W
IL
L
IA
M
S B
U R
G
08/31/26
A fr ic a n A m e ri c a n
H e ri ta g e
T ra il C o m fo rt
S ta ti o n
NOTE: REFER TO SHEET A-701
FINISH PLAN AND FINISH
SCHEDULE FOR INTERIOR FINISHES
AND PRODUCT SELECTIONS.
SECTION 09 67 26 – ACRYLIC RESIN FLOOR
PART ONE – GENERAL
1.01 SECTION INCLUDES:
A. Surface preparation for application of acrylic resin floor.
B. Testing of surface preparation.
C. Acrylic flake floor topping system.
1.02 SUBMITTALS:
A. Product Data including descriptive data and specific recommendations for surface preparation, mixing, and application of materials.
B. Samples of one square foot of specified acrylic resin flooring system applied to hardboard or similar backing for rigidity and handling.
1.03 QUALITY ASSURANCE:
A. Manufacturer Qualifications:
a. Acceptable Manufacturer: Sika Corporation, 201 Polito Drive, Lyndhurst, NJ 07071.
b. No request for substitution shall be considered that would change the generic type of system specified. Equivalent materials of other manufacturers may be substituted only on approval of the Architect or Engineer. Requests for substitution will be considered only if submitted 10 days prior to bid date. Requests shall include the respective manufacturer’s technical literature for each product giving the name, generic type, descriptive information, recommended dry film thickness (DFT), Material Safety Data Sheet (MSDS), and certified test reports showing results to equal performance criteria of products specified herein.
B. Applicator Qualifications:
a. Applicator shall be approved by the manufacturer for application of the specified products. Approved applicator shall have a minimum of 5 years experience installing the specified flooring system.
1. Sub-contractor: The only sub-contractor to the installer shall be for concrete surface preparation and shot-blast cleaning of the concrete surfaces. The sub-contractor shall be approved by the manufacturer.
2. Bond Testing: Surface preparation shall be evaluated by conducting the manufacturer's specified bond test at the site prior to application of the topping. The manufacturer shall perform and document all bond testing. Quantity of bond test shall be two per bay minimum.