IF-25-015 Wes Deist Aquatic Center Boiler Bid.pdf

PDF 562 KB Posted

Attached to
2025 Wesley Deist Aquatic Center Boiler and Heat Exchanger Replacement
Solicitation number
IF-25-015
Issued by
Bonner County, Idaho

About this file

The document is a comprehensive bid packet (Bid 25-015) from the City of Idaho Falls for the 2025 Wesley Deist Aquatic Center Boiler and Heat Exchanger Replacement project. The bid solicits sealed proposals for replacing boiler and heat exchanger systems, with electronic submissions required through the BidNet platform by 2:00 PM Mountain Standard Time on Wednesday, May 28, 2025. The project is located at 149 7th Street in Idaho Falls, with a targeted project completion timeframe of 90 calendar days after receiving notice to proceed, and a specific final connection window between Monday, July 28, 2025 and Friday, August 1, 2025. Bidders must be properly licensed, able to obtain required insurance and bonds, and comply with state public works contractor regulations.

The bid includes specific technical requirements for the replacement equipment, with a preference for manufacturers like Laars MagnaTherm FT, AERCO Benchmark, and LOCHINVAR Crest. The boiler specifications are extensive, requiring a high-efficiency (95% minimum) condensing design with low NOx emissions, modulation capabilities, advanced control systems, and specific technical features like stainless steel heat exchangers and electronic PID modulating controls. The project also has specific provisions for Idaho-domiciled bidders, with potential bid preference for contractors based in Idaho. Bidders must submit a 5% bid security, comply with non-discrimination requirements, and provide certifications regarding boycott policies and ownership. The contract term is 60 working days, with the City reserving the right to purchase additional units or reject any bid.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID 25-015 2024 City of Idaho Falls Boiler Replacement

CI T Y O F I D A H O F A L L S

INSTRUCTION TO BIDDERS

Invitation to Bid Number: 25-015 2025 Wesley Deist Aquatic Center Boiler and Heat Exchanger Replacement

INVITATION:

Sealed bids for Aquatic center Boiler and Heat Exchanger Replacement for the City of Idaho Falls City Hall as described in "Construction Drawings" will be received electronically through the BidNet platform on or before 2:00pm Mountain Standard Time (MST) on Wednesday, May 28, 2025. (https://www.bidnetdirect.com//cityofidahofalls) Email, facsimile, or mailed proposals will not be accepted. Proposals received after the specified date and time will not be given further consideration.

Solicitation Documents, Clarification Requests, Inquiries, and Changes (Addenda). All solicitation documents may be viewed on the BidNet platform (https://www.bidnetdirect.com//cityofidahofalls).

You can also link to the BidNet platform by going to https://www.idahofallsidaho.gov/Bids.aspx or navigating to the City of Idaho Falls website at www.idahofallsidaho.gov, click on the Business Tab, then select Services Bid Opportunities and proceed to the BidNet platform through the applicable BID posting.

Questions and clarification requests will be accepted until 2:00 PM PST on May 21st, 2025. All questions shall be submitted through the BidNet platform.

Changes or responses to questions and clarification requests of will be posted through the BidNet no later than 4:00 PM MST on May 27th, 2025. Respondents are responsible for checking BidNet for the issuance of any addenda prior to submitting a proposal. The City reserves the right to issue additional addenda at any time if, in its sole, discretion, as needed. No questions will be accepted by telephone.

Questions or comments directed by a Respondent to persons outside of the individual listed above are inappropriate and such activity may result in that proposal being deemed non-responsive.

PREFERENCE FOR IDAHO DOMICILED BIDDERS:

In determining the lowest responsible bidder, the City shall consider the preferences for Idaho domiciled public works contractors and Idaho suppliers for purchases as provided in Idaho Code Sections 67-2348 and 67-2349, as currently in force and subsequently amended. The law requires providing a reciprocal https://www.bidnetdirect.com/cityofidahofalls https://www.bidnetdirect.com/cityofidahofalls https://www.idahofallsidaho.gov/Bids.aspx http://www.idahofallsidaho.gov/ preference for Idaho domiciled bidders on purchases of materials, supplies or equipment. The law and any applicable percentage preference is ONLY applicable to bidders domiciled in a state granting THEIR in-state bidders a preference law or a reciprocal preference law. It is not applicable to domiciled bidders in states without a preference law or a reciprocal preference law. Bidder shall indicate on the signature page, in the space provided, the bidder’s state of domicile. If a bidder is domiciled outside the State of Idaho and desires to be considered as an Idaho domiciled bidder, bidder shall indicate this on the signature page, in the space provided.

If the bidder indicates that bidder is domiciled outside the State of Idaho and that bidder desires to be considered as an Idaho domiciled bidder, bidder shall provide information with the bid sufficient to establish a significant Idaho economic presence as defined in Idaho Code Section 67-2349, as currently in force and subsequently amended. Bids received without this information will be considered invalid. If the bidder is domiciled in a state with a bid preference penalty, the bidder shall provide information with the bid concerning the bidder’s state of domicile, the amount of the bid preference penalty in bidder’s state and a copy of the applicable code section with respect thereto. Failure to provide such information may result in rejection of the bid.

DELIVERY:

Bids submitted must show: Delivery Cost FOB to Idaho Falls.

Delivery Date to Idaho Falls

GENERAL:

The intention of the Construction Drawings is to describe the boiler replacement in sufficient detail to secure bids. Bids to be submitted through the BidNet platform only.

Regulatory Requirements: State of Idaho Public Works laws shall govern submittal, opening, and award of bids.

Project Location: 149 7th Street, Idaho Falls, Idaho 83401.

CERTIFICATE OF ELIGIBILITY:

The successful Bidder shall be required to execute a Certificate of Eligibility (See attached) as a condition for the award of this Bid / Contract.

INTERPRETATIONS:

Interpretations, corrections and changes of the bid will be made by Addendum. Addendums will be posted on the BidNet platform at least three (3) days prior to the electronic bid opening. Interpretations, corrections and changes of the bid made in any other manner will not be binding, and Bidders shall not rely upon them.

TERMS AND CONDITIONS:

This formal bid document and subsequent Purchase Order are to be considered the City's sole terms and conditions. Bids submitted with any additional terms and conditions may not be considered.

Bid security shall be submitted with each bid in the amount of 5 percent of the bid amount.

Bond submittal: A bidder’s bond executed by a qualified surety company, made payable to the City of Idaho Falls submitted with bid. No bids may be withdrawn for a period of 45 days after opening of bids.

No bids may be withdrawn for a period of 45 days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities.

Bidders must be properly licensed under the laws, including the requirement for holding a

Public Works Contractor’s License, governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, separate Labor and Material Payment Bond, and Insurance in a form acceptable to Owner will be required of the successful Bidder.

The Bidder to whom the award is made will be promptly notified and within thirty (30) calendar days.

From the date of such notification, he shall execute the contract agreement in triplicate, furnish contract bond and insurance certification.

Time is hereby expressly declared to be of the essence of the contract. The successful bidder will be expected to gear their operations and organize the work and subcontract to complete this project in the earliest possible time. The Owner acknowledges that the Contractor is not able to control the weather;

however, the Contractor shall be otherwise required to take all necessary steps to furnish adequate labor to complete the project as soon as possible. Contractor shall be responsible for any and all damages incurred by the Owner by reason of delays necessitated by Contractor failure or failure of the Subcontractors to diligently act to secure necessary materials and labor for the completion of this project in a reasonable time, which we have calculated to be 90 calendar days after receiving notice to proceed with actual construction. Final connection to the new boiler will need to be scheduled between Monday, July 28, 2025– Friday, August 1 2025.

The Contractor and the Contractor’s surety, if any, shall be liable for and shall pay the Owner the sums hereinafter stipulated as liquidated damages, and not as a penalty, for each calendar day of delay after the date established for Substantial Completion in the Contract Documents until the Work is substantially complete One Thousand and No/100 Dollars ($ 1,000.00).

BASIS OF AWARD:

The award of the bid will be made to the responsible bidder submitting the responsive bid which will best serve the interest and requirements of the City of Idaho Falls. The bids will be evaluated for compliance with the specifications furnished by the City of Idaho Falls. The contract will be awarded to the bidder submitting the lowest responsive bid based upon the bid evaluation method set forth in the paragraph entitled “BID EVALUATION”. In the Bid Evaluation the City of Idaho Falls reserves the right to consider the bid on the basis of the lowest total cost and delivery date to the City of Idaho Falls as needed dependent on delivery date options.

BID IRREGULARITIES

If the bid form furnished is not used or is altered or if there are unauthorized additions, conditional bids, or irregularities of any kind, which make the bid incomplete, indefinite, irregular, or ambiguous; the bid may be rejected. The City of Idaho Falls reserves the right to accept or reject any or all bids, to waive any or all bids, to waive any informalities and irregularities in said bids, and to accept individual bid items.

TERM OF BID AND BID AWARD

The Bidder’s bid shall remain in effect for a period of 60 working days after the bid opening. If awarded the Bid, the successful Bidder will comply with the terms and conditions of the Bid Documents and subsequent Purchase Orders through the period of time as listed above. The City of Idaho Falls reserves the right to purchase any or all of the items as listed.

The City of Idaho Falls along with any other public entity reserves the right to purchase additional unit(s) and/or item(s) per this bid at a later date should the need arise and if the seller agrees to same pricing.

BID EVALUATION:

General Contractor shall bid and price all items for bid to be valid. Evaluation for award will be made according to price and delivery date.

DISCLAIMER:

The City of Idaho Falls reserves the right to accept or reject any or all bids, to waive any or all bids, to waive any informalities and irregularities in said bids, and to accept individual bid items.

NON-DISCRIMINATION:

Contractor shall not discriminate against any employee or applicant for employment on the basis of race, color, religion, creed, political ideals, sex, age, marital status, physical, or mental handicap, gender identity/expression, sexual orientation, or national origin. Nothing in this section shall be interpreted to require Contractor to provide accommodation beyond the reasonable accommodations required by Idaho and Federal law.

ANTI-BOYCOTT AGAINST ISRAEL ACT:

Pursuant to Idaho Code section 67-2346, if payments under this Agreement exceed one hundred thousand dollars ($100,000) and Contractor employs ten (10) or more persons, Contractor certifies that it is not currently engaged in and will not for the duration of this Agreement engage in, a boycott of goods or services from Israel or territories under its control. The terms in this Paragraph that are defined in Idaho Code section 67-2346 shall have the meaning defined therein.

CERTIFICATE OF NO CHINESE OWNERSHIP:

Pursuant to Idaho Code § 67-2359, Contractor certifies that Contractor is not currently owned or operated by the government of the People’s Republic of China and will not, for the duration of this Agreement, be owned or operated by the government of the People’s Republic China.

CERTIFICATE OF ELIGIBILITY

(Please fill out the top or bottom portion of this document, whichever is applicable)

, represented by _ represents that:

(Bidder/Vendor) (Representative’s Name)

1) For the purposes of this certificate, the term “Ineligible Person” shall mean any officer, agent or employee of the City of Idaho Falls, and the spouse and any member of the household of such officer, agent or employee. The term “Ineligible Entity” shall mean any corporation, partnership, trust, association, sole proprietorship or organization of any kind in which an Ineligible Person holds any pecuniary or ownership interest of any kind or which employs an Ineligible Person.

2) Bidder is not an Ineligible Person or Ineligible Entity.

3) No Ineligible Person or Ineligible Entity has an interest of any kind in the abovementioned Bidder, nor will any Ineligible Person or Ineligible Entity receive any consideration or benefit of any kind on account of the above-referenced project or purchase.

4) To the best of my knowledge no Ineligible Person or Ineligible Entity has any interest in the above-referenced project or purchase, which is prohibited under Idaho Code Section 59-201.

5) I am over eighteen (18) years of age, have personal knowledge of the foregoing and would so testify if called upon in a court of law.

Dated the day of , 20 .

BIDDER/VENDOR:

Representative’s Signature

Bidder/Vendor

If you are unable to sign the above Certificate of Eligibility, you may, depending upon the circumstances, still be eligible to carry out this contract (PO). In order to receive such consideration, please explain the reasons why you are unable to execute the Certificate of Eligibility.

Dated the day of , 20 .

BIDDER/VENDOR:

Representative’s Signature

Bidder/Vendor

GENERAL CONDITIONS

Vendor/Contractor agrees, at his own proper cost and expense, to do all the work and furnish all the materials, tools, labor and all appliances, machinery, and apprehensions for the construction of the Project.

The submittal of the “Informal Proposal,” the “General Conditions,” the “Plans and Specifications,” the fully executed “Payment Bond” and the “Performance Bond” along with the City of Idaho Falls Purchase Order/Contract are hereby referred to and by reference all made a part of this Contract.

BOND REQUIREMENTS:

If the amount quoted for this proposal is less than $10,000, the requirements of this section will not be applicable per Idaho Code Section 54-1903(i).

Before commencing work under this contract, the Vendor/Contractor agrees to deliver to the City of Idaho Falls, security (Performance Bond) for faithful performance of the Contract in the amount of one hundred percent (100%) of the Contract amount and security (Payment Bond) for the protection of persons supplying labor or materials for the Contract in the amount of one hundred percent (100%) of the Contract amount within ten (10) days after receipt of Notice of Award. Such security may be in the form of a Certified Check or Cashier's Check drawn on a bank in good standing; Performance Bond and Payment Bond in the form specified in the Contract Documents and issued by a Surety authorized to issue such bonds in the State of Idaho; or Government Obligations, as defined under Idaho Code Section 54-1901(h).

If Government Obligations are used in lieu of payment and performance bonds, then separate obligations shall be delivered for the payment and performance security. Such obligations shall be physically delivered to the City in accordance with the provisions of Idaho Code Section 54-1926A and shall be accompanied by a Power of Attorney executed by all owners thereof and in the form specified in the Contract Documents. Each of the obligations shall have a market value on the date of their delivery to the Owner, of not less than one hundred percent (100%) of the Contract amount. If the Contractor elects to deliver a certified check or cashier's check, the Contractor shall also execute and deliver performance and payment security agreements in the form specified by the City. In the event the market value of either of such bonds decreases to an amount less than one hundred percent (100%) of the contract amount, at any time during the performance of the contract, Contractor shall immediately, upon demand of the City, furnish additional government obligations or cash security sufficient to restore the amount of the security to the amount set forth above.

The above referenced payment bond or government obligation--as a payment bond shall be in force for a period of one (1) year after the Vendor/Contractor completed and or ceased work on the project per Idaho Code Section 54-1927. The performance bond or government obligation in lieu of a performance bond shall be in effect for the length of the warranty period as specified.

VENDOR/CONTRACTOR’S INSURANCE:

Insurance coverage specified herein constitutes the minimum requirements and said requirements shall in no way lessen or limit the liability of the Vendor/Contractor under terms of the Contract. The Vendor/Contractor shall procure and maintain at their own cost and expense any additional kinds and amounts of insurance that in their judgment may be necessary for their proper protection in the prosecution of the work. Self-insurance by the Vendor/Contractor will not be acceptable.

The Vendor/Contractor shall not commence work under the Contract or under any special condition until they have obtained all insurance and all necessary permits as required in the following paragraphs, and until such insurances have been approved by the City, nor shall the Contractor allow any subcontractor to commence work on his subcontract until all similar insurances required of the subcontractor have been obtained and approved.

Notice to Proceed/Purchase Order shall not be issued until the Contractor has furnished to the City a Certificate of Insurance executed by insurance companies authorized to do insurance business in Idaho certifying that policies of insurance as required by the Contract have been duly issued to the Contractor (and its subcontractors where required). This paragraph applies to all insurance required by the Contract, including, but not limited to, Worker’s Compensation Insurance.

WORKER’S COMPENSATION INSURANCE:

The Vendor/Contractor shall take out and maintain during the life of this Contract, Worker’s Compensation Insurance for all of their employees, employed at the site of the project and in case of any work that is sublet, the Vendor/Contractor shall require the subcontractor, similarly, to provide Worker’s Compensation Insurance for all the latter’s employees unless such employees are covered by the protection afforded by the Vendor/Contractor. In case any class of employees engaged in hazardous work under this Contract at the site of the project, is not protected under Worker’s Compensation statutes, the Vendor/Contractor shall provide and shall cause such subcontractor to provide compensation insurance with a private company in an amount equal to that provided by the Worker’s Compensation statute for the protection of his employees not otherwise protected.

PUBLIC LIABILITY AND OTHER INSURANCE:

The Vendor/Contractor shall obtain and keep in force during the term of the Contract, Public Liability and Property Damage Insurance in companies and in a form to be approved by the City. Said insurance shall provide coverage to the Contractor, any subcontractor performing work provided by this Contract, and the City. The City shall be named as an additional insured on said policy insofar as the work and obligations performed under the Contract are concerned. The coverage so provided shall protect against claims for personal injuries, including accidental death as well as claims for property damages, which may arise from any act or omission of the Vendor/Contractor or the subcontractor, or by anyone directly or indirectly employed by either of them. The minimum policy limits of such insurance shall be as follows:

Bodily Injury Liability Coverage with limits of not less than $500,000.00 single limit, or as required in the Special Conditions, for bodily injury, and Property Damage Coverage in an amount of not less than $100,000.00 for each occurrence.

PUBLIC LIABILITY AND OTHER INSURANCE:

Before Commencing work on any building or housing project having a project cost of more than $50,000.00 the Vendor/Contractor shall submit written evidence that they have obtained, for the period of the Contract, Builder’s Risk “All Risk” Completed Value Insurance Coverage upon the entire project which is the subject of the Contract and including completed work and work in progress. Such insurance shall include as Additional Named Insureds, the City, the Engineer, and their Consultants and each of their officers, employees and agents, and any other persons with an insurable interest designated by the City as an Additional Named Insured. Such insurance may have a deductible clause, but the amount of deductible shall not exceed $500.00.

CONTRACTOR INDEMNIFICATION:

The Vendor/Contractor here agrees to save the City harmless from all losses and damage occasioned to it or to any third person or to property by reason of any acts or omissions on the part of the Vendor/Contractor, subcontractors, agents, and employees in the performance of the Contract and will, after reasonable notice thereof, defend and pay the expense of defending any suit which may be commenced against the City by any third person alleging injury by reason of such acts or omissions and will pay any judgment which may be obtained against the City in such suit.

PROTECTION OF CONTRACTORS WORK AND PROPERTY:

The Vendor/Contractor shall protect their work, supplies, and materials from damage due to the nature of the work, the action of the elements, trespassers, or any cause whatsoever until the completion and the acceptance of the work. Neither the City nor any of its officers, employees, or agents assumes any responsibility for collecting indemnity from any person or persons causing damage to the work of the Vendor/Contractor.

PAYMENT OF TAXES, EXCISES AND LICENSE FEES:

Pursuant to the provisions Section 63-1503 of the Idaho Code, the Vendor/Contractor, in consideration of securing the business of erecting or constructing public works in the State of Idaho, recognizing that the business in which the Vendor/Contractor is engaged is of a transitory character, and that in the pursuit thereof, the Vendor’s/Contractor's property used therein may be without the State of Idaho when taxes, excises, or license fees to which the Vendor/Contractor is liable become payable, agrees:

a) To pay promptly when due all taxes (other than on real property), excises, and license fees due to the State of Idaho, its subdivisions, and municipal and quasi-municipal corporations therein, accrued or accruing during the term of this Contract, whether or not the same shall be payable at the end of such term;

b) That if the said taxes, excises, and license fees are not payable at the end of said term, but liability for the payment thereof exists, even though the same constitute liens upon his property, to secure the same to the satisfaction of the respective officers charged with the collection thereof;

c) That, in the event of the Vendor’s/Contractor's default in the payment or securing of such taxes, excises, and license fees, to consent that the Owner may withhold from any payment due the Vendor/Contractor under the Contract the estimated amount of such accrued and accruing taxes, excises, and license fees for the benefit of all taxing units to which said Vendor/Contractor is liable.

PAYMENT OF TAXES, EXCISES AND LICENSE FEES: (Cont.)

d) That pursuant to the provisions Section 63-1504 of the Idaho Code, the Vendor/Contractor shall furnish the Owner evidence that the Vendor/Contractor has paid all taxes, excises, and license fees due to the State of Idaho and its taxing units, due and payable during the term of the Contract for such construction, and that the Vendor/Contractor has secured all such taxes, excises and license fees liability for the payment of which has accrued during the term of such Contract, notwithstanding that they may not yet be due or payable.

e) TO FILL OUT AND RETURN THE IDAHO STATE TAX COMMISSION FORM

WH-5 TO THE CITY WITH THE SIGNED CONTRACT.

APPLICATIONS FOR PAYMENTS:

If Vendor/Contractor faithfully performs the work herein embraced, in accordance with the Contract Documents, the City agrees to pay to the Vendor/Contractor the amounts set forth in the Proposal. The City must receive a Public Works Contract Tax Release fully executed by the State of Idaho, Department of Revenue and Taxation prior to payment of retainage to the Vendor/Contractor.

ATTORNEYS FEES:

In the event Vendor/Contractor defaults in the performance of its obligations hereunder and it becomes necessary to commence and prosecute legal action to enforce Owner's rights hereunder, Vendor/Contractor shall pay all reasonable attorney’s fees and costs incurred by Owner, if Owner is determined to be the prevailing party.

FINAL AGREEMENT:

These Contract Documents evidence the complete and final agreement of the parties hereto and no other prior statement, understanding or representation shall be binding upon the parties hereto, except as expressly set forth herein.

LAWS AND ORDINANCES:

The Vendor/Contractor is assumed to be familiar with all Federal, State, and Local Laws, Ordinances and Regulations, which in any manner affect those engaged or employed in the work or the materials or the equipment used in the proposed construction, or which in any way affect the conduct of work and no plea of misunderstanding will be considered because of ignorance thereof. If the Vendor/Contractor shall discover any provision in the Plans, Specifications, or Contract which is contrary to or inconsistent with any law, ordinance, or regulations, they shall forthwith report it to the City in writing.

ONLY FIRM PRICES ON BIDS WILL BE ACCEPTED!

The City of Idaho Falls reserves the right to accept or reject any bid.

Wes Deist Center Boiler and Heat Exchanger Replacement

IF 25-015

SIGNATURE PAGE:

Exceptions: If the terms and conditions provided on the preceding pages cannot be met, bidders are instructed to note those terms and conditions with which they take exception, giving a full explanation and sign below. If no exceptions are taken, write "NONE" and sign below.

Bidder’s State of Domicile .

Does your State of Domicile have a Bid Preference Penalty? Yes No_ Amount of Bid Preference Penalty (If Applicable) . Please provide a copy of the State Statute regarding such Bid Preference Penalty.

Failure to furnish information on State of Domicile may result in Rejection of Bid. (Please see section entitled Bidder’s State of Domicile).

**BID PROPOSAL SIGNATURE**

Representative’s Signature Bidder-Company

Representative's Name--Printed Address

Representative's E-Mail Address City

Telephone State Zip Code

Facsimile Date

CITY OF IDAHO FALLS,

WESLEY DEIST AQUATIC CENTER

BOILER AND HEAT

EXCHANGER REPLACEMENT

ENGINEER DRAWINGS

AND SPECIFICATIONS

SECTION 23 05 00 COMMON WORK

RESULTS FOR HVAC

P A R T 1 - G E N E R A L

QUALITY ASSURANCE

Refer to Division 1, General Conditions, Equals and Substitutions.

Where equipment or accessories are used which differ in arrangement, configuration, dimensions, ratings, or engineering parameters from those indicated on the contract documents, the contractor is responsible for all costs involved in integrating the equipment or accessories into the system and for obtaining the performance from the system into which these items are placed. This may include changes found necessary during the testing, adjusting, and balancing phase of the project.

CONTINUITY OF EXISTING SERVICES

Do not interrupt or change existing services without prior written approval from the RPR (Residence Project Representative). When interruption is required, coordinate the down-time with the user agency to minimize disruption to their activities. Unless specifically stated, all work involved in interrupting or changing existing services is to be done during normal working hours.

SLEEVES AND OPENINGS

Refer to Division 1, General Requirements, Sleeves and Openings.

SEALING AND FIRE STOPPING

Sealing and fire stopping of sleeves/openings between ductwork, piping, etc. and the sleeve, structural or partition opening shall be the responsibility of the contractor whose work penetrates the opening. Provide all fire stopping of fire rated penetrations and sealing of smoke rated penetrations in compliance with section 07 84 00 Fire Stopping.

SUBMITTALS

Refer to Division 1, General Conditions, Submittals.

Submit for all equipment and systems as indicated in the respective specification sections, marking each submittal with that specification section number. Mark general catalog sheets and drawings to indicate specific items being submitted and proper identification of equipment by name and/or number, as indicated in the contract documents.

Before submitting electrically powered equipment, verify that the electrical power and control requirements for the equipment are in agreement with the motor starter schedule on the electrical drawings. Include a statement on the shop drawing transmittal to the architect/engineer that the equipment submitted and the motor starter schedules are in agreement or indicate any discrepancies.

Include wiring diagrams of electrically powered equipment.

Submit sufficient quantities of shop drawings to allow the following distribution:

• Operating and Maintenance Manuals 2 copies

• Testing, Adjusting and Balancing Contractor 1 copy

• Division of Facilities Development 1 copy

• A/E 1 copy

OFF SITE STORAGE

Prior approval by RPR and the Engineer will be needed. The contractor shall submit Storage Agreement Form to RPR for consideration of offsite materials storage.

Generally, sleeves, pipe/pipe fittings and similar rough-in material will not be accepted for offsite storage. For material that can be stored off site, no material will be accepted for offsite storage unless shop drawings for that material have been approved.

CERTIFICATES AND INSPECTIONS

Refer also to Division 1, General Conditions, Permits, Regulations, Utilities and Taxes.

Obtain and pay for all required City installation inspections and permit fees except those provided by the Architect/Engineer in accordance with code. Deliver originals of these certificates to the Resident Project Representative. Include copies of the certificates in the Operating and Maintenance Instructions.

OPERATION AND MAINTENANCE DATA

All operations and maintenance data shall comply with the submission and content requirements specified under section GENERAL REQUIREMENTS.

In addition to the general content specified under GENERAL REQUIREMENTS supply the following additional documentation:

1. Records of tests performed a to certify compliance with system requirements

2. Certificates of inspection by regulatory agencies

3. Valve schedules

4. Lubrication instructions, including list/frequency of lubrication

5. Copies of all approved shop drawings.

6. Manufacturer's wiring diagrams for electrically powered equipment

7. Temperature control record drawings and control sequences

8. Parts lists for manufactured equipment

9. Warranties

10. Additional information as indicated in the technical specification section

TRAINING OF OWNER PERSONNEL

Instruct user city personnel in the proper operation and maintenance of systems and equipment provided as part of this project. Include not less than 4 (four) hours of instruction, using the Operating and Maintenance manuals during this instruction.

Demonstrate startup and shutdown procedures for all equipment. All training to be during normal working hours.

RECORD DRAWINGS

Refer to Division 1, General Requirements, Record Drawings.

In addition to the data indicated in the General Requirements, maintain temperature control record drawings on originals prepared by the installing contractor/subcontractor. Include copies of these record drawings with the Operating and Maintenance manuals.

P A R T 2 - P R O D U C T S

IDENTIFICATION

STENCILS:

Not less than 1 inch high letters/numbers for marking pipe and equipment.

SNAP-ON PIPE MARKERS:

Cylindrical self-coiling plastic sheet that snaps over piping insulation and is held tightly in place without the use of adhesive, tape or straps. Not less than 1 inch high letters/numbers and flow direction arrows for piping marking. W. H. Brady, Seton, Marking Services, or equal.

ENGRAVED NAME PLATES:

White letters on a black background, 1/16 inch thick plastic laminate, beveled edges, screw mounting, Setonply Style 2060 by Seton Name Plate Company or Emedolite- Style EIP by EMED Co., or equal by Marking Services, or W. H. Brady.

VALVE TAGS:

Round brass tags with 1/2 inch numbers, 1/4 inch system identification abbreviation, 1-1/4 inch minimum diameter, with brass jack chains or brass "S" hooks around the valve stem, available from EMED Co., Seton Name Plate Company, Marking Services, or W.

H. Brady.

CEILING and ACCESS DOOR LABELS:

Clear polyester tape ¾” width with black printing W. H. Brady or equal.

SEALING AND FIRE STOPPING

FIRE AND/OR SMOKE RATED PENETRATIONS:

Provide all fire stopping of fire rated penetrations and sealing of smoke rated penetrations in compliance with Fire Code.

NON-RATED PENETRATIONS:

Pipe Penetrations Through Below Grade Walls:

In exterior wall openings below grade, use a modular mechanical type seal consisting of interlocking synthetic rubber links shaped to continuously fill the annular space between the uninsulated pipe and the cored opening or a water-stop type wall sleeve.

Pipe Penetrations:

At pipe penetrations of non-rated interior walls, floors and exterior walls above grade, use urethane caulk in annular space between pipe insulation and sleeve. For non-rated drywall, plaster or wood walls where sleeve is not required use urethane caulk in annular space between pipe insulation and wall material.

P A R T 3 - E X E C U T I O N

DEMOLITION

Perform all demolition as indicated on the drawings to accomplish new work. Where demolition work is to be performed adjacent to existing work that remains in an occupied area, construct temporary dust partition to minimize the amount of contamination of the occupied space. Where pipe or duct is removed and not reconnected with new work, cap ends of existing services as if they were new work. Coordinate work with the user agency to minimize disruption to the existing building occupants.

All pipe, wiring and associated conduit, insulation, ductwork, and similar items demolished, abandoned, or deactivated are to be removed from the site by the Contractor. All piping and ductwork specialties are to be removed from the site by the Contractor unless they are dismantled and removed or stored by the user agency. All designated equipment is to be turned over to the user agency for their use at a place and time so designated. Maintain the condition of material and/or equipment that is indicated to be reused equal to that existing before work began.

CONCRETE WORK

All cast-in-place concrete will be performed by the Concrete Contractor unless otherwise noted. Provide all layout drawings, anchor bolts, metal shapes, and/or templates required to be cast into concrete or used to form concrete for support of mechanical equipment.

CUTTING AND PATCHING

Refer to Division 1, General Requirements, Cutting and Patching.

BUILDING ACCESS

Arrange for the necessary openings in the building to allow for admittance of all apparatus. When the building access was not previously arranged and must be provided by this contractor, restore any opening to its original condition after the apparatus has been brought into the building.

EQUIPMENT ACCESS

Install all piping, conduit, ductwork, and accessories to permit access to equipment for maintenance and service. Coordinate the exact location of wall and ceiling access panels and doors with the General Contractor, making sure that access is available for all equipment and specialties.

COORDINATION

Coordinate all work with other contractors prior to installation. Any installed work that is not coordinated and that interferes with other contractor's work shall be removed or relocated at the installing contractor's expense.

Verify system completion to the RPR (flushing, pressure testing, chemical treatment, filling of liquid systems, proper pressurization and air venting of hydronic systems, clean filters, clean strainers, duct and pipe systems cleaned, controls adjusted and calibrated, controls cycled through their sequences, etc.). Install s, shutoff and balancing valves, flow measuring devices, gauges, temperature controls, etc., required for functional systems. Demonstrate the starting, interlocking and control features of each system.

IDENTIFICATION

Where stenciling is not appropriate for equipment identification, engraved name plates may be used.

Identify piping not less than once every 30 feet, not less than once in each room, adjacent to each access door or panel, and on both side of the partition where exposed piping passes through walls, floors or roofs. Place flow directional arrows at each pipe identification location. Use one coat of black enamel against a light background or white enamel against a dark background for stenciling, or provide snap-on pipe markers as specified in Part 2 – Products.

Identify valves with brass tags bearing a system identification and a valve sequence number.

Valve tags are not required at a terminal device unless the valves are greater than ten feet from the device or located in another room not visible from the terminal unit. Provide a typewritten valve schedule indicating the valve number and the equipment or areas supplied by each valve;

locate schedules in each mechanical room and in each Operating and Maintenance manual.

Schedules in mechanical rooms to be framed under clear plastic.

Use engraved name plates to identify control equipment.

LUBRICATION

Lubricate all bearings with lubricant as recommended by the manufacturer before the equipment is operated for any reason. Once the equipment has been run, maintain lubrication in accordance with the manufacturer's instructions until the work is accepted by RPR. Maintain a log of all lubricants used and frequency of lubrication; include this information in the Operating and Maintenance Manuals at the completion of the project.

SLEEVES AND OPENINGS

Pipe penetrations in new poured concrete horizontal construction requiring F and T rating:

Form opening using hole form or core drill opening. Alternatively provide cast in place fire stopping devices/sleeves.

Pipe penetrations in new poured concrete horizontal construction requiring F rating but no T rating: Same as pipe penetrations in new poured concrete construction requiring F and T ratings except that schedule 40 steel sleeves may also be used.

Pipe penetrations in new poured concrete horizontal construction that do not require F or T ratings: Provide schedule 40 steel pipe sleeve, form opening using hole form or core drill opening.

Pipe penetrations in existing concrete floors: Core drill openings.

Pipe penetrations through existing floors located in food service areas that do not require a T rating: Core drill sleeve opening large enough to insert schedule 40 sleeve, extend sleeve 2 inches above the floor and grout area around sleeve with hydraulic setting, non-shrink grout.

Size sleeve to allow insulated pipe to run through sleeve and paint the sleeve.

Where penetrating pipe or conduit weight is supported by floor, provide manufactured product or structural bearing collar designed to carry load.

END OF SECTION

Wes Deist Aquatic Center Boiler and Heat Exchanger Replacement

SECTION 23 05 15

PIPING

SPECIALTIES

Refer to division 1, General Conditions, Equals and Substitutions.

SHOP DRAWINGS

Refer to division 1, General Conditions, Submittals.

Required for all items in this section; Include materials of construction, dimensional data, ratings/capacities/ranges, pressure drop data where appropriate, and identification as referenced in this section and/or on the drawings.

OPERATION AND MAINTENANCE DATA

All operations and maintenance data shall comply with the submission and content requirements specified under section GENERAL REQUIREMENTS.

DESIGN CRITERIA

All piping specialties are to be rated for the highest pressures and temperatures in the respective system in accordance with ANSI B31, but not less than 125 psig unless specifically indicated otherwise.

THERMOMETERS

Manufacturers: Ashcroft, Marsh, Taylor, H. O. Trerice, U. S. Gauge, Weiss, Weksler.

Stem Type, cast aluminum case, nine inch scale, clear acrylic window. adjustable angle brass stem with stem of sufficient length so the end of the stem is near the middle of a pipe without reducing the thickness of any insulation, red or blue indicating fluid, black lettering against a white background, with scale ranges as follows:

Service Scale Range, °F Min. Increment, °F Heating Water 30 - 240 2 Chilled Water 0 - 120 1 Glycol Water 30-130 2 Condenser Water

0 - 120 or 30 - 130 1

Steam Condensate

30 – 300 1

THERMOMETER SOCKETS

Brass with threaded connections suitable for thermometer stems and temperature control sensing elements in pipeline. Furnish with extension necks for insulated piping systems.

TEST WELLS

Similar to thermometer sockets except with a brass cap that thread into the inside of the test well to prevent dirt from accumulating. Secure cap to body with a short chain.

Furnish with extension necks, where appropriate, to accommodate the pipeline insulation.

P/T (PRESSURE/TEMPERATURE) TEST PLUGS

Brass plug with 1/4" NPT threads, EPDM or neoprene valve core, knurled cap with cap strap. Use extended length plugs to clear insulated piping. Adaptors shall have 1/4" FPT connection for standard pressure gauges.

HOSE CONNECTION CAPS

Hose connection caps shall be pressure rated for 150 psig at 180 deg F.

PRESSURE GAUGES

Manufacturers: Ametek/U. S. Gauge Division, Ashcroft, Marsh, Taylor, H. O.

Trerice, Weiss, Weksler.

Cast aluminum case of not less than 4.5 inches in diameter, double strength glass window, black lettering on a white background, phosphor bronze bourdon tube with bronze bushings, recalibration from the front of the dial, 99% accuracy over the middle half of the scale, 98.5% accuracy over the remainder of the scale, with scale range as follows:

P A R T 3 - E X E C U T I O N

THERMOMETERS

STEM TYPE:

Install in piping systems as indicated on the drawings and/or details using a separable socket in each location.

THERMOMETER SOCKETS

Install at each point where a thermometer or temperature control sensing element is located in a pipeline.

TEST WELLS

Install in piping systems as indicated on the drawings and/or details wherever provisions are needed for inserting a thermometer at a later date.

P/T (PRESSURE/TEMPERATURE) TEST PLUGS

Install in piping systems as indicated on the drawings and/or details. Do not insulate over test plugs.

PRESSURE GAUGES

Install in locations where indicated on the drawings and/or details, including any gauge piping, with scale range appropriate to the system operating pressures.

SECTION 23 05 23

GENERAL-DUTY VALVES FOR HVAC

PIPING P A R T 1 - G E N E R A L

Refer to division 1, General Conditions, Equals and Substitutions.

Contractors shall submit a schedule of all valves indicating type of service, dimensions, materials of construction, and pressure/temperature ratings for all valves to be used on the project. Temperature ratings specified are for continuous operation.

All operations and maintenance data shall comply with the submission and content requirements specified under section GENERAL REQUIREMENTS.

Where valves are specified for individual mechanical services (i.e. hot water heating, steam, etc.) all valves shall be of the same manufacturer unless prior written approval is obtained from RPR.

MANUFACTURERS

Anvil, Apollo, Armstrong, Bell & Gossett, Cash-Acme, Dresser Consolidated, Conval, Crane, Anderson Greenwood and Crosby, Danfoss-Flomatic, DeZurik, Durco, Fisher, Grinnell, Griswold, Hammond, Hancock, Hoffman, Jamesbury, Keystone, Kunkle, Leslie, Lunkenheimer/Cincinnati, Metraflex, Milwaukee, Mueller, Newco, Nexus, Nibco, Powell, RP&C, Sarco, Spence, Stockham, Taco, Tasco, Thrush-Amtrol, Vogt, Watts, or approved equal.

BALL VALVES:

2" and smaller: Two piece bronze body; threaded or soldered ends, as appropriate to the pipe material; soild stainless steel ball; [full, conventional] port; glass filled teflon seat; threaded packing gland follower; blowout-proof stem; 600 psig WOG.

Valve stems shall allow operators to clear insulation without interference. Provide stem extensions when valve operators interfere with pipe insulation.

BUTTERFLY VALVES:

2" and smaller: Use ball valves; butterfly valves will not be accepted in sizes 2 inch and smaller.

2-1/2" and larger: Cast iron body; stainless steel shaft; Teflon, nylatron, or acetal bearings;

EPDM resilient seat. Disk to be bronze, aluminum-bronze, nickel plated ductile iron, cast iron with welded nickel edge, or 316 - stainless steel. Pressure rated to 150 psig. Valve assembly to be bi-directionally bubble tight to 150 psig with no downstream flange/pipe attached. Nylon coated ductile iron discs are not acceptable. Polymid or polyamide coated valves are not acceptable.

Valve stems shall allow operators to clear insulation without interference. Provide stem extensions when valve operators interfere with pipe insulation.

Use threaded lug type valves for installation with class 125/150 flanges.

Apollo 70-100/200 series, Hammond 8301/8311, Milwaukee BA100/150, Nibco T/S 585- 70, Stockham S206/216.

2-1 /2" and over: Ball valves will not be accepted in sizes over 2 inch.

GENERAL

Properly align piping before installation of valves in an upright position; operators installed below the valves will not be accepted.

Install valves in strict accordance with valve manufacturer's installation recommendations.

Do not support weight of piping system on valve ends.

Install all valves with the stem in the upright position. Valves may be installed with the stem in the horizontal position only where space limitations do not allow installation in an upright position or where large valves are provided with chain wheel operators.

SECTION 23 05 29

HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

P A R T 1 - G E N E R A L

Refer to Division 1, General Conditions, Equals and Substitutions.

DESCRIPTION

Provide all supporting devices as required for the installation of mechanical equipment and materials. All supports and installation procedures are to conform to the latest requirements of the ANSI Code for pressure piping.

Do not hang any mechanical item directly from a metal deck or run piping so it rests on the bottom chord of any truss or joist.

Support apparatus and material under all conditions of operation, variations in installed and operating weight of equipment and piping, to prevent excess stress, and allow for proper expansion and contraction.

Protect insulation at all hanger points; see Related Work above.

Schedule of all hanger and support devices indicating shields, attachment methods, and type of device for each pipe size and type of service.

Materials and application of pipe hangers and supports shall be in accordance with MSS Standard Practice SP-58 unless noted otherwise.

Piping connected to base mounted pumps, compressors, or other rotating or reciprocating equipment is to have vibration isolation supports for a distance of one hundred pipe diameters or three supports away from the equipment, whichever is greater. Standard pipe hangers/supports as specified in this section are required beyond the 100 pipe diameter/3 support distance.

Piping flexible connections and vibration isolation supports are required for piping connected to coils that are in a fan assembly where the entire assembly is mounted on vibration supports; the vibration isolation supports are required for a distance of one hundred pipe diameters or three supports away from the equipment, whichever is greater.

Piping flexible connection and vibration isolation supports are not required when the fan section is separately and independently isolated by means of vibration supports and duct flexible connections. Standard pipe hangers/supports as specified in this section are required when there are no vibration isolation devices in the piping and beyond the 100 pipe diameter/3 support distance.

Piping supported by laying on the bottom chord of joists or trusses will not be accepted.

Fasteners depending on soft lead for holding power or requiring powder actuation will not be accepted.

Allow sufficient space between adjacent pipes and ducts for insulation, valve operation, routine maintenance, etc.

P A R T 2 - P R O D UCTS

PIPE HANGER AND SUPPORT MANUFACTURERS

Anvil, B-Line, G-Strut, Fee and Mason, FNW, Kindorf, Michigan Hanger, Unistrut, or approved equal. Anvil figure numbers are listed below; equivalent material by other manufacturers is acceptable.

STRUCTURAL SUPPORTS

Provide all supporting steel required for the installation of mechanical equipment and materials, whether or not it is specifically indicated or sized, including angles, channels, beams, etc. to suspend or floor support tanks and equipment.

PIPE HANGERS AND SUPPORTS

MULTIPLE OR TRAPEZE HANGERS:

Steel channels with welded spacers and hanger rods if calculations are submitted.

WALL SUPPORT:

Welded steel bracket with hanger. B-Line 3068 Series, Anvil 194 Series.

Perforated epoxy painted finish, 16-12 gauge min., steel channels securely anchored to wall structure with interlocking, split type, bolt secured, galvanized pipe/tubing clamps. B-Line type S channel with B-2000 series clamps, Anvil type AS200 H with AS 1200 clamps.

When copper piping is being supported, provide flexible elastomeric/thermoplastic isolation cushion material to completely encircle the piping and avoid contact with the channel or clamp, equal to B-Line B1999 Vibra Cushion or provide manufacturers clamp and cushion assemblies, B-Line BVT series, Anvil cushion clamp assembly.

VERTICAL RISER SUPPORT:

Carbon steel riser clamp, copper plated when used with copper pipe. Anvil figure 261 for steel pipe, figure CT121 for copper pipe.

FLOOR SUPPORT FOR PIPE SIZES THROUGH 4”:

Cast iron adjustable pipe saddle, locknut nipple, floor flange, and concrete pier or steel support.

INSULATION PROTECTION SHIELDS:

Galvanized carbon steel of not less than 18 gauge for use on insulated pipe 2-1/2 inch and larger. Minimum shield length is 12 inches. Equal to Anvil figure 167.

STEEL HANGER RODS:

Threaded both ends, threaded one end, or continuous threaded, black finish.

Size rods for individual hangers and trapeze support as indicated in the following schedule.

Total weight of equipment, including valves, fittings, pipe, pipe content, and insulation, are not to exceed the limits indicated.

Maximum Load

(Lbs.)

Rod

Diameter (650°F Maximum

Temp.)

(inches)

610 3/8 1130 1/2 1810 5/8 2710 3/4 3770 7/8 4960 1 8000 1-1/4

Provide rods complete with adjusting and lock nuts.

INSTALLATION

Install supports to provide for free expansion of the piping and duct system. Support all piping from the structure using concrete inserts, beam clamps, ceiling plates,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .