18 MECHANICAL PLANS - WES DEIST AQUATICCENTER BOILER 2-10-25 (1).pdf
PDF 3 MB Posted
- Solicitation number
- IF-25-015
- Issued by
- Bonner County, Idaho
About this file
These mechanical engineering plans detail a boiler and heat exchanger replacement project for the City of Idaho Falls at the Wesley Deist Aquatic Center, located at 149 7th Street in Idaho Falls, Idaho. The project involves demolishing the existing electric boiler and replacing it with a new gas-fired boiler, removing the current circulation pump and heat exchanger, and installing new equipment with associated infrastructure modifications. Key project components include a new LAARS Magnatherm FT 3000 natural gas boiler with 3000 MBH input, a new Taco recirculation pump, a new heat exchanger with titanium plates, and related mechanical and electrical upgrades such as new ball valves, pressure gauges, thermometers, and a 4" floor sink.
The project drawings indicate specific technical requirements, including mounting the new boiler on a 72" x 48" x 4" concrete housekeeping pad, connecting to a 480/3/60 electrical source, installing a 10" combustion air duct and flue, and coordinating with the local gas company for meter placement. The boiler replacement is designed with 95% thermal efficiency and includes accessories like a 75 PSI relief valve and condensate neutralizer. The estimated flow rates are 190-200 GPM, with the heat exchanger designed to handle specific temperature ranges and flow volumes. The project appears to be a comprehensive mechanical system upgrade to improve the aquatic center's heating infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IF-25-015 Wes Deist Aquatic Center Boiler Bid.pdf | ||
| 4-Drug-Free-Workplace.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET
SCALE: As Shown
ENGINEER: RON RICE
DWG. BY: S.R.
JOB No.: 2467
MO.0
G a t e
C i t y
E N
G
IN
E E
R
IN
G S
E R
V
IC
E S
S O
U T
H
M A
I N
P
O C
A T
E L
L O
,I D
REVISIONS
REV DATE DESCRIPTION
DATE: 2/10/25
TH
S
TR
EE
T
ID
A H O
F A
LL
S
ID
C
IT
Y O
F
ID
A H O
F A
LL
S W
ES
LE
Y D
EI
S T
A Q
U A
TI
C C
EN
TE
R
B O
IL
ER
H
EA
T
EX
C H A N G
ER
R
EP
LA
C
EM
EN
T
FO
R
WESLEY DEIST AQUATIC CENTER
BOILER / HEAT EXCHANGER REPLACEMENT
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text O
AutoCAD SHX Text D.
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
ORIGINAL DRAWING SIGNED BY: RON D. RICE
AutoCAD SHX Text
DATE ORIGINAL SIGNED:
AutoCAD SHX Text
ORIGINAL ON FILE AT
AutoCAD SHX Text
340 E. CLARK, POCATELLO, IDAHO 83204
AutoCAD SHX Text 2-10-2025
FS-1
PROJECT NOTES:
DEMO EXISTING ELECTRIC BOILER.(TO BE
REPLACED WITH NEW GAS BOILER)
DEMO EXISTING CIRCULATION PUMP. (TO BE
REPLACED WITH NEW)
DEMO EXISTING HEAT EXCHANGER. (TO BE
REPLACED WITH NEW) PROVIDE NEW BALL
VALVES, PRESSURE GAUGES, AND
THERMOMETERS TO NEW 3" CONNECTIONS (4)
TOTALS)
EXISTING 2" FLOOR DRAIN TO BE REMOVED.
NEW 4" FLOOR SINK
NEW GAS FIRED BOILER
NEW CIRCULATION PUMP TO REPLACE EXISTING.
NEW 4" DRAIN LINE FROM FLOOR SINK TO
EXISTING SUMP. CUT & PATCH CONCRETE FLOOR
AS NECESSARY.
VFD LOCATION FOR NEW CIRCULATION PUMP.
PROVIDE NEW PIPE PENETRATIONS THROUGH
WALL.
NEW BOILER CONTROL LOCATION.
(HONEYWELL T775)
OLD BOILER CONTROL PANEL LOCATION.
RETAIN PRIMARY & SECONDARY POOL WATER
PUMP CONTROLS.
MAINTAIN EXISTING HONEYWELL T774 POOL
WATER TEMPERATURE CONTROL. CONNECT TO
NEW BOILER CONTROL AS REQUIRED FOR
PROPER SYSTEM OPERATION. (LOCATED IN
STORAGE ROOM ABOVE)
PIPING TO BE SUPPORTED AND SECURED TO
FLOOR WITH UNI-STRUT SLEEPERS.PROVIDE 16
GAUGE METAL COVER OVER PIPING / CONDUITS -
SECURE TO FLOOR.
G G G
CONNECTION POINTS
FOR BOILER SUPPLY
AND RETURN LINES
4"
3"
4"
VERIFY CLEAR WIDTH OF DOOR JAM
PRIOR TO ORDERING BOILER. NEW
BOILER EQUIPMENT IS -
34-5/8" WIDE BY 75-1/2" HIGH.
1"
LBS. TO OZ.
REGULATOR
CP
B
3" R S
HE
10" Ø INSULATED COMBUSTION
AIR DUCT 8' A.F.F
10" Ø FLUE UP TO ROOF
OL-1
SUMP
CONTRACTOR TO CONTACT GAS
COMPANY FOR PLACEMENT OF NEW
METER. 3000 MBH @ 2 PSI 10
S
EXISTING SENSOR
LOCATION IN SECONDARY
POOL WATER SUPPLY.
VERIFY LOCATION.
IN STORAGE ROOM ABOVE
NEW BOILER TO BE CONNECTED TO
NEAREST AVAILABLE 480/3/60
SOURCE. CONDUCTORS TO BE RUN IN
APPROVED CONDUIT. SEE SCHEDULE.
BOILER TO BE PLACED ON NEW
72" x 48" x 4" THICK CONCRETE
HOUSEKEEPING PAD.
BOILER TO BE PLACED ON NEW
72" x 48" x 4" THICK CONCRETE
HOUSEKEEPING PAD.
GENERAL NOTES:
1. VERIFY ALL PROJECT SITE DIMENSIONS AND
CONDITIONS PRIOR TO COMMENCEMENT OF
WORK.
2. ALL APPLICABLE BUILDING CODES SHALL BE
FOLLOWED FOR PERFORMANCE OF THIS WORK.
3. ALL REQUIRED MECHANICAL AND ELECTRICAL
EQUIPMENT AND DEVICE ACCESSES SHALL BE
MAINTAINED TO THE APPLICABLE CODES FOR
ALL MECHANICAL ITEMS SHOWN.
4. MECHANICAL OPERATION AND MAINTENANCE
MANUALS SHALL BE PROVIDED IN A THREE
RING BINDER CONTAINING SUBMITTALS,
INSTRUCTIONS, AND WARRANTY (3) REQUIRED.
HVAC REMODEL
PLAN
SCALE: As Shown
ENGINEER: RON RICE
DWG. BY: S.R.
JOB No.: 2467
M1.0
G a t e
C i t y
E N
G
IN
E E
R
IN
G S
E R
V
IC
E S
U
I N
P
O C
A T
E L
L O
,I D
REVISIONS
REV DATE DESCRIPTION
TH
S
TR
EE
T
ID
A H O
F A
LL
S
ID
C
IT
Y O
F
ID
A H O
F A
LL
S W
ES
LE
Y D
EI
S T
A Q
U A
TI
C C
EN
TE
R
B O
IL
ER
U
PG
R A D
E
FO
R
DATE: 2/10/25
B O
IL
ER
H
EA
T
EX
C H A N G
ER
R
EP
LA
C
EM
EN
T
FO
R
AutoCAD SHX Text
STAIR
AutoCAD SHX Text
AutoCAD SHX Text
DECK/STOR
AutoCAD SHX Text
AutoCAD SHX Text
CHLORINE
AutoCAD SHX Text
AutoCAD SHX Text
EQUIP
AutoCAD SHX Text
POOL
AutoCAD SHX Text
AutoCAD SHX Text 1/4"=1'-0"
AutoCAD SHX Text
BOILER REPLACEMENT PLAN
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NORTH
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text O
AutoCAD SHX Text D.
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
ORIGINAL DRAWING SIGNED BY: RON D. RICE
AutoCAD SHX Text
DATE ORIGINAL SIGNED:
AutoCAD SHX Text
ORIGINAL ON FILE AT
AutoCAD SHX Text
340 E. CLARK, POCATELLO, IDAHO 83204
MARK
TACO 480/3/60
HPVOLTAGE NOTES
RECIRCULATION 5
MANUF.
& MODEL
NUMBER TYPE
KV-3007D
CP
RECIRCULATION PUMP SCHEDULE
MANUFACTURER
HOT WATER
UNIT
GAS BOILER SCHEDULE
AND MODEL TYPE
VOLT
/PH
480/3/60LAARS
MAGNATHERM FT 3000
FUEL
NG
MIN. BTU/HR
INPUT
150 MBH
THERMAL
EFFICIENCY
95%B
L x W x H
DIMENSIONS
57 X 35 X 80
MAX. BTU/HR
INPUT
3000 MBH
OPTIONS / ACCESSORIES
75 PSI RELIEF VALVE, CONDENSATE NUETRALIZER
RATE
FLOW
190 GPM
FLOW
200 GPM
HEAD
35 FT VFD CONTROLLED
MARK
TACO 120 F
OUT
NOTES
150 PSI
MANUF.
& MODEL
NUMBER PRESSURE
PF 4206-23-2-NH
HE
HEAT EXCHANGER SCHEDULE
VOLUME
200 GPM
IN
140 F
MAX COLD SIDE TEMPS
110 F
OUTIN
90 F
HOT SIDE TEMPS
MCA /
MOP
2.6 / 15
COLDHOT
200 GPM
MASS FLOW
98,546
COLDHOT
99,252
LB / HRLB / HR 3"3"
CONNECTION
COLDHOT
CONSTRUCTION
PLATES: TITANIUM GR.1 (.05MM)
GASKETS: HBR HT
FRAME: SA516 GR.6
PAINTING: EPOXY 2 COAT
SYMBOL DESCRIPTION NECK NOTESMATERIAL PATTERN INSTALLATIONSIZE
OL-1 INTAKE LOUVER
GRILLE
SIZE
12 X 12 EXTERIOR SIDE WALL10" Ø
LOUVER SCHEDULE
ALUMINUM FINISH COLORS
PER OWNERFIXED BLADE
PLUMBING FIXTURE SCHEDULE
SYMBOL DESCRIPTION COLD HOT VENT WASTE
FLOOR SINK: ZURN FD2375-NH4-T WITH 3/4 GRATEFD-1 4"
FLA
2.1
(NO TRAP - DAYLIGHT TO SUMP PER PLAN)
HVAC SCHEDULES
AND DETAILS
SCALE: As Shown
ENGINEER: RON RICE
DWG. BY: S.R.
JOB No.: 2467
M2.0
G a t e
C i t y
E N
G
IN
E E
R
IN
G S
E R
V
IC
E S
U
I N
P
O C
A T
E L
L O
,I D
REVISIONS
REV DATE DESCRIPTION
2-10-2023
TH
S
TR
EE
T
ID
A H O
F A
LL
S
ID
C
IT
Y O
F
ID
A H O
F A
LL
S W
ES
LE
Y D
EI
S T
A Q
U A
TI
C C
EN
TE
R
DATE: 2/10/25
B O
IL
ER
H
EA
T
EX
C H A N G
ER
R
EP
LA
C
EM
EN
T
FO
R
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text H
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text
AutoCAD SHX Text O
AutoCAD SHX Text D.
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text
ORIGINAL DRAWING SIGNED BY: RON D. RICE
AutoCAD SHX Text
DATE ORIGINAL SIGNED:
AutoCAD SHX Text
ORIGINAL ON FILE AT
AutoCAD SHX Text
340 E. CLARK, POCATELLO, IDAHO 83204
| Sheets and Views |
| CV |
| Sheets and Views |
| M1 |
| Sheets and Views |
| M2 |
File details come from the government source that posted it. Updated .