This document is an Attachment 12 (amended 13 FEB2023) for the Purvciems EMS Garage Renovation project in Latvia, contract number IEU-24-0010. It is a Contractor Past Experience Information Sheet that requires offerors to provide details on a past project, including the project name, contract number, location, completion date, final cost, and scope of work. Offerors must indicate if the work was completed as the prime contractor, subcontractor, joint venture, or key subcontractor. Additional details are required depending on the role, such as explaining the relationship and added benefit for a joint venture or key subcontractor. This information will be used to evaluate the offeror's past performance for the Purvciems EMS Garage Renovation project.

The related federal contract opportunity is for the Koknese Nursing Home Renovation project in Latvia, solicitation number IEU-24-0007. This is a design-build project that includes providing an elevator access road, new walkway, renovating the existing nursing home building, constructing a new elevator tower, replacing exterior egress stairs, and providing a new fire alarm system. A pre-proposal site visit was held on 23 April 2024, and proposals must be submitted per the solicitation instructions. The contracting agency is the Department of the Army European Command.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 12 (amended 13 FEB2023) W912GB24R0046; IEU-24-0010 Purvciems EMS Garage Renovation, Latvia

CONTRACTOR PAST EXPERIENCE INFORMATION SHEET

PROJECT NO. IEU-24-0010 Purvciems EMS Garage Renovation, Latvia, Page 1

Project Name, Contract number, and Location:

Past Performance:

1. The day, month, and year work was completed: _______________

2. Is this project more than 75% complete? ____ Yes ____ No If “No” explain current percentage of completion, if yes and between 75-99% complete please explain how the percentage was calculated and what work remains.

3. The final cost of this project €_________________________

4. Do not provide a listing of existing or previous contracts, but rather provide detailed information of work for this project:

o Design- Build or Design-Bid-Build o Scope of the project, to include purpose/use of facility.

o Size of the project, differentiate square footage of new construction versus renovation if project includes both.

o Type and percentage of work that was self-performed.

o Whether the project involved new construction, renovation, or both. Clearly delineate square meters for construction and renovation.

o Whether the project was completed for the United States DoD.

(Continue typing if required to provide more information)

ATTACHMENT 2 – CONTRACTOR PAST EXPERIENCE INFORMATION SHEET

PROJECT NO. IEU-24-0010 Purvciems EMS Garage Renovation, Latvia Page 2

Offeror: A contractor and/or company submitting a proposal for this solicitation.

Prime Contractor: A contractor that performed at least 15% of the work, and managed all other work for the project.

Sub Contractor: A contractor that performed part of the project work, but did not manage the entire project.

Joint Venture: More than one contractor with a legal binding agreement to work together.

Key Subcontractor: A contractor that has signed a letter of commitment to perform work for the duration of the contract for the Offeror, and the Offeror may take credit for the Key Subcontractor’s past performance if it was meaningful to this procurement. Ensure you the letter of commitment is signed by both the Offeror and the Key Subcontractor.

5. Mark one of these selections:

Work was completed as the ____ Prime ____ Subcontractor ___ Joint Venture __ Key Subcontractor

a. No additional information is required for work performed as the Prime other than what is on Page 1 of this form.

b. If work was as a Joint Venture, explain the relationship of the company, which company performed the work, and how the work performed and the relationship provides an added benefit for experience.

c. If work was performed as a Key Subcontractor, explain how the work performed as a Key Subcontractor provides an added benefit for experience:

d. If work was as a Subcontractor, explain how the work performed as a Subcontractor is a benefit for experience such as, responsible for the work performed and managed the portion of work performed including submittals: