IDVA R99763 REPAIR OF CONCRETE RAMPS AND SIDEWALKS GSR.pdf

PDF 138 KB Posted

Attached to
IVHM FY22 Concrete Project
Solicitation number
22-497DVA-MANTE-B-24267
Issued by
Kane County, Illinois

About this file

The document is a BEP Project Goal Setting Review Form for Contract ID R99763 titled "REPAIR OF CONCRETE RAMPS & SIDEWALKS" for the Illinois Department of Veterans' Affairs (IDVA). The contract is for the repair and installation of concrete ramps, sidewalks, and patios at the Illinois Veterans Home Manteno, with a total contract amount of $300,000.00 and a recommended 7% BEP goal. The contract has no renewal option and the primary service categories are 90974, 91347, 91382, and 91457.

The document also references a related state and local contract opportunity, IVHM FY22 Concrete Project, which is to be submitted electronically pursuant to CPO Notice 202006. The procurement is for the repair and installation of concrete ramps, sidewalks, and patios at the Illinois Veterans Home Manteno. The state agency for this contract is the State of Illinois.

View the file

Other files

File Type Posted
BEP Vendors for Concrete Solicitation.csv CSV file
Forms A Section V.18.1~46.doc DOC document
Forms B Section V.20.1~78.docx DOCX document
Facility Overhead Map~1.pdf PDF
CPO Notice 2020~10.06 Procurement and Electronic Submission —
IFB Manteno Veterans Home Concrete project.docx DOCX document
Copy of BEP ADDENDUM for b24267.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(Version 20.0 – 1/24/21)

BIDBUY NUMBER: R99763 CONTRACT AGENCY:

IDVA

CONTRACT TITLE:

REPAIR OF

CONCRETE RAMPS

& SIDEWALKS

AGENCY

PROCUREMENT

OFFICER:

TYLER WHITE

TOTAL CONTRACT

AMOUNT:

$300,000.00

AGENCY

RECOMMENDED

GOAL:

7%

RENEWAL (Y/N): NO

PRIMARY SERVICE

CATEGORY:

90974 91347

91382

91457

X Concur with the overall goal for the contract.

Recommend the following adjusted goal to the contract:

Identify the Scope(s) of

Work

All BEP

Firms

Available

All BidBuy

Firms

Available

Reason for Adjustment and/or Comments

BEP RECOMMENDED

GOAL:

JEANETTA CARDINE________ JEANETTA CARDINE ____07/22/21____

BEP Compliance Officer Signature Date

CMS CONTRACT GOAL SETTING FORM

Date

Received:

07/21/21

BEP PROJECT GOAL SETTING REVIEW FORM

File details come from the government source that posted it. Updated .