IDOT 78977-178.pdf
PDF 1 MB Posted
- Attached to
- Reconstruction of Benton Square (IL 14 / IL 37) with improved turning movements and island crosswalks.
- Solicitation number
- 78977
- Issued by
- Fulton County, Illinois
About this file
This is a Notice to Bidders and Specifications document issued by the Illinois Department of Transportation (IDOT) for Contract No. 78977, a reconstruction project of Benton Square located at the intersection of IL 14, IL 37, and IL 34 in Franklin County, Illinois. The project involves converting Benton Square to a roundabout through the installation of splitter islands, pavement markings, and signage, with proposed work including hot-mix asphalt (HMA) resurfacing, Portland cement concrete (PCC) pavement, pedestrian and ADA-compliant crosswalks, raised splitter islands, and mountable truck aprons. Electronic bids must be submitted to the integrated Contractors Exchange (iCX) system prior to 12:00 p.m. on June 12, 2026, at which time bids will be publicly opened. The contract is designated as FAP Route 869, Project STP-ZTR0(450), Section 5N-3, and is classified as a Federal-Aid construction project under District 9 Construction Funds. No specific site visit or bidder's conference date is mentioned in the document.
The contract will be awarded to the lowest responsive and responsible bidder in accordance with terms and conditions established by IDOT, with the Department reserving the right to determine responsibility at award, reject any or all proposals, re-advertise the improvement, and waive technicalities. The project is funded through Federal-aid sources as indicated by the FAP (Federal-Aid Primary) route designation. Multiple utility companies have facilities within the project limits, including water, sewer, lighting, fiber optic, telephone, cable television, gas, and electric services, with utility adjustments estimated to occur before or during construction. The Special Provisions document includes numerous supplemental specifications and recurring special provisions covering materials, construction methods, traffic control, quality assurance, and federal compliance requirements applicable to this Federal-Aid construction contract.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting June 12, 2026
Notice to Bidders, Specifications and Proposal
Contract No. 78977 FRANKLIN County Section 5N-3 Route FAP 869 Project STP-ZTR0(450) District 9 Construction Funds
Prepared by F
Checked by
(Printed by authority of the State of Illinois)
NOTICE TO BIDDERS
1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.
June 12, 2026 at which time the bids will be publicly opened from the iCX SecureVault.
2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the
Invitation for Bids as:
Contract No. 78977 FRANKLIN County Section 5N-3 Project STP-ZTR0(450) Route FAP 869 District 9 Construction Funds
Reconstruction of Benton Square (IL 14 / IL 37) with improved turning movements and island crosswalks.
3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.
(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.
4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.
By Order of the Illinois Department of Transportation
Gia Biagi, Secretary
FAP ROUTE 869 (IL 14/IL 37)
PROJECT STP-ZTR0(450)
SECTION 5N-3
FRANKLIN COUNTY
CONTRACT NO. 78977
INDEX
FOR
SUPPLEMENTAL SPECIFICATIONS
AND RECURRING SPECIAL PROVISIONS
Adopted January 1, 2026
This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.
ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)
SUPPLEMENTAL SPECIFICATIONS
Std. Spec. Sec. Page No.
109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires
1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment
SECTION 5N-3
RECURRING SPECIAL PROVISIONS
The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:
CHECK SHEET # PAGE NO.
1 X Additional State Requirements for Federal-Aid Construction Contracts 2 X Subletting of Contracts (Federal-Aid Contracts)
3 X EEO
4 Specific EEO Responsibilities Nonfederal-Aid Contracts 5 Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 X Construction Layout Stakes
10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 X Quality Control of Concrete Mixtures at the Plant 23 X Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 X Concrete Mix Design – Department Provided 32 Station Numbers in Pavements or Overlays
SECTION 5N-3
i
TABLE OF CONTENTS
LOCATION OF PROJECT
DESCRIPTION OF PROJECT
UTILITIES
CHANGEABLE MESSAGE SIGNS
DROP-OFF NEAR THE EDGE OF TRAVELED WAY
NOTIFICATION PRIOR TO STARTING WORK
PORTLAND CEMENT CONCRETE PAVEMENT 9” JOINTED
PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH
PROFILE DIAMOND GRINDING CONCRETE PAVEMENT
COOPERATION BETWEEN CONTRACTORS
TRAFFIC CONTROL PLAN
AVAILABILITY OF ELECTRONIC FILES
3D MODEL – CONTRACTOR SUPPLIED
INTERSECTION LANE RENTAL
STAGE 5 CONSTRUCTION
STAGING PLAN
STAMPED COLORED PORTLAND CEMENT CONCRETE PAVEMENT 9” (JOINTED) AND STAMPED
COLORED PORTLAND CEMENT CONCRETE MEDIAN SURFACE, 4 INCH
CLASS C PATCHING AND PAVEMENT REMOVAL
SIGN REMOVAL
DELAYED START
AGGREGATE SUBGRADE IMPROVEMENT (BDE)
CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE)
COMPENSABLE DELAY COSTS (BDE)
HOT-MIX ASPHALT (BDE)
HOT-MIX ASPHALT – LONGITUDINAL JOINT SEALANT (BDE)
LONGITUDINAL TINING (BDE)
PAVEMENT MARKING (BDE)
PAVEMENT PATCHING (BDE)
PERFORMANCE GRADED ASPHALT BINDER (BDE)
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (BDE)
SHORT TERM AND TEMPORARY PAVEMENT MARKINGS (BDE)
SIGN PANELS AND APPURTENANCES (BDE)
SOURCE OF SUPPLY AND QUALITY REQUIREMENTS (BDE)
SECTION 5N-3
ii
SUBCONTRACTOR AND DBE PAYMENT REPORTING (BDE)
SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE)
SUBMISSION OF BIDDERS LIST INFORMATION (BDE)
SUBMISSION OF PAYROLL RECORDS – FEDERAL AID CONTRACT (BDE)
SURFACE TESTING OF PAVEMENTS – IRI (BDE)
SURVEYING SERVICES (BDE)
VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)
WORK ZONE TRAFFIC CONTROL DEVICES (BDE)
WORKING DAYS (BDE)
SECTION 5N-3
STATE OF ILLINOIS
SPECIAL PROVISIONS
The following Special Provisions supplement the "Standard Specifications for Road and Bridge Construction," adopted January 1, 2022, the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways," and the "Manual of Test Procedures for Materials" in effect on the date of invitation for bids, and the Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included herein which apply to and govern the construction of FAP Route 869 (IL 14/IL 37), Project STP-ZTR0(450), Section 5N-3, Franklin County, Contract No. 78977, and in case of conflict with any part or parts of said Specifications, the said Special Provisions shall take precedence and shall govern.
FAP Route 869 (IL 14/IL 37) Project STP-ZTR0(450)
Section 5N-3 Franklin County
Contract No. 78977
LOCATION OF PROJECT
This improvement is located at the Benton square, the intersection of IL 14, IL 37, and IL 34, in Franklin County.
DESCRIPTION OF PROJECT
This project involves converting the Benton Square to a roundabout through using splitter islands, pavement markings, and signage. Proposed work include HMA resurfacing, PCC pavement, pedestrian and ADA compliant crosswalks, raised splitter islands, and mountable truck aprons.
UTILITIES
Effective 1984 Revised 4/8/20
There are no known utility conflicts within the project limits. However, the following utility companies have facilities within the project limits:
SECTION 5N-3
Name and Address of Utility
Type
Location
Estimated Adjustment
Status Benton, City of P.O Box 640 Benton, IL 62812 ATTN: Dailus Richardson Cell: (618) 513-5419 Email: wssupt@bentonil.gov
WATER/
SEWER/
LIGHTING
AROUND
THE SQUARE
THROUGHOUT BEFORE OR
DURING
CONSTRUCTION
Clearwave Fiber Two North Vine St.
P.O. Box 808 Harrisburg, IL 62946 ATTN: Mylon Rice Tel: (618) 918-1539 Email: mylon.rice@clearwavefiber.com
FIBER OPTIC THROUGHOUT BEFORE OR
DURING
CONSTRUCTION
Extenet 3030 Warrenville Road, Suite 340 Lisle, IL 60532 ATTN: Coy Potts Tel: (630) 505-3845 Cell: (815) 995-1903 Email: cpotts@extenetsystems.com
FIBER OPTIC THROUGHOUT BEFORE OR
DURING
CONSTRUCTION
Frontier Communications 208 West Union St.
Marion, IL 62959 ATTN: Rick Shaw Tel: (618) 997-0253 Cell: (618) 967-5540 Email: rick.shaw@ftr.com
TELEPHONE/
FIBER OPTIC
THROUGHOUT BEFORE OR
DURING
CONSTRUCTION
Hamilton County Telephone Cooperative 600 Halfway RD. Ste 104 Marion, IL 62959 ATTN: Terry Phillips Tel: (618) 736-1023 Cell: (618) 922-3992 Email: Terryp@hamiltoncom.net
TELEPHONE/
FIBER OPTIC
THROUGHOUT BEFORE OR
DURING
CONSTRUCTION
New Wave/Sparklight Communications 184 Southtowne Shopping Center Du Quoin, IL 62832 ATTN: Terry Delaval Tel: (618) 663-7300 Email: Terry.Delaval@sparklight.biz
CABLE T.V. THROUGHOUT BEFORE OR
DURING
CONSTRUCTION
SECTION 5N-3
Windstream 148 Co Hwy 25 Shumway, IL 62461 ATTN: Eric Porter Cell: (217) 343-0864 Email: Eric.Porter@windstream.com
FIBER OPTIC THROUGHOUT BEFORE OR
DURING
CONSTRUCTION
Ameren Illinois Gas 1800 West Main Street Marion, IL 62959 ATTN: Odee Kokelu Cell: (618) 579-5008 Email: CKokelu@ameren.com
GAS THROUGHOUT
BEFORE OR
CONSTRUCTION
Ameren Electric 1800 West Main Street Marion, IL 62959 ATTN: Eric Turner Tel: (618) 751-1283 Email: eturner@ameren.com
ELECTRIC THROUGHOUT BEFORE OR
CONSTRUCTION
Additional utility information may be obtained by calling the "Joint Utility Location Information for Excavators" phone number, 800-892-0123. This project is located in Benton, Illinois.
CHANGEABLE MESSAGE SIGNS
Revised 4/15/20
This work consists of furnishing, placing, and maintaining changeable message signs according to Section 701 and the following:
A total of four changeable message signs shall be required in this contract. All signs must be in place and operational for a minimum of 14 calendar days prior to lane or roadway closures. Each sign shall state the day work will begin and delays are possible. The exact message will be approved by the Engineer. The Contractor may be required to relocate each sign multiple times during the contract at his or her expense. The exact location of the placement of these signs shall be determined in the field by the Engineer.
This work will be paid for per CALENDAR DAY as CHANGEABLE MESSAGE SIGN.
SECTION 5N-3
DROP-OFF NEAR THE EDGE OF TRAVELED WAY
Revised 3/20/17
In order to be in compliance with Safety Engineering Policy Memorandum 4-21 (Drop Off Policy), the Contractor will utilize Traffic Control and Protection, Standard BLR-21. At any time a greater than 12” drop off is located within 8 ft. of the edge of the nearest open traffic lane, that lane shall be closed until the drop off is brought up to less than 12”. Pavement patching is not considered a drop off condition, except when individual patching holes are left open in excess of 24 hours. For drop offs >1.5” but <12” there shall be no long duration stationary operation allowed (14 days or more) located within 8 ft. of the edge of the nearest open traffic lane.
The Contractor will be assessed a traffic control deficiency deduction per Article 105.03(b) for each day a drop off greater than 1.5” exists for more than 14 days within 8 ft. of the edge of the nearest open traffic lane.
NOTIFICATION PRIOR TO STARTING WORK
Effective 12/05 Revised 2/10/17
Revise the first sentence of Article 107.09 Public Convenience and Safety to the following. “The Contractor shall notify the Engineer at least 14 days in advance of starting any construction work.
For projects involving width or height restrictions or complete closures of the roadway, an additional seven days of notice (21 days total) will be required.”
This additional notification is required, so the public can be notified of the pending construction.
PORTLAND CEMENT CONCRETE PAVEMENT 9” JOINTED
Revised 2/10/17
The construction of the 9" PCC pavement shall be completed as quickly as possible and shall be subject to the Intersection Rental special provisions. The mix design shall utilize class PP concrete criteria and should be based on obtaining a compressive strength of no less than 2000 psi in 24 hours. Only non-calcium chloride accelerators will be permitted.
The requirements in Article 420.07 Paragraph 8 regarding use of newly constructed adjacent lanes will be waived. However, the concrete must obtain a strength of no less than 2000 psi before allowing mechanical equipment or traffic on the pavement. Curing will be maintained until opening strength is attained. Finishing shall meet the requirements of the Article 420.09; Article 420.09a(3) and b(3) will be allowed.
SECTION 5N-3
PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH
Revised 07/06/23
This work shall include all materials, labor, and equipment necessary to construct the PCC sidewalk, excavation, and grading at locations shown on the plans and as directed by the Engineer. This work shall be in accordance with Section 424.
The excavation necessary for construction of the PCC sidewalk shall be included in contract unit price and in accordance with Section 202.
Basis of Payment. This work will be paid for at the contract unit price per SQUARE FOOT for PORTLAND CEMENT CONCRETE SIDEWALK 4 INCH. Price shall include all earth excavation.
PROFILE DIAMOND GRINDING CONCRETE PAVEMENT
Effective: March 23, 2022
Description. This work shall consist of diamond grinding concrete pavement.
Equipment. Equipment shall be according to the following.
Diamond Grinder. The diamond grinder shall be a self-propelled planing machine specifically designed for diamond saw grinding. It shall be capable of accurately establishing the profile grade and controlling the grinding cross slope. It shall also have an effective means for removing excess material and slurry from the surface and for preventing dust from escaping into the air. The removal of slurry shall be continuous throughout the grinding operation. The slurry shall be disposed of according to Article 202.03.
The grinding head shall be a minimum of 4 ft. wide, and the diamond saw blades shall be gang mounted on the grinding head at a rate of 50 to 60 blades/ft.
Construction Requirements. After all components have been properly cured, the concrete pavement shall be ground over its entire length and over a width that extends to within 2 ft. of the curbs. Whenever possible, each subsequent longitudinal grinding pass shall progress down the cross slope from high to low. The maximum thickness removed shall be 1/4 inch; however, additional removal thickness may be permitted.
The grinding process shall produce a pavement surface that is true in grade and uniform in appearance with longitudinal line-type texture. The line-type texture shall contain corrugations parallel to the outside pavement edge and present a narrow ridge corduroy type appearance. The peaks of the ridges shall be 1/8-inch +/- 1/16-inch higher than the bottom of the grinding with evenly spaced ridges. It shall be the Contractor’s responsibility to select the actual number of blades per foot to be used to provide the proper surface finish for the aggregate type and concrete present on the project within the limits specified above.
The vertical difference between longitudinal passes shall be 1/8-inch maximum.
SECTION 5N-3
Method of Measurement. This work will be measured for payment in place, and the area computed in square yards of diamond grinding performed.
Basis of Payment. This work will be paid for at the contract unit price per SQUARE YARD for
PROFILE DIAMOND GRINDING CONCRETE PAVEMENT.
COOPERATION BETWEEN CONTRACTORS
Revised 2/10/17
The Contractor is to be aware that traffic control limits of this contract may overlap those of another project(s) that may be under construction along IL 14 concurrently with this work. The Contractor shall coordinate his/her work with the other contractors to minimize any possible conflicts. The Contractor shall also notify the Engineer five working days in advance of any work that may affect other adjacent contracts.
Adjacent Project, Contract No. 78845
TRAFFIC CONTROL PLAN
Effective 1985 Revised 4/17/23
During the entire construction period, the road shall be kept open to traffic as follows:
(a) The highway shall be kept open to at least one lane of traffic at all times and to two lanes of traffic to the greatest extent possible, except as noted in Intersection Lane Rental special provision.
(b) Access to all public roads and private entrances shall be maintained during all stages of the work.
(c) The road shall be kept open on the detour road during construction.
(d) There shall be no lane closures, milled surface, or short-term pavement marking allowed during the weekend of the Car Show Sept 12th at the Benton Square.
Prior to allowing traffic on any portion of the roadway that has been cold milled, the Contractor shall have erected "Rough Grooved Surface" and "Uneven Pavement" signs that conform to the details shown in the plans. A minimum of one sign at each end of the improvement will be required. The Contractor shall maintain the "Rough Grooved Surface" signs until the cold milled surface is covered with binder. The Contractor shall maintain the "Uneven Pavement" signs until the resurfacing operations are completed. The cost of furnishing, erecting, maintaining, and removing the required signs shall be included in the contract.
SECTION 5N-3
AVAILABILITY OF ELECTRONIC FILES
Effective 10/16 Revised 12/11/19
Electronic files of this project will be made available to the Contractor after contract award.
Contractor shall coordinate obtaining electronic files through the Engineer. If there is a conflict between the electronic files and the printed contract plans and documents, the printed contract plans and documents shall take precedence over the electronic files. The Contractor shall accept all risk associated with using the electronic files and shall hold the Department harmless for any errors or omissions in the electronic files and the data contained therein. Errors or delays resulting from the use of the electronic files by the Contractor shall not result in an extension of time for any interim or final completion date or shall not be considered cause for additional compensation.
The Contractor shall not use, share, or distribute these electronic files except for the purpose of constructing this contract. Any claims by third parties due to use or errors shall be the sole responsibility of the Contractor. The Contractor shall include this disclaimer with the transfer of these electronic files to any other parties and shall include appropriate language binding them to similar responsibilities.
3D MODEL – CONTRACTOR SUPPLIED
Revised 12/10/19
3D models of the project site developed by the Contractor shall be provided to the Engineer at no additional cost to the Department.
INTERSECTION LANE RENTAL
The Contractor will be allowed the following number of intersection lane rental days of closure as described below and as shown in the Staging Plan.
Stage 1 – 9 days Stage 2 – 9 days Stage 3 – 7 days Stage 4 – 7 days
An intersection lane rental day is defined as a 24 hour consecutive period of time beginning at 12:00 midnight and ending at 12:00 midnight for which any through lane or turn lane on IL 14, IL 37, or IL 34 is closed to traffic in the stages indicated above. A full intersection lane rental day will be charged for any partial days of closure. Only one intersection rental will be charged per 24 hour closure.
The Contractor shall not have more than one leg of the intersection closed at a time. The parking that is shown closed on stages 1-4 shall be open to use by the public at the completion of each stage.
SECTION 5N-3
The Contractor shall be liable to the Department for $5,000 for each intersection lane rental day beyond the stated days allowed to complete the work. There is no limit to the number of intersection lane rental days assessed that exceed the allotted days.
Should the Contractor be delayed in the commencement, prosecution, or completion of the work for any reason, there shall be no extension of the disincentive payment calculation.
STAGE 5 CONSTRUCTION
The Contractor will be allowed four days to complete the patching, milling, and resurfacing of the square and parking areas, shown on the stage 5 construction sheet. Work will only be allowed between 7 pm and 7 am. Traffic must be maintained at all times.
The Contractor shall submit a milling and paving staging plan two weeks prior to stage 5 construction to show maintenance of traffic. The traffic control items required to facilitate this work shall be included in the cost of Standard 701701.
The Contractor shall be liable to the Department for $5,000 for each stage 5 construction day beyond the stated days allowed to complete the work. There is no limit to the number of intersection lane rental days assessed that exceed the allotted days.
Should the Contractor be delayed in the commencement, prosecution, or completion of the work for any reason, there shall be no extension of the disincentive payment calculation.
STAGING PLAN
A suggested staging plan for the construction of the proposed subbase and pavement is included in the plans. The Contractor may choose, but is not required, to use this plan.
If the Contractor chooses not to use the plan provided therein he/she shall submit a staging plan for the improvement to the District’s Project Implementation Engineer within ten days of the award of the contract. The Contractor’s submittal shall detail the location and sequence of work and include a traffic control plan for each stage.
The Contractor will be responsible for any additional efforts required to facilitate the construction of PCC pavement as shown on the plans. Such additional efforts include, but are not limited to:
concrete pumping, pouring from the sub-grade of the lane being constructed, and additional flagmen to provide protection for personnel and equipment adjacent to the open lane of traffic.
During staged construction the Contractor shall have “NO PARKING” signs in accordance with the adjacent leg of construction. These signs will be included in the cost of Traffic Control and Protection, Standard 701701. Placement of these signs shall be approved by the Engineer.
SECTION 5N-3
STAMPED COLORED PORTLAND CEMENT CONCRETE PAVEMENT 9” (JOINTED) AND
STAMPED COLORED PORTLAND CEMENT CONCRETE MEDIAN SURFACE, 4 INCH
This work shall consist of the installation of stamped colored PCC pavement 9” (jointed) on the splitter islands as well as the truck aprons as shown on the plans. This work shall be completed in accordance with the applicable portions of Section 420 of the Standard Specifications. This work shall also consist of the installation of stamped colored Portland cement median surface, 4 inch on the sidewalks as shown on the plans. This work shall be completed in accordance with the applicable portions of Section 606 of the Standard Specifications.
The installer shall provide a qualified foreman or supervisor who has a minimum of three years of experience with imprinted and textured concrete and who has successfully completed at least five imprinted concrete installations of high quality and similar in scope to that required.
Prior to beginning work, the contract shall provide field samples of integrally colored Portland cement pavement with the imprinted pattern. The sample is to be 48” x 48” in size , 9” thick, and surface colors and patterns as specified. Work shall not proceed until the workmanship, pattern, and color are approved by the Engineer. The Contractor will be required to provide additional samples as required to obtain the Engineer’s approval.
The concrete shall be integrally colored for the full depth of the pavement. The color shall be Butterfield SG09 – Dark Taupe, or approved equal.
Pigment shall meet the requirements of ASTM C979 and be on the Department’s Approved List of Pigments for Integrally Colored Concrete. All work shall also be in accordance with the manufacturer’s recommendations, including pigment %, pigment mixing, additional concrete admixture compatibility, concrete curing, required sealants, etc. Care shall be taken such that different batches of concrete do not have different finished colors.
Do not add calcium chloride to the concrete mix design.
The rolled or stamped pattern shall be heavy slate, similar to the Malkovich Park Pavilion concrete on the southwest corner of the Benton Square. Vertical surface discontinuities shall be 0.5 inches maximum. Vertical surface discontinuities between 0.25 inches and 0.5 inches shall be beveled with a slope no steeper that 50%. The bevel shall be applied across the entrie vertical surface discontinuity.
Note that the adjacent combination curb and gutter is measured and paid for separately and is to remain natural concrete color.
Method of Measurement: Stamped colored PCC pavement 9” (jointed) shall be measured for payment in square yards. Stamped colored PCC median surface, 4 inch shall be measured for payment in square feet.
Basis of Payment: The work will be paid for at the contract unit price per SQUARE YARD for STAMPED COLORED PORTLAND CEMENT CONCRETE 9” (JOINTED) and STAMPED
COLORED PORTLAND CEMENT CONCRETE MEDIAN SURFACE, 4”.
SECTION 5N-3
CLASS C PATCHING AND PAVEMENT REMOVAL
Work shall be done in accordance with Sections 440 and 442. When class C patches and pavement removal are located in areas of existing brick pavement, a diamond blade wheel saw shall be required to limit spalling of the existing brick pavement.
This work will not be paid for separately, but shall be considered included in the contract unit prices of the type and size of patches involved and the plan quantity of pavement removal.
SIGN REMOVAL
This work consists of removing the existing posts and any attached signs at the locations shown on the sign schedule in the plans. This work shall be done in accordance with Section 724 of the Standard Specifications. The decrotavie sign posts and attached signs to be removed shall be delivered to the City of Benton Street Department.
This work will be paid for at the contract unit price per EACH for SIGN REMOVAL.
DELAYED START
No work is to be allowed prior to September 21st, 2026, at the request of the City of Benton.
SECTION 5N-3
AGGREGATE SUBGRADE IMPROVEMENT (BDE)
Effective: April 1, 2012 Revised: April 1, 2022
Add the following Section to the Standard Specifications:
“SECTION 303. AGGREGATE SUBGRADE IMPROVEMENT
303.01 Description. This work shall consist of constructing an aggregate subgrade improvement (ASI).
303.02 Materials. Materials shall be according to the following.
Item Article/Section
(a) Coarse Aggregate ............................................................................................... 1004.07
(b) Reclaimed Asphalt Pavement (RAP) ................................................................... 1031.09
303.03 Equipment. The vibratory roller shall be according to Article 1101.01, or as approved by the Engineer. Vibratory machines, such as tampers, shall be used in areas where rollers do not fit.
303.04 Soil Preparation. The minimum immediate bearing value (IBV) of the soil below the improved subgrade shall be according to the Department’s “Subgrade Stability Manual” for the aggregate thickness specified.
303.05 Placing and Compacting. The maximum nominal lift thickness of aggregate gradations CA 2, CA 6, and CA 10 when compacted shall be 9 in. (225 mm). The maximum nominal lift thickness of aggregate gradations CS 1, CS 2, and RR 1 when compacted shall be 24 in. (600 mm).
The top surface of the aggregate subgrade improvement shall consist of a layer of capping aggregate gradations CA 6 or CA 10 that is 3 in. (75 mm) thick after compaction. Capping aggregate will not be required when aggregate subgrade improvement is used as a cubic yard pay item for undercut applications.
Each lift of aggregate shall be compacted to the satisfaction of the Engineer. If the moisture content of the material is such that compaction cannot be obtained, sufficient water shall be added so that satisfactory compaction can be obtained.
303.06 Finishing and Maintenance. The aggregate subgrade improvement shall be finished to the lines, grades, and cross sections shown on the plans, or as directed by the Engineer. The aggregate subgrade improvement shall be maintained in a smooth and compacted condition.
303.07 Method of Measurement. This work will be measured for payment according to
Article 311.08.
303.08 Basis of Payment. This work will be paid for at the contract unit price per cubic yard
(cubic meter) or ton (metric ton) for AGGREGATE SUBGRADE IMPROVEMENT or at the
SECTION 5N-3
contract unit price per square yard (square meter) for AGGREGATE SUBGRADE IMPROVEMENT, of the thickness specified.”
Add the following to Section 1004 of the Standard Specifications:
“ 1004.07 Coarse Aggregate for Aggregate Subgrade Improvement (ASI). The aggregate shall be according to Article 1004.01 and the following.
(a) Description. The coarse aggregate shall be crushed gravel, crushed stone, or crushed concrete. In applications where greater than 24 in. (600 mm) of ASI material is required, gravel may be used below the top 12 in (300 mm) of ASI.
(b) Quality. The coarse aggregate shall consist of sound durable particles reasonably free of deleterious materials.
(c) Gradation.
(1) The coarse aggregate gradation for total ASI thickness less than or equal to 12 in.
(300 mm) shall be CA 2, CA 6, CA 10, or CS 1.
The coarse aggregate gradation for total ASI thickness greater than 12 in. (300 mm) shall be CS 1 or CS 2 as shown below or RR 1 according to Article 1005.01(c).
COARSE AGGREGATE SUBGRADE GRADATIONS
Grad No. Sieve Size and Percent Passing 8” 6” 4” 2” #4
CS 1 100 97 ± 3 90 ± 10 45 ± 25 20 ± 20
CS 2 100 80 ± 10 25 ± 15
COARSE AGGREGATE SUBGRADE GRADATIONS (Metric)
Grad No. Sieve Size and Percent Passing 200 mm 150 mm 100 mm 50 mm 4.75 mm
CS 1 100 97 ± 3 90 ± 10 45 ± 25 20 ± 20
CS 2 100 80 ± 10 25 ± 15
(2) Capping aggregate shall be gradation CA 6 or CA 10.”
Add the following to Article 1031.09 of the Standard Specifications:
“ (b) RAP in Aggregate Subgrade Improvement (ASI). RAP in ASI shall be according to Articles 1031.01(a), 1031.02(a), 1031.06(a)(1), and 1031.06(a)(2), and the following.
(1) The testing requirements of Article 1031.03 shall not apply.
(2) Crushed RAP used for the lower lift may be mechanically blended with aggregate gradations CS 1, CS 2, and RR 1 but it shall be no greater than 40 percent of the total product volume. RAP agglomerations shall be no greater than 4 in. (100 mm).
SECTION 5N-3
(3) For capping aggregate, well graded RAP having 100 percent passing the 1 1/2 in.
(38 mm) sieve may be used when aggregate gradations CS 1, CS 2, CA 2, or RR 1 are used in the lower lift. FRAP will not be permitted as capping material.
Blending shall be through calibrated interlocked feeders or a calibrated blending plant such that the prescribed blending percentage is maintained throughout the blending process. The calibration shall have an accuracy of ± 2.0 percent of the actual quantity of material delivered.”
CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE)
Effective: January 1, 2025 Revised: January 1, 2026
Revise the first paragraph of Article 285.05 of the Standard Specifications to read:
“ 285.05 Fabric Formed Concrete Revetment Mat. The grout shall consist of a mixture of cement, fine aggregate, and water so proportioned and mixed as to provide a pumpable slurry.
Fly ash or ground granulated blast furnace (GGBF) slag, and concrete admixtures may be used at the option of the Contractor. The grout shall have an air content of not less than 6.0 percent nor more than 9.0 percent of the volume of the grout. The mix shall obtain a compressive strength of 2500 psi (17,000 kPa) at 28 days according to Article 1020.09.”
Revise Article 302.02 of the Standard Specifications to read:
“ 302.02 Materials. Materials shall be according to the following.
(a) Cement
(b) Water
(c) Hydrated Lime .................................................................................................... 1012.01
(d) By-Product, Hydrated Lime ................................................................................ 1012.02
(e) By-Product, Non-Hydrated Lime ........................................................................ 1012.03
(f) Lime Slurry ......................................................................................................... 1012.04
(g) Fly Ash
(h) Soil for Soil Modification (Note 1) ....................................................................... 1009.01
(i) Bituminous Materials (Note 2)
Note 1. This soil requirement only applies when modifying with lime (slurry or dry).
Note 2. The bituminous materials used for curing shall be emulsified asphalt RS-2, CRS- 2, HFE 90, or HFE 150; rapid curing liquid asphalt RC-70; or medium curing liquid asphalt MC-70 or MC-250.”
Revise Article 312.07(c) of the Standard Specifications to read:
“ (c) Cement .................................................................................................................... 1001”
SECTION 5N-3
Add Article 312.07(i) of the Standard Specifications to read:
“ (i) Ground Granulated Blast Furnace (GGBF) Slag ...................................................... 1010”
Revise the first paragraph of Article 312.09 of the Standard Specifications to read:
“ 312.09 Proportioning and Mix Design. At least 60 days prior to start of placing CAM II, the Contractor shall submit samples of materials to be used in the work for proportioning and testing.
The mixture shall contain a minimum of 200 lb (120 kg) of cement per cubic yard (cubic meter).
Cement may be replaced with fly ash or ground granulated blast furnace (GGBF) slag according to Article 1020.05(c)(1) or 1020.05(c)(2), respectively, however the minimum cement content in the mixture shall be 170 lbs/cu yd (101 kg/cu m). Blends of coarse and fine aggregates will be permitted, provided the volume of fine aggregate does not exceed the volume of coarse aggregate. The Engineer will determine the proportions of materials for the mixture according to the “Portland Cement Concrete Level III Technician Course” manual. However, the Contractor may substitute their own mix design. Article 1020.05(a) shall apply, and a Level III PCC Technician shall develop the mix design.”
Revise Article 352.02 of the Standard Specifications to read:
“ 352.02 Materials. Materials shall be according to the following.
(a) Cement (Note 1)
(b) Soil for Soil-Cement Base Course ....................................................................... 1009.03
(c) Water
(d) Bituminous Materials (Note 2)
Note 1. Bulk cement may be used for the traveling mixing plant method if the equipment for handling, weighing, and spreading the cement is approved by the Engineer.
Note 2. The bituminous materials used for curing shall be emulsified asphalt RS-2, CRS-2, HFE 90, or HFE 150; rapid curing liquid asphalt RC-70; or medium curing liquid asphalt MC-70 or MC-250.”
Revise Article 404.02 of the Standard Specifications to read:
“ 404.02 Materials. Materials shall be according to the following.
(a) Cement
(b) Water
(c) Fine Aggregate .................................................................................................... 1003.08
(d) Bituminous Material (Tack Coat) .......................................................................... 1032.06
(e) Emulsified Asphalts (Note 1) (Note 2) .................................................................. 1032.06
(f) Fiber Modified Joint Sealer .................................................................................. 1050.05
(g) Additives (Note 3)
Note 1. When used for slurry seal, the emulsified asphalt shall be CQS-1h according to Article 1032.06(b).
SECTION 5N-3
Note 2. When used for micro-surfacing, the emulsified asphalt shall be CQS-1hP according to Article 1032.06(e).
Note 3. Additives may be added to the emulsion mix or any of the component materials to provide the control of the quick-traffic properties. They shall be included as part of the mix design and be compatible with the other components of the mix.
Revise the last sentence of the fourth paragraph of Article 404.08 of the Standard Specifications to read:
“When approved by the Engineer, the sealant may be dusted with fine sand, cement, or mineral filler to prevent tracking.”
Revise Note 2 of Article 516.02 of the Standard Specifications to read:
“ Note 2. The sand-cement grout mix shall be according to Section 1020 and shall be a 1:1 blend of sand and cement comprised of a Type I, IL, or II cement at 185 lb/cu yd (110 kg/cu m). The maximum water cement ratio shall be sufficient to provide a flowable mixture with a typical slump of 10 in. (250 mm).”
Revise Note 2 of Article 543.02 of the Standard Specifications to read:
“ Note 2. The grout mixture shall be 6.50 hundredweight/cu yd (385 kg/cu m) of cement plus fine aggregate and water. Fly ash or ground granulated blast furnace (GGBF) slag may replace a maximum of 5.25 hundredweight/cu yd (310 kg/cu m) of the cement. The water/cement ratio, according to Article 1020.06, shall not exceed 0.60. An air-entraining admixture shall be used to produce an air content, according to Article 1020.08, of not less than 6.0 percent nor more than 9.0 percent of the volume of the grout. The Contractor shall have the option to use a water-reducing or high range water-reducing admixture.”
Revise Article 583.01 of the Standard Specifications to read:
“ 583.01 Description. This work shall consist of placing cement mortar along precast, prestressed concrete bridge deck beams as required for fairing out any unevenness between adjacent deck beams prior to placing of waterproofing membrane and surfacing.”
Revise Article 583.02(a) of the Standard Specifications to read:
“ (a) Cement .................................................................................................................... 1001”
Revise the first paragraph of Article 583.03 of the Standard Specifications to read:
“ 583.03 General. This work shall only be performed when the air temperature is
45 °F (7 °C) and rising. The mixture for cement mortar shall consist of three parts sand to one part cement by volume. The amount of water shall be no more than that necessary to produce a workable, plastic mortar.”
Revise Article 606.02(h) of the Standard Specifications to read:
SECTION 5N-3
“ (h) Fibers (Note 1) ........................................................................................................ 1014”
Revise Note 1 in Article 606.02(h) of the Standard Specifications to read:
“ Note 1. Fibers, when required, shall only be used in the concrete mixture for slipform applications.”
Revise the third paragraph in Article 606.10 of the Standard Specifications to read:
“ Welded wire fabric shall be 6 x 6 in. (150 x 150 mm) mesh, #4 gauge (5.74 mm), 58 lb (26 kg) per 100 sq ft (9 sq m).”
Revise Article 1001.01(d) of the Standard Specifications to read:
“ (d) Rapid Hardening Cement. Rapid hardening cement shall be according to the Bureau of Materials Policy Memorandum “Portland or Blended Cement Acceptance Procedure for Qualified and Non-Qualified Plants”, and ASTM C 1600, Type URH, Type VRH, or Type RH-CAC. It shall be used according to Article 1020.04 or when approved by the Engineer.
The Contractor shall submit a report from the manufacturer or an independent lab that contains results for testing according to ASTM C 1600 which shows the cement meets the requirements of either Type URH, Type VRH, or Type RH-CAC. Test data shall be less than 1 year old from the date of submittal.
Revise Article 1001.01(e) of the Standard Specifications to read:
“ (e) Other Cements. Other cements shall be according to the Bureau of Materials Policy Memorandum “Portland or Blended Cement Acceptance Procedure for Qualified and Non- Qualified Plants”, and ASTM C 1157 or ASTM C 1600, as applicable. Other cements shall be used according to Article 1020.04 or when approved by the Engineer. For cements according to ASTM C 1157, the Contractor shall submit a report from the manufacturer or an independent lab that contains results of tests which shows the cement meets the requirements Type GU, HE, MS, MH, or LH. For cements according to ASTM C 1600, the Contractor shall submit a report from the manufacturer or an independent lab that contains results of tests which shows the cement meets the requirements Type MRH or GRH. Test data shall be less than 1 year old from the date of submittal.”
Revise Article 1002.02 of the Standard Specifications to read:
“ 1002.02 Quality. Water used with cement in concrete or mortar and water used for curing concrete shall be clean, clear, and free from sugar. In addition, water shall be tested and evaluated for acceptance according to one of the following options.
OPTION 1.
(a) Acceptable limits for acidity and alkalinity when tested according to ITP T 26.
(1) Acidity -- 0.1 Normal NaOH ........................................................................ 2 ml max.*
(2) Alkalinity -- 0.1 Normal HCI...................................................................... 10 ml max.*
*To neutralize 200 ml sample.
SECTION 5N-3
(b) Acceptable limits for solids when tested according to the following.
(1) Organic (ITP T 26)....................................................................................... 0.02% max.
(2) Inorganic (ITP T 26) .................................................................................... 0.30% max.
(3) Sulfate (SO4) (ASTM D 516-82) ................................................................ 0.05% max.
(4) Chloride (ASTM D 512) .............................................................................. 0.06% max.
(c) The following tests shall be performed on the water sample and on deionized water. The same cement and sand shall be used for both tests.
(1) Unsoundness (ASTM C 151).
(2) Initial and Final Set Time (ASTM C 266).
(3) Strength (ASTM C 109).
The test results for the water sample shall not deviate from the test results for the deionized water, except as allowed by the precision in the test method.
OPTION 2. Water shall meet the requirements ASTM C 1602 Tables 1 and 2 as outlined in Sections 5.1, 5.2, and 5.4.”
Revise Note 2/ in Article 1003.01(b) of the Standard Specifications to read:
“ 2/ Applies only to sand. Sand exceeding the colorimetric test standard of 11 (Illinois
Modified AASHTO T 21) will be checked for mortar making properties according to Illinois Modified ASTM C 87 and shall develop a compressive strength at the age of 14 days when using Type I, IL, or II cement of not less than 95 percent of the comparable standard.
Revise the second sentence of Article 1003.02(e)(1) of the Standard Specifications to read:
“ The test will be performed with Type I, IL, or II portland cement having a total equivalent alkali content (Na2O + 0.658K2O) of 0.90 percent or greater.”
Revise the first sentence of the second paragraph of Article 1003.02(e)(3) of the Standard Specifications to read:
“ The ASTM C 1293 test shall be performed with Type I, IL, or II portland cement having a total equivalent alkali content (Na2O + 0.658K2O) of 0.80 percent or greater.”
Revise the second sentence of Article 1004.02(g)(1) of the Standard Specifications to read:
“ The test will be performed with Type I, IL, or II portland cement having a total equivalent alkali content (Na2O + 0.658K2O) of 0.90 percent or greater.”
Add the following Section to the Standard Specifications.
“SECTION 1014. FIBERS FOR CONCRETE
SECTION 5N-3
1014.01 General. Fibers used in concrete shall be Type II or Type III (polyolefin or carbon) according to ASTM C 1116. The testing required for Type II fibers or Type III polyolefin fibers shall be performed by an independent lab a minimum of once every five years, and the test results provided to the Department. Manufacturers of Type III carbon fibers shall provide materials certification documentation not more than 6 years old a minimum of once every 5 years to the Department. The Department will maintain a qualified product list. The method of inclusion of fibers into concrete mixtures shall be according to the manufacturer’s specifications.
At the discretion of the Engineer, the concrete mixture shall be evaluated in a field demonstration for fiber clumping, ease of placement, and ease of finishing. The field demonstration shall consist of a minimum 2 cu yd (1.5 cu m) trial batch placed in a 12 ft x 12 ft (3.6 m x 3.6 m) slab.
1014.02 Concrete Gutter, Curb, Median and Paved Ditch. Fibers shall be Type III. Fibers shall have a minimum length of 1/2 in. (13 mm) and a maximum length of 0.75 in. (19 mm). The maximum dosage rate in the concrete mixture shall not exceed 1.5 lb/cu yd (0.9 kg/cu m). The minimum dosage rate shall be per the manufacturer’s recommendation.
1014.03 Concrete Inlay or Overlay. Fibers shall be Type III. Fibers shall have a minimum length of 1.0 in. (25 mm), a maximum length of 2 1/2 in. (63 mm), and a maximum aspect ratio (length divided by the equivalent diameter of the fiber) of 150. The maximum dosage rate shall not exceed 5.0 lb/cu yd (3.0 kg/cu m). The minimum dosage rate shall be per the manufacturer’s recommendation.
1014.04 Bridge Deck Fly Ash, Ground Granulated Blast Furnace (GGBF) Slag, High
Reactivity Metakaolin, or Microsilica (Silica Fume) Concrete Overlay. Fibers shall be Type III. The dosage rate shall be a minimum of 3.0 lb/cu yd (1.8 kg/cu m), unless a field demonstration according to Article 1014.01 indicates that a lower dosage rate is necessary.
Based on the results of the field demonstration, the Department has the option to reduce the dosage rate of fibers, but the dosage will not be reduced to less than 2.0 lb / cu yd (1.2 kg/cu m).
1014.05 Bridge Deck Latex Concrete Overlay. Fibers shall be Type II or III. Fibers shall have a minimum length of 0.75 in. (19 mm), a maximum length of 1.75 in. (45 mm), and an aspect ratio (length divided by the equivalent diameter of the fiber) of between 70 and 100. The dosage rate shall be a minimum of 3.0 lb/cu yd (1.8 kg/cu m), unless a field demonstration according to Article 1014.01 indicates that a lower dosage rate is necessary. Based on the results of the field demonstration, the Department has the option to reduce the dosage rate of fibers, but the dosage will not be reduced to less than 2.0 lb/cu yd (1.2 kg/cu m).”
Add the following Section to the Standard Specifications:
“SECTION 1015. HIGH PERFORMANCE SHOTCRETE
1015.01 Packaged Shotcrete With Aggregate. The packaged shotcrete with aggregate shall be a pre-blended dry combination of materials for the wet-mix shotcrete method according to ASTM C 1480, Type FA or CA, Grade FR, Class I. The fibers shall be Type III according to Article 1014.01. The cement and finely divided minerals in the mixture shall be a minimum
6.65 cwt/cu yd (395 kg/cu m), and the portland cement shall not be below 4.70 cwt/cu yd (279 kg/cu m). Microsilica is required in the mixture and shall be a minimum of 5 percent by weight
SECTION 5N-3
(mass) of cementitious material, and a maximum of 10 percent. Strength requirements shall be according to ASTM C 1480 except that the strength at 28 days shall be at least 4000 psi (27,500 kPa). Strength testing shall be according to ASTM C 1140. The air content as shot shall be 4.0 – 8.0 percent when tested according to AASHTO T 152, and the coarse aggregate shall be a maximum size of 1/2 in. (12.5 mm).
The packaged shotcrete shall have a water soluble chloride ion content of less than 0.15% by weight of cementitious material when tested according to ASTM C 1218 or AASHTO T 260.
The testing according to ASTM C 1480, ASTM C 1140, AASHTO 152, and ASTM C 1218 or
AASHTO T 260 shall be performed by an independent lab a minimum of once every 5 years, and the test results shall be provided to the Department. The Department will maintain a qualified product list. Batching and mixing shall be per the manufacturer’s recommendations.
1015.02 Packaged Shotcrete Without Aggregate. The packaged shotcrete that does not include pre-blended aggregate shall be according to Article 1015.01, except the added aggregate shall be according to Articles 1003.02 and 1004.02. The aggregate gradation shall be according to the manufacturer. The Department will maintain a qualified product list. Batching and mixing shall be per the manufacturer’s recommendations.”
Revise Section 1017 of the Standard Specifications to read:
“SECTION 1017. PACKAGED, DRY, COMBINED MATERIALS FOR MORTAR AND
CONCRETE
1017.01 Mortar. The mortar shall be high-strength according to ASTM C 387 and shall have a minimum 80.0 percent relative dynamic modulus of elasticity when tested according to AASHTO T 161. For prestressed concrete applications, the mortar shall have a water-soluble chloride ion content of less than 0.06 percent by weight of cementitious material when tested according to ASTM C 1218 or AASHTO T 260; and for non-prestressed concrete applications, the water soluble chloride content shall be less than…