IDOT Contract 66N45 - Superstructure Replacement Project Summary
This is a Notice to Bidders and Special Provisions document issued by the Illinois Department of Transportation (IDOT) for Contract No. 66N45, a federal-aid highway construction project located on Interstate 80 (FAI Route 80) approximately 2 miles north of US 6 at Wyanet in Bureau County, Illinois. The project consists of removing and replacing the superstructure of structure number (SN) 006-0112 carrying I-80 under County Highway 8, along with limited hot-mix asphalt resurfacing, guardrail replacement, and embankment widening. Electronic bids must be submitted to the integrated Contractors Exchange (iCX) system prior to 12:00 p.m. on June 12, 2026, at which time bids will be publicly opened. The contract will be awarded to the lowest responsive and responsible bidder in accordance with Department rules and the terms established in the contract documents. The project requires complete closure of I-80 for beam removal and erection operations, limited to 10 PM to 4 AM between the IL 40 and IL 26 interchanges, with County Highway 8 also requiring complete closure during construction. The contractor must maintain traffic control with smart work zone monitoring systems, changeable message signs, real-time traffic control signing, and traffic surveillance systems throughout construction.
The contract includes numerous supplemental specifications and recurring special provisions addressing materials, construction methods, and quality assurance, including specifications for concrete pavement, asphalt, bridge deck construction with slipform parapet options, fiber-reinforced polymer wraps, preformed pavement joint seals, and environmental compliance for soil contamination management (ISGS Site 4602-2). The project is funded with NHPP (National Highway Performance Program) federal-aid funds and requires full compliance with Federal Highway Administration standards, MUTCD traffic control guidelines, and Illinois Department of Transportation specifications adopted January 1, 2026. Key construction requirements include contractor notification of closure dates at least 21 days in advance to state agencies and 14 days to local municipalities and emergency services, weekly payments for smart traffic monitoring systems and real-time traffic control devices, and multiple submittals for fiber wrap installation, quality control procedures, and inspection documentation. No pricing information, set-asides, or incumbent contractor details are specified in this bidding document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting June 12, 2026
Notice to Bidders, Specifications and Proposal
Contract No. 66N45 BUREAU County Section (06-3HB)BR Route FAI 80 Project NHPP-NP9A(889) District 3 Construction Funds
Prepared by F
Checked by
(Printed by authority of the State of Illinois)
NOTICE TO BIDDERS
1. TIME AND PLACE OF OPENING BIDS. Electronic bids are to be submitted to the electronic bidding system (iCX-Integrated Contractors Exchange). All bids must be submitted to the iCX system prior to 12:00 p.m.
June 12, 2026 at which time the bids will be publicly opened from the iCX SecureVault.
2. DESCRIPTION OF WORK. The proposed improvement is identified and advertised for bids in the
Invitation for Bids as:
Contract No. 66N45 BUREAU County Section (06-3HB)BR Project NHPP-NP9A(889) Route FAI 80 District 3 Construction Funds
Superstructure replacement (SN 006-0112) at CH 8 (Overhead), 2 miles north of US 6 on I-80.
3. INSTRUCTIONS TO BIDDERS. (a) This Notice, the invitation for bids, proposal and letter of award shall, together with all other documents in accordance with Article 101.09 of the Standard Specifications for Road and Bridge Construction, become part of the contract. Bidders are cautioned to read and examine carefully all documents, to make all required inspections, and to inquire or seek explanation of the same prior to submission of a bid.
(b) State law, and, if the work is to be paid wholly or in part with Federal-aid funds, Federal law requires the bidder to make various certifications as a part of the proposal and contract. By execution and submission of the proposal, the bidder makes the certification contained therein. A false or fraudulent certification shall, in addition to all other remedies provided by law, be a breach of contract and may result in termination of the contract.
4. AWARD CRITERIA AND REJECTION OF BIDS. This contract will be awarded to the lowest responsive and responsible bidder considering conformity with the terms and conditions established by the Department in the rules, Invitation for Bids and contract documents. The issuance of plans and proposal forms for bidding based upon a prequalification rating shall not be the sole determinant of responsibility. The Department reserves the right to determine responsibility at the time of award, to reject any or all proposals, to re-advertise the proposed improvement, and to waive technicalities.
By Order of the Illinois Department of Transportation
Gia Biagi, Secretary
FAI Route 80 (I-80)
Section (06-3HB)BR Bureau County
INDEX
FOR
SUPPLEMENTAL SPECIFICATIONS
AND RECURRING SPECIAL PROVISIONS
Adopted January 1, 2026
This index contains a listing of SUPPLEMENTAL SPECIFICATIONS, frequently used RECURRING SPECIAL PROVISIONS, and LOCAL ROADS AND STREETS RECURRING SPECIAL PROVISIONS.
ERRATA Standard Specifications for Road and Bridge Construction (Adopted 1-1-22) (Revised 1-1-26)
SUPPLEMENTAL SPECIFICATIONS
Std. Spec. Sec. Page No.
109 Measurement and Payment 202 Earth and Rock Excavation 204 Borrow and Furnished Excavation 207 Porous Granular Embankment 211 Topsoil and Compost 214 Grading and Shaping Ditches 406 Hot-Mix Asphalt Binder and Surface Course 407 Hot-Mix Asphalt Pavement (Full-Depth) 420 Portland Cement Concrete Pavement 502 Excavation for Structures 504 Precast Concrete Structures 509 Metal Railings 522 Retaining Walls 540 Box Culverts 542 Pipe Culverts 550 Storm Sewers 586 Granular Backfill for Structures 601 Pipe Drains, Pipe Underdrains, and French Drains 630 Steel Plate Beam Guardrail 632 Guardrail and Cable Road Guard Removal 644 High Tension Cable Median Barrier 665 Woven Wire Fence 701 Work Zone Traffic Control and Protection 781 Raised Reflective Pavement Markers 782 Reflectors 801 Electrical Requirements 821 Roadway Luminaires
1003 Fine Aggregates 1004 Coarse Aggregates 1010 Finely Divided Minerals 1020 Portland Cement Concrete ……… 1030 Hot-Mix Asphalt 1040 Drain Pipe, Tile, and Wall Drain 1042 Precast Concrete Products 1061 Waterproofing Membrane System 1067 Luminaire ……… 1097 Reflectors 1102 Hot-Mix Asphalt Equipment
Section (06-3HB)BR
RECURRING SPECIAL PROVISIONS
The following RECURRING SPECIAL PROVISIONS indicated by an “X” are applicable to this contract and are included by reference:
CHECK SHEET # PAGE NO.
1 X Additional State Requirements for Federal-Aid Construction Contracts 2 X Subletting of Contracts (Federal-Aid Contracts)
3 X EEO
4 Specific EEO Responsibilities Nonfederal-Aid Contracts 5 Required Provisions - State Contracts 6 Asbestos Bearing Pad Removal 7 Asbestos Waterproofing Membrane and Asbestos Hot-Mix Asphalt Surface Removal 8 Temporary Stream Crossings and In-Stream Work Pads 9 X Construction Layout Stakes
10 Use of Geotextile Fabric for Railroad Crossing 11 Subsealing of Concrete Pavements 12 Hot-Mix Asphalt Surface Correction 13 Pavement and Shoulder Resurfacing 14 Patching with Hot-Mix Asphalt Overlay Removal 15 Polymer Concrete 16 Reserved 17 Bicycle Racks 18 Temporary Portable Bridge Traffic Signals 19 Nighttime Inspection of Roadway Lighting 20 English Substitution of Metric Bolts 21 Calcium Chloride Accelerator for Portland Cement Concrete 22 Quality Control of Concrete Mixtures at the Plant 23 X Quality Control/Quality Assurance of Concrete Mixtures 24 Reserved 25 Reserved 26 Temporary Raised Pavement Markers 27 Restoring Bridge Approach Pavements Using High-Density Foam 28 Portland Cement Concrete Inlay or Overlay 29 Portland Cement Concrete Partial Depth Hot-Mix Asphalt Patching 30 Longitudinal Joint and Crack Patching 31 Concrete Mix Design – Department Provided 32 Station Numbers in Pavements or Overlays
Section (06-3HB)BR i
TABLE OF CONTENTS
LOCATION OF PROJECT
DESCRIPTION OF PROJECT
STATUS OF UTILITIES TO BE ADJUSTED:
CLEARING
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES
MULCH METHOD 2
TACK COAT
FIBER WRAP
REMOVE IMPACT ATTENUATORS, NO SALVAGE
FURNISH PERMANENT SURVEY MARKER
TEMPORARY RUMBLE STRIPS (SPECIAL)
KEEPING ROADS OPEN TO TRAFFIC
TRAFFIC CONTROL AND PROTECTION, (SPECIAL)
TRAFFIC CONTROL AND PROTECTION, STANDARD BLR 21
TRAFFIC CONTROL SURVEILLANCE
VEHICLE PARKING
PLASTIC DRUMS
CHANGEABLE MESSAGE SIGN
CHANGEABLE MESSAGE SIGN, SPECIAL
TEMPORARY INFORMATION SIGNING
MODIFIED URETHANE PAVEMENT MARKING – TWO APPLICATIONS
CONTROL OF WORK – SMART WORK ZONE
SMART TRAFFIC MONITORING SYSTEM
SLIPFORM PARAPET
BRIDGE DECK CONSTRUCTION
PREFORMED PAVEMENT JOINT SEAL
BAR SPLICERS, HEADED REINFORCEMENT
CEMENT, FINELY DIVIDED MINERALS, ADMIXTURES, CONCRETE, AND MORTAR (BDE) 32
COMPENSABLE DELAY COSTS (BDE)
CONCRETE SEALER (BDE)
EROSION CONTROL BLANKET (BDE)
FUEL COST ADJUSTMENT (BDE)
Section (06-3HB)BR ii
GUARDRAIL (BDE)
HOT-MIX ASPHALT (BDE)
HOT-MIX ASPHALT – LONGITUDINAL JOINT SEALANT (BDE)
PAVEMENT MARKING (BDE)
PERFORMANCE GRADED ASPHALT BINDER (BDE)
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES (BDE)
SEEDING (BDE)
SHORT TERM AND TEMPORARY PAVEMENT MARKINGS (BDE)
SIGN PANELS AND APPURTENANCES (BDE)
SOURCE OF SUPPLY AND QUALITY REQUIREMENTS (BDE)
SPEED DISPLAY TRAILER (BDE)
STEEL COST ADJUSTMENT (BDE)
STRUCTURAL REPAIR OF CONCRETE (BDE)
SUBCONTRACTOR AND DBE PAYMENT REPORTING (BDE)
SUBCONTRACTOR MOBILIZATION PAYMENTS (BDE)
SUBMISSION OF BIDDERS LIST INFORMATION (BDE)
SUBMISSION OF PAYROLL RECORDS – FEDERAL AID CONTRACT (BDE)
SURVEYING SERVICES (BDE)
TEMPORARY RUMBLE STRIPS (BDE)
VEHICLE AND EQUIPMENT WARNING LIGHTS (BDE)
WORK ZONE TRAFFIC CONTROL DEVICES (BDE)
WORKING DAYS (BDE)
Section (06-3HB)BR
STATE OF ILLINOIS
SPECIAL PROVISIONS
The following Special Provisions supplement the "Standard Specifications for Road and Bridge Construction," adopted January 1, 2022, the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways," and the "Manual of Test Procedures for Materials" in effect on the date of invitation for bids, and the Supplemental Specifications and Recurring Special Provisions indicated on the Check Sheet included herein which apply to and govern the construction of FAI Route 80 (I-80), Project NHPP-NP9A(889), Section (06-3HB)BR, Bureau County, Contract No. 66N45 and in case of conflict with any part or parts of said Specifications, the said Special Provisions shall take precedence and shall govern.
LOCATION OF PROJECT
This project is located on FAI 80 (I-80) under FAS 188 (CH 8) approximately 2 miles north of US 6 at Wyanet, Illinois in Bureau County.
DESCRIPTION OF PROJECT
This project consists of removing and replacing the superstructure of structure number (SN) 006- 0112. Additional work includes limited Hot-Mix Asphalt resurfacing, guardrail replacement and embankment widening.
Section (06-3HB)BR
STATUS OF UTILITIES TO BE ADJUSTED:
(Effective January 1, 2007; Revised January 24, 2011)
Name & Address of Utility
Type
Location
Estimated Date Relocation Complete
Ameren Illinois 340 Raccuglia Dr PO Box 1428 LaSalle, IL 61301
Gas Ameren has a 2 inch high pressure gas line that is near the east right of way line, running north and south.
No conflicts are anticipated.
Frontier Communications Princeton, IL 61356
Communications Frontier has facilities along the east right of way line of Wyanet- Walnut Rd. It has been located 1 foot from the right of way line and should be clear of this work.
No conflicts are anticipated.
The above represents the best information of the Department and is only included for the convenience of the bidder. The applicable provisions of Section 102 and Articles 105.07, 107.20, 107.37, 107.38, 107.39, 107.40, and 108.02 of the Standard Specifications for Road and Bridge Construction shall apply.
The estimated utility relocation dates should be part of the progress schedule submitted by the Contractor.
** Above utility relocation information reflected as of December 4, 2025.
CLEARING
Description. This work shall be according to Clearing as defined in Standard Specification Section 201.
Method of Measurement. This work shall not be measured for payment in accordance with Standard Specification Article 201.10(a).
Basis of Payment. This work shall not be paid for separately, but is included in the cost of the contract.
REMOVAL AND DISPOSAL OF REGULATED SUBSTANCES
Description. This work shall consist of the removal and disposal of regulated substances according to Section 669 of the Standard Specifications as revised below.
Contract Specific Work Areas. For stationing, the lateral distance is measured from centerline and the farthest distance is the offset distance or construction limit, whichever is less.
Section (06-3HB)BR
The following contract specific work areas shall be monitored by the Environmental Firm for soil contamination and workers protection.
ISGS Site 4602-2 – ROW, Approximate I-80 M.M. 49.9 to 50.1, unincorporated Wyanet Township, Bureau County
• Station 17+50 to Station 19+00 (CL CH-8), 0’ to 40’ LT. The Engineer has determined this material in the vicinity of the station and off-set meets the criteria of and shall be managed in accordance with Article 669.05(c). Contaminant of concern sampling parameter: Iron.
• Station 17+50 to Station 19+00 (CL CH-8), 0’ to 40’ RT. The Engineer has determined this material in the vicinity of the station and off-set meets the criteria of and shall be managed in accordance with Article 669.05(c). Contaminant of concern sampling parameter: Iron.
• Station 745+90 to Station 747+50 (CL I-80), 0’ to 30’ LT & RT. The Engineer has determined this material in the vicinity of the station and off-set meets the criteria of and shall be managed in accordance with Article 669.05(c). Contaminant of concern sampling parameter: Iron.
• Station 745+90 to Station 746+15 (CL I-80), 70’ to 100’ RT. The Engineer has determined this material in the vicinity of the station and off-set meets the criteria of and shall be managed in accordance with Article 669.05(c). Contaminant of concern sampling parameter: Iron.
• Station 746+15 to Station 747+50 (CL I-80), 70’ to 110’ RT. The Engineer has determined this material in the vicinity of the station and off-set meets the criteria of and shall be managed in accordance with Article 669.05(c). Contaminant of concern sampling parameter: Iron.
• Station 21+00 to Station 22+70 (CL CH-8), 0’ to 40’ RT. The Engineer has determined this material in the vicinity of the station and off-set meets the criteria of and shall be managed in accordance with Article 669.05(c). Contaminant of concern sampling parameter: Iron.
• Station 21+25 to Station 22+70 (CL CH-8), 0’ to 40’ RT. The Engineer has determined this material in the vicinity of the station and off-set meets the criteria of and shall be managed in accordance with Article 669.05(c). Contaminant of concern sampling parameter: Iron.
Work Zones Three distinct OSHA HAZWOPER work zones (exclusion, decontamination, and support) shall apply to projects adjacent to or within sites with documented leaking underground storage tank (LUST) incidents, or sites under management in accordance with the requirements of the Site Remediation Program (SRP), Resource Conservation and Recovery Act (RCRA), or Comprehensive Environmental Response, Compensation and Liability Act (CERCLA), or as deemed necessary. For this project, the work zones apply for the following ISGS PESA Sites:
None.
Additional information on the above sites collected during the Phase I Engineering process is available through the District’s Environmental Studies Unit (DESU).
Any waste generated as a special waste, or a waste not certified as a non-special waste from this project, should be manifested off-site using the IEPA Bureau of Land generator number associated IDOT right-of-way in the affected County. The IEPA generator number for IDOT right-of-way in Bureau County is 0118995006.
Section (06-3HB)BR
MULCH METHOD 2
(Effective August 1, 1994; Revised January 1, 2007)
Article 251.03 Method 2 Procedure 1 of the Standard Specifications shall be required for this improvement.
TACK COAT
(Effective December 10, 2025)
Replace the application rate table in Article 406.05 (c)(1) of the Standard Specifications with the following:
Type of Surface to be Tacked Residual Asphalt Rate lb/sq ft Concrete, Existing HMA, and Milled HMA .05 New HMA and Brick .05
FIBER WRAP
(Effective: March 14, 2018; Revised: July 12, 2018; Revised: October 15, 2025)
Description. This work shall consist of furnishing and installing fiber-reinforced polymer (FRP) wraps at the locations shown in the plans. The FRP strengthening shall be of the size, type, layer, materials, tension, and spacing shown in the plans. The Contractor shall submit drawings of the FRP strengthening system, showing materials, components, and installation procedures to the Engineer for approval prior to ordering materials and commencing work.
All other concrete repairs and/or modifications shall be completed prior to performing this work.
Concrete placed in areas receiving FRP wraps shall have a maximum moisture content of 4% using a digital moisture meter before wrapping begins unless bond testing shows no detrimental effect for installing prior to obtaining the required moisture content. All manufacturer's recommendations for surface preparation and installation of FRP wraps shall be followed.
Submittals. The following submittals, but not limited to, shall be required of the FRP system manufacturer, installation contractor and inspection agency. All submittals, except daily installation data logs, shall be given to the Engineer for review allowing at least 60 days for approval.
Submittals required of the FRP system manufacturer:
• Product information and data sheets indicating physical, mechanical and chemical properties and limitations of the FRP system and all its components.
• Tensile properties for the FRP system shall be reported in accordance with ASTM D7565 in units of kips/inch/ply for strength and modulus (stiffness). FRP systems not reporting their design properties in accordance with ASTM D7565 are not allowed.
• Durability test data and structural test reports of the FRP system for the proposed application in the expected environmental conditions.
Section (06-3HB)BR
• Installation and maintenance instructions and general recommendations regarding each material used in the FRP system. Note that surface preparation requirements shall be included in the installation procedures.
• Material Safety Data Sheets of each product used and certification that all materials abide by all local, state, and federal environmental and worker's safety laws and regulations.
• Quality control procedures for tracking FRP materials and material certifications.
• List of projects where similar FRP system has been implemented.
Submittals required of the FRP system installation Contractor:
• Documentation from the FRP system manufacturer stating the Contractor has been trained to install the FRP system shown on the design plans.
• List of completed projects by the Contractor where similar FRP system has been implemented. Include location, owner, engineer and contact numbers associated with each project.
• Quality control procedures, daily installation data logs, and any other inspection forms used by the Contractor.
If an independent inspection agency is used, the following submittals are required of the FRP system inspection agency:
• Qualifications and a list of each inspector used on the project.
• Sample inspection forms to be used during inspection.
• List of prior inspections performed by each inspector used on the project.
Material Requirements. The Contractor shall inspect and ensure all materials meet specifications, conform to design plans and are undamaged upon job-site arrival. All products shall be delivered to the job-site in their original, un-opened containers with the Manufacturer's name, labels, product identification, and batch numbers. Ensure FRP system materials are protected from chemicals, dirt, extreme, temperatures, moisture, and physical damage, by storing, handling, and applying materials according to manufacturer and OSHA recommendations.
FRP shall be high modulus, high strength fiber fabric of the type, size, layer, materials, tension, spacing and location as specified on the design plans. FRP Reinforcement shall meet the requirements as listed below.
Minimum FRP Cured Composite Property Requirements Property Carbon Fiber ASTM Test Method
Prior to testing, laminate samples shall be cured at least 7 days at 70° then post-cured at 140° for 48 hours Tensile Strength 140 ksi D3039 Tensile Modulus 11,000 ksi D3039 Elongation at Break 1.0% D3039 Thickness Per Layer* 0.035 in. - Unit Tensile Strength 5.6 k/in/layer D7565 Unit Tensile Modulus 440 k/in/layer D7565
*Individual layer thickness may not exceed 0.05 in.
Section (06-3HB)BR
Fabric saturant (saturating resin) and concrete primer shall be two-component, 100% solids, tolerant to moisture, high strength and high modulus epoxy. Manufacturer's recommendations for mixing shall be followed. Components of saturating resin may be proportioned; however, provisions shall be made for checking the accuracy of proportions and mixing. Dilution of components will not be permitted. Mixtures shall be used within its pot life.
A vapor permeable, UV resistant polymer or acrylic based protective coating shall be used. The protective coating shall be applied according to the manufacturer's recommendations.
Construction Requirements. A technical representative from the manufacturer shall be on site at the start of the installation and for as long as needed to ensure the contractor is installing the material in accordance with the Installation manual. All costs associated with providing a technical representative shall be the responsibility of the Contractor.
The Contractor shall maintain a Daily Installation Log. The log shall be available for review by the Engineer, and a copy shall be furnished to the Engineer at completion of installation and construction for each day's production. The Log shall provide material traceability and process records for each wrap and shall include all the following information:
(a) Date, time and specific location of installation.
(b) Construction and installation requirements, including plans and drawings and references thereto.
(c) Surface preparation methods.
(d) Widths and lengths of cracks not injected with epoxy.
(e) Material information including product description, data of manufacture, product and fiber batch numbers, mixture ratios, mixing times, appearance description of mixed resins (i.e.
primers, putties, saturants, adhesives, and protective coatings used for the day).
(f) Ambient temperatures, humidity, and general weather observations at the beginning, middle and end of each wrap installation shift.
(g) Concrete surface temperature, concrete moisture content and surface cleanliness.
(h) Heat sources used for increasing surface temperature or curing.
(i) Number of FRP layers used, composite thickness measurements, curing progress of resins including full documentation of curing temperature ramping and final curing temperature and thickness measurements of protecting coating used.
(j) Location and size of FRP debonding or air voids.
(k) Documentation stating installation procedures were followed.
(l) Pull off test results including bond strength, failure mode, and location.
(m) Other general work progress.
Surface Preparation:
FRP wraps shall be placed on sound concrete having a maximum moisture content of 4% using a digital moisture meter unless bond testing shows no detrimental effect for installing prior to obtaining the required moisture content. All bond inhibiting and foreign materials, including but not limited to dust, laitance, paint, grease, curing compounds, impregnations and waxes, shall be removed from the concrete surface by blast cleaning or equivalent mechanical means. All concrete surfaces shall be air blasted and vacuumed clean to a dust-free condition.
Section (06-3HB)BR
All concrete surface irregularities shall be ground smooth and/or filled with an approved repair technique. See special provision for Structural Repair of Concrete for repair of the concrete surface and exposed reinforcement. All sharp edges shall be ground smooth and flush. All repairs shall be completed in such a manner as to not damage the existing structure.
When wrapping FRP around exterior corners of rectangular cross sections, the corners should be rounded to a minimum of ½” radius. Interior corners shall be smoothed by troweling epoxy mortar into the corners. After concrete surface preparation has been completed, adhesive strength of the concrete shall be verified by random pull-off testing according to ACI 503R as per the direction of the Engineer.
All cracks greater than 0.007 in. shall be injected with epoxy according to Section 590 of the Standard Specifications for Road and Bridge Construction and paid for according to Section 109.04.
Constituent Material Application:
All materials shall be applied according to conditions (i.e. surface temperature of the concrete, air temperature, relative humidity, and corresponding dew point) recommended by the FRP manufacturer.
Components of saturating resin may be proportioned and mixed by hand or by automatic equipment. Provision shall be made for checking the accuracy of proportions and mixing. Diluting is not permitted.
The saturating resin shall be applied to a properly prepared substrate as a surface primer. The primer should be applied uniformly on the prepared surface to all areas of concrete receiving the FRP wrap according to the manufacturer's specifications. Primed surfaces shall be protected from all contaminants (e.g. dust, moisture, etc.) prior to the application of the FRP wraps.
The resin-to-fabric ratio shall be verified and documented on the daily installation data log.
Saturating resin shall be applied uniformly to prepared surfaces. FRP-ply orientation shall not deviate from the orientation shown on the design plans. Fiber wraps shall be handled in a manner to maintain fiber straightness and prevent fiber damage. Any kinks, folds, or severe waviness should be reported to the Engineer. If multiple fabric layers are being placed, successive layers shall be placed before the complete curing of the previous layer to ensure complete bonding between layers. Entrapped air beneath each layer of fabric shall be rolled out before the saturating resin sets.
Subject to approval by the Engineer, the Contractor may provide suitable enclosures to permit application and curing of the fiber wrap during inclement weather. Provisions shall be made to control atmospheric conditions artificially within the enclosures within the limits specified for application and curing of the fiber wrap.
The FRP system shall be protected from rain, sand, dust, and other foreign particles during and after curing as per the Engineer and manufacturer's recommendations.
Section (06-3HB)BR
The Contractor shall inspect the cured FRP system to ensure saturating resin has completely cured. The Contractor must check for defects such as voids, delamination’s, external cracks, chips, cuts, loose fibers, external abrasions, blemishes, foreign inclusions, depressible raised areas, or fabric wrinkles. All defects with a dimension greater than 1½ inch, or an area greater than one square inch, or defects with any dimension greater than 1 inch within one foot from another defect area of similar size, shall be repaired or replaced as determined by the Engineer.
Repairs shall be made according to manufacturer's recommendations and as specified by the Engineer. For large, defective areas, additional layers of FRP may be required as per the Engineer.
A vapor permeable, UV resistant polymer or acrylic based protective coating shall be used. The protective coating shall be compatible with the FRP system and applied according to the manufacturer's recommendations. Any solvents used to clean the FRP surface prior to the application of the protective coating shall be approved by the FRP manufacturer since solvents can have harmful effects on the polymer fabric. Two layers of protective coating shall be applied to all surfaces of the fiber wrap. The cost of the protective coating shall be paid for as Acrylic Coating.
Method of Measurement. FRP wraps will be computed for payment in place in square feet based on the surface area measurements of the substrate to be repaired. The measured quantity will not be modified for multiple layers of FRP needed as shown in the design plans.
The areas upon which the protective coat is applied will be measured for payment in place and the area computed in square yards.
Basis of Payment. This work will be paid for at the contract unit price per square foot for FIBER WRAP. Payment shall constitute full compensation for all materials, labor, tools, equipment, and incidentals necessary to complete the work.
Full compensation for any additional testing, materials, enclosures, or work required because of the use of a particular type of fiber wrap, shall be considered as included in the item FIBER WRAP.
Protective coat will be paid for at the contract unit price per square yard for ACRYLIC COATING.
REMOVE IMPACT ATTENUATORS, NO SALVAGE
Description. This work shall consist of removing and disposing of existing impact attenuators at locations designated in the plans. Disposal shall be performed in accordance with Article 202.03 of the Standard Specifications. No materials removed shall be salvaged under the contract.
Removal of the existing attenuator base (PCC or HMA), if present, shall be completed in accordance with the applicable portions of Section 440 of the Standard Specifications.
This work shall be coordinated with the traffic control plan for this project.
Method of Measurement. This work will be measured for payment as each, where each is defined as one complete removal.
Section (06-3HB)BR
Basis of Payment. This work will be paid for at the contract unit price per EACH for REMOVE
IMPACT ATTENUATORS, NO SALVAGE.
Removal of the existing attenuator base will not be paid for separately, but is included in REMOVE
IMPACT ATTENUATORS, NO SALVAGE.
FURNISH PERMANENT SURVEY MARKER
(Effective May 28, 2025)
Description. Survey markers shall be in general accordance with Highway Standard 667101, except they shall be bronze instead of aluminum and shall have a diameter of 3.5 inches. They shall be stamped “SECTION CORNER” as a circular row of text inside the words “ILLINOIS DEPARTMENT OF TRANSPORTATION” and shall have a “+” stamped in the center instead of a dimpled triangle.
The Engineer will supply a Professional Land Surveyor and equipment for installation of the survey markers. The Contractor shall supply traffic control for installation of the survey markers by the Engineer.
Basis of Payment. This work will be paid for at the contract unit price per each for FURNISH
PERMANENT SURVEY MARKER.
TEMPORARY RUMBLE STRIPS (SPECIAL)
(Effective March 30, 2023)
Description. This work shall consist of the furnishing, installation, maintenance, and removal of temporary rumble strips and advance signage.
Materials. Materials shall be according to the following:
Item Article/Section
(a) Sign Posts, Metal (Note 1) ..................................................................................... 1093.01(a)
(b) Sign Posts, Wood (Note 2) ......................................................................................... 1007.05
(c) Preformed Plastic Pavement Markings ......................................................................... 780.07
Note 1. Galvanizing of metal posts will not be required.
Note 2. The nominal size of wood posts shall be 4 in x 4 in.
Equipment. Equipment shall be according to the following:
Item Article/Section
(a) Signs .......................................................................................................................... 1106.01
Section (06-3HB)BR
CONSTRUCTION REQUIREMENTS
General. The rumble strips shall consist of six layers of Preformed Plastic Pavement Marking, Type B - Inlaid - Line 6" (White). The temporary rumble strips shall be placed as shown in the plans or as directed by the Engineer.
Advance signage shall be furnished and installed as shown on the applicable plan details.
Method of Measurement. This work will be measured for payment as each, where each is defined as a set of three temporary rumble strips across a single lane of pavement
Basis of Payment. This work will be paid for at the contract unit price per each for TEMPORARY
RUMBLE STRIPS (SPECIAL).
KEEPING ROADS OPEN TO TRAFFIC
All lanes of I-80 (eastbound and westbound) shall be open to traffic during the legal holiday periods according to Article 107.09 of the Standard Specifications, during weekends defined as 3:00 p.m. Friday to 12:00 midnight Sunday, and at the end of each workday, with the following exception(s):
Prior approval from the Engineer for overnight weekday lane closure.
This work will not be paid for separately but shall be included in the cost of the applicable traffic control items.
TRAFFIC CONTROL AND PROTECTION, (SPECIAL)
Description. This work shall consist of furnishing, installation, maintenance, relocation, and removal of work zone traffic control and protection in association with the closure and detour of I- 80.
Traffic control shall be in accordance with the applicable sections of the Standard Specification, the applicable guidelines contained in the Federal Highway Administration “Manual on uniform Traffic Control Devices for Streets and Highways” (MUTCD), Illinois Supplemental MUTCD, these Special Provisions, and special details and Highway Standards contain herein and in the plans.
Special attention is called to Articles 107.09 and 107.14 of the Standard Specification and the following Highway Standards relating to traffic control:
701428 701901
Section (06-3HB)BR
District 3 Standards (included in the Details of the plans):
701-1 Freeway Nighttime Closure Detail 701-12 Smart Work Zone Detail 720-7 Freeway Entrance And Exit Ramp Closure Detail
In addition, the following Special Provision(s) will govern traffic control for this project:
Traffic Control and Protection, BLR 21 Traffic Control Surveillance Changeable Message Sign Changeable Message Sign (Special) Temporary Rumble Strips (Special) Vehicle Parking Plastic Drums Control Of Work - Smart Work Zone Smart Traffic Monitoring System Short Term and Temporary Pavement Markings (BDE) Speed Display Trailer (BDE) Temporary Concrete Barrier (BDE) Work Zone Traffic Control Devices (BDE)
Complete closure of I-80 is anticipated for the removal of existing beams and erection of new beams for Structure Number (SN) 006-0112 carrying I-80 under County Highway (CH) 8.
I-80 between the IL 40 interchange and the IL 26 interchange may only be closed between 10 PM and 4 AM.
Closure of the eastbound and westbound lanes shall be in accordance with the I-80 Detour Plan sheet and the Freeway Nighttime Closure (District 3 Standard 701-1) Detail shown in the plans.
Ramp closure, including rest area ramps, to prevent traffic from accessing the closed portion of I- 80 shall be in accordance with the I-80 Detour Plan sheet and the Freeway Entrance and Exit Ramp Closure (District 3 Standard 720-7) Detail shown in the plans.
A Changeable Message Sign shall be placed at the exit ramp from westbound I-80 to the Great Sauk Trail Rest Area indicating times that the entrance ramp from the rest area onto westbound I-80 will be closed. A flagger shall be stationed at the entrance ramp from the rest area onto westbound I-80 for the entire duration of the ramp closure to ensure no vehicles maneuver around the barricades. A FLAGGER sign and lighted station shall be provided, similar to what is shown at the exit ramps on the Freeway Nighttime Closure (District 3 Standard 701-1) Detail, when the flagger is present.
Temporary pavement marking shall be TEMPORARY PAVEMENT MARKING – TYPE IV TAPE.
The cost of furnishing, placing, maintaining, and removing the signs and other traffic control items shown on the applicable Highway Standards, Road Closure and Detour details included in the plans and those not covered by the special provisions shall be included in the cost of the various traffic control pay items included in the contract.
Section (06-3HB)BR
The Contractor shall notify the Resident Engineer in written format (email) of the I-80 closure start date and closure duration. This request shall be submitted a minimum of three weeks (21 days) and no earlier than four weeks (28 days) prior to the anticipated closure date to allow the State adequate time to enter the information into their system and send the necessary notifications.
The Contractor shall notify the Bureau County Highway Department, the corresponding Township Commissioner, city municipality, emergency response agencies (i.e.: fire, ambulance, police), and school bus companies regarding the lane closure start date, closure duration, and any subsequent changes in traffic control at least two weeks (14 days) prior to the implementation of traffic control.
Basis of Payment. This work will be paid for at the contract unit price per lump sum for TRAFFIC CONTROL AND PROTECTION, (SPECIAL). Each occurrence shall not be paid for separately if multiple separate closures are required.
Signs associated with the I-80 closure and detour will not be paid for separately, but shall be included in the LUMP SUM cost of TRAFFIC CONTROL AND PROTECTION, (SPECIAL).
Temporary pavement marking will not be paid for separately, but shall be included in the LUMP SUM cost of TRAFFIC CONTROL AND PROTECTION, (SPECIAL).
Flaggers will not be paid for separately but shall be included in the LUMP SUM cost of TRAFFIC
CONTROL AND PROTECTION, (SPECIAL).
TRAFFIC CONTROL AND PROTECTION, STANDARD BLR 21
Description. This work shall consist of furnishing, installation, maintenance, relocation, and removal of work zone traffic control and protection in association with the closure of CH 8.
Traffic control shall be in accordance with the applicable sections of the Standard Specification, the applicable guidelines contained in the Federal Highway Administration “Manual on uniform Traffic Control Devices for Streets and Highways” (MUTCD), Illinois Supplemental MUTCD, these Special Provisions, and special details and Highway Standards contain herein and in the plans.
Special attention is called to Articles 107.09 and 107.14 of the Standard Specification and the following Highway Standards relating to traffic control:
BLR 21-9 701901
In addition, the following Special Provision(s) will govern traffic control for this project:
Traffic Control and Protection, (Special) Temporary Information Signing Traffic Control Surveillance Changeable Message Sign Changeable Message Sign (Special) Temporary Rumble Strips (Special) Vehicle Parking Plastic Drums Control Of Work - Smart Work Zone
Section (06-3HB)BR
Smart Traffic Monitoring System Short Term and Temporary Pavement Markings (BDE) Speed Display Trailer (BDE) Temporary Concrete Barrier (BDE) Work Zone Traffic Control Devices (BDE)
Complete closure of CH 8 is anticipated for the construction of Structure Number (SN) 006-0112 carrying I-80 under County Highway (CH) 8. Closure of CH 8 shall be in accordance with Highway Standard BLR 21-9 and the detour shall be according to the CH 8 Detour Plan sheet shown in the plans.
The cost of furnishing, placing, maintaining, and removing the signs and other traffic control items shown on the applicable Highway Standards, Maintenance of Traffic details included in the plans and those not covered by the special provisions shall be included in the cost of the various traffic control pay items included in the contract.
When the roadway is not closed and/or Standard BLR 21 is not in effect, the mainline shall be kept open to one-way traffic at all times during working hours and two-way traffic during non-working hours.
The Contractor shall notify the Resident Engineer in written format (email) of the road closure start date and closure duration. This request shall be submitted a minimum of three weeks (21 days) and no earlier than four weeks (28 days) prior to the anticipated closure date to allow the State adequate time to enter the information into their system and send the necessary notifications.
The Contractor shall notify the Bureau County Highway Department, the corresponding Township Commissioner, city municipality, emergency response agencies (i.e.: fire, ambulance, police), and school bus companies regarding the lane closure start date, closure duration, and any subsequent changes in traffic control at least two weeks (14 days) prior to the implementation of traffic control.
Basis of Payment. This work will be paid for at the contract unit price per lump sum for TRAFFIC
CONTROL AND PROTECTION, BLR 21.
Detour Signs associated with the CH 8 detour shall not be paid for separately, but will be included in included in the cost of TRAFFIC CONTROL AND PROTECTION, BLR 21.
All other work associated with CH 8 traffic control will not be paid for separately but is included in the cost of TRAFFIC CONTROL AND PROTECTION, BLR 21.
TRAFFIC CONTROL SURVEILLANCE
(Effective January 1, 2016)
Revise the first sentence of Article 701.10 of the Standard Specifications to read:
701.10 Surveillance. When open holes, broken pavement, trenches over 3 in. deep and 4 in.
wide, or other hazards are present within 8 ft of the edge of an open lane; when opposing directions of traffic are separated by barrier wall; or on a closed road from the time a structure is removed until the time the structure has been replaced, the Contractor shall furnish traffic control surveillance during all hours when the Contractor is not engaged in construction operations
Section (06-3HB)BR
VEHICLE PARKING
(Revised January 1, 2007)
Parking of personal vehicles within the interstate right of way will be strictly prohibited. Parking of construction equipment within the right of way will be permitted only at locations approved by the Engineer and never within median area or overnight on any roadway area.
PLASTIC DRUMS
(Effective August 15, 2005; Revised April 27, 2018)
Plastic drums according to Standard 701901 shall be used in lieu of cones, Type I and Type II barricades, and vertical barricades throughout lane closures.
CHANGEABLE MESSAGE SIGN
(Effective December 1, 1999; Revised August 7, 2008)
In addition to any changeable message signs shown in the traffic control standards, the Contractor shall furnish two (2) Changeable Message Signs for this project. The signs shall be operational two weeks prior to any lane closure and shall be located as directed by the Engineer. Any relocation of the signs directed by the Engineer during construction will not be paid for separately, but shall be included in the cost of the Changeable Message Sign.
CHANGEABLE MESSAGE SIGN, SPECIAL
This work shall consist of providing seven Portable Changeable Message Signs (PCMS) per direction according to Article 701.15(j). Each PCMS shall be connected and work as a part of the Smart Traffic Monitoring System. Portable changeable message signs used in conjunction with the plan detail for TC&P Standard 701400 (Special) with Smart Traffic Control shall meet these requirements and the requirements set forth in the SMART TRAFFIC MONITORING SYSTEM special provision.
One additional portable changeable message sign (PCMS), described in the changeable message sign, special provision will be required to be positioned in advance of the construction (I-80 EB: west of the IL 40 interchange; I-80 WB: east of the IL 26 interchange) to provide construction zone information and, if necessary, details to utilize an alternate route.
Method of Measurement. This work shall be measured on a calendar WEEK per each PCMS sign.
Basis of Payment. This work will be paid for at the contract unit price per calendar WEEK for each sign as CHANGEABLE MESSAGE SIGN, SPECIAL.
Section (06-3HB)BR
TEMPORARY INFORMATION SIGNING
(Effective September 24, 2013; Revised July 31, 2020)
Description. This work shall consist of the furnishing, installation, maintenance, and removal of temporary information signs.
Materials. Materials shall be according to the applicable portions of Section 701 of the Standard Specifications and as shown on the plans.
Construction Requirements. The temporary information signs shall be in place at least one week prior to the beginning of construction activities that impact traffic flow and shall remain in place until the completion of the project. If all lanes are open for an extended period of time during the project, the Contractor shall cover the signs until lane closures resume. If the project is shut down for the winter, the signs shall read “Road Work Resumes Spring XXXX.”
Signs shall be installed according to the requirements of Section 701.
Method of Measurement. This work will be measured for payment in square feet in place. The auxiliary sign panel will not be measured for payment.
Basis of Payment. This work will be paid for at the contract unit price per square foot for
TEMPORARY INFORMATION SIGNING.
MODIFIED URETHANE PAVEMENT MARKING – TWO APPLICATIONS
Description. This work consists of furnishing and applying modified urethane pavement marking according to Section 780 of the Standard Specifications except that the modified urethane shall be applied in two applications.
Materials. Each application shall meet the requirements of Article 780.12 of the Standard Specifications.
General. The first application shall be allowed to cure for a minimum of 14 days prior to placing the second application over the first. The Contractor shall not place one thick application in lieu of two regular applications.
Basis of Payment. Each application will be measured and paid for.
Section (06-3HB)BR
CONTROL OF WORK – SMART WORK ZONE
The contractor must possess enough equipment to provide the following:
• One Smart Traffic Monitoring (STM) systems and Five (5) Smart Traffic Monitoring devices (STMDs) per direction, described in the SMART TRAFFIC MONITORING SYSTEM special provision.
• Two Real-time Traffic Control (RTTC) Signing units per direction. A unit (two signs, four flashers plus equipment) is described in the SMART TRAFFIC MONITORING SYSTEM special provision and shown in the applicable plan detail.
• Seven Portable Changeable Message Signs (PCMS) per direction, described in the
CHANGEABLE MESSAGE SIGN, SPECIAL provision and shown in the applicable plan detail.
• One additional portable changeable message sign (PCMS), described in the changeable message sign, special provision will be required to be positioned in advance of the construction (I-80 EB: west of the IL 40 interchange; I-80 WB: east of the IL 26 interchange) to provide construction zone information and, if necessary, details to utilize an alternate route.
• Additional control hardware and devices per direction as described in the SMART
TRAFFIC MONITORING SYSTEM special provision.
SMART TRAFFIC MONITORING SYSTEM
Description. This work shall consist of furnishing, installing, maintaining, relocating, removing, and programming various components of an automated Smart Traffic Monitoring (STM) System. This work shall be completed according to Article 701 of the Standard Specifications, as detailed in the plans described herein, and as directed by the Engineer.
Schedule: The STM System shall be in operation 24 hours a day and seven days per week when traffic is reduced to one lane in the direction for longer than one consecutive day. The system or any components shall be relocated as needed for each new traffic control stage. One adjustment of component locations in each direction after the initial set-up of the system shall be included in the cost of the applicable components.
Function: The typical STM System components shall include Smart Traffic Monitoring Devices (STMD), Real-Time Traffic Control (RTTC) signing, portable changeable message signs (PCMSs), and control software for various communication functions.
The STM System shall collect real-time vehicle data at various locations prior to and within the work zone and, depending upon traffic conditions, shall activate various, specific preapproved messages, developed through coordination with the Engineer, on PCMSs and activate appropriate RTTC signs.
Section (06-3HB)BR
The STM system shall be capable of providing dynamic lane merging by use of pre-programmed conditions to allow the system to determine when early merging should be required (generally low volumes and high speeds), and when late merging should be required (generally high volumes and low speeds). STM system components shall have the capacity and the accuracy to determine to implement the specific messages for each type of merging and to prevent frequent and unnecessary changes in merge type. Dynamic lane merging will require PCM’s, RTTC signing, or a combination of both throughout the expected queue area, as well as advance warning locations as described below.
The STM system shall activate RTTC signing flashers in advance of the congested area to warn traffic whenever the average traffic speed falls below 30 mph. Flashers shall turn off when the average speed returns to 40 mph or more. These speed thresholds shall be capable of being changed based on field conditions and sensor locations with approval of the Engineer.
The STM System shall notify road users of the delay, within 20% accuracy and the distance, within 0.5-mile accuracy, to stopped or significantly slowed traffic ahead (speeds less than 30 mph) by displaying messages on PCMSs located on mainline. The location of PCMS’s shall be intended to give traffic enough advance warning to choose alternate routes when appropriate and will be determined by the Engineer. PCMS’s may be located in advance of entrance ramps within the project limits to allow users to make the choice to enter the highway based on current traffic conditions. The actual message text on each PCMS displaying messages will be determined by the Engineer. STM PCMSs shall display the flashing caution mode when not in use by the system or shall be treated as non-operating equipment in accordance with Article 701.11.
The STM System shall immediately inform delay time and slow or stopped traffic to the Resident Engineer and emergency services in addition to the District 3 Operations Center, the District 4 Traffic Operations Center and the Illinois State Police (ISP) Dispatch Center. Notifications shall identify which RTTC signs and PCMS’s are active and what message is being displayed, if applicable.
Smart Traffic Monitoring Devices (STMDs): The Contractor shall provide devices that are MUTCD compliant, meeting NCHRP 350 or MASH, Category 2, crashworthy standards and shall be consistent with work zone channelizing devices used throughout the work zone. The STMDs shall have internal power sources, shall communicate wirelessly in real-time, and shall provide continuous, uninterrupted, data collection during normal operations or during power or communication interruptions. The STMDs shall communicate in real-time with multiple other STMDs, RTTC signs, and PCMSs in the system. Traffic sensors shall not be affected by environmental conditions. The STMDs shall collect data for each lane separately, in real-time, provide 95 percent accuracy on all vehicle detection, have Global Positioning System (GPS) functionality, transfer data to web-based communications for monitoring, and communicate with the RTTC signs and PCMSs 24 hours a day seven days a week. The web-based interface shall provide vehicle speed, volume, and queue information at each device location and maintain data history for a minimum of 12 months beyond contract completion. The system shall provide vehicle detection in advance of the maximum projected vehicle queue and report real-time data throughout the duration of the project. The number and proper locations of STMDs needed to provide dynamic, travel time messages and queue detection from the STM System shall be recommended by the manufacturer and approved by the Engineer. Data shall include the date, time, and average vehicle speed through the work zone.
Section (06-3HB)BR
Real-Time Traffic Control Signing (RTTC): RTTC signing shall consist of sets of two warning signs with a sign legend as shown in the plans.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .