This document is a Scope of Work for a Small Purchase Procurement issued by the Illinois Department of Natural Resources (IDNR) for the replacement of residential flooring at the Jake Wolf Fish Hatchery in Topeka, Illinois. The project involves removing existing carpet and installing new luxury vinyl plank flooring and sheet vinyl flooring in two residential houses on the hatchery property. The total square footage for the flooring replacement is approximately 1,278 sq ft for House 1 and 1,006 sq ft for House 2. Bids must be submitted electronically through the Bid Buy system, and all work must be completed within 90 days of the contract execution or notice to proceed. The IDNR is seeking experienced contractors with at least one year of experience in carpet removal and luxury vinyl plank flooring installation. The selected contractor will be required to provide a two-year warranty on workmanship and the flooring manufacturer's standard warranty.

The bid documents specify the required flooring materials, including minimum thickness and wear layer requirements. Approved manufacturers include Shaw, TrafficMaster, NuCore, COREtec, Armstrong, SmartCore, and Lifeproof. The contractor must comply with prevailing wage requirements and be registered as a small business under the Illinois Procurement Gateway. IDNR will not allow any subcontractors, and the selected contractor must be a participant in an approved apprenticeship and training program.

View the file

Other files

File Type Posted
Standard Certifications V.18.1~58.docx DOCX document
COVID protocols_50~1.docx DOCX document
Public Works Project Bidding Requirements~29.docx DOCX document
RoomMeasurements_Flooring.xlsx XLSX spreadsheet
Standard Terms and Conditions v.20.1_75~17.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LLINOIS DEPARTMENT OF NATURAL RESOURCES

SMALL PURCHASE PROCUREMENT

SCOPE OF WORK & PROJECT REQUIREMENTS

Date: July 7, 2022

LOCATION:Jake Wolf Fish Hatchery
25410 Fish Hatchery Road
Topeka, IL 61567

PROJECT TITLE: Residential Houses Flooring Replacement

PROJECT NARRATIVE:

Jake Wolf Fish Hatchery located near Havana, Illinois, opened in 1984, and is one of the largest and most sophisticated hatcheries in the United States. Up to eighteen fish species are spawned and/ or raised there annually and stocked into hundreds of public lakes and rivers statewide. Four residential houses are located on site. The current flooring in two of the houses have outlived their useful life and need to be replaced. Therefore, the Illinois Department of Natural Resources is seeking bids to remove and replace the existing carpet flooring in these structures with new luxury vinyl plank flooring.

SCOPE OF WORK:

Measurements and square footage for each room are listed in an attached spreadsheet. Square footage of flooring for House 1 is approximately 1278 sq ft and for House 2 approximately 1006 sq ft.

Therefore, the scope of work includes:

1. Remove existing carpet, associated padding, and/or vinyl flooring

2. Remove baseboard trim as necessary to install new flooring

3. Inspect all subfloor boards before laying down flooring. If any damaged is discovered, report to Site Manager before proceeding with installation.

4. For bathrooms and laundry room in House 2 install sheet vinyl flooring

5. For rooms in House 1 and the remaining rooms in House 2 install underlayment before installing luxury vinyl plank flooring (LVP)

6. Install new waterproof luxury vinyl plank flooring

7. Install new T-moldings at all door entryways

8. Place baseboard trim back over the new flooring; replace any baseboard trim with new product if damaged during removal/placement.

9. Clean up all construction debris and properly dispose of materials off-site.

ATTACHMENTS:

The following documents are included:

1) Excel spreadsheet with dimensions of each room

PROJECT SPECIFICATIONS & REQUIREMENTS:

A.Project Specifications:
1)Qualifications of Contractors/Installers:

Contractor must have at least one year of experience in the removal of carpet and the installation of luxury vinyl plank flooring and sheet vinyl flooring. Contractor shall employ only experienced workmen, skilled in the installation of the specified materials. No subcontractors will be allowed.

2)Materials:
Waterproof Luxury Vinyl Plank and T-moldings: Shall be NEW click together luxury vinyl plank, 6” -8” wide, total thickness at least 8.0 mm with a wear layer of at least 6 mil; color and style to be approved by site manager. T-moldings to match LVP. Underlayment shall be NEW and be no less than 1mm in thickness.

Vinyl Sheet Flooring: Shall be NEW woven vinyl sheet flooring, waterproof, thickness at least 2.5 mm with a wear layer thickness of at least 13 mils, with Scotchgard Protector to repel dirt and mess; color and style to be approved by site manager.

Approved Flooring Manufacturers include:

Shaw, Traffic Master, NuCore, COREtec, Armstrong, Smart Core, Lifeproof; other manufacturers may be considered for approval if the above material requirements are met.

3) Delivery, Storage & Handling:

Deliver all materials in unopened packages with the label attached. Store all materials inside/out of the elements.

4) Environmental Requirements: N/A

5) Warranty:

General Contractor Warranty shall be two (2) years on workmanship in accord with this Standard Document and installation life of the floor. Manufacturer’s Warranty shall be no less than 20- year for contract, expand, curl, crack, rip, tear, gouge, indent, fade, stain, discolor, or wear through.

B.Project Instructions and Notes:
1)Coordination of Work Activities:

Coordinate available working hours, parking, staging areas, equipment storage, and access requirements with Site Manager Scott Shasteen (309/ 968 – 7531).

2) Contractor’s Licensing and/or Certifications:

Contractor shall be responsible for compliance with all applicable contractor and trades person licensing with the appropriate State agency.

3) Shop Drawings:

Submit for the approval of the DNR Project Architect/Engineer, shop drawings and product data for the following items: N/A

4)Extended Warranty:
a)Workmanship, materials and equipment will be in conformance with the contract and free from defects for a period of two years, commencing from the goods acceptance date.
C.Project Requirements:
1)Project Meeting
PROJECT MEETING TO BE HELD: YES NO X|_|
MANDATORY ATTENDANCE: YES |_| NO |X|
If marked YES, a project meeting will be held at a time TBD to discuss the
scope of work and view the work site.
2)Duration
Bids shall be good for ninety (90) calendar days after the submittal date, or for an extended period of time, if agreed to in writing by the Contractor and DNR.
3)Prevailing Wage Rates
The Contractor must comply with provisions of the Prevailing Wage Act, 820 ILCS 130/, and the
Illinois Procurement Code (30 ILCS 500/25-60), which applies to the wages of laborers, mechanics and other workers employed in any public works. The Contractor is responsible for
contacting the Illinois Department of Labor (DOL) at 217/782-6206 or (http://www.state.il.us/agency/idol) to ensure understanding of prevailing wage requirements.
4)Certified Payroll
State law 820 ILCS 130/5 requires all contractors working on state
construction projects to submit certified payroll records to the Department of Natural
Resources. The payroll records must include all workers employed by contractors on the
project.

In accordance with 820 ILCS 130/5, the contractor shall make and keep, for a period of 5 years from the date of the last payment made on or after January 1, 2014 (the effective date of Public Act 98-328) on a contract or subcontract for public works, records of all laborers, mechanics, and other workers employed by them on the project.

No later than the 15th day of each calendar month, the contractor shall file a certified payroll for the immediately preceding month with the Department of Natural Resources.

5) Small Business Set-Aside The Contractor awarded the project must be registered as a small business, as required by the Small Business Set-Aside Program. (For complete requirements, to become registered, or to certify your business is in the Small Business Set-Aside Program, visit the Illinois Procurement Gateway (IPG) at https://ipg.vendorreg.com/ or call (217) 782-1270.

6) Apprenticeship-in-Training When applicable, the contractor must be a participant in apprenticeship and training programs that are both approved by and registered with the U.S. Department of Labor’s Bureau of Apprenticeship and Training. The program(s) must be in the same trade(s) in which the contractor performs work. For information on how to participate in or set up a program, contractors may call the U.S. Department of Labor at 312/596-5508 or visit their website http://www.doleta.gov/oa/ .

7) Construction Bond Pursuant to the Public Construction Bond Act (30 ILCS 550/), a construction bond shall be required if the project cost exceeds $50,000.

8) Permits and Licenses Permits and licenses necessary for the execution of the work shall be secured and paid for by the Contractor.

9) New Products Unless otherwise specifically provided in the contract documents, all materials, equipment and products incorporated in the work under the contract shall be new and of a suitable grade for the purpose intended.

10)Steel Products
Any steel product(s) used or supplied in the performance of this contract shall be manufactured or produced in the United States, in accordance with the Steel Products Procurement Act, unless a waiver is granted by IDNR (30 ILCS 565/).

11) Specified Materials Bids shall be based on providing all products exactly as required by the project specifications. Contractor may select from the list of acceptable manufacturers, or, for products specified only by reference or performance standards, select any product which meets or exceeds the specified standards, by any manufacturer, subject to the approval of DNR.

12) Final Cleaning Contractor shall clean-up all work related debris and construction materials and properly dispose off-site. The Contractor shall repair and otherwise make good any damage caused by the work and leave the premises in the equivalent of the original condition.

13) Warranty The Contractor warrants that all work provided under the contract will be in conformance with the contract and free from defects in workmanship, materials, and equipment for a period of two years from the goods acceptance date. See Section B. Project Instructions and Notes, for any extended warranties that apply to flooring materials.

14) Small Purchase Procurement Bid Bid may be submitted electronically through the Bid buy system. Any questions about bidbuy or the project should be directed to Nicole.bergee@illinois.gov

15)Term of Contract
All work shall be completed within 90 days from the last dated signature on the fully executed
Contract or from the Notice to Proceed, unless agreed to by both the Contractor and
DNR, that a time extension is warranted.
16)Contact Information
Project Architect/Engineer:
John Cronin
Illinois Department of Natural Resources

Division of Architecture & Engineering Springfield, IL, 62702

Phone:217-782-3484
Fax:217-782-9599
E-mail:john.cronin@illinois.gov
Site Manager:
Scott Shasteen
Jake Wolf Fish Hatchery

25410 Fish Hatchery Road Topeka, IL 61567

Phone:309 / 968 - 7531
Fax:309 / 968 - 6017
E-mail:scott.shasteen@illinois.gov
Billing:
Diane Shasteen
Jake Wolf Fish Hatchery