About this file

This document provides details on a Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS) solicitation for the Galena Region in Alaska. The solicitation seeks contractors to provide environmental remediation and long-term monitoring services at 38 active sites on Galena Air Force Base. Required services include operation and maintenance of existing remediation systems, groundwater monitoring, land use control inspections, and five-year reviews. Projected completion dates for ongoing remedial actions range from fiscal year 2026 to fiscal year 2043. The solicitation is being issued by the Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency. An Indefinite Delivery Indefinite Quantity (IDIQ) multiple award contract structure will be utilized, with individual task orders issued on both a fixed price and cost reimbursement basis.

View the file

Other files for this federal contract opportunity

Other files attached to Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS) Galena Region, newest first.
File Type Posted
Solicitation Amendment FA890320R00120002 SF 30.pdf PDF
06092020_FA890320R0012_BECOS_Galena_Section_L_Amendment 02.docx DOCX document
06032020_Galena TO2 Price Model_Amendment 01.xlsx XLSX spreadsheet
06032020_FA890320R0012_BECOS Galena QAs.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00120001 SF 30 (1).pdf PDF
06032020_FA890320R0012_Galena_BECOS_Section_M_Amendment 01.docx DOCX document
06032020_FA890320R0012_BECOS_Galena_Section_L_Amendment 01.docx DOCX document
IDIQ PWS Attch 2 Galena Acr and Def BECOS vf3.docx DOCX document
Galena IDIQ_Sched B_CLIN Structure and Price Model_v1_02112020.xlsx XLSX spreadsheet
IDIQ PWS Galena BECOS vf4.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Galena BECOS vf1.pdf PDF
IDIQ PWS Attch 3 Galena Del Rev Process BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Galena BECOS vf1.pdf PDF
TO 1 PWS Galena BECOS vf4.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A005-A006-A011 (CMAN) Galena BECOS vf1.pdf PDF
IDIQ PWS Attch 4 Galena Perf Obj Def and Req BECOS vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Galena BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Galena BECOS vf1.pdf PDF
20200131_FA890320R0012_BECOS_Relevancy_Matrix v2.docx DOCX document
20191217_Compensation Plan Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Galena BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Galena BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Galena BECOS vf1.pdf PDF
IDIQ PWS Attch 5 Galena Background Info Key Docs BECOS vf3.docx DOCX document
20200131_FA890320R0012_BECOS_Relevancy_PPQ v2.docx DOCX document
20200122_Galena FFP FBLR Tables v2.xlsx XLSX spreadsheet
Solicitation Galena FA890320R0012 vf.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT) Galena BECOS vf1.pdf PDF
TO 2 PWS Galena BECOS vf4.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B001 (MISC) Galena BECOS vf1.pdf PDF
AK20200001 31Jan20 Alaska Building Heavy.pdf PDF
TO 2 CDRLs Exhibit A B Galena BECOS vf1.docx DOCX document
20200203_FA890320R0012_Galena_BECOS_Section_M v4.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Galena BECOS vf1.pdf PDF
TO 1 CDRLs Exhibit A B Galena BECOS vf1.docx DOCX document
20200203_FA890320R0012_BECOS_Galena_Section_L v6.docx DOCX document
20200131_FA8903-20-R-0012_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Galena BECOS vf1.pdf PDF
20200109_Galena TO2 Price Model v2.xlsx XLSX spreadsheet
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Galena

RegionBaseSite IDSite NameSite AliasOperable Unit (OU)Regulatory ProgramSite PhaseCurrent RemedyNotesProjected
RC DateProjected

SC Date Galena Galena CG001 Million Gallon Hill ADEC RA-O Horizontal well air sparging system for CG001 and CG002 installed in 2017 and one small vertical well air sparging system (CG001 only) installed in 2018 will require O&M, GW monitoring, LUC inspections, and Five-Year Reviews

CG001 and CG002 have been combined into one Cleanup PlanFY40FY40
GalenaGalenaCG002Missile Storage AreaADECRA-OHorizontal well air sparging system for CG001 and CG002 installed in 2017 will require O&M, GW monitoring, LUC inspections, and Five-Year ReviewsCG001 and CG002 have been combined into one Cleanup Plan. Note that AF is pursuing administrative closure for the CG002 source area.FY40FY40
GalenaGalenaCB001Galena Aviation Vocation Technical CenterADECRA-OHorizontal well air sparging system for ST005 and CB001 installed in 2017 will require O&M, GW monitoring, LUC inspections, and Five-Year Reviews
Sub slab depressurization/ SVE system at GAVTC building (CB001) and vapor mitigation system at Building 191 (ST005) operate when horizontal well system is on and will also require O&MST005 and CB001 have been combined into one Cleanup Plan. Note that AF is pursuing administrative closure for CB001.FY35FY35
GalenaGalenaST005POL Tank FarmADECRA-OHorizontal well air sparging system for ST005 and CB001 installed in 2017 and one small SVE system (ST005 Area C) installed in 2018 will require O&M, GW monitoring, LUC inspections, and Five-Year Reviews

Sub slab depressurization/ SVE system at GAVTC building (CB001) and vapor mitigation system at Building 191 (ST005) operate when horizontal well system is on and will also require O&M ST005 and CB001 have been combined into one Cleanup Plan.

Current PBR contractor is closing ST005 Area D.FY35FY35
GalenaGalenaST009West Unit JP-4 Fuel StandsADECRA-OOngoing O&M of SVE system installed in 2016, GW monitoring, LUC inspections, and Five-Year Reviews. Sulfate injections conducted in 2017FY33FY33
GalenaGalenaST010Southeast Runway Fuel SpillADECRA-OOngoing O&M of bioventing system installed in 2017 and expanded in 2018, GW monitoring, LUC inspections, and Five-Year ReviewsFY35FY35
GalenaGalenaSS005Wilderness Hall (Bldg 1872)ADECRA-OOngoing O&M of SVE installed in 2016, GW monitoring, LUC inspections, and Five-Year ReviewsFY28FY28
GalenaGalenaSS016Building 2541 – Former POL Fuel LabADECRA-OOngoing O&M of bioventing system installed in 2017, GW monitoring, LUC inspections, and Five-Year ReviewsFY36FY36
GalenaGalenaSS017Former Truck FillstandsADECRA-OOngoing O&M of bioventing system installed in 2017 and expanded in 2018, GW monitoring, LUC inspections, and Five-Year Reviews. Sulfate injections conducted in 2017.SS014 and SS017 have been combined into one Cleanup Plan. Closure of SS014 source area recommended in 2018 Construction Completion Report and is in process.FY43FY43
GalenaGalenaCSS002Building 1812 Former Hazardous Waste Satellite Accumulation PointB1812ADECRA-OOngoing O&M of bioventing system installed in 2017, GW monitoring, LUC inspections, and Five-Year Reviews. Excavation conducted in 2015. Sulfate injections conducted in 2017.FY35FY35
GalenaGalenaTU001Power Plant Tank 49ADECRA-OOngoing O&M of vertical well air sparging system and SVE system installed in 2016, GW monitoring, LUC inspections, and Five-Year ReviewsFY32FY32
GalenaGalenaCPL006Old Abandoned PipelineOAPADECRA-OOngoing O&M of bioventing system at Area 3 installed in 2017 and expanded in 2018, GW monitoring, LUC inspections, and Five-Year ReviewsCurrent PBR contractor will complete remediation at Area 2 and no further action is required at Areas 1 and 4. Current PBR contractor evaluating options to recover NAPL in one well during low groundwater.FY36FY36
GalenaGalenaCST011Combat Alert Cell USTsUST1428ADECRA-OOngoing GW monitoring at Area 2, LUC inspections, and Five-Year ReviewsFY28FY28
GalenaGalenaCST014Dining Facility USTUST1859ADECRA-OOngoing O&M of vertical well air sparging system and SVE system installed in 2016, GW monitoring, LUC inspections, and Five-Year ReviewsFY33FY33
GalenaGalenaFT001Fire Protection Training AreaCERCLARA-OBioventing system installed in 2018 with plastic liner/soil cover over former fire training pit will require O&M, GW monitoring, LUC inspections, and Five-Year ReviewsRemedy is under an interim ROD. ADEC will not close site until PFAS are addressed.FY36FY36
GalenaGalenaSS006TCE Area (Bldg 1845)CERCLARA-OSVE system installed in 2018 with startup and operation in summer 2019 will require O&M, GW monitoring, LUC inspections, and Five-Year Reviews. Enhanced bioremediation injections conducted in 2018.SS006, SS019, and solvent-contamination previously associated with S1850 have been combined into one Cleanup Plan. Solvent contamination in groundwater associated with SS006 has migrated beneath SS019, SS018, and CSS002, and is included in SS006.FY38FY38
GalenaGalenaSS015South Apron Maintenance AreaCERCLARA-OSVE system installed in 2018 will require O&M, GW monitoring, LUC inspections, and Five-Year Reviews. Enhanced bioremediation injections conducted in 2018.FY35FY35
GalenaGalenaSS018Waste Accumulation Area - South of Bldg 1499AOC023CERCLARA-OMonitoring well installation completed in 2018. Post-excavation requirements include GW monitoring, LUC inspections, and Five-Year ReviewsFY27FY27
GalenaGalenaSS019Building 1700 – Refueler Maintenance ShopCERCLARA-OPilot test SVE system installed in 2015 is final remedy and requires O&M, GW monitoring, LUC inspections, and Five-Year Reviews. Primary contamination is petroleum and small area of solvents at former dry well.SS006, SS019, and solvent-contamination previously associated with S1850 have been combined into one Cleanup Plan. Solvent contamination in groundwater associated with SS006 has migrated beneath SS019, SS018, and CSS002, and is included in SS006.
Closure of drywell to be completed by the current PBR contractor.FY31FY31
GalenaGalenaSS022Building 400 Former CAA- Air Force Weather StationB400CERCLARA-OPilot test SVE system installed in 2015 and expanded in 2017 is final remedy and requires O&M, GW monitoring, LUC inspections, and Five-Year ReviewsFY26FY26
GalenaGalenaDP023Former Disposal Site West of DikeDSWDCERCLARA-OGW monitoring, LUC inspections, and Five-Year Reviews.
Excavation conducted in 2019. Results are pending.FY39FY39
GalenaGalenaFT001Fire Protection Training AreaPFAS Site
GalenaGalenaCG109AFFF Release AreasPFAS Site
GalenaKulisCAT56PPFC Research SitePFAS Site
GalenaGalenaCS001Contaminated Sediments (Soils)TBD
GalenaGalenaSS025West Perimeter Road TCE SpillTBD
GalenaGalenaSS107Northern Tar AreaTBD
GalenaGalenaSS108Southern Tar AreaTBD
GalenaGalenaDP106Disposal SiteTBD

FA8903-20-R-0012

Attachment 1 Galena AK Region 5 December 2019