This document is a Performance Work Statement (PWS) for a planned Indefinite Delivery Indefinite Quantity (IDIQ) contract for Unmanned Hyperbaric Systems Support Services to be awarded by the Department of the Navy Naval Facilities Engineering Command (NAVFAC).

The PWS outlines the scope of work, which includes services in support of various shore-based unmanned hyperbaric systems, such as design, fabrication, installation, maintenance, repair, and overhaul. The contractor must have capabilities in areas like pressure vessel fabrication, non-destructive testing, piping systems, quality control, and project management. Approximately 60% of the work will be on unmanned hyperbaric systems and 40% on unmanned pressure vessels. Key performance objectives include timely proposals, meeting schedule milestones, effective quality control, and technical competence. The anticipated period of performance is 5 years with a 6-month option period. This PWS provides background information and detailed requirements, but does not include solicitation details. A separate Sources Sought notice has been issued to conduct market research for this upcoming procurement.

View the file

Other files for this federal contract opportunity

Other files attached to Unmanned Hyperbarics System Services, newest first.
File Type Posted
Sources Sought Information Sheet.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Based Work Statement (PWS) for

Unmanned Hyperbaric Systems Support Services

C.1. General/Organization/Scope/Background/Objective:

C.1.1 General

This is a contract for Hyperbaric Systems Support. The equipment to be serviced under this contract is classified as equipment or supplies, vice construction. However, when work is being performed at

Government installations much of the work is being performed by “laborers” and “mechanics” that are covered by the construction wage rate requirements. Further, some of the tasks required under this contract will require work that will require the contractor to provide submittals such as designs, specifications, safety plans, quality control plans. Therefore, the contract includes clauses and requirements that relate to supplies, services, and construction.

C.1.2 Organization to be supported:

Naval Facilities Engineering and Expeditionary Warfare Center

1100 23rd Ave. Bldg. 1100

Port Hueneme, CA 93043-4301

1) Work is to be accomplished for the Naval Facilities Engineering and Expeditionary Warfare Center

(NAVFAC EXWC).

2) Actual work locations will be detailed within individual Task Orders under this contract.

3) The contractor will, in accordance with all applicable federal, state, and local laws, regulations, guidance, and policies, furnish the necessary personnel, services, products, materials, equipment, knowledge, and expertise to successfully complete the tasks required under this contract.

4) The recurring phrase, “The contractor shall,” means that the firm selected for this procurement will, in accordance with all applicable federal, state, and local laws, regulations, guidance, and policies, furnish the necessary personnel, services, products, materials, equipment, knowledge, and expertise to successfully complete the tasks required under this contract.

5) The Contractor shall be responsible for complying with all applicable Federal Acquisition Regulations

(FAR), and Defense Federal Acquisition Regulations (DFAR).

C.1.3 Scope:

This performance work statement is to describe tasking for hyperbaric systems services in support of projects involving various shore-based unmanned hyperbaric systems. The work will be performed worldwide at all shore-based locations where installation, maintenance, inspection, repair, and overhaul operations may be needed to support NAVFAC EXWC customers.

C.1.3.1 Security Requirements:

1) Security Clearance Requirement

This effort may involve the Contractor to access and potentially populate information/material at the

Controlled Unclassified Information (CUI) level or gain access to restricted locations onboard and installation. Unless otherwise stated in the Task Orders that fall under this base contract, all Contractor and

Subcontractor employees gaining access to CUI must have a current (within the past 10 years) favorable

Tier 1 or equivalent investigation or higher investigation prior to starting work on the contract. As this is an unclassified contract, NAVFAC EXWC Security will be responsible for ensuring contractors meet the

PSI requirements.

2) Facility Clearance Level

Contractors are not required to have an FCL to work on this contract and will not be sponsored for one by

NAVFAC EXWC for this effort.

3) Logical and Physical Access

Contractors and Subcontractors may require logical or physical access to DoD installations and or Navy

Information Technology (IT) systems. Common Access Cards (CAC) will only be issued in accordance with DoDI-5200.46. Contractors shall submit required paperwork to the Contracting Officer’s

Representative (COR) and all CAC issuances will be conducted by the government security management office. Contractor employees who do not require access to Navy IT systems or physical access to a single

DoD installation will use the local defense Biometric Identification System (DBIDS). DBIDS processing is the responsibility of the Contractor.

If a Contractor/Subcontractor is already in possession of a CAC in support of another contract, they may retain the CAC until such a time as they no longer require it for that contracting effort. The

Contractor/Subcontractor must still submit the required Contractor Eligibility Request vice a DD-1172-2 to the government security management office via the COR.

Once a contractor no longer requires CAC or DBIDS access in support of this contract, the

Contractor/Subcontractor shall mail the applicable card to NAVFAC EXWC via Command Security

Manager, 1000 23rd Ave, Port Hueneme, CA 93043 and email the COR the USPS tracking number or return it to a local RAPIDS office.

4) Safeguarding Controlled Unclassified Information

The Contractor shall protect all CUI information per DoD 5200.01 volumes 1-3, DoD 5200.48, 32 CFR

Part 117, and Navy Information Security Program manuals. Contractor/Subcontractor personnel shall not disclose and must safeguard procurement sensitive information, computer systems and data, privacy act data, and government personnel work products, which are obtained or generated in the performance under this contract. This includes but is not limited to electronic transmission of material.

Personnel shall adhere to the Privacy Act, Title 5 of the U.S. Code (USC), section 552a and applicable agency rules and regulations.

Contract and Subcontractor shall be held liable for all Personal Identifiable Information (PII) and CUI data breaches where it is culpable (e.g., unauthorized disclosure, contract proprietary information, social security numbers, etc.).

5) Photography

If photography or video imagery is required in the performance of this contract, contractor must obtain the appropriate command and/or installation photography pass. A formal review of all photography or video imagery must be completed by the host security office before the use of photography or video imagery can be utilized by the Contractor or Subcontractor. Contractor shall ensure all photography and video associated with this task are safeguarded per DoD I 5200.01 vol 1-3. Dissemination is limited to NAVFAC

EXWC and publishing of imagery is prohibited to any other source without the consent of the COR. At the completion of this contract/task order/project all copies of said material are turned over to the COR or properly destroyed.

6) Foreign Travel

Contractor personnel who hold a T1 or equivalent suitability must follow their companies foreign travel policies. Contractor employees traveling to foreign counties who hold an adjudicated United States clearance (T3/T5) while under this effort must comply with the Foreign Clearance Guide (FCG) and gain the appropriate country and theater clearance prior to travel. Contractor Facilities Security Officer shall be responsible for the submission and approval of any foreign travel requests. Any Synchronized Pre-deployment and Operational Tracker (SPOT) system Letter of Authorization requirements shall be processed by the COR for this contract. If contractor employees are traveling to a Force Protection

Condition Charlie or higher country in support of this effort, a request must be submitted to the government security management office to obtain Individual Anti-Terrorism Plan/Travel Tracker approvals. Travel submission requirements dependent on location may be as follows:

Human Rights Awareness training

Antiterrorism/Force Protection Level 1 training

Isolated Personnel Report (ISOPREP)

Survival, Evasion, Resistance, and Escape (SERE) Level B training

Individual Anti-Terrorism Plan/Travel Tracker

Aircraft and Personnel Automated Clearance System (APACS)

C.1.3.2 Physical Security:

The Contractor shall be responsible for safeguarding all Government property provided for Contractor use.

At the close of each work period, Government facilities, equipment, and materials shall be secured in accordance with federal, DoD, DON, and local policy requirements.

C.1.4 Background:

The Naval Facilities Engineering and Expeditionary Warfare Center (NAVFAC EXWC) is tasked by the

Navy to perform under the resulting indefinite delivery indefinite quantity (IDIQ) that will include services in support of various shore based hyperbaric unmanned testing facilities. Individual Task Orders may include technical support in the following general areas: hyperbaric systems fabrication and installation, hyperbaric systems maintenance, repair and overhauls.

This is a new requirement for NAVFAC EXWC OC6 Ashore Hyperbaric and Diving Systems product group.

C.1.5 Objective:

1) The performance objectives described below are applicable to the total scope of services to be performed under this contract.

2) The Ocean Facilities Department of the NAVFAC EXWC is the Navy’s technical center of expertise for shore-based hyperbaric systems design and engineering. The Ashore Hyperbarics and Diving System product group conducts development, fabrication, test, evaluation, inspection, maintenance and repair in the following technical areas:

Unmanned Hyperbaric Systems

Unmanned Pressure Vessels

3) In order to successfully perform the requirements of this contract, the contractor will require the following skills, abilities, and facilities to:

Capable of managing multiple projects workload, and taskings.

Capable of performing work in remote locations worldwide.

Store and maintain materials, which requires facilities to store contract materials separate from other work areas.

Perform Quality Control to maintain configuration control over complex systems.

Fabricate and install complex piping systems.

Perform piping welding in accordance with the standards of American Society of Mechanical

Engineers (ASME B31.1 and ASME B31.3.)

Perform cleaning and inspection with Grade B water and NID.

Produce drawing in AutoCAD 2020 or later.

Perform and document all maintenance IAW approved Work Control Packages.

The contractor will require the ability to coordinate service providers with the following skills, abilities, and facilities to:

Fabricate pressure vessels IAW ASME Boiler Pressure and Vessel Code (BPVC), Section VIII or applicable DOT regulation or specification.

Provide Non-Destructive Testing (NDT) in accordance with ASME V.

Perform cleaning and inspection in accordance with CGA G-4.1, and CGA G-7.1.

Provide gauge calibration conducted by a manufacturer qualified calibration shop or DoD metrology and Calibration (METCAL) qualified shop.

C.2. Definitions as applied to this contract:

C.2.1 Defective Service:

A service output that does not meet the standard of performance associated with it in the PWS.

C.2.2 Contracting Officer’s Representative (COR):

A COR is a government employee appointed by the Contracting Officer to provide technical direction/clarification and guidance with respect to the contract performance work statement. Their authority is clearly defined in an appointment letter. COR appointment letters are tailored to specific Task

Order requirements and vary in the amount of authority. They also serve as the key on site point of contact for the Contractor Project Officer. Qualifications could include technical expertise in the functional areas of this PWS. They are also responsible for surveillance of the contractor's progress in fulfilling the PWS requirements specified in the contract Task Order. All COR appointees inform the Port Hueneme prime

COR and Contracting Officer of any technical or contractual problems or delays.

C.2.3 Quality Control (QC):

Actions taken by the Contractor to control the quality (practices, resources, and activities) of services, ensuring requirements of the PWS are met.

C.2.4 Quality Assurance (QA):

Actions taken by the government to ensure Contractor services meet the requirements of the PWS.

C.2.5 Knowledge and Skill Levels:

Entry-Level: Applies fundamental concepts, processes, practices, and procedures on technical assignments. Performs work that requires practical experience and training. Work is performed under supervision.

Journeyman: Possesses and applies expertise on multiple complex work assignments. Assignments may be broad in nature, requiring originality and innovation in determining how to accomplish tasks. Operates with appreciable latitude in developing methodology and presenting solutions to problems. Contributes to deliverables and performance metrics where applicable.

Senior: Possesses and applies a comprehensive knowledge across key tasks and high impact assignments.

Plans and leads major technology assignments. Evaluates performance results and recommends major changes affecting short-term project growth and success. Functions as a technical expert across multiple project assignments.

Master: Provides technical/management leadership on major tasks or technology assignments. Establishes goals and plans that meet project objectives. Has domain and expert technical knowledge. Directs and controls activities for a client, having overall responsibility for financial management, methods, and staffing to ensure that technical requirements are met. Interactions involve client negotiations and interfacing with senior management. Decision making and domain knowledge may have a critical impact on overall project implementation.

C.2.6 Government and Acquisition Acronyms:

Acronym Description

AQL Acceptable Quality Level

CCD Contract Completion Date

CLIN Contract Line Item Number

COB Close Of Business

CONUS Continental United States

COR Contracting Officer’s Representative

CVS Contractor Verification System

CYE Calendar Year End

DFAR Defense Federal Acquisition Regulation

DISA Defense Information Systems Agency

DoD Department of Defense

DODD Department of Defense Directive

DODI Department of Defense Instruction

DON Department Of Navy

DWAS Defense Working capital fund Accounting System

EOY End Of (Fiscal) Year

FAR Federal Acquisition Regulation

FAQ Frequently Asked Questions

FEC Facilities Engineering Command

FMO Financial Management Office

FTE Full-Time Equivalent

FY Fiscal Year

GF General Fund

GOTS Government-off-the-shelf

NAVFAC Naval Facilities Engineering Command

NBVC Naval Base Ventura County

NGEN Next Generation NMCI Network (see NMCI)

NAVNETWARCOM Naval Network Warfare Command

EXWC Naval Facilities Engineering and Expeditionary Warfare Center

NMCI Navy Marine-Corps Intranet

OCONUS Outside Continental United States

OO Ordering Officer

OST Operational Support Team

PBSOW Performance Based Statement of Work

POC Point Of Contact

POP Period Of Performance

PW Public Works

PWS Performance Work Statement

QA/CM Quality Assurance/Configuration Management

QASP Quality Assurance Surveillance Plan

QC Quality Control

QI Quality Improvement (as applicable to QI Sessions)

SECNAV Secretary of the Navy

SLIN Sub Line Item Number

TOM Task Order Manager

USC US Code (US Public Law)

PVHO Pressure Vessel for Human Occupancy

NDT Non Destructive Testing

C.2.7 References:

Available electronic copies of all applicable documents and publications will be provided by the Task Order upon request

C.3. Contract Description and Deliverables:

Task Orders negotiated under this contract shall include its own list of deliverables and/or Contract Data

Requirements List (CDRL) as specified by the Government. They will include appropriate details such as content, format, timing, and receiving party.

The Contractor shall provide the following documentation according to the delivery scheduled shown in Table 2 and in attachment 1 in Section J.

CDRL DESCRIPTION SOW DUE DATE FREQUENCY

Preliminary

Design

Submittal

Design and Plan of all fabrication, overhaul or maintenance data IAW Task

Order PWS.

60 days after award date

Once

As-Built

Submittal

Documentation of all fabrication, overhaul and maintenance

IAW Task Order

PWS.

30 days before

CCD

Once

Monthly

Report

Progress Report and Current

Schedule

Monthly Monthly

Format Deliverables: All reports and CDRLs will be submitted electronically in two formats. A Microsoft

Office 2016 or later compatible format and an Adobe Acrobat PDF version 5.0 or higher are required.

Documents shall be supplied electronically via a readable media (CD, E-mail). Note: Minimum Protection

Requirements for Controlled Unclassified Information: Security Classifications Guides (OPNAVINST 5513 services) and unclassified limited documents (e.g. FOUO, Distribution Statement Controlled) are not authorized for public release and, therefore, cannot be posted on a publicly accessible web server or transmitted over the internet unless appropriately encrypted.

Submittals shall provide a comprehensive description of work being documented. Drawings, charts, illustrations and other material needed to clarify the presentation shall be included. The format for required reports shall reflect the appendices to the submittal.

Reports shall be clearly written, described the work adequately, be well edited and be acceptable for release as a quality document. The report shall document the results of all analyses performed. Draft reports shall be finished products requiring only technical changes as the result of Government review.

C.3.1 Schedule:

The delivery schedule for work ordered will be defined in each individual Task Order

C.3.2 Services Required:

The contractor shall provide all labor, material, equipment and facilities to perform the work as described below.

C.3.2.1 The contractor shall travel to Government facilities and other locations to perform the services as described in Section 4.0 of this PWS. Locations may include project locations worldwide and work aboard government, government contracted or contractor chartered vessels.

C.3.2.2 The contractor shall participate in project reviews at the contractor’s facility, project sites, and other locations as specified by individual Task Orders. The contractor shall provide facilities (meeting or working spaces) and equipment (presentation and information technology equipment, etc.) for project reviews conducted at the contractor’s facility.

C.3.2.3 The contractor shall provide progress reports, quality control reports, project schedules, financial reports, technical reports, drawings, manuals, or any other documentation as specified by the contract and individual Task Orders.

C.3.2.4 Unless otherwise directed in individual Task Orders, the contractor shall utilize Microsoft Office software

(Word, Excel, PowerPoint, Project) for preparation of documents and Adobe Acrobat compatible software for scanned and formatted data. Drawings produced by the contractor shall be in AutoCAD unless otherwise specified in the individual Task Orders.

C.3.2.5 Services required under this contract shall normally be performed at the contractor’s facilities or a field location. Direct technical collaboration will also be required with EXWC personnel at the contractor’s facility and/or at EXWC at the EXWC East Coast Detachment in Washington D.C. US citizenship is required. Specific classification requirements will be specified in individual Task Orders.

C.3.3 Technical Services:

Technical support to accomplish tasks specified in individual Task Orders issued under this contract may be required in the following general areas. This list is not all inclusive, but is intended to show the range of capabilities required. The technical tasks and technology areas are as follows.

The estimated percentage of total work in each technical area is identified below. The actual work percentages may vary significantly.

C.3.3.1 Unmanned Hyperbaric Systems – 60% of effort

1) Design, fabrication, installation and testing of piping systems and pressure vessels.

2) Overhaul of U.S. Military Unmanned Hyperbaric Systems.

3) Documentation for fabrication, cleaning, and Non-Destructive Testing including all procedures and qualifications.

C.3.3.2 Unmanned Pressure Vessels - 40% of effort

1) New design of pressure vessels including new hull design requiring Finite Elemental Analysis (FEA) and Strain Gauging.

2) Fabrication of pressure vessels including all weldment, manways, reinforcement forgings, service-locks, viewports, support structures, and lugs.

3) Design, fabrication, installation, testing, and inspection pressure vessel and support piping systems including systems for U.S. Military facilities.

4) Overhaul of U.S. Military Unmanned Pressure Vessels and support piping systems.

5) Documentation for fabrication, cleaning, and Non-Destructive Testing including all procedures and qualifications.

C.3.4 Personnel Requirements:

1) Proposed personnel must possess comprehensive knowledge of their respective discipline and demonstrated ability to perform the work and to summarize and document findings in specified report form.

C.3.5 Specifications

The work under this contract shall be performed in accordance with the Performance Work Statement in the individual Task Order. In the event of any conflict between the Government specification and the

Contractor’s proposal submitted for the base contract or any Task Order, the Government specification shall control unless the government specifically accepts the deviation in writing.

C.3.6 Performance Requirements:

The contractors Performance Requirements are outlined in the Quality Assurance Surveillance Plan

(QASP). Specific performance requirements for this contract and each subsequent contract will be provided when a request for proposal is submitted to the contractor.

C.3.6.1 Performance Objectives:

The performance objectives described below are applicable to the total scope of services being performed under this contract. Additionally, the performance specifications will be addressed in each Task Order. The measurable objectives that may be used include the following:

1) Timely proposal submissions that meet or exceed project requirements.

2) Ability to meet or exceed project schedule milestones.

3) Creation and management of an effective QA/QC and Health & Safety Program

4) Ability to manage multiple contract Task Orders.

5) Ability to demonstrate technical competence and innovation.

6) Ability to perform project planning and produce appropriate technical documents/drawings as required.

7) Effective control and management of subcontractor efforts.

8) Ability to meet required performance specifications.

9) Ability to manage and execute Task Orders within the negotiated budget.

10) Ability to meet environmental requirements.

C.3.6.2 Performance Measurement:

The following will be used to measure performance of the above stated objectives.

1) All proposals are submitted on or before the due date and meet or exceed all project requirements.

2) In performance of Task Orders, all project schedules are met or exceeded (excluding government accepted delays).

3) Projects meet all Occupational Safety and Health Administration (OSHA) and other standards as identified in the individual Task Orders.

4) Multiple contract Task Orders are managed while meeting all Task Order requirements.

5) Performance of the Task Order reflects technical competence and innovation that adds value to the overall project.

6) Technical documents and drawings meet or exceed project requirements.

7) Subcontractor cost, schedule, and technical competency meet or exceed project requirements.

8) All Task Order performance specifications are met.

9) All Task Orders are completed within the negotiated budget.

10) Projects meet all National Environmental Policy Act (NEPA) and other regulations as identified in the individual Task Orders

C.3.6.3 Quality Planning, Control and Assurance

C.3.6.3.1 Quality Assurance Surveillance Plan (QASP):

1) The Quality Assurance Surveillance Plan (QASP) outlines the framework and methods that will be utilized to provide surveillance and review of the Contractor’s fulfillment of contract acceptance criteria and other contract standards, including its quality control plan execution. The Government shall develop the QASP and evaluate Contractor performance based on this framework. The Government will evaluate the overall project performance on a regular basis to provide confidence that the project will satisfy the relevant quality standards. The system shall be applicable to all subcontractors and members of the contractor’s team, if appropriate.

C.3.6.3.2 Quality Control Plan (QC):

1) The Contractor shall monitor the specific project results to determine that they comply with relevant quality standards and identify ways to eliminate causes of unsatisfactory performance through utilization of its

Quality Control (QC) plan based on International Organization for Standardization (ISO) 9000.

2) The Contractor shall address the quality control planning, execution and tracking to be utilized to assure compliance with Task Order performance standards. The contractor shall develop, implement and maintain a quality assurance program. The system shall included inspection, validation, evaluation, corrective action and procedures necessary to effect quality control of all performance and products under the contract. The system shall allow inspection and evaluation by the government.

C.3.7 Government Furnished Information, Services, and Equipment:

1) The Government will make available relevant standards, functional statements, technical manuals, computer systems guides, reference material, regulations, instructions, and operational procedures necessary to accomplish this contract.

2) The Contractor shall provide technical support as needed to meet the requirements of the Task Order as it pertains to facilities, supplies, and services.

3) Contractor shall be responsible for reproduction and shipping charges for training manuals.

4) Contractors traveling overseas shall be required to provide passports.

C.3.8 Utilities:

1) All utilities in NAVFAC facilities will be available for the Contractor’s use in performance of duties as outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities.

Contractors shall abide by installations trash removal and pickup policies.

C.3.9 Project Management and Contract Oversight:

C.3.9.1 Contract Review Meetings and Materials for Review:

1) Program and contract management requires day-to-day oversight of resources associated with all Task

Orders under this contract. Program oversight shall include a well-defined and efficient line of authority, responsibility, and communication in managing all Task Orders people. The contractor will designate a

Contract Project Officer who will be the contractor POC with the government COR and Contracting

Officer for work related direction in accordance with the PWS and Task Orders

2) The Contractor Project Officer shall provide, on an ongoing monthly basis, project management information via status reports and/or meetings.

3) All meetings and reviews shall be held either at the Contracting Officer or the COR’s office, or at any other location as specified by the COR within the geographic locations identified in the Task Order. The contractor shall submit a monthly status report consisting of an Executive Summary detailing the major accomplishments, activities, of the previous month and challenges that need attention.

4) These reports shall contain an accurate and timely summary of major accomplishments, and activities.

5) Reports will be provided to the COR in Adobe PDF format. Alternate report formatting may be considered at the discretion of the COR.

6) The Contractor shall submit monthly reports via E-Mail to the COR no later than Ten (10) business days from the first day of the following month.

C.4.0 Schedule/Travel/Training:

C.4.1 Hours of Work:

1) Hours of work shall vary based on the task being performed, but will generally conform to the NAVFAC business hours of 0600-1600. Certain tasks may require work and travel after normal business hours, including evenings, weekends, and holidays. Actual hours of work will be included within individual Task

Orders.

C.4.2 Travel/Transportation:

1) Travel and Transportation: Performance under this contract may require travel by Contractor personnel at the Task Order level. If travel is required, the Contractor is responsible for making all needed arrangements for Contractor personnel. Travel may include trips to foreign countries.

A valid passport is required for all contractor personnel traveling to foreign countries. Travel costs will be reimbursed in accordance with this section.

a. Travel a.1 The Government may reimburse the Contractor for all allowable, allocable and reasonable travel costs incurred by the Contractor in performance of the task order –or – establish travel costs as part of the overall firm-fixed price established during task order negotiations.

a.2 If travel is reimbursed, travel costs will be reimbursed in accordance with FAR 31.205-46. If reimbursable travel is chosen, copies of all travel receipts must be included in the invoice as a condition of reimbursement.

a.3 Travel costs are payable only up to the rates or amounts authorized by the following:

a.3.1 Joint Travel Regulation (http://www.defensetravel.dod.mil/site/travelreg.cfm) provisions applicable to civilian personnel as prescribed by the Department of Defense for travel in the United States, including

Alaska, Hawaii, the commonwealth of Puerto Rico and its other territories and possessions; or a.3.2 Standardized regulations (Government civilians, foreign areas) Section 925, maximum travel per diem allowances in foreign areas prescribed by the Department of State for travel in areas not covered in travel regulations cited above.

a.4 The contractor will be paid the fixed hourly rate for the specified category of labor for personnel in travel status subject to the following:

a.4.1 Travel must be to the temporary duty site from the regular work site and from the temporary duty site to the regular work site;

a.4.2 Payment will be at the straight (regular) time rate regardless of when the travel occurs and its duration.

a.4.3 Local transportation, lodging, meals, or any other expenses contractor personnel will not be reimbursed. (Local travel is determined to be travel within a 50 mile radius of the local A-E office).

b. Transportation b.1 When transportation by privately owned conveyance is authorized, the Contractor shall be paid on a mileage basis not to exceed the applicable Government transportation rate specified in the travel regulations cited in FAR 31.205-46(a) b.2 Contractor travel shall be reviewed and authorized by the COR prior to travel.

b.2.1 Any travel required to perform a task order should be specifically identified by the Contractor in its task order proposal.

b.2.2 If the contractor discovers a need to travel after task order award the Contractor shall send the travel request to the Contracting Officer’s Representative (COR), with the Administrative

Contracting Officer (ACO) cc’d, with the following information:

b.2.2.1. Date, time, and place of proposed travel b.2.2.2 Purpose of the travel and how it relates to the contract b.2.2.3 Contractor’s estimated cost of travel b.2.2.4 Names of individuals travel b.2.2.5 A breakdown of estimated travel and per diem charges http://www.defensetravel.dod.mil/site/travelreg.cfm b.3 The Contractor is responsible for obtaining visas, passports, international driver’s licenses and any other documentation required to perform their work.

C.4.3 Training:

1) The Government will not pay costs, associated with the Contractor training employees in an effort to attain and/or maintain the minimum personnel qualification requirement(s), nor any specialized certification requirements of this contract.

C.4.4 Contractor Identification:

1) All Contractor employees shall ensure that when participating in meetings with Government and/or other

Contractor employees, that their personnel properly identify themselves as Contractor employees so that their actions will not be construed as acts of Government officials.

2) In accordance with DFARS 211.106.

3) Contractor shall ensure that external correspondence signed by Contractor employees is on company letterhead. Internal correspondence, including e-mail and memoranda, must include the name of the company in the signature line or in another clearly identifiable location. In all contact with the public and

Government officials, contractor personnel shall identify themselves as contractor employees working under contract to NAVFAC.

4) Contractor shall ensure that their onsite personnel, when receiving or placing telephone calls, identify their employer, in addition to whatever other appropriate greeting are used.

5) All Contractor staff working on-site at any of the client installations during Task Order performance shall wear at all times a DoD or Contractor furnished Identification. Additionally, contractor workspaces will be clearly marked “contractor” and their company name and their name

C.4.5 Non-Personal Service Statement:

Contractor employees performing services under this order will be controlled, directed and supervised at all times by management personnel of the contractor. Contractor employees will perform independent of and without the supervision of any Government official. The contractor shall submit an oversight plan that outlines how service providers on the contract will be managed by the contractor in order to perform the requirements of the contract. Actions of contractor employees may not be interpreted or implemented in any manner that results in any contractor employee creating or modifying Federal policy, obligating the appropriated funds of the U.S. Government, overseeing the work of Federal employees, providing direct personal services to any Federal employee or otherwise violating the prohibitions set forth in Parts 7.5 and

37.1 of the Federal Acquisition Regulation (FAR). The Government will control access to the facility and will perform the inspection and acceptance of the completed work.

File details come from the government source that posted it. Updated .