This is a set of preliminary design documents for a road rehabilitation project on Forest Road 221 in the Nez Perce-Clearwater National Forest, Idaho County, Idaho. The project involves 29.70 miles of roadway improvements, including pavement preservation, subexcavation, pavement repair, and drainage work. The rehabilitation techniques include chip seal, full depth reclamation with cement (in 8-inch and 12-inch depths), deep patching, crack sealing, and reinforced soil slope installation. The project will employ various construction methods such as roadway aggregate placement, geotextile stabilization, and underdrain system installation. Additional features include culvert replacements, temporary traffic control, and environmental mitigation measures like streambed material placement. The work is being prepared by the Federal Highway Administration's Western Federal Lands Highway Division, with a project manager named W. Schmidt, and is currently in the preliminary design phase, not yet ready for construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S A

E K

N

IDAHO

M O

N T A

N A

O R

E G

O N

BOISE

R

E N

O R

A I

N

N

ST F

R

I

D

D E P A

T

NTOFT A SP

T T

O

U

TE

ATESO

AM

E R

IC

A

M

PROJECT MANAGER

W. SCHMIDT

N

Lake

Orielle

Pend

Reservoir

American Falls

R

I V

E R

S A

E K

N

PARK

NATIONAL

YELLOWSTONE

IDAHO

84 15

COLUMBIA

BRITISH

W A

S H I N

G T

O N

M O

N T A

N A

W Y

O M I N

G

O R

E G

O N

NEVADA UTAH

UNITED STATES

CANADA

d'Alene

Coeur

Moscow

Lewiston

FALLS

IDAHO

POCATELLO

Twin Falls

Home

Mountain

BOISE

IDAHO KEY MAP

GRANGEVILLE

PLANS PREPARED BY

FEDERAL HIGHWAY ADMINISTRATION

U. S. DEPARTMENT OF TRANSPORTATION

ROAD 221 REHABILITATION

NATIONAL FOREST SYSTEM

TYPE OF CONSTRUCTION:

pavement repair, and drainage

Pavement preservation, subexcavation, DESIGN DESIGNATION:

e (max)

V

ADT (2046)

ADT (2026)

8%

30 MPH

<100

<100

SPECIFICATION:

on Federal Highway Projects, FP-24

Construction of Roads and Bridges

Standard Specifications for

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

VANCOUVER, WASHINGTON

WESTERN FEDERAL LANDS HIGHWAY DIVISION

LENGTH 29.70 MILES

PLANS FOR PROPOSED PROJECT

BEGIN PROJECT

ID FS NEZPR117 221(1)

IDAHO

IDAHO COUNTY

NEZ PERCE-CLEARWATER NATIONAL FOREST

APPROVED:

Western Federal Lands Highway Division

Chief of Engineering, DATE

0-25 25 50

SCALE IN MILES

END PROJECT

:2

M

S e p te m b e r

T it le

S h e e t c p w w o r k \d

\i d f n e z p r A

.d g n

PROJECT

NUMBER

SHEET

A.1ID FS NEZPR117 221(1)

PRELIM

INARY - N

OT FO

R CONSTRUCTION

BH TP

CUYD

culv.

CUFT

cubic yard(s) culvert cubic foot (feet) mon.

min.

MGAL

max.

matl.

M.P.

M.L.

monument minimum thousand gallon maximum material mile post main line

W

RIP

DI

G W G WV

CP GPS

36 31

36 31

N

E

N 1000EL. 1234.56

TP

TP

SEC.

SEC.

θs Ø ∆c spiral central angle diameter curve central angle total central angle approach ahead average daily traffic abutment appr.

AH

ADT

abut.

between bearing bridge balance point bench mark back face back btwn brg.

br.

BP

BM

b.f.

BK

ctrs.

CS

cont.

constr. jt.

conn.

conc.

col.

CMP

clr.

cc or c. to c.

centers point of curve to spiral continuous construction joint connection concrete column corrugated metal pipe clear centerline center to center

NO SCALE

NOTE:

1.

on the appropriate plan sheet.

Other symbols used in the plans will be shown in a legend

W west drwg(s).

dist.

diaph.

dia.

DHV

D exp. jt.

exc.

EW

EQ or eq.

EOP

emb.

elev.

El. 94.16 e.f.

e E expansion joint excavation edge of water equation edge of pavement embankment elevation elevation in feet each face superelevation rate east drawing(s) distance diaphragm diameter design hourly volume diameter galv.

ga.

galvanized gage (gauge) jt.

IE

ID

joint invert elevation inside diameter ftg.

flg.

fin.

f.f.

footing flange finish front face

LW

lt. or LT Ls

LPSM

long.

LNFT

lat.

L low water left length of spiral lump sum longitudinal linear foot (feet) latitude length of curve rte.

rt. or RT reqd.

reinf.

rdwy.

R/W R.

R route right required reinforcement roadway right-of-way range radius typ.

Ts

TS

thd.

TBM

T.

T typical tangent distance (spiraled curve) point of tangent to spiral thread temporary bench mark township tangent distance

VPI

vph V vertical point of intersection vehicles per hour design speed (velocity)

STS

struc.

stiff.

stgr.

std.

STA, Sta.

ST

SS

SRS

SQYD

SQFT

spa.

SLRY

shldr.

sect.

SC

SADT

S point of spiral to tangent spiral structural stiffener stringer standard station point of spiral to tangent point of spiral to spiral (no curve) point of spiral to reverse spiral square yard square foot spacing, spaces or spaced slurry unit shoulder section point of spiral to curve seasonal average daily traffic south

KSI

square inch thousand pounds per pvmt.

PT

PST

PSC

PSI

PSF

PS

POT

POS

POC

pl.

PI

PCS

PCC

PC

pavement point of tangent point of spiral to tangent point of spiral to curve pounds per square inch pounds per square foot point of tangent to spiral point on tangent point on spiral point on curve plate point of intersection point of curve to spiral point of compound curve point of curve

OHWM

OG

OD

o. to o.

o.c.

ordinary high water mark original ground outside diameter out to out on center

NC

N normal crown north

A A

DI

National Boundary

State Boundary

County Boundary

City Boundary

Township or Range Line

Section Line

Section Corner (Found, Projected)

Control Point (Terrestrial and GPS)

Gas & Water Meter; Gas & Water Valve

Flagpole; Fire Hydrant

Cooking Grate; Garbage Can; Picnic Table

Boulder; Well; Antenna; Grave

Above Ground Tank; Underground Tank

Spot Elevation; Coordinate Grid Tick

Material Source; Bore Hole; Test Pit

Treeline; Individual Trees

Spring or Seep

Section Line 4

Section Corner (Found, Projected) 4

Section Line 16

Section Corner (Found, Projected)16

Property Line

Parcel Number

National Park Boundary

National Forest Boundary

National Wildlife Refuge Boundary

BLM Lands Boundary

Indian Reservation Boundary

Existing Roadway (Paved, Gravel)

Railroad

Trail

Fiber Roll

Silt Fence

Sandbag

Intermittent Drainage or Small Creek

Large Creek or River

Lake, Pond or Reservoir; Marshland

North Arrow

Slope Stake Limits Top of Cut

Toe of Fill

Construction Limits

Bottom of Ditch

Fence

Gate with Fence

Cattleguard

Guardrail

Concrete Barrier and Guard Wall

Retaining Wall wall face

Signs (single, double post; portable)

Delineators

Pipe Culvert (arrow shows flow)

Pipe Culvert with End Section

Pipe Culvert with Headwall

Pipe Culvert with Drop Inlet

Box Culvert

Underdrain

Overhead/Above Ground Utilities

Underground Utilities

Light, Support w/Anchor) Poles (Power, Telephone, Joint Use, Miscellaneous Utility Features

Building

Right-of-Way Line

Permanent Easement

Construction Easement

Riprap

- no symbol -

Section A-A

EXISTING PROPOSED

STEAM = steam, T = telephone, TV = CATV, W = water P = power, SA = sanitary sewer, SD = storm drain, SS = storm sewer, FM = force main, FO = fiber optic, G = gas, IRR = irrigation, O = oil, UP = transformer or junction box, WF = water fountain EM = electric meter, TP = telephone pedestal, TV = CATV pedestal,

- no symbol -

ABBREVIATIONS

PLAN SYMBOLS AND

101-1W

FP-14

6/2022

WFLHD DETAIL

:2

P

J u ly

D e t W

-1 p w

-w o rk

\d \i d f-n e z p r2

-1

A

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

A.2 ID FS NEZPR117 221(1)

INARY - N

IDAHO

IDAHO

BEGIN PROJECT

END PROJECT

HISTORIC PARK

NEZ PERCE NATIONAL

MOUNT IDAHO RD

GRANGEVILLE SALMON RD

NFD 243 RD

TWIN CABINS RD

N

MATERIAL SOURCE

STAGING AREA AND

TWIN CABINS PIT

MATERIAL SOURCE

STAGING AREA AND

ADAM CAMP PIT

STAGING AREA

AND POTENTIAL

CHIP PILE

AREA

WILDERNESS

GOSPEL HUMP

OREGON

S A L

M O

N R

IV

E R

FREE USE RD

CLEARWATER RIVER

SOUTH FORK

MP 6.749

MP 34.30

SCALE IN MILES

0 1 2 3 4 5 10

45°35'48" N 116°01'59"

45°51'32" N 116°04'48"

ELK CITY

G R

A N

G E

V

IL

L E

R

IG

G

IN

S

9.7 MILES

.4

M

IL

E S

.0

M

IL

E S

FOREST

NATIONAL

NEZ PERCE

FOREST

NATIONAL

NEZ PERCE

:5

A u g u s t

V ic in it y

M a p

V p w w o r k

\d

\i d f n e z p r

A

.d g n

VICINITY MAP

PROJECT

A.3ID FS NEZPR117 221(1)

INARY - N

NOTE:

Slope

Variable

Construction Limits onstruction LimitsC

Vari es

Varies

EXISTING PAVEMENT

CHIP SEAL OVER

TYPICAL SECTION

Grade varies Grade varies

CL

after chip seal and micro surfacing is complete.

Grade small clipping berm back against new roadway surface4.

to create a small berm.

equiptment down the length of both sides of the roadway

Clip along edge of roadway with a motor grader or other3.

Micro seal pavement edge to pavement edge for chip seal.2.

Locations to be determined by the CO.

Patch surface and seal/fill cracks prior to chip sealing.1.

MP 30.546 to 34.30

MP 6.749 to 23.08

Roadway aggregate, method 2

Existing Ground

CL

SHOULDER REPAIR

TYPICAL SECTION

Fog Seal

, Type 2Micro Surfacing

Emulsified Asphalt

Chip seal, Type 1C

Existing asphalt surface

Slope

Variable

Construction Limits onstruction LimitsC

Vari es

Varies

FDR WITH CEMENT

CHIP SEAL OVER

TYPICAL SECTION

Grade varies Grade varies

CL

MP 23.08 to 30.546

Fog Seal

, Type 2Micro Surfacing

Emulsified Asphalt

Chip seal, Type 1C

Prime coat cement, see sheet C.2

Full depth reclamation with

NO SCALE

See Clipping Detail

See Clipping Detail

DETAIL

CLIPPING

Existing Ground and shoulder

Existing subgrade

Existing asphalt

Existing lane width

12.25' (Varies by location)

11' 1' +/-11'1' +/-

11'1' +/- 11' 1' +/-

6"

:1 e p te m b e r

T Y

P

IC

A L

S E

C T

IO

N p w w o r k \d

\i d f n e z p r C

.d g n

DETAILS

TYPICAL SECTION

PROJECT

NUMBER

SHEET

ID FS NEZPR117 221(1) C.1ID FS NEZPR117 221(1)

PRELIM

INARY - N

Profile grade

Chip Seal, see sheet C.1 depth

Full depth reclamation with cement, 8-inch

Existing Subgrade

LC

Existing ground

1'

Edge of chip seal

Full depth reclamation with cement

Chip seal

Profile grade

Chip Seal, see sheet C.1 inch depth

Full depth reclamation with cement, 12-

Existing Subgrade

LC

Existing ground

C o n s tr u c ti o n l im it

C o n s tr u c ti o n

L im it

See Safety Edge

12.25'12.25'5' 5'

Full depth reclamation limits

SAFETY EDGE

C o n s tr u c ti o n l im it

C o n s tr u c ti o n

L im it

See Safety Edge

12.25'12.25'5' 5'

Full depth reclamation limits

NO SCALE

MP 23.08 to MP 23.9

MP 24.1 to MP 25.5

MP 25.9 to MP 26.25

MP 26.55 to MP 30.546

FULL DEPTH RECLAMATION, 8-INCH

MP 23.9 to 24.1

MP 25.5 to 25.9

MP 26.25 to 26.55

FULL DEPTH RECLAMATION, 12-INCH

:3 e p te m b e r

T y p ic a l

S e c ti o n p w w o r k \d

\i d f n e z p r C

.d g n

DETAIL

TYPICAL SECTIONS

PROJECT

C.2ID FS NEZPR117 221(1)

1:41:4

1:41:4

PRELIM

INARY - N

Existing pavement

Existing base course

Fog seal

Separation geotextile

Pay limits (4' minimum width)

Varies subgrade material to a depth of 6"

Remove damaged pavement, base and

FULL DEPTH PATCH TYPE 2

NOTE:

Seal surface seams see sheet C.4 for details3.

Seams to be placed outside of location of wheel ruts2.

time of construction by the CO based on conditions encountered at the

Pavement patch locations and limits to be determined1.

NO SCALE

:2 e p te m b e r

T Y

P

IC

A L

S E

C T p w w o r k \d

\i d f n e z p r C

.d g n

DETAIL

TYPICAL SECTIONS

PROJECT

C.3ID FS NEZPR117 221(1)

INARY - N

with existing surface

Strike off material to flush flush with the existing surface

Ensure all remaining overband is crack sealant

Seal crack with hot applied flush with existing surface

Fill crack with pre-formulated mastic material in the field by the CO.

Crack sealing and filling locations and limits to be determined1.

1/4" to 1"

Greater than 1"

NOTE:

CRACK SEALING CRACK FILLING

CRACK SEALING AND FILLING

NO SCALE

:3 e p te m b e r

T Y

P

IC

A L

S E

C T p w w o r k \d

\i d f n e z p r C

.d g n

DETAIL

TYPICAL SECTIONS

PROJECT

NUMBER

SHEET

C.4ID FS NEZPR117 221(1)

PRELIM

INARY - N

INARY - N

pavement

Existing

Reinforcement geogrid, type 3

D E

P T

H V

A R

IE

T R

A N

S

IT

IO

N

D E

E P

P A

T C

H

E

D

TRANSITION DETAIL

DEEP PATCH

WIDTH VARIES

WIDTH VARIES

T R

A N

S

IT

IO

N

D E

E P

P A

T C

H

E N

D

Select borrow

8" compacted depth

Roadway aggregate, method 2

Stabilization geotextile

2V:15H 2V:1 5H

T R

A N

S

IT

IO

N

D E

E P

P A

T C

H

B E

G

IN

T R

A N

S

IT

IO

N

D E

E P

P A

T C

H

B E

G

IN

Chip seal, see sheet C.1placed in two equal lifts with tackcoat between lifts

0.3 to < 3 million ESAL, 4-inch compacted depth, inch nominal, maximum size aggregate,-4 inch or -2

Asphalt concrete pavement, gyratory mix, pavement

Existing

NO SCALE

:5 e p te m b e r

D e e p P a tc h T r a n s it io n D e ta il s p w w o r k \d

\i d f n e z p r C

.d g n

DETAIL

TYPICAL SECTIONS

PROJECT

NUMBER

SHEET

C.6ID FS NEZPR117 221(1)

PRELIM

INARY - NOT FO

Existing ground

LC

see sheet C.1

Chip seal, VariesTie into existing ditch

Va rie s Slope

Match Existing

24.5' Traveled Way

[1]

Embankment see sheet H.1 for details

Reinforced soil slope, 8" compacted depth

Roadway aggregate, method 2 equal lifts with tackcoat between lifts million ESAL, 4-inch compacted depth, placed in two

3/4-inch nominal maximum size aggregate, 0.3 to <3

Asphalt concrete pavement, gyratory mix, 1/2-inch or

REINFORCED SOIL SLOPE

MP 19.8

C le a r in g l im it s

10'

C le a r in g l im it s

FOOTNOTE:

Construct embankment surfacing per Subsection 204.10.

[1]

NO SCALE

Providing and placing topsoil

M atch existing

:2

S e p te m b e r

M

P

.0 p w w o r k \d

\i d f n e z p r C

.d g n

DETAIL

TYPICAL SECTIONS

PROJECT

C.7ID FS NEZPR117 221(1)

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER NORTH EAST ORTHOMETRIC

ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

C3 1.

25101 1519797.595 2541795.112 4956.755 45°50'08.625919"N 116°04'30.582351"W 4905.0179 0.999706863 5/8" ir w/fhwa alum cap

25102 1519831.877 2541693.546 4956.782 45°50'08.960290"N 116°04'32.018852"W 4905.0448 0.999706881 5/8" ir w/fhwa alum cap

25103 1519601.281 2541655.218 4951.488 45°50'06.682133"N 116°04'32.546920"W 4899.756 0.999707141 5/8" ir w/fhwa alum cap

C4

25104 1516766.799 2541418.284 4990.227 45°49'38.688484"N 116°04'35.729685"W 4938.5802 0.999705332 5/8" ir w/fhwa alum cap

25105 1516625.302 2541484.229 4982.995 45°49'37.294180"N 116°04'34.790246"W 4931.3537 0.999705664 5/8" ir w/fhwa alum cap

25106 1516462.028 2541482.269 4978.630 45°49'35.682143"N 116°04'34.808509"W 4926.9923 0.999705873 5/8" ir w/fhwa alum cap

C5

25107 1511841.358 2543127.223 5135.338 45°48'50.129045"N 116°04'11.317542"W 5083.8469 0.999698072 5/8" ir w/fhwa alum cap

25108 1511692.417 2543215.773 5130.884 45°48'48.662084"N 116°04'10.058932"W 5079.3997 0.999698268 5/8" ir w/fhwa alum cap

25109 1511481.900 2543259.324 5124.301 45°48'46.585408"N 116°04'09.432176"W 5072.8232 0.999698574 5/8" ir w/fhwa alum cap

C7

25110 1507859.740 2544192.826 5216.717 45°48'10.861203"N 116°03'56.050682"W 5165.352 0.999693982 5/8" ir w/fhwa alum cap

25111 1507762.713 2544333.130 5213.028 45°48'09.908747"N 116°03'54.064769"W 5161.6682 0.999694133 5/8" ir w/fhwa alum cap

25112 1507576.644 2544457.714 5203.866 45°48'08.076569"N 116°03'52.295826"W 5152.5126 0.999694547 5/8" ir w/fhwa alum cap

C8

25113 1505048.066 2544125.560 5327.425 45°47'43.099474"N 116°03'56.843383"W 5276.1289 0.999688704 5/8" ir w/fhwa alum cap

25114 1504921.926 2544257.070 5327.825 45°47'41.859245"N 116°03'54.980227"W 5276.5342 0.999688661 5/8" ir w/fhwa alum cap

25115 1504682.714 2544205.811 5327.552 45°47'39.495557"N 116°03'55.690369"W 5276.2661 0.999688683 5/8" ir w/fhwa alum cap

C9

25116 1501186.227 2543584.170 5202.943 45°47'04.951054"N 116°04'04.267778"W 5151.712 0.999694746 5/8" ir w/fhwa alum cap

25117 1501008.835 2543528.677 5203.320 45°47'03.197513"N 116°04'05.040896"W 5152.0916 0.999694738 5/8" ir w/fhwa alum cap

25118 1500637.895 2543473.351 5209.364 45°46'59.533114"N 116°04'05.800770"W 5158.1409 0.999694459 5/8" ir w/fhwa alum cap

C10

25119 1499337.966 2549201.376 5150.174 45°46'46.916311"N 116°02'44.905315"W 5099.0777 0.999696255 5/8" ir w/fhwa alum cap

25120 1499387.211 2549488.862 5145.118 45°46'47.412989"N 116°02'40.851445"W 5094.025 0.999696447 MagNail

25121 1499456.793 2549687.259 5138.638 45°46'48.107167"N 116°02'38.055655"W 5087.5467 0.999696723 5/8" ir w/fhwa alum cap

C11,C12

25122 1500839.467 2550825.159 5063.050 45°47'01.799101"N 116°02'22.070405"W 5011.9397 0.99970014 5/8" ir w/fhwa alum cap

25123 1500660.417 2551199.790 5052.001 45°47'00.044722"N 116°02'16.774850"W 5000.9003 0.999700604 5/8" ir w/fhwa alum cap

25124 1500518.577 2551437.654 5048.190 45°46'58.652805"N 116°02'13.411176"W 4997.0957 0.999700746 5/8" ir w/fhwa alum cap

C13

25125 1496453.442 2553704.177 4960.069 45°46'18.597337"N 116°01'41.229042"W 4909.1101 0.999704575 5/8" ir w/fhwa alum cap

25126 1496323.710 2553700.542 4958.488 45°46'17.316385"N 116°01'41.273956"W 4907.5322 0.999704651 5/8" ir w/fhwa alum cap

COORDINATE SYSTEM : Idaho West zone SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID12b

EPOCH DATE : 2010.000

CADD SYSTEM COORDINATE SYSTEM : ID83/2011-W-IF NSRS11(NAD83/2011) Idaho, West Zone, International foot

PROJECT : FR 221

DATE OF FIELD WORK : July-August 2025 DATE OF FINAL ADJUSTMENT : August, 2025

PROJECT UNITS : INTERNATIONAL FOOT

-S ep -2

:3

A M c:

\p w

-w or k\ d0

ID

_F

S _N

EZ

PR

7_

1(

1) _c on tr ol -s he et

.x ls x] S he et

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

PROJECT

D.1ID FS NEZPR117 221(1)

SHEET

NUMBER

SURVEY CONTROL

PRELIM

STATE PLANE COORDINATES GEO COORDINATES

POINT

NUMBER NORTH EAST ORTHOMETRIC

ELEVATION LATITUDE LONGITUDE ELLIPSOID

HEIGHT

COMBINED

FACTOR DESCRIPTION NOTE:

C14 1.

25128 1494847.595 2552800.659 4927.008 45°46'02.711772"N 116°01'53.896116"W 4876.0734 0.9997063 5/8" ir w/fhwa alum cap

25129 1494700.792 2552760.940 4925.831 45°46'01.261018"N 116°01'54.449142"W 4874.8996 0.999706363 5/8" ir w/fhwa alum cap

25130 1494512.222 2552800.674 4924.994 45°45'59.400666"N 116°01'53.879254"W 4874.0679 0.999706396 5/8" ir w/fhwa alum cap

C16

25131 1491907.508 2553527.140 5001.150 45°45'33.709725"N 116°01'43.503115"W 4950.3128 0.999702636 5/8" ir w/fhwa alum cap

25132 1491613.562 2553646.222 5004.228 45°45'30.811714"N 116°01'41.809060"W 4953.4006 0.999702469 5/8" ir w/fhwa alum cap

25133 1491325.587 2553815.728 5007.162 45°45'27.974383"N 116°01'39.404116"W 4956.3455 0.999702301 5/8" ir w/fhwa alum cap

C17

25137 1485247.375 2558793.560 5148.976 45°44'28.129158"N 116°00'28.917569"W 5098.3454 0.999694742 5/8" ir w/fhwa alum cap

25138 1484893.262 2558961.336 5155.386 45°44'24.638350"N 116°00'26.535808"W 5104.7618 0.99969441 5/8" ir w/fhwa alum cap

25139 1484705.399 2559079.987 5155.731 45°44'22.787353"N 116°00'24.854301"W 5105.1107 0.999694376 5/8" ir w/fhwa alum cap

C20,C21

25140 1478008.052 2553796.245 5346.865 45°43'16.490460"N 116°01'39.027358"W 5296.3309 0.999686066 5/8" ir w/fhwa alum cap

25141 1477917.315 2553621.198 5353.284 45°43'15.588618"N 116°01'41.490259"W 5302.7502 0.999685788 5/8" ir w/fhwa alum cap

25142 1477240.860 2552732.628 5379.370 45°43'08.879306"N 116°01'53.981318"W 5328.8427 0.999684686 5/8" ir w/fhwa alum cap

C24

25143 1452457.645 2548194.907 5408.403 45°39'04.031551"N 116°02'56.634853"W 5358.0186 0.99968406 5/8" ir w/fhwa alum cap

25144 1452656.427 2548322.848 5410.906 45°39'05.998851"N 116°02'54.844166"W 5360.5246 0.999683918 5/8" ir w/fhwa alum cap

25145 1452788.654 2548450.036 5408.127 45°39'07.309015"N 116°02'53.060564"W 5357.7517 0.999684028 5/8" ir w/fhwa alum cap

C25 ° ' " ° ' "

25146 1446218.133 2554315.545 5235.873 45°38'02.644682"N 116°01'30.168748"W 5185.7636 0.99969126 5/8" ir w/fhwa alum cap

25147 1446238.753 2554509.420 5234.191 45°38'02.854821"N 116°01'27.441241"W 5184.0904 0.999691309 5/8" ir w/fhwa alum cap

25148 1446312.202 2554743.844 5233.546 45°38'03.587906"N 116°01'24.145605"W 5183.4545 0.999691302 5/8" ir w/fhwa alum cap

Wall ° ' " ° ' "

25134 1486008.491 2557686.473 5121.180 45°44'35.608062"N 116°00'44.563074"W 5070.5304 0.999696238 5/8" ir w/fhwa alum cap

25135 1485840.560 2557837.760 5129.386 45°44'33.954982"N 116°00'42.422052"W 5078.74 0.999695823 5/8" ir w/fhwa alum cap

25136 1485724.186 2558034.377 5137.562 45°44'32.812376"N 116°00'39.644253"W 5086.9194 0.999695402 5/8" ir w/fhwa alum cap

Pit ° ' " ° ' "

PIT1 1499640.139 2543605.323 5234.920 45°46'49.687618"N 116°04'03.882573"W 5183.7183 0.999693213 5/8" ir w/fhwa alum cap

PIT2 1499608.543 2543713.314 5233.789 45°46'49.379914"N 116°04'02.357028"W 5182.5907 0.999693247 5/8" ir w/fhwa alum cap

-S ep -2

:3

A M c:

\p w

-w or k\ d0

ID

_F

S _N

EZ

PR

7_

1(

1) _c on tr ol -s he et

.x ls x] S he et

2)

PROJECT : FR 221

DATE OF FIELD WORK : July-August 2025 DATE OF FINAL ADJUSTMENT : August, 2025

PROJECT UNITS : INTERNATIONAL FOOT

COORDINATE SYSTEM : Idaho West zone SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID12b

EPOCH DATE : 2010.000

CADD SYSTEM COORDINATE SYSTEM : ID83/2011-W-IF NSRS11(NAD83/2011) Idaho, West Zone, International foot

To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.

PROJECT

D.2ID FS NEZPR117 221(1)

SHEET

NUMBER

SURVEY CONTROL

PRELIM

INARY - N

I L

E P

O S

T

M I L

E P

O S

T

M I L

E P

O S

T

I n c h p ip e c u lv e r t

M

P

.6

I n c h p ip e c u lv e r t

M

P

.3

B E

G

IN

P R

O J E

C T

B E

G

IN

C h ip s e a l, t y p e

C

M

P .6

.7

M I L

E P

O S

T

M I L

E P

O S

T

M I L

E P

O S

T

I n c h p ip e c u lv e r t

M

P

.6

I n c h p ip e c u lv e r t

M

P

.5

:3

S e p te m b e r

L in e G r a p h p a g e o f p w w o r k \d

\i d f n e z p r D

.d g n

LINE GRAPH (PAGE 1 OF 5)

PROJECT

D.4ID FS NEZPR117 221(1)

L

E P

O S

T

M I L

E P

O S

T

M I L

E P

O S

T

-I

N C

H P

IP

E

C U

L V

E R

T

M

P

.2

I n c h p ip e c u lv e r t

M

P

.2

M I L

E P

O S

T

M I L

E P

O S

T

M I L

E P

O S

T

I n c h p ip e c u lv e r t

M

P

.8

I n c h p ip e c u lv e r t

M

P

.3

S e e s h e e t

G .6

I n c h p ip e c u lv e r t

M

P

.5

I n c h p ip e c u lv e r t

M

P

.4

I n c h p ip e c u lv e r t

M

P

.6

M

P

.5 a n d S ta g in g A r e a

M a te r ia l S o u r c e

T w in C a b in s

:3

S e p te m b e r

L in e G r a p h p a g e o f p w w o r k \d

\i d f n e z p r D

.d g n

LINE GRAPH (PAGE 2 OF 5)

PROJECT

D.5ID FS NEZPR117 221(1)

INARY - N

L

E P

O S

T

M I L

E P

O S

T

M I L

E P

O S

T

I n c h p ip e c u lv e r t

M

P

.5

I n c h p ip e c u lv e r t

M

P

.2

D e e p

P a tc h

M

P

.9

R e in f o r c e d S o il

S lo p e

M

P

.8

M I L

E P

O S

T

M I L

E P

O S

T

M I L

E P

O S

T

I n c h p ip e c u lv e r t

M

P

.8

I n c h p ip e c u lv e r t

M

P

.1

B E

G

IN

F u ll d e p th r e c la m a ti o n w it h c e m e n t, in c h d e p th

M

P

.3

D e e p p a tc h

M

P

.6

D e e p p a tc h

M

P

.3

:3

S e p te m b e r

L in e G r a p h p a g e o f p w w o r k \d

\i d f n e z p r D

.d g n

LINE GRAPH (PAGE 3 OF 5)

PROJECT

D.6ID FS NEZPR117 221(1)

L

E P

O S

T

M I L

E P

O S

T

M I L

E P

O S

T

(12-inch depth) Full depth reclamation with cement

(12-inch depth) with cement Full depth reclamation

M P

.9

S U

S P

E N

D F u ll d e p th r e c la m a ti o n w it h c e m e n t, in c h d e p th

M P

.5

S U

S P

E N

D F u ll d e p th r e c la m a ti o n w it h c e m e n t, in c h d e p th

M P

.1

R E

S U

M E

F u ll d e p th r c la m a ti o n w it h c e m e n t, in c h d e p th

M I L

E P

O S

T

M I L

E P

O S

T

M I L

E P

O S

T

I n c h p ip e c u lv e r t

M

P

.1 cement (12-inch depth) Full depth reclamation with

8-inch depth with cement, Full depth reclamation

M P

.5

R E

S U

M E

F u ll d e p th r e c la m a ti o n w it h c e m e n t, in c h d e p th

MP 26.25

:3

S e p te m b e r

L in e G r a p h p a g e o f p w w o r k \d

\i d f n e z p r D

.d g n

LINE GRAPH (PAGE 4 OF 5)

PROJECT

D.7ID FS NEZPR117 221(1)

INARY - N

L

E P

O S

T

M I L

E P

O S

T

M I L

E P

O S

T

I n c h p ip e c u lv e r t

M

P

.6

E N

D F u ll d e p th r e c la m a ti o n w it h c e m e n t, in c h d e p th

M

P

.5

) D e e p

P a tc h

M

P

.3

M I L

E P

O S

T

M I L

E P

O S

T

M I L

E P

O S

T

E N

D P

R O

J E

C T

E N

D C h ip s e a l, T y p e

C

M

P

.3

D e e p

P a tc h

M

P

.8

M

P

.6 a n d S ta g in g A r e a

M a te r ia l S o u r c e

A d a m

C a m p P it

:3

S e p te m b e r

L in e G r a p h p a g e o f p w w o r k \d

\i d f n e z p r D

.d g n

LINE GRAPH (PAGE 5 OF 5)

PROJECT

D.8ID FS NEZPR117 221(1)

R2 R1

L

TYPICAL APPROACH DETAIL

NO SCALE

W

:5 e p te m b e r

T A

B U

L A

T

IO

N O

F P

L A

N A

N D

P R

O F

IL

E

Q U

A N

T

IT

Y p w w o r k

\d

\i d f n e z p r

E

.d g n

APPROACH ROADS

PROJECT

E.1ID FS NEZPR117 221(1)

INARY - N

NO SCALE

SLOPE DRAINS

WATERWAY

PLASTIC LINED

PLAN PLAN

Berm at top of fill slope

FLOW FLOW

Berm at top of fill slope

Toe of slopeToe of slope

FLOW

FLOW

B

B

CC

A

A

Graded roadbed Graded roadbed may be end dumped

Temporary riprap may be end dumped

Temporary riprap temporary riprap stabilized area or on

Discharge in drainage ditch, to direct into end section contain surface drainage and

Berm, length as required to temporary riprap stabilized area or on

Discharge in drainage ditch, End section to direct into end section contain surface drainage and

Berm, length as required to

Plastic liner or riprap protected slopeflexible tubing

6.

5.

4.

3.

2.

1.

Use Class 2 temporary riprap.

immediately after berm construction.

Seed and mulch all cut slope berms and toe-of-fill berms from disturbed areas.

Use toe-of-fill slope berms to divert offsite runoff away

Plastic liner is not required for rock embankments.

Do not use transverse or longitudinal joints in plastic liner.

runoff velocity when existing grades are steep.

designated by the CO. Use check dams to reduce the slopes as shown on the Erosion Control Plans or as

Construct temporary berms at the top of all erodible cut

Use slope drains until the slopes are permanently stabilized.

Place all slope drains at the end of each work shift.

on the Erosion Control Plans or as designated by the CO.

the embankment is constructed. Use spacings as shown

Use temporary slope drains (berms, drains, and riprap) as

SECTION A-A

FLOW

Slope drain

End section

Fill slope

Flow line compacted with wheel or track (typ.)

fill surface intermediate

Subgrade or

CUT SLOPE BERM

FLOW

Original ground

Slope rounding

Cut slope

Berm

Roadway

FLOW

Fill slope

Waterway

Berm fill surface intermediate

Subgrade or

SECTION C-C

SECTION B-B

(See Note 3)

Plastic liner

TOE-OF-FILL SLOPE BERM

FLOW

Original ground

Silt fence

(when required)

Toe of fill ditch

Berm or as directed

5' ± radius or as directed

5' ± radius m in

9" min.

Temporary 1' Ø

Berm, 4' width x 2' height, m in m in min.

6"

2' min.

:2

J u n e

S td p w w o r k \d

\i d f n e z p r F

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

LINED WATERWAYS

BERMS, SLOPE DRAINS AND

TEMPORARY EROSION CONTROL

157-7

FP-24, FP-14

1/2024

FLH STANDARD

PROJECT

F.2ID FS NEZPR117 221(1)

STABILIZED CONSTRUCTION EXIT

CONSTRUCTION EXIT

STABILIZED

NOTE:

4.

3.

2.

Existing paved roadway

Adjust length to fit field conditions as approved.

built up sediment.

Minimize tracking onto paved roadway by removing crosses existing drainage ditches.

Provide temporary drainage culvert where entrance

Construct drainage ditches along entrance as directed.

Use this entrance for construction vehicles only.

movement of typical truck using exit

Construct radius to allow turning geotextile, class 2, type E

Separation-stabilization

Filter rock in gr es s / e gr es s ar ea

Pr ov id e fu ll w id th o f ty p.

50' (typ.)

6" (min.)

DETAIL APPROVED FOR USE 7/2016

REVISED:

157-19W

:3

J u n e

D e t

W p w w o r k \d

\i d f n e z p r F

.d g n

DETAIL

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

PROJECT

F.3ID FS NEZPR117 221(1)

Spacing Slope

STAKES REQUIRED

1:1

1:2

1:3

1:4 or flatter for each roll

Stakes required

FIBER ROLL SPACING

Fiber roll length

Fl ow

T o e o f fi ll s lo p e

ELEVATION

PLAN

disturbed areas

Runoff from

INSTALLATION BEYOND TOE OF SLOPE

INSTALLATION ALONG SLOPES

FIBER ROLL STAKING DETAIL

PROPERLY STAKED AND ENTRENCHED FIBER ROLL

Existing ground (typ.)

Fiber roll

Flow direction

Slope

Direction of runof f from distur bed area s sp ac in g ch ar t

S ee F ib er R ol l

Fiber roll ff o n ur f o n oi t c er i

D along contours

Install fiber rolls

Fiber roll

Slope

Fi ll slo pe

Direction of runoff ground

Existing soil to match ground level

Backfilled and compacted

Flow larger than fiber roll wood stakes. See Note 2.

Pay lim its

Pay lim its

SLOPE PROTECTION INSTALLATION

ALTERNATE FIBER ROLL JOINT DETAIL

FIBER ROLL LAPPING DETAIL

on uphill side of fiber roll

Place excavated material Stagger joints (typ.)

2.

1.

permanent installations. Do not crush fiber roll while staking.

roll is secure to slope. Live stakes may be used for and install fiber rolls

Step 1: Excavate trench Step 2: Backfill soil against fiber rolls

FIBER ROLL

(FT)

(FT)

2" (min.) Excavate trench 2"

1" x 1" or 1" Ø ove rlap

12" (m in.)

t o m in m in

1" x 1" Wood stake as specified in plans

3' min. or

3' (min.)

Drive stakes at each end and at 4-foot spacing until fiber fiber roll and space stakes at 4-foot max.

6-inches from fiber roll end angles towards the adjacent

Overlap fiber rolls 12-inch minimum. Drive stakes at

NOTE:

DETAIL APPROVED FOR USE 10/2014

7/2016 REVISED:

157-21W

:3

J u n e

D e t

W p w w o r k \d

\i d f n e z p r F

.d g n

DETAIL

OFFICE OF FEDERAL LANDS HIGHWAY

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

PROJECT

F.4ID FS NEZPR117 221(1)

INARY - N

membrane

Waterproof

Existing ground

(anchoring method to be approved)

Waterproof membrane

Existing ground

Portable water bladder streambed grade

Existing sandbags (as needed)

Hand-placed stream flow side of diversion berm.

Impervious sheeting. Place on Minimum berm top elevation manufacturer's recommendations.

handling bags. Fill and place per

Machine-placed large material placing temporary diversion berm.

to the extent practicable when of existing streambed material

Minimize leveling or trenching

Sandbag (typ.)

Minimum berm top elevation

Sandbag (typ.)

NO SCALE

NOTE:

directed.

Use as needed when constructing the isolation barrier as

Repair as needed after rainfall events or as directed.

Inspect and maintain the temporary diversion berm daily.

time.

Place a maximum of one diversion in the stream at any given rows of sandbags above the joints in lower rows.

bottom rows as there are vertical course. Overlap the upper

Place sandbags to form a pyramid by laying equal numbers of approval, including alternate methods, prior to installation.

guidance. Submit temporary stream diversion plans for freeboard. The examples shown are intended as representative

Provide a temporary diversion berm with a minimum height

5.

4.

3.

2.

1.

Limit of work zone

OPTION B

OPTION A

OPTION C

Diverted water level at time of construction

Diverted water level at time of construction

Existing abutment or pier

Water surface elevation

Water surface elevation

Water surface elevation equal to the water surface elevation with at least 12 inches m in m in

4'-6" min.

METHODS

TEMPORARY DIVERSION BERM

628-10W

FP-24

6/2025

WFL STANDARD

:3 e p te m b e r

S td

W p w w o r k \d

\i d f n e z p r F

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

F.5ID FS NEZPR117 221(1)

INARY - N

Compacted native soil

Erosion control blanket

Erosion control blanket

Compacted native soil

Erosion control blanket

12" spacing

12" spacing

6" x 6" Trench

6" x 6" Trench

NOTE:

Overlap in the direction of the prevailing wind.

recommendations.

Install fasteners according to the manufacturer's

2.

1.

Se e

Not e

Pr ev ai lin g wi nd

AT TOP OF SLOPE

ANCHOR TRENCH

DETAIL A

AT TOE OF SLOPE

ANCHOR TRENCH

DETAIL B

SHINGLE SPLICE

DETAIL C

PERSPECTIVE VIEW

Fasteners @

Fastener

Fastener

Flow

Fastener (typ)

Fasteners @

Toe of slope of slope. See Detail A

Anchor trench at top

Slope stake

Blanket edge

Shingle splice. See Detail C edge overlap of slope. See Detail B

Anchor trench at toe

Blanket ends

S ee N ote 1

Fasten er sp acin g

6"

6"

3'

' m

ax. c to c

4" min.

overlap

6" m in.

12" max. c to c

12" max. c to c

12" max. c to c

PRODUCT ON SLOPES

ROLLED EROSION CONTROL

629-1W

8/2024

:3 e p te m b e r

S td

W p w w o r k \d

\i d f n e z p r F

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

F.6ID FS NEZPR117 221(1)

INARY - N

COVER

MINIMUM

DIAMETER

VALENT

EQUI-

RADIUS

CORNER

MINIMUM

COVER

MINIMUM

COVER

MINIMUM

COVER

MINIMUM

DIAMETER

VALENT

EQUI-

RADIUS

CORNER

MINIMUM

142 x 91

137 x 87

128 x 83

117 x 79

112 x 75

103 x 71

95 x 67

87 x 63

83 x 57

81 x 59

77 x 52

73 x 55

71 x 47

66 x 51

64 x 43

60 x 46

57 x 38

49 x 33

42 x 29

35 x 24

28 x 20

24 x 18

21 x 15

17 x 13

MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)

MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET) MAXIMUM FILL HEIGHT ABOVE TOP OF PIPE (FEET)

INCHES INCHES

0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8 0.064/160.079/140.109/120.138/10 0.168/8

INCHES INCHES INCHES INCHES

0.060/160.075/140.105/120.135/10 0.164/8 0.060/160.075/140.105/120.135/10 0.164/8

INCHES INCHES

0.064/160.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.079/140.109/120.138/10 0.168/8 0.060/160.075/140.105/120.135/100.060/160.075/140.105/120.135/10

INCHESINCHES INCHES INCHES

NO SCALE

NOTE:

of camber or increase the pipe culvert gradient.

elevation of the inlet invert, reduce the amount parabolic curve as designed exceeds the curve. If the midpoint elevation on the pipe length. Develop camber on a parabolic inverts an ordinate amount equal to 1% of the from a chord through the inlet and outlet

When directed, camber pipe culverts upward

4.

3.

2.

1.

culvert to the top of the pavement.

maximum fill height from the top of the pipe

For all roadway surface types, measure pipe culvert to the top of the pavement.

measure minimum cover from the top of the roadway subgrade. For rigid pavements, top of the pipe culvert to the bottom of the roadways, measure minimum cover from the

For flexible pavement and aggregate surface corrugation pipe.

Obtain approval before furnishing annular of helical lockseam and welded seam pipe.

corrugations are more restrictive than those

Fill heights for culvert pipe with annular lockseam and welded seam pipe only.

The fill heights in the table are for helical special analysis by the CO.

METAL ROUND PIPE CULVERT

FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT

METAL PIPE ARCH CULVERT

FILL HEIGHT AND METAL THICKNESS TABLE FOR HELICAL LOCKSEAM AND WELDED SEAM PIPE CULVERT

Fill heights exceeding 100 feet require

STEEL ALUMINUM

DIAMETER

SIZE

PIPE

SPAN x RISE

SIZE

PIPE ARCH

ALUMINUMSTEEL

DIAMETER

SIZE

PIPE

SPAN x RISE

SIZE

PIPE ARCH

" CORRUGATIONS2

" x 3

2 3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS

METAL THICKNESS (INCH/GAGE) METAL THICKNESS (INCH/GAGE)

" CORRUGATIONS2

" x 3

2 3" x 1" CORRUGATIONS

" CORRUGATIONS2

" x 3

METAL THICKNESS (INCH/GAGE)

3" x 1" CORRUGATIONS 5" x 1" CORRUGATIONS " CORRUGATIONS2

" x 3

2 3" x 1" CORRUGATIONS

METAL THICKNESS (INCH/GAGE)

3.5

103 x 71

95 x 67

87 x 63

81 x 59

73 x 55

66 x 51

64 x 43

60 x 46

57 x 38

49 x 33

42 x 29

35 x 24

28 x 20

24 x 18

21 x 15

17 x 13

3.5

METAL PIPE CULVERT

602-1

8/2024

:4

J u n e

S td p w w o r k \d

\i d f n e z p r G

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.2ID FS NEZPR117 221(1)

INARY - N

Band Band

Band Band

Band BoltsBolts corrugation in pipe end with second annular around band meshes

Continuous corrugation heel and toe of angle of corrugation at fillet weld at crest

Rivet, spot weld, or

Pipe Pipe

Pipe

Band

BandBand

Bolts Bolts

Angle Angle strap connector

Bolt, bar andof corrugation at heel and toe of angle

Rivet, spot weld, or fillet weld at crest

Wedge

NO SCALE

NOTE:

1.

used.

Bridges, Division II Section 26 may be

Standard specifications for Highway joint performance criteria of AASHTO fastening devices that comply with the

Other types of coupling bands or

W

SMOOTH SLEEVE BAND FLAT BAND

ANNULAR BAND HELICAL BAND

SEMI-CORRUGATED BAND

STANDARD BAND CONNECTIONS

SLEEVE JOINT

SIDE VIEW SIDE VIEW

END VIEWEND VIEW

Band Angle

Bar & Strap

Oval Lug

Integral Flange Wedge and Strap

END VIEW

SIDE VIEW

W W W

Stab type joint

Smoother sleeve with center stop.

COUPLING BANDS FOR METAL PIPE CULVERT

the connecting pipe. Provide coupling bands not more than 3 nominal sheet thicknesses

Fabricate annular, helical and semi-corrugated type coupling bands from the same metal as

Use annular corrugated bands with pipes having annular corrugations or with helical pipe dimension of the end corrugation in the pipe.

For helically corrugated pipe with rerolled ends, the nominal corrugations size refers to the corrugations on rerolled pipe ends.

Use helical corrugated bands with pipes having helically corrugated ends.

[2]

[3]

[4]

[5]

[6]

"2

" × 3

The minimum band widths shown for 3" × 1" and 5" × 1" corrugated sizes apply to 2 or 0.036 inch for aluminum, or a plastic with an equivalent strength to metal.

Use a matching metal having a nominal thickness of not less than 0.040 inch for steel, Smooth sleeve-type couplers and flat bands may be used for pipe diameters of 12" or less.

steel or 0.048 inch for aluminum. Fasten coupling bands with the following diameter of bolt:

thinner than the thickness of the pipe to be connected, and no thinner than 0.052 inch for

" for 18" round culvert (21" × 15" pipe arch) or less8

" for 21" round culvert (24" × 18" pipe arch) or more2 rerolled with 3" × 1" pipe corrugations.

having rerolled end to form annular corrugations. A 10.5 inch band is acceptable on

" corrugations. A 12 inch band is acceptable on pipe ends 2

" × 3 pipe ends rerolled with 2 diameter, required above 42" diameter

Second angle connection optional to 42" diameter, required above 42" diameter

Second angle connection optional to 42"

DIAMETER

ROUND PIPE

SPAN × RISE

PIPE ARCHCORRUGATION

CORRUGATED

ANNULAR

CORRUGATED

HELICALLY

CORRUGATED

SEMI-

BANDS

[4]

BANDS

[5]

BANDS

SIZE

[6] underline

INCHESINCHESINCHES

87 × 64 to 142 × 91

60 × 46 to 81 × 59

87 × 64 to 142 × 91

60 × 46 to 81 × 59

49 × 33 to 83 × 57

17 × 13 to 42 × 29

78 to 144

36 to 72

78 to 144

36 to 72

78 to 84

42 to 72

12 to 36

10.5

10.5

10.5

10.5

10.5

10.5

10.5

MINIMUM BAND WIDTH (INCHES)

× 2

× 3

3 × 1

5 × 1

COUPLING BAND

METAL PIPE CULVERT

602-2

:4 e p te m b e r

S td p w w o r k \d

\i d f n e z p r G

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.3ID FS NEZPR117 221(1)

INARY - N

Roadway embankment Roadway embankment

Natural ground

Natural ground Natural ground

Roadway embankment

Roadway excavation

Natural ground

H H

H H

H H

H

H

H

H

Finished subgrade Finished subgrade

Natural ground

Finished subgrade before trench excavation embankment height

Finished subgrade or

Original natural ground surface

Finished subgrade

Roadway embankment

Roadway embankment

Finished subgrade trench excavations depth table

See bedding excavation in trench

HH

H

Half diameter or whichever is less

(see table)

Minimum spacing or Span

Diameter or Span

Diameter section

Metal endMetal end section or 36" (max.) for embankment installations

> 54"

12" to 54"

6"

4"

18" (min.)

* Reduce to 18" for

UP to 48"

48" and UP

24" span or 36", 18" ±

18" ±18"±

(min.)

6"

(min.)

6"

12" (min.), 24" (max.)

"/foot of cover,2 minimum

1'-0"

2H or 12' (max.)

2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.) 2H or 12' (max.)

2H or 12' (max.)2H or 12' (max.)

2H or 12' (max.) 2H or 12' (max.)

When directed, camber pipe culverts upward from a chord through the inlet and outlet inverts an ordinate amount equal to 1% of the pipe length. Develop camber on a parabolic curve. If the midpoint elevation on the parabolic curve as designed exceeds the elevation of the inlet invert, reduce the amount of camber or increase the pipe culvert gradient.

H equals the diameter of all round pipe culverts or the rise dimension of all pipe arch culverts.

See Section 704 for bedding and backfill requirements.

1.

2.

3.

Construct piping plug of impermeable backfill material at the pipe culvert inlet where granular material is used for backfill. Width may be adjusted to tie into impervious material.

MULTIPLE PIPE INSTALLATION

PIPING PLUG

BELOW NATURAL GROUND OR

TRENCH EXCAVATION IN EMBANKMENT

ON UNSTABLE MATERIAL

ABOVE AND BELOW

NATURAL GROUND

ON NATURAL GROUND

ABOVE NATURAL GROUND

ON UNYIELDING MATERIAL

PIPE BEDDING

ELEVATION

SECTION A-A

LEGEND:

Bedding material (uncompacted)

Impermeable backfill material.

BEDDING DEPTH

MINIMUM SPACING

Toe plate Toe plate

H

Width

H H

Pipe culvert

Embankment slope

High water elevation treatment

Culvert end

Piping plug

A

A

Embankment material placed in layers

Compacted backfill material placed in layers not backfill according to Section 614.

compact in layers not over compressible material. Lightly and replace with selected fine

Remove unyielding material fill material properly compacted with approved granular foundation firm bearing soil and replace

Remove unstable material to

Bedding

Bedding

Bedding

Bedding

NO SCALE

NOTE:

not exceeding 6" compacted depth.

exceeding 6" compacted depth; or flowable

6" in uncompacted depth.

2'-0" ±

1'-0" ±

SPACING

DIAMETER

or SPAN

PIPE SIZE (H) DEPTH

PIPE CULVERT BEDDING

METAL AND PLASTIC

602-3

:4

J u n e

S td p w w o r k \d

\i d f n e z p r G

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.4ID FS NEZPR117 221(1)

INARY - N

or Span

Dia.

or Span

Dia.

/2

/2or Span

Dia.

or Span

Dia.

Original ground Original ground ground

Original ground

Original ground

Original

GeotextileGeotextile

Geotextile Geotextile Geotextile

Flowline

(INCHES) (FEET) (INCHES) (CUYD) (SQYD)

(INCHES) (FEET) (INCHES) (CUYD) (SQYD)

NO SCALE

NOTE:

3.

2.

1.

for payment.

Do not measure riprap placement excavation

Furnish separation and stabilization geotextile.

less than 10%.

Use for aprons serving culverts with slopes FOR INFORMATION ONLY

PROTECTIVE APRON DIMENSIONS AND QUANTITIES

OUTLET WITHOUT DITCH

FOR INFORMATION ONLY

PROTECTIVE APRON DIMENSIONS AND QUANTITIES

OUTLET WITH DITCH

L

A A

END SECTION

CULVERT WITH STANDARD

PLAN VIEW PLAN VIEW

END SECTION

CULVERT WITHOUT STANDARD

L

B

C D

B

C D

SECTION A-A SECTION B-B

SECTION C-C SECTION D-D SECTION E-E

PLAN VIEW

END SECTION

CULVERT WITH STANDARD

PLAN VIEW

END SECTION

CULVERT WITHOUT STANDARD

PROTECTIVE APRON AT CULVERT OUTLET WITHOUT DITCH

PROTECTIVE APRON AT CULVERT OUTLET WITH DITCH

m in

H m in

H

Variable slope Variable slope

L L

/2

/2

D it c h

D

D it c h

D

E

EE

E b o tt o m w id th b o tt o m w id th

4D

H m in

D /2 m in

D /2 ditch slope

Match existing ditch slope

Match existing m in

H m in

D /2 m in

H

2' min.

2' min.

or flatter

Sloped 1V:2H

QUANTITY

RIPRAP

ESTIMATED

CLASS

RIPAP

QUANTITY

GEOTEXTILE

ESTIMATED

SECTION

END

WITH

SECTION

END

WITHOUT

D

SIZE

CULVERT

L

LENGTH

APRON

H

DEPTH

APRON

QUANTITY

RIPRAP

ESTIMATED

CLASS

RIPAP

QUANTITY

GEOTEXTILE

ESTIMATED

SECTION

END

WITH

SECTION

END

WITHOUT

D

SIZE

CULVERT

L

LENGTH

APRON

H

DEPTH

APRON

14.5

12.5

49.8

38.7

18.5

13.2

5.2

3.2

1.7

44.4

34.0

15.6

10.8

3.9

2.2

1.0

14.5

12.5

38.5

29.8

15.1

10.7

4.4

2.7

1.3

35.6

27.2

13.3

9.3

3.6

2.0

0.9

CULVERT OUTLETS

PLACED RIPRAP AT

251-1W

8/2016

:4 e p te m b e r

S td

W p w w o r k \d

\i d f n e z p r G

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

G.5ID FS NEZPR117 221(1)

INARY - N

48" CMP OUTLET

Invert El. = 5053.21'

E = 2,550,663.2243

N = 1,500,960.9852

Invert El. = 5050.59'

E = 2,550,683.1632

N = 1,500,893.3695

Flowline El. 5055.21'

Flowline El. 5052.59'

Conserved Streambed Material

70 LNFT

72-inch Pipe Culvert

Existing grade

Proposed channel profile

Class 1, Non-woven

Geotextile Filter

Excavation Limit

70 LNFT

72-inch Pipe Culvert

Placed riprap, Class 3

Placed riprap, Class 3

Environmental mitigation, streambed material

Grade to match existing

Grade to match existing

0+10 0+20 0+30 0+40 0+50 0+60 0+70 0+80 0+90 1+00 1+10 1+20 1+30 1+40 1+50

5,040 5,040

5,045 5,045

5,050 5,050

5,055 5,055

5,060 5,060

5,065 5,065

5,070 5,070

5,075 5,075

5,080 5,080

-3.81%

5'

2'

.1

5'

:2

S e p te m b e r

S h e e t]

P la n

P r o f p w w o r k \d

\i d f n e z p r H

Y P

C T

I n tl

F t-

D

.d g n

PLAN/PROFILE

CULVERT - MP 16.345

PROJECT

G.6

NPS Drwg No. xxxxxx NPS PMIS No. xxxxxx

ID FS NEZPR117 221(1)

PRELIM

INARY - N

FOOTNOTE:

LOCATION

GRADATION

COBBLE

STREAMBED

INFILL INFORMATIONAL QUANTITIES

(CUYD)

COBBLE

STREAMBED

(CUYD)

SEDIMENT

STREAMBED

Class B

ITEM DESCRIPTION UNIT

CUYD

64704-1000

QUANTITY

MITIGATION QUANTITIES

Environmental Design, Streambed material streambed cobble gradations.

See special contract requirements for streambed sediment, and

Mix streambed cobbles evenly throughout streambed sediment.

Streambed Material.

Quantities included in Item 64704-1000 Environmental Design, [2] parabolic shape.

Slope streambed aggregate towards flowline to ensure [1]

MP 16.345 10 30

SECTION A-A

Round pipe culvert wall

Streambed top

Streambed sediment

Streambed cobble

Channel flowline

.1 b u r ia l d e p th

CULVERT INTERIOR TREATMENT

SIMULATED STREAM

CULVERT - MP 16.345

:2

S e p te m b e r

S h e e t]

D e ta il s S tr e a m im p w w o r k \d

\i d f n e z p r H

Y P

C T

I n tl

F t-

D

.d g n

PROJECT

G.7ID FS NEZPR117 221(1)

2"

18"

WELDED WIRE FORM DETAIL

10'±

TYPICAL CONNECTION DETAIL

VEGETATED FACE

REINFORCED SOIL SLOPE WITH

TYPICAL WALL END TREATMENT

5'-0"

1:2

RSS backfill material

FACING GEOGRID WRAP DETAIL

18"

12"-16"

Typical Section

See C Sheets for material

RSS backfill geosynthetic, type 3

Reinforcement

Limit of RSS backfill

4'

3.5'

Base width: 9" - 12"

Top width: 12" - 16"

Topsoil pocket length - overlap 2" at ends

W4.0xW4.0 form and strut) 10'

Welded-wire form facing (4x4-

9"-12" geosynthetic type 3

Reinforcement

12"

RSS backfill material of adjoining wire form for support

Place edge of wire form inside

24" C to C or as needed

Galvanized support struts spaced galvanized

4" x 4" - W4 x W4

Final grade

RSS face

Existing ground at

Facing geogrid

Welded wire form (typ.)

Details, this sheet

See Typical Connection

R e in fo rc e d

S o il S lo p e P a y

L im it s

Geotextile filter, class 2, non-woven

(bottom of wall)

12" back from slope

Toe welded wire form greater than the minimum to the temporary excavation slope if

10.5' min. Extend geogrid length

Reinforcement length = L leveling pad

Crushed aggregate

Min. gradient = 2.0%

UNDERDRAIN SYSTEM

PERFORATED PIPE

Underdrain backfill pad

Leveling

12"

Flow

24" sheet drain Geocomposite beneath leveling pad. Minimum gradient 0.5%

6" Ø Perforated pipe underdrain system pipe drain every 100 feet (max.)

6" Ø Rigid outlet

2% class 2, non-woven

Geotextile filter, m in

(2) 45° Elbows

Rodent guard

RODENT GUARD DETAIL

Hose clamp

Outlet pipe

-inch max.2

Wire mesh sheets spaced 4' apart)

50% coverage (i.e., 4' wide up excavation slope 2/3 H at

Geocomposite sheet drain stabilization geotextile

Line slope face with this sheet

See Rodent Guard Detail, System, this sheet

See Perforated Pipe Underdrain

Existing ground

NOTE:

indicated otherwise.

common backfill and 9 inches topsoil unless

Welded wire form faced wall toe treatment to be 2.

the CO.

those shown on the plans require approval by adjustment. Any increase in wall heights over

The heights and quantities are subject to field 1.

FOOTNOTE:

structural excavation material is exhausted.

backfill materal. Supplement with unclassified borrow when

Conserve and reuse structure excavation material for RSS [1]

1.5 drain towards underdrain system.

Slope bottom of excavation at a minimum 2 percent grade to [2]

H e ig h t, H

V a r ie s

1' accordance with OSHA standards.

Construct slopes at a stable inclination in3.

:2 e p te m b e r

W a ll

T a b u la ti o n

S h e t] p w w o r k \d

\i d f n e z p r H

.d g n

DETAIL

REINFORCED SOIL SLOPE

PROJECT

H.1ID FS NEZPR117 221(1)

INARY - N

B

C P

N

Edge of pavement

E= 2,557,636.9838

N= 1,486,070.7524

Begin existing gabion basket wall

E= 2,557,679.5011

N= 1,486,009.8547

End existing gabion basket wall

FR 221 Centerline

Construction limits

Reinforced soil slope limits

0-10 10 20 40

SCALE IN FEET

100'

15'

15'

:4

S e p te m b e r

.2 p w w o r k \d

\i d f n e z p r H

.d g n

PLAN VIEW

REINFORCED SOIL SLOPE

PROJECT

H.2ID FS NEZPR117 221(1)

ROAD WORK

END

WORK

ROAD

AHEAD

ROAD NAME

WORK

ROAD

AHEAD

ROAD WORK

END

WORK

ROAD

xxxxx

WORK

ROAD

xxxxxxx

ROAD WORK

NEXT xx MILES

WORK

ROAD

AHEAD

xx

MPH

ROAD NAME

ROAD WORK

END

WORK

ROAD

xxxxxxx

ROAD WORK

END

xx

MPH

WORK

ROAD

xxxxxxx

ROAD WORK

NEXT xx MILES

12.

11.

10.

9.

8.

7.

6.

5.

4.

3.

2.

1.

ROAD TYPE

DISTANCE BETWEEN

A B C

NOTE:

M in o r R o a d

M a jo r R o a d

C

B as de ter mi ne d b y t he C

O

Wor k z on e A re a o f I nfl ue nc

(S ee S ign S pa cin g T ab le)

ADVANCE W

ARNI

NG

AREA

(S ee S ign S pa cin g T ab le)

ADVANCE W

ARNI

NG

AREA

A

B

C

A

A

A

A

Pr oje ct Lim its

See Note 8 W16-8P W20-1 over

W20-1

G20-2

See Note 9 W20-1

See Note 9 W20-1

(optional) W13-1P

See Note 10 G20-1

G20-2

See Note 8 W16-8P W20-1 over

G20-2

G20-2

See Note 9 W20-1

See Note 9 W20-1

(optional) W13-1P

See Note 10 G20-1 specify the distance to the work area in feet or in miles. Install an The message on the W20-1 signs may be ROAD WORK AHEAD or may roads only).

name of the road on which the construction does occur (applies to major construction work occurs, include a supplementary plaque indicating the If W20-1 is placed on a roadway other than that on which the actual

Cover post-mounted signs when not applicable.

Do not store traffic control devices along the roadway when not in use.

Maintain two-way traffic during all non-work hours except as approved.

Ensure all sign supports exposed to traffic are crashworthy.

construction area.

needed to indicate a maximum recommended speed through the Install advisory speed plaques under the W20 series warning signs as messages as required.

signs, locate the warning signs to fit field conditions as approved. Vary Where advance warning signs, placed as shown, interfere with permanent operations.

and details in this traffic control plan as necessary to accommodate actual applicable to this project. The Contractor may add or delete information Not all details shown on the temporary traffic control sheets may be

Erect all project advance warning signs before starting construction work.

State standards may be used as an alternative if approved.

verify that an encroachment permit has been obtained.

If signing on a roadway under a jurisdiction other than the client agency, nearest whole mile.

at each end of the project. Show the distance on the G20-1 sign to the

Ro ad N ame

SIGN SPACING TABLE

For work zones that are 2 miles or more in length, install G20-1 signs

Sign Spacing Table.

When used, place the two W20-1 signs "B" feet apart according to the additional W20-1 sign when approach speeds exceed 50 mph.

Expressway / Freeway

NO SCALE

SIGNS IN FEET

Rural greater than 50 mph

Urban and Rural 35 mph to 50 mph

Urban and Rural 30 mph and less

ADVANCE SIGNING

TEMPORARY TRAFFIC CONTROL

635-1

2/2024

:3 e p te m b e r

S td p w

-w o rk \d

\i d f-n e z p r2

-1

I2

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PROJECT

I.2ID FS NEZPR117 221(1)

1.

Traffic flow yellow centerline yellow centerline solid yellow centerline and solid yellow centerline

Traffic flow

Traffic flow

Traffic flow

Traffic flow

Traffic flow

Traffic flow

Traffic flow

Traffic flow

Traffic flow

Traffic flow

Traffic flow

4" Broken yellow centerline

4" Broken yellow centerline

NOTE:

Two-way traffic

No passing zone one direction

DETAIL A2

Two-way traffic

No Passing zone one direction

DETAIL B2

Two-way traffic

No passing zone both directions

DETAIL A3

Two-way traffic

No Passing zone both directions

DETAIL B3

Shoulder

Shoulder

Shoulder Shoulder

Shoulder

Shoulder

On two- or three-lane roads, signs may be used instead of following patterns:

To substitute raised pavement markers for lines, use the

Double solid line: two pavement markers, side by side, allowed by the gap shown based on curvature.apart

Two-way traffic

Passing zone both directions

DETAIL B1

Two-way traffic

Passing zone both directions

DETAIL A1

DETAIL A DETAIL B

2' 18'

20'

40'

2' 38'

2' 18'

20'

2' 38'

40'

4" Broken yellow and

4" Broken yellow

4" Solid double

4" Solid double

2 ft broken line: two pavement markers spaced 2 ft

Single solid line: pavement markers spaced on 10 ft centers.

spaced on 10 ft centers.

temporary pavement markings as shown on Standard 635-3.

Curves < 500' Radius Tangents or Curves ≥ 500' Radius 635-2

:4 e p te m b e r

S td

-2 p w

-w o rk \d

\i d f-n e z p r2

-1

I3

.d g n

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION, FHWA

SPECIFICATION

APPROVED FOR USE

PAVEMENT MARKINGS

TEMPORARY

PROJECT

I.3ID FS NEZPR117 221(1)

Traffic flow

Traffic flow

Traffic flow

Traffic flow

Traffic flow

Traffic flow

NO

CENTER

LINE

NO

CENTER

LINE

PASS

WITH

CARE

DO

NOT

PASS

NO

CENTER

LINE

NO

CENTER

LINE

NO

PASSING

ZONE

NO

PASSING

ZONE

PASS

WITH

CARE

DO

NOT

PASS

NO

CENTER

LINE

NO

CENTER

LINE

DO

NOT

PASS

PASS

WITH

CARE

NO

PASSING

ZONE

vehicle positioning guides

Bi-directional yellow vehicle positioning guides

Bi-directional yellow vehicle positioning guides

Bi-directional yellow cycle length

40' 500'

500' cycle length

40' 500'

500' cycle length

40' 500'

500' for temporary traffic control zones greater than 3 miles long.

Repeat W8-12 after each major intersection and every 2 miles

Repeat R4-1 at 1 mile intervals.

On curves with radius less than 500 ft, reduce cycle length to 20 ft.

NOTE:

6.

5.

4.

3.

2.

1.

PROJECT LIMITS

Two-way traffic

Passing zone both directions

DETAIL A

PROJECT LIMITS

Two-way traffic

No Passing zone one direction

DETAIL B

PROJECT LIMITS

Passing AllowedNo Passing ZonePassing Allowed

Two-way traffic

No Passing zone both directions

DETAIL C

provide…