ICRA MPD Nurse Call Replacement_ complete.pdf
PDF 618 KB Posted
- Attached to
- Menlo Park Replace Nurse Call Bldg. 331 and 360
- Solicitation number
- 36C26124R0009
About this file
This document is an Infection Control Risk Assessment (ICRA) for a construction project to replace the nurse call system in buildings 331 and 360 at the Menlo Park VA Medical Center. The project involves category B construction activities that will affect high-risk patient care areas. Infection control precautions will be at Level III, requiring the construction of critical barriers, maintaining negative pressure within the workspace, HEPA filtration of exhaust air discharged outdoors, and daily cleaning. Upon project completion, barriers will be removed following cleaning procedures, HVAC systems will be verified to meet design specifications, and water systems will be flushed biweekly until activation. The related federal contract opportunity is solicitation number 36C26126R0009 to replace the nurse call system in the specified buildings for the Veterans Health Administration Network 21 at the Department of Veterans Affairs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26124R0009 0003.pdf | ||
| 36C26124R0009 0002.pdf | ||
| NURSE CALL_MERGED SET.pdf | ||
| 000000 Specs Merged NEW.pdf | ||
| Wage Determination San Mateo.pdf | ||
| PER VHA DIRECTIVE 7715 EMR.docx | DOCX document | |
| 36C26124R0009.pdf | ||
| S02 - RFI FORM.docx | DOCX document | |
| Cost Breakdown.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAInfectionControlRiskAssessment(ICRA) forConstruction,RenovationandMaintenance
6/8//2023
Instructions:
ThisICRAtemplatepertainsspecificallytoinfectionprevention.Itmustbeusedinconjunctionwiththerequired Pre-ConstructionRiskAssessment(PCRA)fortheactivitywhichaddressesotheractivity-relatedsafetyconcerns (e.g.,vibration,noise)outsidethescopeoftheICRA
InfectionPreventionandControlConstruction/Renovation/MaintenancePermit(lastpage)shouldbepostedatthe entranceoftheproject.Pleasecompletethisform,attachthescopeofworkdocumentandsubmitthisformtothe InfectionPreventionandControlcontactasfollows:
PAD-LauraMarkmanRN(x64168)orJayasreeSureshkumarRN(x64849)orMaribelMarronRN(x67533) MenloPark—JackieDugyon-EscalanteRN(52-22999) Livermore-MaricarTelmoRN(53-32260)
Tocompletethetemplate:
•Table1((ProjectManagertocomplete)toidentifythecategoryoftheconstruction,renovationand/or maintenanceactivity.
•Table2(ProjectManagertocomplete)toidentifytheareasaffectedbytheactivity.
•Table3(InfectionPrevention&Controltocomplete)toidentifytheoverallpatientriskcategorythatwill beaffectedbytheactivity.
•Table4(InfectionPrevention&Controltocomplete)todeterminethelevelofinfectionpreventionand controlprecautionsneededfortheactivity.
•Onceall4stepsabovearecompleted:RefertoTable5fortheminimumrequiredcontrolmeasuresfor thelevelofinfectionpreventionandcontrolprecautionsneededfortheactivity.RefertoTable6forthe minimuminfectionpreventionandcontrolmeasuresrequiredoncompletionoftheactivity.
Project#:640A0-22-103
ProjectTitle:ReplaceNurseCallSystem___________________________________
ProjectLocation:MPDB331andB360_________________________________
ProjectStartDate:_101112023_______EstimatedDuration:6months_______
COR(print):_DominicRamos______________Phone:510-449-8753
Table1:(ProjectManagertocomplete)Construction,Renovation,and/orMaintenance ActivityCategory
NOTE:Ifanyofthebulletedcriteriainahigheractivitycategorypertainstotheworkthatwillbedone (eveniftheothercriteriaareinalowercategory),usethehigheractivitycategoryfortheVHAICRA.
ActivityCategorydeterminedfromTable1(A,B,C,orD):B
Inspectionandlorfacilityupkeepgenerallydefinedasfollows:
.Workcanbecompletedinasingleshift,nottoexceed10hours.
•Patientsand/oremployeesmaybeintheareadependingontheactivity.
Category•Workthatdoesnotcreatedustordebris.
•Removalofceilingtileoraccesstomechanicalorelectricalchaseforvisualinspection limitedto1tileper50squarefeetwithlimitedexposuretime(nottoexceedanhourfor eachtile)withintheshift.
•Minorinteriorupdates(e.g.,replacingfloororceilingtiles,carpentryworktoinclude hanging_signage,_and_painting_without_sanding)_that_do_not_create_dust_or_debris.
VHA-ICRA-2023-1.0Page1of7
6/8//2023
•Limitedbuildingsystemmaintenancesuchasplumbingonpotablesystemslimitedto faucetreplacementetc.andelectricalworksuchasreplacementofbulbs,receptacles, orswitches.
Generalmaintenanceandrepairworkgenerallydefinedasfollows:
Category•Prolongedinspectionandworkthatmaytakelongerthanasingleshiftbutnot
Bexceedingaweek.
•Patientsandemployeesarenottobeintheareauntilactivityiscompleted.
•Workthatcreatesminimaldustanddebris.
•Interiorfinishorsurfacerepairs,updates,ormodificationssuchasrepairoffirewalls andbarriers,andnewflooringthatproducesminimaldustanddebris.Controlled sandingactivities(e.g.,wetordrysanding)thatproduceminimaldustanddebris.
•Plumbingworksuchasinstallationorreplacementofasinglefixtureorpipingfora singlefixture.Anyworkonsanitaryplumbingincludingsnakingofdrains.
•Electricalworksuchasinstallationofcabling/wiring/conduitforasingledevice, installationofnewdevicesuchasalightfixturethatproducesminimaldustanddebris.
•AirHandlerand/orfanshutdown/startupandHVACworksuchasreplacementofa singlediffuser,singleterminalunitorasingledevicethatproducesminimaldustand debris.
Small-scaleconstruction,renovation,ormaintenancegenerallydefinedasfollows:
•Workrequiringlongerthanasingleweektocompletebutnotexceeding6months.
•Patientsandemployeesarenottobeintheareauntilactivityiscompleted.
•Demolition/removalofpreexistingfloorcovering,casework,lay-inceiling,orother
Categoryarchitecturalelements.
C
•Demolition/removalofmorethan32ft2ofdrywall/framing,hardceilings,and doors/framingandminimalinfrastructuresuchaselectricalcircuitsandbranchpiping.
•Installationofnewwalls,ceilingsanddoorsincludingframing,drywall/plasterand associatedwork.
•Plumbingworksuchastheinstallationofnewsinks,showersandtoiletsand associatedplumbing.
•Shutdownofsectionsofpotablewatersystems.
•Electricalworksuchasinstallationofconduitandwireforlighting,receptaclesand switchesforanarea,theinstallationofconduitandwirefornewdevicessuchas terminalunits,fansetc.
•Modificationofexistingfirealarmandsuppressionsystems.
•Mechanicalworksuchastheinstallationofductwork,diffusers,andterminalunitsfor anarea.
Large-scaleconstruction,renovation,ormaintenancegenerallydefinedasfollows:
•Workexceeding6monthsinduration.
Category•Patientsandemployeesarenottobeintheareauntilactivityiscompleted.
D•Large-scaledemolitionofbuildingcomponentsandinfrastructureincludingremovalof multipledoors,walls,framing,ceilings,flooring,piping,electricalandHVAC.
•Theinstallationbuildingcomponentssuchasnewwalls,ceilingsanddoorsincluding framing,drywallandassociatedplasterwork.
VHA-ICRA-2023-1.0Page2of7
6/8//2023
•Plumbingworksuchastheinstallationof:
onewmedicalgassystems, osteam/heatinghotwater,condensatesystems, omultiplesinks,showersandtoiletsincludingassociatedplumbing.
•Shutdownofpotablewater,steam/heatinghotwater,condensate,andmedicalgas systems.
•Electricalworksuchasinstallationofelectricalfeeders,distributionpanels,conduitand wireforlighting,receptaclesandswitchesforanarea,theinstallationofconduitand wirefornewdevicessuchasterminalunits,fansetc.
•Installationoffirealarmandsuppressionsystems.
•Electricalshutdownofmultiplepanels.
•Mechanicalworksuchastheinstallationofairhandlingequipment,associated ductwork,diffusers,heatexchangers,terminalunitsandcontrols.
vHA-IcRA-2o23-1.oPage3of7
6/8//2023
Table2:(ProlectManagertocomplete)AffectedAreaAssessment
Identifytheareasandassociatedpatientsthatwillbeaffectedbythe construction/renovation/maintenanceactivity(seetheFigureforavisualrepresentationofadjacent affectedareas).
AREAABOVE
j
-$ADJACENTAREA2
I ATVITYLfi
Jr
AREABELOW]
Figure:Isometricdrawingofaffectedareaassessment
AreaService(s)/Type(s)ofArea(s)PointofContact(POC)POCContact (e.g.,OR,Unit/Ward,SterileInformation
Processing,_Administrative,_etc.)
ActivityArea**Bldg.331and360AnthonyLositoAnthonyLositova.gov
AreaAboveNone
AreaBelowNone
AdjacentArea1
AdjacentArea2
AdjacentArea3
AdjacentArea4
TheremaybemorethanoneService/typeofareaforeachrow.Listall.
Listthearea(s)inwhichtheconstruction/renovation/maintenanceactivitywilloccur.NOTE:WhentheActivity
CategoryisB,C,orD,thecontrolmeasuresaredeterminedbythePatientRiskintheadjacentaffected areas.
VHA-ICRA-2023-1.0Page4of7
6/8//2023
Table3InfectionPrevention&Control:PatientRiskCategory
UsingTable3,identifythepatientriskcategoryforeacharealistedinTable2.Ofthepatientrisk categoriesidentified,selecttheonewiththegreatestriskastheoverallPatientRiskCategoryforthe activity.
OverallPatientRiskCategorydeterminedfromTable3(Low,Medium,High,orHighest):High
LowRiskMediumRiskHighRiskHighestRisk
Non-patientcareareasPatientcaresupportPatientcareareassuchProcedural,invasive, suchas:areassuchas:as:sterilesupportandhighly compromisedpatientcare areassuchas:
Publichallwaysand•Waitingareas•Patientcarerooms•Allintensivecareunits gatheringareasnot•Clinicalandareas,including•Alloncologyunitsand inclinicalareas..spinalcordinjurychemotherapy/infusion engineering units •Officeareasnotin(biomedical)centers clinicalareas•Allacutecareunits, .Materials•ORtheatersand Breakroomsnotinmanagementincludingmentalrestrictedareas clinicalareashealth
.Sterile•Hemodialysisunits •Bathroomsorlockerprocessing
•Alloutpatientunits andclinics•Proceduralrooms* roomsnotinclinicaldepartment— areasdirtyside•Emergency•Pharmacy
•Mechanical/electrical•Kitchen,departmentcompoundingarea roomsnotinclinicalcafeteria,gift•CommunityLiving•Sterileprocessing areasshop,coffeeCenters,department—clean shop,andfooddomiciliaries,andside Outsidespaceskioskstransitional•Transfusionservices residences .Imagingsuites—
.Employeehealthinterventionalimaging •Pharmacy—general•Dedicatedisolation workzonewards/unitsfor .Medicationroomsinfectiousdiseases andcleanutility rooms
•Imagingsuites— diagnosticimaging
•Laboratory
ProceduralRoomsaredesignatedfortheperformanceofpatientcareactivitiesthatmayrequirehigh-level disinfectedorsterileinstrumentsandsomeenvironmentalcontrolsbutisnotrequiredtobeperformedwiththe environmentalcontrolsofanoperatingroom(OR).Theroomisintendedforproceduresthatareperformedinan asepticsurgicalfieldandpenetratestheprotectivesurfacesofapatient’sbody(e.g.,subcutaneoustissue, mucousmembranes,cornea)orentryintooropeningofasterilebodycavity.Examplesofthesespacesinclude CardiacCatheterizationSuites,ElectrophysiologySuites,Endovascular/GISuites,AngioSuitesandotherspaces whichmayhavehighriskpatientpopulations.
VHA-ICRA-2023-1.0Page5of7
6/8//2023
AdditionalRiskAssessment:
1.Iisruptionofessentialservices(e.g.,ventilation,water)topatients/employeesanticipated?
esNorzi
Comments:ectrica
2.Isrelocationofpatientstoalternateunitsrequired?Yes( Comments:
3.Willtheremovalofdebrispassthroughpatientcareareas?cNo Comments:
4,IsLegionellaandotherenvironmentwatertestingrequiredbeforeoccupancy?Yes
5.IstherepossibleexposuretoactiveTBintheconstructionarea?Yes
Ifyes,contractormustprovidedocumentationofTBscreeningresultofconstructionworkerswithin90 daysofworkcommencing.AnyonewithpositiveTBscreeningmustshowproofofstartingtreatment.
Table4(InfectionPrevention&Controltocomplete):LevelofInfectionPreventionand ControlPrecautions
MatchtheOverallPatientRiskCategory(Low,Medium,High,Highest)determinedfromTable3with theplannedConstruction/Renovation/MaintenanceActivityCategory(A,B,C,D)fromTableIto determinetheminimumLevelofInfectionPreventionandControlPrecautions(I,II,III,orIV)using Table4below.
LevelofPrecautionsdeterminedfromTable4(I,II,III,orIV):
PatientRiskActivityCategory Category
LowRisk
MediumRisk
HighRisk
HighestRisk
AninfectionpreventionandcontrolpermitisrequiredforLevelIIIandLevelIV.ICRAshouldbe completedforallprojectsregardlessofPrecautionLevel.
Table5RequiredInfectionPreventionandControlMeasures,byLevelofPrecautions
ControlsdefinedbelowfortheLevelofPrecautionsidentifiedfortheactivitymustbeinplacebeforethe activitybeginsandmaintaineduntilworkiscompletedandtheareaisactivated.Controlmeasuresfor eachPrecautionLevelmustalsoincludethecontrolmeasuresintheprecedingLevel(s).
VHA-ICRA-2023-1.0Page6of7
6/8//2023
Astheactivityprogresses,afullre-evaluationofremainingactivitytypeandpatientriskisrequiredprior todowngradingtheLevelofPrecautions.
LevelofControlMeasures Precautions LevelI1.Performworkactivityinamannerthatdoesnotcreatedust.
2.Immediatelyreplaceanyceilingtile,closeaccesspanels,etc.,uponcompletionof work.
3.Anymaterialsandequipmentbeingbroughtintothefacilitymustbefreeof contaminantsandloosematerial.
LevelIIAllcontrolmeasuresinLevelIandthefollowing:
1,Provideactivemeanstocontrolairbornedustfromdispersingintooccupiedareas and/orwatermistsurfacetocontroldust(e.g.,MobileDustContainmentCartor otherapproveddustcontainmentsystemorprocess).
2.Ensureworkerclothingiscleanandfreeofvisibledustbeforeleavingtheworkarea.
3.Removeorisolateairdiffusers(supplyandreturn)toprotecttheHVACsystemfrom dustandreduceairturbulence.Rebalancesystemtoaddressdiffuserisolation.
4.Whentheworkinvolvesorimpactspotablewatersystemsincludingstagnationdue toreducedusage,thepipingshallbeflushedtwiceaweekorisolatedfromthemain system.
5.Sealdoorstopreventdustmigration.
6.Containalltrashanddebrisintheworkarea.Performdailycleaninganddisposalof trash(covered)fromworkareausinganidentifiedexitroute.
7.Anyequipment,tools,ormaterialsremovedfromtheworkareamustbeinsealed containersand/orcleanedofdustanddebrispriortoremovalfromthearea.
8.Nonporous/smoothandcleanablecontainers(withahardlid)mustbeusedto transporttrashanddebrisfromtheconstructionareas.Thesecontainersmustbe damp-wipedcleanedandfreeofvisibledust/debrisbeforeleavingthecontained workarea.
9.Installasticky(dustcollection)matatentranceofcontainedworkarea.Stickymats mustbechangedroutinelyandwhenvisiblysoiled.
10.MaintaincleansurroundingswhenareaisnotcontainedbydampmoppingorHEPA vacuumingsurfacesatleastdaily.
LevelIllAllcontrolmeasuresinLevelsIandIIandthefollowing:
1.Ensureavailabilityofequipmentforcleaninghands.
2.ConstructandcompletecriticalbarriersmeetingNFPA241requirements.Barriers mustextendtotheceilingorifceilingtileisremoved,tothedeckabove.
3.All(plasticorhard)barrierconstructionactivitiesmustbecompletedinamanner thatpreventsdustrelease.Plasticbarriersmustbeeffectivelyaffixedtofloorand ceiling(orfloor/roofdeckabove)andsecurefrommovementordamage.
4.Sealallpenetrationsincontainmentbarriers,includingfloorsandceiling,using approvedmaterials(ULschedulefirestopifapplicableforbarriertype).
5.Maintain.01inches/watergaugenegativepressurizationoftheentireworkspaceby useofHEPAexhaustairsystemsdirectedoutdoors:thismustbemaintained continuously24/7forthedurationoftheproject.Exhaustdischargeddirectlytothe outdoorsthatis25feetorgreaterfromentrances,airintakesandwindowsisnot requiredtobeHEPA-filtered.Exhaustingdischargedairintosharedorrecirculating HVACsystems,orothersharedexhaustsystems(e.g.,bathroomexhaust)is prohibited.
VHA-ICRA-2023-1.0Page7of7
6.Installadifferentialpressuresensingdevice(e.g.,magnehelic,manometer,ordigital monitoring)onexteriorofworkcontainmenttocontinuallymonitoranddocument negativepressurization.The“ballinthewall”orsimilarapparatusare acceptable.
LevelIVAllcontrolmeasuresinLevelsI,IIandIIIandthefollowing:
1.Barriersmustbehardbarriersunlesstemporarytoinstallfinalbarrier.
2.Containmentmustincludeananteroomtoensurepressurecontrol.Anteroommust belargeenoughforequipmentstaging,cartcleaning,workers’PPEandcleaning.
3.Workerclothingand/orPPEmustberemovedorcleanandfreeofvisibledust beforeleavingtheworkareaanteroom.HEPAvacuumingofclothingoruseof coversuitsisacceptable.
4.Workersmustwearshoecoversorhaveamethodtocleanshoesinanteroom.
Shoecoversmustberemovedpriortoexitingtheanteroomtotheoccupiedspace (non-work_area)._Damaged_shoe_covers_must_be_changed_immediately.
Table6MinimumInfectionPreventionandControlMeasuresRequiredUpon CompletionoftheActivity
Controlsdefinedbelowshallbecompleteduponcompletionoftheactivityandinspectedpriorto terminatingmeasuresdefinedinTable5.
Constructionareasmustbeinspectedbyaninfectionpreventionistandengineering representative/COR(andothersasdeterminedbythefacility)forfinalactivity/projectcloseoutand removalofinfectionpreventionandcontrolmeasures.
LevelofMeasures Precautions
Cleaning:
LevelsI-Il1.Cleanworkareasincludingallenvironmentalsurfaces,highhorizontalsurfacesandflooring materials.
2.Checkallsupplyandreturnairregistersfordustaccumulationonuppersurfacesaswellasair diffusersurfaces.
HVACSystems:
1.RemoveisolationofHVACsysteminareaswhereworkisbeingperformed.VerifythatHVAC systemsarecleanandoperational.
2.VerifytheHVACsystemsmeetoriginalairflowandairexchangedesignspecifications.
Watersystems:
1.Untilthepotablewatersystemisactivatedandinuse,flushingshallcontinueatleasttwiceper weekinovernightstayareas.
WorkAreaCleaning:
LevelsIll-IV1.Cleanworkareasincludingallenvironmentalsurfaces,highhorizontalsurfacesandflooring materials.
2.Checkallsupplyandreturnairregistersfordustaccumulationonuppersurfacesaswellasair diffusersurfaces.
RemovalofCriticalBarriers:
1.Criticalbarriersmustremaininplaceduringallworkinvolvingdrywallremoval,creationofdust andactivitiesbeyondsimpletouch-upwork.ThebarriermayNOTberemoveduntilawork areacleaninghasbeenperformed.Additionalcleaningmaybeneededafterremovalofbarrier.
2.All(plasticorhard)barrierremovalactivitiesmustbecompletedinamannerthatpreventsdust release.Usethefollowingprecautionswhenremovinghardbarriers:
i.Carefullyremovescrewsandpaintertape.
ii.If_dust_will_be_generated_during_screw_removal,_use_hand-held_HEPA_vacuum.
6/87/2023
VHA-ICRA-2023-1.0Page8of7
6/8//2023 forConstruction,RenovationandMaintenance iii.Drywallcuttingisprohibitedduringremovalprocess.
iv.CleanallstudtrackswithHEPAvacuumbeforeremovingouterhardbarrier.
v.Useaplasticbarriertoencloseareaifdustcouldbegenerated.
NegativeAirRequirements:
1.Theuseofnegativeairmustbedesignedtoremovecontaminantsfromtheworkarea.
2.Negativeairdevices(fans,filters,monitoringanddocumentationequipment)mustremain operationalatalltimesandinplaceforaperiodaftercompletionofdustcreatingactivitiesto removecontaminantsfromtheworkareaandbeforeremovalofcriticalbarriers.
HVACsystems:
1.Uponremovalofcriticalbarriers,removeisolationofHVACsysteminareaswhereworkis beingperformed.
2.VerifythatHVACsystemsarecleanandoperational.
3.VerifyanddocumentthroughaTABtheHVACsystemsmeetsoriginalairflowandair exchangedesignspecifications.
Watersystems:
1.Untilthepotablewatersystemisactivatedandinuse,flushingshallcontinueatleasttwiceper weekinaccordancewithVHADirective1061
Additiona’requirements:
PkcLWl/iEW—,iz)iv7a’-xei-wher’?Z-‘17*fYfl7Jcd/Y?Ci1.
a4kIeOccjwaafa Reviewedby:ProjectManagername:InfectionPreventionfsfname:
ProjectManagersignatureDatei
InfectionPreventionistDate signature yzø&3
KeepthisICRAonfile Post
InfectionPreventionandControlConstructionlRenovation/MaintenancePermit AtWorkSite
VHA-ICRA-2023-1.0Page9of7
InfectionPreventionandControlConstructionlRenovationlMaintenancePermit ThispagemustbepostedattheentrancetotheprojectareaforLevelIllandLevelIVactivities.
LocationofMPDB331andB360 construction/renovation/maintenance ProjectmanagerIDominichamosProjectstartdate10/1/2023 Contactphonenumber51n-44q-R75Completiondate3/1/2024 ContractorIPermitexpirationdate
LevelofInfectionPreventionandControl .iig?iPrecautions(I,IlIIlorIV)1/
LevelofControlmeasurestobeinplaceforthedurationoftheactivity Precautions(Checktheboxfortheactivity’sLevelofPrecautionstoindicatetheControlMeasures) LevelI1.Performworkactivityinamannerthatdoesnotcreatedust.
j2.Immediatelyreplaceanyceilingtile,closeaccesspanels,etc.,uponcompletionofwork.
3.Anymaterialsandequipmentbeingbroughtintothefacilitymustbefreeofcontaminantsandloosematerial.
LevelIIAllcontrolmeasuresinLevelIandthefollowing:
1.Provideactivemeanstocontrolairbornedustfromdispersingintooccupiedareasand/orwatermistsurfacetocontroldust(e.g., /MobileDustcontainmentCartorsomeothersystem).
2.Ensureworkerclothingiscleanandfreeofvisibledustbeforeleavingtheworkarea.
3.Removeorisolateairdiffusers(supplyandretum)toprotecttheHVACsystemfromdustandreduceairturbulence.Rebalance systemtoaddressdiffuserisolation.
4.\Nhentheworkinvolvesorimpactspotablewatersystemsincludingstagnationduetoreducedusage,thepipingshallbeflushed twiceaweekorisolatedfromthemainsystem 5.Sealdoors,topreventdustmigration.
6.Containalltrashanddebrisintheworkarea.Performdailycleaninganddisposaloftrash(covered)fromworkareausingan identifiedexitroute.
7.Anyequipment,tools,ormaterialsremovedfromtheworkareamustbeinsealedcontainersand/orcleanedofdustanddebris priortoremovalfromthearea.
8.Nonporous/smoothandcleanablecontainers(withahardlid)mustbeusedtotransporttrashanddebrisfromtheconstruction areas.Thesecontainersmustbedamp-wipedcleanedandfreeofvisibledust/debrisbeforeleavingthecontainedworkarea.
9.Installasticky(dustcollection)matatentranceofcontainedworkareabasedonfacilitypolicy.Stickymatsmustbechanged routinelyandwhenvisiblysoiled.
10.MaintaincleansurroundingswhenareaisnotcontainedbydampmoppingorHEPAvacuumingsurfacesatleastdaily.
LevelIllAllcontrolmeasuresinLevelsIandIIandthefollowing:
1.Ensureavailabilityofequipmentforcleaninghands.
2.ConstructandcompletecriticalbarriersmeetingNFPA241requirements.Barriersmustextendtotheceilingorifceilingtileis removed,tothedeckabove.
3.All(plasticorhard)barrierconstructionactivitiesmustbecompletedinamannerthatpreventsdustrelease.Plasticbarriersmust beeffectivelyaffixedtofloorandceiling(orfloor/roofdeckabove)andsecurefrommovementordamage.
4.Sealallpenetrationsincontainmentbarriers,includingfloorsandceiling,usingapprovedmaterials(ULschedulefirestopif applicableforbarriertype).
5.Maintain.01inchesIwatergaugenegativepressurizationoftheentireworkspacebyuseofHEPAexhaustairsystemsdirected outdoors(unlessaworkspecificwaiverisapprovedbyVHA’sOfficeofHealthcareEngineering);thismustbemaintained continuously24/7forthedurationoftheproject.Exhaustdischargeddirectlytotheoutdoorsthatis25feetorgreaterfrom entrances,airintakesandwindowsisnotrequiredtobeHEPA-filtered.Exhaustingdischargedairintosharedorrecirculating HVACsystems,orothersharedexhaustsystems(e.g.,bathroomexhaust)isprohibited.
6.Installadifferentialpressuresensingdevice(e.g.,magnehelic,manometer,ordigitalmonitoring)onexteriorofworkcontainment tocontinuallymonitoranddocumentnegativepressurization.The“ballinthewall”orsimilarapparatusarenotacceptable.
LevelIVAllcontrolmeasuresinLevelsI.IIandliiandthefollowing:
1.Barriersmustbehardbarriersunlesstemporarytoinstallfinalbarrier.
j2.Containmentmustincludeananteroomtoensurepressurecontrol,Anteroommustbelargeenoughforequipmentstaging,cart cleaning,workers’PPEandcleaning.
3.Workerclothingand/orPPEmustberemovedorcleanandfreeofvisibledustbeforeleavingtheworkareaanteroom.HEPA vacuumingofclothingoruseofcoversuitsisacceptable.
4.WorkersmustwearshoecoversorhaveamethodtocleanshoesinanteroomShoecoversmustberemovedpriortoexitingthe anteroomtotheoccupiedspace(non-workarea).Damagedshoecoversmustbechangedimmediately.
.41• Additionalrequirements:[(e4$4’AdI-f’(CUUP’Oi’fle w1e,ft’c1ck-/4s
,,,n..,9.1INI
ProjectManagersignatureDate8/22/2023 — ePrevti05ti,Date
Uniquepermitnumber
ActivityCategoryOverallPatientRiskCategory (A,B,C,orD))(Low,Medium,High,orHighest)
VHA-ICRA-2023-1.0
File details come from the government source that posted it. Updated .