ICRA GNV Electrical Panel Replacement_Basement_BLDG1_Canteen_Tunnel entrance.pdf

PDF 355 KB Posted

Attached to
Y1DZ--(PROJ: 573-19-614) BB Correct Electrical Panelboard Defic. at Bldg 1
Solicitation number
36C24822R0157
Issued by

About this file

This document contains an Infection Control Risk Assessment checklist and details for an electrical panel replacement project at a Veterans Health Administration medical center. The project involves replacing an electrical panel in the basement near the canteen and tunnel entrance, and will require Class I precautions such as minimizing dust, blocking air vents, isolating HVAC systems, and using HEPA vacuums. The work is categorized as a Type C project with moderate to high dust levels. The project start date is October 1, 2022 and end date is October 31, 2023. The related federal contract opportunity is a special notice for project number 573-19-614 to correct electrical panelboard deficiencies at Building 1 of the Malcom Randall VAMC. Proposals were due by August 29, 2022.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NF/SG Veterans Health System

INFECTION CONTROL RISK ASSESSMENT (ICRA)

CHECKLIST

Yes No Construction Types Patient Risk Groups Yes No

Type A: Inspection and Non-Invasive Activities Low Risk

Type B: Small scale, short duration activities, minimal dust Medium Risk

Type C: Moderate to high level of dust Medium to High Risk

Type D: Major demolition and construction projects Highest Risk

CLASS I

Execute work by methods to minimize raising dust from construction activities.

Immediately replace any ceiling tile displaced for visual inspection.

Provide active means to prevent airborne dust from dispensing into atmosphere.

Contain construction waste before transport in tightly covered containers.

Water mist work surfaces to control dust while cutting.

Wet mop floor and/or vacuum with HEPA filtered vacuum before leaving work area.

Seal unused doors with approved duct tape.

Place dust mats at entrance and exits of work area.

Block off and seal air vents. Wipe surfaces with disinfectant.

CLASS II

Remove or isolate HVAC system in areas where work is being performed.

Isolate HVAC system in area where work in being done to prevent contamination of the duct system.

Wet mop with disinfectant.

Complete all critical barriers or implement control cube methods before construction begins.

Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

Maintain negative air pressure within work site utilizing HEP equipment air filtration units.

Contain construction waste before transport in tightly covered containers.

Vacuum work area with HEPA filtered vacuums.

Cover transport receptacles or cars. Tape coverings.

CLASS III

Do not remove barriers from work area until project is completed and thoroughly cleaned.

Remove or isolate HVAC system in areas where work is being performed.

CLASS IV chart follows on page 2.

Construction Types Construction Classification (I-IV)

Patient Risk Groups Type A Type B Type C Type D Low Risk I II II III/IV Medium Risk I II III IV High Risk I II III/IV IV

Highest Risk II III/IV III/IV IV vhanflbakerd1 Typewritten Text

NF/SG Veterans Health System

(ICRA) CHECKLIST – Page 2

Isolate HVAC system in area where work in being done to prevent contamination of the duct system

Do not remove barriers from work area until project is completed and thoroughly cleaned.

Complete all critical barriers or implement control cube methods before construction begins.

Maintain negative air pressure within work site utilizing HEPA equipment air filtration units.

Vacuum work area with HEPA filtered vacuums. Wet mop with disinfectant.

Seal holes, pipes, conduits and punctures appropriately.

Contain construction waste and cover all transport receptacle or carts. Tape coverings.

Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

All personnel entering worksite are required to wear shoe covers, if so directed.

CLASS IV

Construct anterooms, if appropriate, and require all personnel to pass through this room for debris removal with a HEPA vacuum cleaner or for putting on and taking off cloth or paper coveralls before entering or leaving the worksite.

vhanflbakerd1 Typewritten Text vhanflbakerd1 Typewritten Text Project name/location: Electrical Panel Replacement / Basement - near Canteen and tunnel entrance.

vhanflbakerd1 Typewritten Text Start date: October 1, 2022 vhanflbakerd1 Typewritten Text End date: October 31, 2023 vhanflbakerd1 Typewritten Text

Date: 8/17/2022

Type C: Moderate to high level of dust:
Yes, Highest Risk:
No, Highest Risk:
Highest Risk:
CLASS I:
Execute work by methods to minimize raising dust from construction activities:
Block off and seal air vents:
Isolate HVAC system in area where work in being done to prevent contamination of the duct system:
Wet mop with disinfectant:
Complete all critical barriers or implement control cube methods before construction begins:
Maintain negative air pressure within work site utilizing HEP equipment air filtration units:
Vacuum work area with HEPA filtered vacuums:
Do not remove barriers from work area until project is completed and thoroughly cleaned:
CLASS IV:
Isolate HVAC system in area where work in being done to prevent contamination of the duct system_2:
CLASS IV_2:
Complete all critical barriers or implement control cube methods before construction begins_2:
CLASS IV_3:
Vacuum work area with HEPA filtered vacuums_2:
Wet mop with disinfectant_2:
CLASS IV_4:
Seal holes, pipes, conduits and punctures appropriately:
CLASS IV_5:
Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction:
CLASS IV_6:
Text1:
Text2:
Text3:
Provide active means to prevent airborne dust from dispensing into atmosphere:
Water mist work surfaces to control dust while cutting:
Seal unused doors with approved duct tape:
No, Row 4:
Yes, Low Risk:
No, Low Risk:
Yes, Medium Risk:
No, Medium Risk:
Yes, Medium to High Risk:
No, Medium to High Risk:
Yes, Row 1:
No, Row 1:
Yes, Row 2:
No, Row 3:
Yes, Row 3:
No, Row 2:
Yes, Row 4:
Check Box1: Yes
Check Box2: Yes
Check Box3: Yes
Check Box4: Off
Check Box5: Off
Check Box6: Yes
Check Box7: Yes
Check Box8: Off
Check Box9: Off
Check Box10: Yes
Check Box11: Off
Check Box12: Yes
Check Box13: Yes
Check Box14: Off
Check Box15: Off
Check Box16: Yes
Check Box17: Off
Check Box18: Yes
Check Box19: Off
Check Box20: Yes
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Yes
Check Box25: Yes
Check Box26: Yes
Check Box27: Yes
Check Box28: Yes
Check Box29: Yes
Check Box30: Yes
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off
Check Box39: Off
Check Box40: Off
Check Box41: Off
Check Box42: Off
Check Box43: Off
Check Box44: Off
Check Box45: Off
Check Box46: Off
Check Box47: Off
Check Box48: Off
Check Box49: Off
Check Box50: Off
Check Box51: Off
Check Box52: Off