This document contains an Infection Control Risk Assessment checklist and details for an electrical panel replacement project at a Veterans Health Administration medical center. The project involves replacing an electrical panel in the basement near the canteen and tunnel entrance, and will require Class I precautions such as minimizing dust, blocking air vents, isolating HVAC systems, and using HEPA vacuums. The work is categorized as a Type C project with moderate to high dust levels. The project start date is October 1, 2022 and end date is October 31, 2023. The related federal contract opportunity is a special notice for project number 573-19-614 to correct electrical panelboard deficiencies at Building 1 of the Malcom Randall VAMC. Proposals were due by August 29, 2022.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NF/SG Veterans Health System
INFECTION CONTROL RISK ASSESSMENT (ICRA)
CHECKLIST
Yes No Construction Types Patient Risk Groups Yes No
Type A: Inspection and Non-Invasive Activities Low Risk
Type B: Small scale, short duration activities, minimal dust Medium Risk
Type C: Moderate to high level of dust Medium to High Risk
Type D: Major demolition and construction projects Highest Risk
CLASS I
Execute work by methods to minimize raising dust from construction activities.
Immediately replace any ceiling tile displaced for visual inspection.
Provide active means to prevent airborne dust from dispensing into atmosphere.
Contain construction waste before transport in tightly covered containers.
Water mist work surfaces to control dust while cutting.
Wet mop floor and/or vacuum with HEPA filtered vacuum before leaving work area.
Seal unused doors with approved duct tape.
Place dust mats at entrance and exits of work area.
Block off and seal air vents. Wipe surfaces with disinfectant.
CLASS II
Remove or isolate HVAC system in areas where work is being performed.
Isolate HVAC system in area where work in being done to prevent contamination of the duct system.
Wet mop with disinfectant.
Complete all critical barriers or implement control cube methods before construction begins.
Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
Maintain negative air pressure within work site utilizing HEP equipment air filtration units.
Contain construction waste before transport in tightly covered containers.
Vacuum work area with HEPA filtered vacuums.
Cover transport receptacles or cars. Tape coverings.
CLASS III
Do not remove barriers from work area until project is completed and thoroughly cleaned.
Remove or isolate HVAC system in areas where work is being performed.
CLASS IV chart follows on page 2.
Construction Types Construction Classification (I-IV)
Patient Risk Groups Type A Type B Type C Type D Low Risk I II II III/IV Medium Risk I II III IV High Risk I II III/IV IV
Highest Risk II III/IV III/IV IV vhanflbakerd1 Typewritten Text
NF/SG Veterans Health System
(ICRA) CHECKLIST – Page 2
Isolate HVAC system in area where work in being done to prevent contamination of the duct system
Do not remove barriers from work area until project is completed and thoroughly cleaned.
Complete all critical barriers or implement control cube methods before construction begins.
Maintain negative air pressure within work site utilizing HEPA equipment air filtration units.
Vacuum work area with HEPA filtered vacuums. Wet mop with disinfectant.
Seal holes, pipes, conduits and punctures appropriately.
Contain construction waste and cover all transport receptacle or carts. Tape coverings.
Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
All personnel entering worksite are required to wear shoe covers, if so directed.
CLASS IV
Construct anterooms, if appropriate, and require all personnel to pass through this room for debris removal with a HEPA vacuum cleaner or for putting on and taking off cloth or paper coveralls before entering or leaving the worksite.
vhanflbakerd1 Typewritten Text vhanflbakerd1 Typewritten Text Project name/location: Electrical Panel Replacement / Basement - near Canteen and tunnel entrance.
vhanflbakerd1 Typewritten Text Start date: October 1, 2022 vhanflbakerd1 Typewritten Text End date: October 31, 2023 vhanflbakerd1 Typewritten Text
Date: 8/17/2022
| Type C: Moderate to high level of dust: |
| Yes, Highest Risk: |
| No, Highest Risk: |
| Highest Risk: |
| CLASS I: |
| Execute work by methods to minimize raising dust from construction activities: |
| Block off and seal air vents: |
| Isolate HVAC system in area where work in being done to prevent contamination of the duct system: |
| Wet mop with disinfectant: |
| Complete all critical barriers or implement control cube methods before construction begins: |
| Maintain negative air pressure within work site utilizing HEP equipment air filtration units: |
| Vacuum work area with HEPA filtered vacuums: |
| Do not remove barriers from work area until project is completed and thoroughly cleaned: |
| CLASS IV: |
| Isolate HVAC system in area where work in being done to prevent contamination of the duct system_2: |
| CLASS IV_2: |
| Complete all critical barriers or implement control cube methods before construction begins_2: |
| CLASS IV_3: |
| Vacuum work area with HEPA filtered vacuums_2: |
| Wet mop with disinfectant_2: |
| CLASS IV_4: |
| Seal holes, pipes, conduits and punctures appropriately: |
| CLASS IV_5: |
| Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction: |
| CLASS IV_6: |
| Text1: |
| Text2: |
| Text3: |
| Provide active means to prevent airborne dust from dispensing into atmosphere: |
| Water mist work surfaces to control dust while cutting: |
| Seal unused doors with approved duct tape: |
| No, Row 4: |
| Yes, Low Risk: |
| No, Low Risk: |
| Yes, Medium Risk: |
| No, Medium Risk: |
| Yes, Medium to High Risk: |
| No, Medium to High Risk: |
| Yes, Row 1: |
| No, Row 1: |
| Yes, Row 2: |
| No, Row 3: |
| Yes, Row 3: |
| No, Row 2: |
| Yes, Row 4: |
| Check Box1: Yes |
| Check Box2: Yes |
| Check Box3: Yes |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Yes |
| Check Box7: Yes |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Yes |
| Check Box11: Off |
| Check Box12: Yes |
| Check Box13: Yes |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Yes |
| Check Box17: Off |
| Check Box18: Yes |
| Check Box19: Off |
| Check Box20: Yes |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Yes |
| Check Box25: Yes |
| Check Box26: Yes |
| Check Box27: Yes |
| Check Box28: Yes |
| Check Box29: Yes |
| Check Box30: Yes |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |
| Check Box39: Off |
| Check Box40: Off |
| Check Box41: Off |
| Check Box42: Off |
| Check Box43: Off |
| Check Box44: Off |
| Check Box45: Off |
| Check Box46: Off |
| Check Box47: Off |
| Check Box48: Off |
| Check Box49: Off |
| Check Box50: Off |
| Check Box51: Off |
| Check Box52: Off |