IBWC Spec Sheet Blower Motor.pdf

PDF 113 KB Posted

Attached to
Motors for Spencer Blowers Federal contract opportunity
Solicitation number
20213281141
Issued by
International Boundary and Water Commission U.S.-Mexico

View the file

Other files for this federal contract opportunity

Other files attached to Motors for Spencer Blowers, newest first.
File Type Posted
Applicable Clauses and Provisions.pdf PDF
baldor data plate 1.jpg JPG image
power mizer blower data plate.jpg JPG image
Price Sheet.pdf PDF
baldor data plate.jpg JPG image

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SBU - CONTRACTING AND ACQUISITIONS

SPECIFICATION SHEET

THREE MOTORS FOR SPENCER BLOWERS

THE NOGALES INTERNATIONAL WASTEWATER TREATMENT FACILITY

1. BACKROUND

The US International Boundary and Water Commission (USIBWC) operates and maintains the Nogales International Wastewater Treatment Plant (NIWTP) in Rio Rico, Arizona. The NIWTP currently treats approximately 17 million gallons per day of raw sewage entering from Nogales, Mexico and Nogales, Arizona. The NIWTP consists of a Biological Nutrient Removal (BNR), filtering and disinfection. The NIWTP has motors that run Spencer blowers to provide air into bioreactors. These motors are critical for compliance purposes.

2. SPECIFICATIONS:

Supply and deliver three (3) motors meeting the following specifications:

Specifications sheets and pictures of motors shall be submitted with offer.

Spencer Turbine Motor (replacement Motor) Total enclosed fan cooled (TCEP) Frame 449TS Rated Output (HP) 400 Volts 460 Full Load Amps 424 R.P.M 3565 Hz 60 Phase 3 NEMA Design Code B KVA Code G Service Factor 1.15 NEMA Nom. Eff. 95.8 P.F. 93 Rating – Duty Full Load Torque 588 LB-FT Start Configuration DOL Breakdown Torque 2925 LB-FT Locked-Rotor Torque 630 LB-FT Starting Current 2845 Amps No-Load Current 90 Amps Line-line res. @ 25 degrees C. 0.00705 Ohms Temp. Rise @ Rated Load 71 degrees C Temperature Rise @ S.F. Load 94 degrees C

3. SITE ACCESS:

The NIWTP is a restricted access facility and access to the site must be in accordance with

SBU - CONTRACTING AND ACQUISITIONS

USIBWC procedures. Currently all visitors and contractors are escorted by USIBWC personnel.

All vendors and contractors must adhere to COVID-19 requirements for social distancing and the use of personal protective equipment (PPE) (i.e. mask and gloves).

Vendors/Contractors will not be permitted access to IBWC facilities without proper PPE.

4. WORKING HOURS:

Work hours are from 7:30 AM to 4:00 PM local time, Monday to Friday except for Federal Holidays. Delivery of products shall be made within these working hours.

SPECIFICATION SHEET
2. SPECIFICATIONS:
3. SITE ACCESS:
4. WORKING HOURS: