APPENDIX A
WRITTEN AND PUBLIC HEARING COMMENTS
ON THE DRAFT PEIS
Appendix A presents Draft PEIS comments received from agencies, regional legislative and management authorities, organizations, and individuals during a 45-day public review period ending September 24, 2007. This appendix also presents oral comments provided during public hearings held at El Paso, Presidio and McAllen, Texas. Full transcripts of the public hearings are provided in Appendix C.
A total of 19 written responses were received during the Draft PEIS review period, nine from regulatory agencies (identified in Appendix A, for tracking purposes, as AG-1 to AG-10);
six from various organizations (identified as ORG-1 to ORG-6); and from individual reviewers (identified as IND-1 to IND-3). Oral comments were received during the August 21, 2007 public hearing at El Paso (four presenters, identified as EP-H1 to EP-H4); August 22, 2007 hearing at the Presidio (four presenters, identified as PR-H1 to PR-H4); and August 28, 2007 hearing at McAllen (four presenters, identified as McA-H1 to McA-H4). Individual comments provided by each reviewer are indicated by a letter following the reviewer tracking number (e.g. AG-2a, AG-2b, etc.) along the right margin of each comment. Responses to those comments are presented in Appendix B, following the same sequence and identification numbers.
Comments on the Draft PEIS are organized into four sub-sections, comments that are applicable to all flood control projects, and comments related individually to the Rectification FCP, Presidio FCP, and Lower Rio Grande FCP. The list of reviewers is as follows:
PART 1. COMMENTS APPLICABLE TO THE THREE FLOOD CONTROL PROJECTS
AG-1: U.S. Fish and Wildlife Service, 8/21/07 ……………………………………. page 2
AG-2: U.S. Department of the Interior, Bureau of Reclamation, 9/24/07 ………. .page 4
AG-3: U.S. Environmental Protection Agency, 9/24/07 ……………………….…... page 7
AG-4: U.S. Department of the Interior, 9/24/07 ………………………………….... page 9
AG-5: National Oceanic and Atmospheric Administration, 9/24/07…………..… page 11
AG-6: Natural Resources Conservation Service, 12/10/2007 …………………....page 12
AG-7: Texas Historical Commission, 9/12/07 ………………………………….... page 13
AG-8: Texas Commission of Environmental Quality, 9/24/07……………….….. page 14
ORG-1: Lone Star Chapter of the Sierra Club, 9/24/07 ……………………..….. page 15
IND-1: Mr. Conrad Keyes, 9/6/07 ……………………………………………….... page 17
PART 2. COMMENTS SPECIFIC TO THE RECTIFICATION FCP
AG-9: Ysleta del Sur Pueblo, 9/14/07 …………………………………………….. page 19
ORG-2: Friends of the Rio Grande, 9/21/07 ……………………………………... page 20
ORG-3: Southwest Environmental Center, 9/24/07 …………………………….. page 22
ORG-4: University of Texas at El Paso, 9/13/07 …………………………………. page 24
EP-H: EL PASO PUBLIC HEARING, AUGUST 21, 2007
• EP-H1: Ms. Heather McMurray, 9/21/07 ………………………….………..page 27
• EP-H2: Mr. John Sproul, 9/21/07……………………………………..…….. page 31
• EP-H3: Mr. Kevin Bixby, 9/21/07 …………………………………… ……..page 32
• EP-H4: Mr. Ari Michelsen, 9/21/07 …………………………………………..page 36
PART 3. COMMENTS SPECIFIC TO THE PRESIDIO FCP
PR-H: PRESIDIO PUBLIC HEARING, AUGUST 22, 2007
• PR-H1: Mr. Carlos E. Nieto, 9/22/07 ……………………………… ……..page 41
• PR-H2: Mr. Lorenzo Hernandez, 9/22/07 …………………………… .page 45
• PR-H3: Ms. Patt Simms, 9/22/07 …………………………………………..page 48
• PR-H4: Mr. Dennis McEntire, 9/22/07 ……………………………………..page 50
PART 4. COMMENTS SPECIFIC TO THE LOWER RIO GRANDE FCP
AG-10: U.S. Army Corps of Engineers, 11/15/07 ……………………….. ……….page 57
ORG-5: Lower Rio Grande Committee, 8/21/07 …………………………………..page 66
ORG-6: The Arroyo Colorado Watershed Partnership, 09/24/07 ……… ……….page 68
IND-2: Mr. Carl A. Boyd, 9/14/07 ………………………………………………..….page 69
IND-3: Mr. Bill Forbes, 9/24/07 ………………………………………………….…. page 71
McA-H: McALLEN PUBLIC HEARING, AUGUST 28, 2007
• McA-H1: Ms. Laura de la Garza, 8/28/07 ………………………………….page 73
• McA-H2: Mr. Eric Ellmer, 8/28/07 ………………………………………….page 77
• McA-H3: Mr. Godfrey Garza, 8/28/07 …………………………..………….page 80
• McA-H4: Mr. Ernesto Reyes, 8/28/07 ………………………….………….page 82
WRITTEN COMMENTS COMMON TO RECTIFICATION,
PRESIDIO AND LOWER RIO GRANDE
FLOOD CONTROL PROJECTS
Draft PEIS Comments Page 1
48667 Line
48667 Line
Draft PEIS Comments Page 2
Text Box AG-1: Fish & Wildlife Service
Draft PEIS Comments Page 3
Line
48667
AG-1a
Draft PEIS Comments Page 4
Text Box AG-2: USDI - Bureau of Reclamation
48667 Line
48667 Line
48667 Line
48667 Line
48667 Text Box AG-2a
48667 Text Box AG-2b
48667 Text Box AG-2c
48667
AG-2d
Draft PEIS Comments Page 5
Line
48667 Line
48667 Line
48667 Line
48667 Line
48667 Line
48667 Line
48667 Line
48667 Line
48667 Line
48667 Line
48667 Line
48667 Line
48667 Text Box AG-2k
48667 Text Box AG-2n
48667 Text Box AG-2m
48667 Text Box AG-2l
48667 Text Box AG-2e
48667 Text Box AG-2f
48667 Text Box AG-2g
48667 Text Box AG-2h
48667 Text Box AG-2i
48667 Text Box AG-2j
48667 Text Box AG-2o
48667 Text Box AG-2q
48667
AG-2p
Draft PEIS Comments Page 6
Line
48667 Text Box AG-2r
Draft PEIS Comments Page 7
Text Box AG-3: U.S. Environmental Protection Agency
48667 Line
48667
AG-3a
Draft PEIS Comments Page 8
Line
48667 Line
48667 Text Box AG-3b
48667
AG-3c
United States Department of the Interior
OFFICE OF THE SECRETARY
Office of Environmental Policy and Compliance TAKE PRIDE P.O. Box 26567 (MC-9) INAMERICA
Albuquerque, New Mexico 87125-6567
IN REPLY REFER TO:
ER 07/68 1
File 9043.1
September 24,2007
Daniel Borunda Environmental Protection Specialist U.S. Section, International Boundary and Water Commission (USIBWC)
Environmental Management Division 4171 North Mesa St., C-100 El Paso, Texas 79902
Subject: Draft Programmatic Environmental Impact Statement (DPEIS) for the Improvements to the USIBWC Rio Grande Flood Control Projects along the Texas-Mexico Border
Dear Mr. Borunda:
The U.S. Department of the Interior has reviewed the subject DPEIS. In this regard, we provide the following comments for your use in preparing the final document.
General Comments
The Bureau of Reclamation, Albuquerque Area Office, submitted comments independently in their role as a cooperating agency in a letter dated September 2 1,2007.
Specific Comments
Chapter 11, page 2-3, Rectification FCP. Section 2.1.4 Ground Water Resources, lines 7-9; and Chapter 111, page 2-2, Presidio FCP. Section 2.1.4 Ground Water Resources. lines 25-27 - Nitrate and fluoride concentrations would normally be reported in milligrams per liter (mg/L), so it is not clear to the reader what the reported percentages represent.
Page A-5, Section Appendix A - References - The full citation for "USGS, 1996" should be:
Ryder, Paul D., 1996, GROUND WATER ATLAS of the LJNITED STATES, Chapter E;
Oklahoma, Texas: U.S. Geological Survey Hydrologic Atlas 730-E. Also, the link provided for this USGS publication has been updated; the new link is:
http://cap~.~ater.us~s. pov/walch e/index. html
Draft PEIS Comments Page 9
48667 Text Box AG-4: U.S. Department of the Interior
48667 Line
48667 Line
48667 Text Box AG-4b
48667
AG-4a
Thank you for the opportunity to review and comment on this DPEIS. If you have any questions concerning our comments, please contact Lloyd Woosley, Chief, Environmental Affairs Program, U.S. Geological Survey, at 703-648-5028 or at lwoosley@usgs.gov.
Sincerely, I ~ t e f i e n R. Spencer
Regional Environmental Officer
Draft PEIS Comments Page 10
September 24, 2007
Mr. Daniel Borunda Environmental Management Division
USIBWC
4171 North Mesa St., C-100 El Paso, Texas 79902
Dear Mr. Borunda, We have provided comments on the (DEIS) regarding the Programmatic - Rio Grande Flood Control Projects, Proposing a Range of Alts for Maintenances Activities & Future Improvements, along the TX-Mexico Border (20070331).
The DEIS has been reviewed within the areas of the National Oceanic and Atmospheric Administration, National Geodetic Survey’s (NGS) geodetic responsibility, expertise, and in terms of the impact of the proposed actions on NGS activities and projects.
If there are any planned activities which will disturb or destroy geodetic control monuments, NGS requires notification not less than 90 days in advance of such activities in order to plan for their relocation. NGS recommends that funding for this project includes the cost of any required relocation(s).
All available geodetic control information about horizontal and vertical geodetic control monuments in the subject area is contained on the homepage of NGS at the following Internet address: http://www.ngs.noaa.gov. After entering this website, please access the topic “Products and Services” then “Data Sheet.” This menu item will allow you to directly access geodetic control monument information from the NGS database for the subject area project. This information should be reviewed for identifying the location and designation of any geodetic control monuments that may be affected by the proposed project.
We hope our comments will assist you. Thank you for giving NGS the opportunity to review your DEIS.
Sincerely, Christopher W. Harm Program Analyst NOAA’s National Geodetic Survey Office of the Director
1315 East-West Highway
SSMC3 8729, NOAA, N/NGS
Silver Spring, Maryland 20910
Draft PEIS Comments Page 11
48667 Text Box AG-5: National Oceanic and Atmospheric Administration
48667 Line
48667
AG-5a
Draft PEIS Comments Page 12
Text Box AG-6: Natural Resources Conservation Service
48667 Line
48667
AG-6a
From: "Debra Beene" <Debra.Beene@thc.state.tx.us> To: "Daniel Borunda" <danielborunda@ibwc.state.gov>, <dborunda@ibwc.state.go...
Date: 09/12/2007 6:49 PM Subject: PEIS Rio Grande Flood Control Projects along the Border
CC: "Amy Hammons" <Amy.Hammons@thc.state.tx.us> RE: PEIS Rio Grande Flood Control Projects along the Border
Mr. Borunda: The above referenced document does not address the historic or prehistoric cultural resoures;
it simply states that avoidance will take place when possible and when not, testing, excavation and mitigation will be coordinated through our office. We may not always agree that a site should be destroyed through mitigation when it is extremely significant; we may recommend complete avoidance. The cultural resource sections would benefit from in-depth assessments of what is known about the resources in the three flood control project areas and what is expected. What is the purpose of including such a preliminarily discussion of the cultural resources? Please advise at to what you are requesting from our office regarding this PEIS; it is very difficult to respond to such limited data.
Thank you, debra beene debra l. beene archaeologist, review & compliance regional archeologist, lower pecos texas historical commission po box 12276.austin.texas.78711 el rose building, 1st floor 108 west 16th street.austin.texas.78701 phone 512.463.5865 fax 512.463.8927 dbeene@thc.state.tx.us
Draft PEIS Comments Page 13
Text Box AG-7: Texas Historical Commission
48667 Line
48667
AG-7a
Draft PEIS Comments Page 14
Text Box AG-8: Texas Commission on Environmental Quality
48667 Line
48667 Text Box AG-8a
Environmental Protection Specialist
USIBWC
4171 N. Mesa St, C-100 El Paso, TX 79902 danielborunda@ibwc.state.gov
The Lone Star Chapter of the Sierra Club appreciates the opportunity to comment on the Programmatic Environmental Impact Statement for Improvements to USIBWC Rio Grande Flood Control Projects along the Texas-Mexico Border. The Lone Star Chapter, Sierra Club is the state conservation office for the Sierra Club, and has over 25,000 members in Texas. These include both residents of border counties as well as Texans who enjoy the natural beauty and resources of the Texas-Mexico borderlands. In addition, in the last few years, we have worked with organizations and individuals in Mexico concerned with particular issues impacting border health and the environment. Most recently, our chapter has announced its opposition to a physical wall along the Texas- Mexico border which could impact both water management and habitat management goals.
At one point, Sierra Club took legal action against IBWC for the manner in which it implemented its flood control projects along the border, but reached consensus on a more holistic management approach to assure that vegetation important to habitat and endangered species was not completely removed. As such, we recognize that IBWC has already moved beyond a simple technical vision of flood control toward more of a management strategy that takes into account other issues.
These very brief comments are offered in support of the Agency’s fourth alternative:
Multipurpose Project Management Alternative. We believe that it makes sense for the IBWC, in concert with CILA, other federal, state and local agencies and non-governmental organizations and individuals to move beyond flood control, and even more integrated management of water resources to look at issues of habitat enhancement, river flow and coordination with natural areas. We generally support many of the specific actions that would be incorporated into the MPM Alternative, and again believe that for the area downstream of El Paso, upstream and downstream of Presidio and in the Lower
Draft PEIS Comments Page 15
48667 Text Box ORG-1: Lone Star Chapter of Sierra Club
48667 Line
48667
ORG-1a
Rio Grande Valley, it only makes sense to move beyond the more narrow goal of flood control to also consider and implement other goals. While we reserve the right to comment on individual IBWC programs or projects – such as how proposed salt cedar removal projects are carried out – we do support the idea that the IBWC should be in the business of supporting water and habitat management for a variety of uses.
One issue that was not specifically mentioned as part of the MPM Alternative is the issue of water quality. We would ask – and these comments echo similar comments being made by the Arroyo Colorado Watershed Partnership’s Citizens Forum – that as part of the alternative you also incorporate the issue of maintenance and enhancement of water quality.
Thank you for the opportunity to comment on the Draft Programmatic Environmental Impact Statement.
Sincerely, Cyrus Reed, On Behalf of Lone Star Chapter of Sierra Club 1202 San Antonio Austin, Texas 78701 Reed_c@grandecom.net 512-477-1729
Draft PEIS Comments Page 16
48667 Line
48667 Line
48667 Text Box ORG-1b
48667 Text Box ORG-1a (cont.)
Draft PEIS Comments Page 17
Text Box IND-1: Mr. Conrad Keyes
48667 Line
48667 Text Box IND-1a
48667 Line
48667
IND-1b
WRITTEN AND PUBLIC HEARING COMMENTS FOR THE
RECTIFICATION FLOOD CONTROL PROJECT
Draft PEIS Comments Page 18
Draft PEIS Comments Page 19
Text Box AG-9: Ysleta Del Sur Pueblo Nation
48667 Line
48667 Line
48667 Text Box AG-9b
48667
AG-9a
Draft PEIS Comments Page 20
ORG-2: Friends of the Rio Bosque
Draft PEIS Comments Page 21
Line
48667 Line
48667 Text Box ORG-2a
48667
ORG-2b
Daniel Borunda Environmental Management Division
USIBWC
4171 North Mesa, C-100 El Paso, TX 79902
Dear Mr. Borunda:
Thank you for the opportunity to comment on the draft programmatic environmental impact statement (DPEIS) for Improvements to the USIBWC flood control projects along the Texas-Mexico border.
We do not believe the DPEIS complies with either the requirements of the National Environmental Policy Act to analyze impacts of, and alternatives to, current management, or with the MOU signed in 1999 with the Southwest Environmental Center.
The USIBWC signed a memorandum of understanding (MOU) with the Southwest Environmental Center dated March 22, 1999. This agreement was negotiated in lieu of SWEC pursuing litigation against USIBWC for violations of the Endangered Species Act and National Environmental Policy Act (NEPA). It was understood by both parties that the litigation would be renewed if the USIBWC failed to comply with its commitments.
In the MOU, USIBWC committed to making a comprehensive and in-depth reevaluation of existing management practices for the Rectification Flood Control Project in order to find ways to improve the condition of the Rio Grande ecosystem and come into full compliance with federal environmental laws. This has not been done.
Section I.C. of the MOU reads as follows:
The scope of the Rectification EIS will include analysis of available flood protection and alternatives to current management, including watershed-oriented and non-structural alternatives, and including collaborative measures with other agencies and landowners, to determine to what extent project management can support restoration of native riparian and aquatic habitats, as well as the restoration of natural fluvial processes such as channel meanders and overbank flooding. The DEIS shall analyze, pursuant to NEPA, the indirect and cumulative effects of “past, present, and reasonably foreseeable future actions regardless of what agency (Federal or non- Federal) or person undertakes such other actions,” such actions’ impacts are to include, but not be limited to, impacts of USIBWC actions in the project on the Rio Grande ecosystem above and below the project. The DEIS shall make explicit the USIBWC’s modeling assumptions concerning the magnitude and frequency of flood events that flood protection is meant to control. The DEIS shall make explicit the statutory or other basis for USIBWC’s flood protection mandate.
Specifically, the DPEIS does not:
Draft PEIS Comments Page 22
48667 Text Box ORG-3: Southwest Environmental Center
48667 Line
48667 Line
48667 Text Box ORG-3a
48667
ORG-3b
• Provide sufficient information about the (degraded) ecological condition of the
RFCP and the potential to improve it;
• analyze real alternatives to current management;
• analyze watershed-oriented and non-structural alternatives to flood control;
• analyze collaborative measures with other agencies and landowners to any meaningful extent
• determine, other than in a dismissive way, to what extent project management can support restoration of native riparian and aquatic habitats;
• determine how and to what extent restoration of natural fluvial processes such as channel meanders and overbank flooding can be achieved;
• adequately explain the statutory basis for current management of the RFCP;
• provide adequate explanation or justification of current management practices in terms of objective, measurable criteria.
As stated in our scoping comments, we expected the PEIS to include a serious, detailed analysis of the potential for watershed oriented, non-structural and collaborative measures to meet USIBWC’s flood control responsibilities as well as improve the Rio Grande ecosystem. This was not done. We made extensive, detailed suggestions for specific analyses to undertake. These were largely ignored. We are disappointed at USIBWC’s apparent retreat from its earlier commitment to comply with federal environmental laws and its willingness to improve the dismal ecological condition of its projects.
Thank you for the opportunity to provide these comments.
Sincerely, Kevin Bixby Executive Director
Draft PEIS Comments Page 23
48667 Line
48667
ORG-3c
Draft PEIS Comments Page 24
Text Box ORG-4: University of Texas at El Paso
48667 Line
48667
ORG-4a
Draft PEIS Comments Page 25
Line
48667 Line
48667 Line
48667 Text Box ORG-4d
48667 Text Box ORG-4c
48667
ORG-4b
Draft PEIS Comments Page 26
Line
48667 Line
48667 Text Box ORG-4f
48667
ORG-4e
Draft PEIS Comments Page 27
Text Box
EP-H1
Ms. Heather McMurray
48667 Text Box
48667 Line
48667 Text Box EP-H1a
48667 Text Box
EL PASO PUBLIC HEARING - AUGUST 22, 2007
EXCEPT OF COMMENTS FROM COURT REPORTER TRANSCRIPT (full text in presented in Appendix C)
Draft PEIS Comments Page 28
Line
48667 Text Box EP-H1a
Draft PEIS Comments Page 29
Line
48667 Text Box
Draft PEIS Comments Page 30
Line
48667 Text Box
Draft PEIS Comments Page 31
Text Box
EP-H2
Mr. John Sproul
48667 Line
48667
EP-H2a
Draft PEIS Comments Page 32
Text Box
EP-H3
Mr. Kevin Bixby
48667 Line
48667 Line
48667 Text Box EP-H3b
48667
EP-H3a
Draft PEIS Comments Page 33
Line
48667 Line
48667 Text Box EP-H3c
48667 Text Box EP-H3b
Draft PEIS Comments Page 34
Line
48667 Line
48667 Text Box EP-H3c (cont.)
48667
EP-H3d
Draft PEIS Comments Page 35
Line
48667 Text Box EP-H3d
Draft PEIS Comments Page 36
Text Box
EP-H4
Mr. Ari Michelsen
48667 Line
48667
EP-H4a
Draft PEIS Comments Page 37
Line
48667 Line
48667 Text Box EP-H4b
48667 Text Box EP-H4a
Draft PEIS Comments Page 38
Line
48667 Line
48667 Text Box EP-H4d
48667
EPH-4c
Draft PEIS Comments Page 39
Line
48667 Text Box EP-H4d
PUBLIC HEARING COMMENTS FOR THE
PRESIDIO FLOOD CONTROL PROJECT
Draft PEIS Comments Page 40
Draft PEIS Comments Page 41
Text Box
PRESIDIO PUBLIC HEARING - AUGUST 23, 2007
EXCEPT OF COMMENTS FROM COURT REPORTER TRANSCRIPT (full text is provided in Appendix C)
48667 Line
48667 Text Box
PR-H1
Mr. Carlos E. Nieto
48667
PR-H1a
Draft PEIS Comments Page 42
Line
48667 Text Box PR-H1a
Draft PEIS Comments Page 43
Line
48667
PR-H1b
Draft PEIS Comments Page 44
Line
48667
PR-H1c
Draft PEIS Comments Page 45
Line
48667 Text Box
PR-H2
Mr. Lorenzo Hernandez
48667
PR-H1d
Draft PEIS Comments Page 46
Line
48667
PR-H2a
Draft PEIS Comments Page 47
Line
48667
PRH-2b
Draft PEIS Comments Page 48
Line
48667 Line
48667 Text Box
PR-H3
Ms. Patt Sims
48667 Text Box PR-H2b (cont.)
48667
PR-H3a
Draft PEIS Comments Page 49
Line
48667 Text Box PR-H3a
Draft PEIS Comments Page 50
Line
48667 Line
48667 Text Box
PR-H4
Mr. Dennis McEntire
48667 Text Box PR-H3a (cont.)
48667
PR-H4a
Draft PEIS Comments Page 51
Line
48667 Text Box
Draft PEIS Comments Page 52
Line
48667 Text Box
Draft PEIS Comments Page 53
Line
48667 Text Box PR-H2b
Draft PEIS Comments Page 54
Line
48667 Line
48667 Text Box PR-H1e
48667 Text Box PR-H2b
Draft PEIS Comments Page 55
Line
48667 Text Box PR-H1e
WRITTEN AND PUBLIC HEARING COMMENTS FOR THE
LOWER RIO GRANDE FLOOD CONTROL PROJECT
Draft PEIS Comments Page 56
Draft PEIS Comments Page 57
Text Box AG-10: U.S. Army Corps of Engineers
48667 Line
48667
AG-10a
Draft PEIS Comments Page 58
Line
48667 Text Box AG-10a
Draft PEIS Comments Page 59
Draft PEIS Comments Page 60
Draft PEIS Comments Page 61
Draft PEIS Comments Page 62
Draft PEIS Comments Page 63
Draft PEIS Comments Page 64
Draft PEIS Comments Page 65
The Arroyo Colorado Watershed Partnership
2401 E. Hwy 83
Weslaco, Texas 78596
956/969-5607 Office 956/969-5639 Fax www.arroyocolorado.org
Environmental Protection Specialist Environmental Management Division, USIBWC 4171 North Mesa, C-100 El Paso, TX 79902
Dear Mr. Borunda, First of all, thank you for the opportunity to review and comment on the Draft Programmatic Environmental Impact Statement (PEIS) for the Lower Rio Grande Flood Control Project. As a Board Member of the of the LRG Citizen’s Forum and Watershed Coordinator for the Arroyo Colorado Watershed Partnership (ACWP) I submit the following comments regarding the Draft
PEIS.
The ACWP is a coalition of over 500 individuals representing federal, state, and local agencies, NGOs and concerned citizens of the general public. Our mission is to reduce the additions of pollutants to the Arroyo Colorado to the maximum extent possible in order to meet state water quality standards and improve the natural terrestrial, riparian, and aquatic habitat associated with the Arroyo Colorado Watershed. The interior floodway of the USIBWC is part of and within the Arroyo Colorado Watershed and we request that you recognize the initiative to not only improve regional water quality in the Arroyo Colorado and the Lower Laguna Madre, but also to promote a thriving environment and economy for the LRG Valley.
First of all, the USIBWC mandate for flood protection, boundary stabilization, and water delivery is acknowledged and recognized as the core mission of the USIBWC and is of primary importance. Moreover, we acknowledge the USIBWC adoption of additional goals that include improvements in water use, quality, conservation, and multipurpose utilization of projects in support of local or regional initiatives for recreational use and environmental improvement.
The Draft PEIS evaluates maintenance improvement alternatives to maximize flood protection and provides alternatives to minimize potential environmental impacts. However, the Draft PEIS does not address water quality. The ACWP developed “A Watershed Protection Plan for the Draft PEIS Comments Page 66
48667 Text Box ORG-5: The Arroyo Colorado Watershed Partnership
48667 Line
48667
ORG-5a
Arroyo Colorado, Phase I” and the top strategy of the plan is the construction of regional and individual wetland systems. Currently, three small wetland systems are being developed outside the interior floodway and additional potential sites are being reviewed within and outside the interior floodway. Two potential large-scale wetland sites have been identified within the interior floodway, one in the Llano Grande area and one south of the City of La Feria where sand is currently being quarried.
We understand that any growth within the floodway will have some impact on the ability of the floodway to convey water but ask that you evaluate potential alternative practices within the pilot channel and on the levees that consider environmental impacts including impacts to existing and migratory animals. These practices might include wetland systems and selective clearing of vegetation in limited areas with sensitivity to timing.
We request that you evaluate the potential impact of a large-scale (300 -700 ac) wetland system of appropriate low growing plants within the interior floodway. Again, flood control and the protection of human health and safety is priority. Moreover, there may be an opportunity in the flood control project for environmental and recreational improvements. Our Partnership will continue to look for opportunities to improve water quality within and outside the USIBWC interior floodway and we look forward to continued work with the USIBWC in regards to flood control, human safety, environmental improvement and quality of life.
Sincerely, Laura
Laura De La Garza Arroyo Colorado Watershed Coordinator
Cc: Arroyo Colorado Steering Committee
Draft PEIS Comments Page 67
Text Box ORG-6 __ Lower Rio Grande Water Committee, Inc.
48667 Line
48667 Line
48667 Text Box ORG-5a (cont.)
48667
ORG-5b
Draft PEIS Comments Page 68
Text Box ORG-6: Lower Rio Grande Water Committee, Inc.
48667 Line
48667 Line
48667
ORG-6a
Draft PEIS Comments Page 69
Text Box IND-2: Mr. Carl A. Boyd
48667 Line
48667
IND-2a
Draft PEIS Comments Page 70
Line
48667 Line
48667 Text Box IND-2a (cont.)
48667
IND-2b
From: "Bill Forbes" <bforbes@care2.com> To: <danielborunda@ibwc.state.gov> Date: 09/24/2007 7:51 PM Subject: Re: Rio Grande PEIS public hearings this month
Dear Mr. Borunda, My comment is to utilize natural flood control measures as much as possible, including wetland construction and restoration, training Mexican citizens to lead tours of the site highlighting their aesthetic and dollar value for ecosystem services, habitat, and recreation.
---- Begin Original Message ---- From: Sally Spener <sallyspener@IBWC.STATE.GOV> Sent: Tue, 14 Aug 2007 13:16:02 -0600 To: BECCNET@LISTSERV.ARIZONA.EDU Subject: Rio Grande PEIS public hearings this month
For immediate release
AGENCY SEEKS COMMENT ON STUDY OF RIO GRANDE FLOOD CONTROL PROJECTS
The United States Section of the International Boundary and Water Commission (USIBWC) is seeking public comment on its Draft Programmatic Environmental Impact Statement, Improvements to the USIBWC Rio Grande Flood Control Projects along the Texas-Mexico Border (Draft PEIS). The document analyzes potential environmental impacts of future flood control project improvements under consideration over the next 20 years.
The Draft PEIS considers future improvements to three projects in Texas - the Rectification Flood Control Project in El Paso and Hudspeth Counties, the Presidio Flood Control Project in Presidio County, and the Lower Rio Grande Flood Control Project in Hidalgo and Cameron Counties. The Draft PEIS takes a broad programmatic look at the potential environmental implications of measures identified for future implementation. This broad evaluation will guide more detailed future studies of individual projects that may be implemented.
The Draft PEIS is available on the USIBWC web page at http://www.ibwc.state.gov/Files/RioGrandeDraftPEIS.pdf. Copies of the Draft PEIS are also available for inspection and review at the following locations:
§ USIBWC Headquarters, 4171 N. Mesa, Bldng C, El Paso, TX 79902 § City of Presidio Library, 2440 Oreilly St., Presidio, TX 79845 § McAllen Public Library, 601 N. Main Street, McAllen, TX 78501 § USIBWC Mercedes Field Office, 325 Golf Course Road, Mercedes, TX 78570 § Harlingen Public Library, 410 ’76 Drive, Harlingen, TX 78550 § Brownsville Public Library, 2600 Central Blvd., Brownsville, TX 78520
The USIBWC has also scheduled three public hearings in August to accept comments on the Draft PEIS. The hearings are scheduled as follows:
El Paso - 6:00 p.m. August 21, USIBWC Headquarters, 4171 N. Mesa St., Draft PEIS Comments Page 71
48667 Text Box IND-3: Mr. Bill Forbes
48667 Line
48667
IND-3a
Bldng C Presidio - 6:00 p.m. August 22, Presidio Chamber of Commerce, 202 W.
Oreilly St.
McAllen - 6:00 p.m. August 28, Four Point Sheraton Hotel, 2721 S. 10th St.
Written comments are requested by September 24, 2007. To submit written comments or to request additional information, please contact Mr. Daniel Borunda, Environmental Protection Specialist, USIBWC, 4171 N.
Mesa St., C-100, El Paso, TX 79902 or via e-mail at danielborunda@ibwc.state.gov.
For more information:
Sally Spener 915-832-4175 sallyspener@ibwc.state.gov
Daniel Borunda 915-832-4767 danielborunda@ibwc.state.gov
---- End Original Message ----http://toolbar.Care2.com Make your computer carbon-neutral (free).
http://www.Care2.com Green Living, Human Rights and more - 7 million members!
Draft PEIS Comments Page 72
1 MR. PENA: Thank you.
2 As I mentioned, part of our analysis we're
3 asking for your input. We're interested in hearing from
4 all of you to find out if you have any particular
5 concerns, questions or comments about this draft
6 Programmatic EIS. And if you have any questions or
7 concerns, this is the time to express them or bring them
8 forward to us.
9 Remember that the September 24th is the
10 date we will take comments up until that time so we have a
11 couple more weeks to do that.
12 I'll continue with the second part. As I
13 mentioned before, we're going to take comments from you.
14 As I mentioned we're interested in what you have to say, 15 so -- we won't be making any official responses or
16 comments. All responses will be included in the final
17 Programmatic EIS after we had a chance to consider all of
18 the comments fully.
19 I'm going to call for our first group of
20 speakers here.
21 Laura de la Garza.
22 MS. DE LA GARZA: Thank you. I appreciate
23 this opportunity to review and comment on the draft of
24 Programmatic EIS. My name is Laura de la Garza. I serve
25 as a board member of the Lower Rio Grande Valley Citizens
Draft PEIS Comments Page 73
48667 Text Box McALLEN PUBLIC HEARING - AUGUST 28, 2007 EXCEPT OF COMMENTS FROM COURT REPORTER TRANSCRIPT (full text is provided in Appendix C)
48667 Text Box McA-H1 Ms. Laura de la Garza
1 Forum and I'm also watership coordinator for the
2 implementation of the Arroyo Colorado Watershed Protection
3 Plan.
4 The watershed protection plan was developed
5 by the Arroyo Colorado watershed partnership, a coalition
6 of over 500 individuals representing federal, state and
7 local agencies, NGOs and concerned citizens of the general
8 public.
9 The implementation of the plan is a
10 regional initiative, not only to improve the quality of
11 water in the Arroyo Colorado and Lower Lagune Madre but
12 also an initiative to promote a driving environment and
13 economy for the Lower Rio Grande Valley. The focus of my
14 comment this evening is the Lower Rio Grande Port Isabel
15 project as the interior floodway is connected to and part
16 of the Arroyo Colorado.
17 First of all, I acknowledge the mission of
18 the IBWC, including the immense responsibility to minimize
19 potential flood impacts through levee and floodway
20 projects. Improvement to flood control systems including
21 levees are part of the Corps mission. Moreover, the IBWC
22 has adopted additional goals that include improvement to
23 water use, quality, conservation, and multipurpose
24 utilization of projects in support of levee regional
25 initiatives for recreational use and environmental
Draft PEIS Comments Page 74
48667 Line
48667
McA-H1a
1 improvement.
2 The draft Programmatic EIS is being
3 prepared to evaluate the maintenance and improvement
4 alternatives to maximize flood protection. It also
5 provides alternatives to minimize potential environmental
6 impact; however, the draft EIS does not address water
7 quality.
8 Again, there is a regional initiative to
9 improve water quality in the Arroyo Colorado. The top
10 strategy of that plan is the construction of regional and
11 individual wetland systems.
12 As many of you know, wetlands not only
13 improve water quality, settle out sediments and provide
14 habitat, they also provide recreational, educational and
15 economic opportunities.
16 Other strategies in the Arroyo Colorado
17 watershed protection plan include the support of best
18 management practices for agriculture, improved wastewater
19 collection and treatment facilities, including improved
20 infrastructure for colonias, the support for ongoing
21 local, federal and state agencies and other organizations
22 in regards to habitat conservation and protection and
23 restoration of existing repairing areas resacas and fresh
24 water wetlands.
25 In the plan, we also call for reduction of
Draft PEIS Comments Page 75
48667 Line
48667 Text Box
(cont)
1 stream channel and bank erosion and the development of
2 alternative drainage ditch maintenance and practices.
3 The partnership plans to submit formal
4 comments regarding this draft PEIS and they will be along
5 the lines of the need to address water quality with
6 consideration to the added potential of creating
7 environmental recreational and economic opportunities.
8 Again, all this while considering the mandate for flood
9 protection boundary stabilization and water delivery.
10 Representatives of the IBWC Mercedes field
11 office are valued members of our partnership and increased
12 participation in the IBWC is encouraged in the evaluation
13 and positive development of wetlands projects.
14 As brought up at the last citizens forum
15 meeting held here in the Valley, we also look forward to
16 discussing alternative stream and drainage ditch
17 configurations that promote improved water quality. Also
18 recommended is an increased IBWC participation in current
19 and future efforts of other agencies, local governments
20 and organizations for increased use of the Lower Rio
21 Grande Valley as an ecco-tourism destination, improve our
22 local economy and promoting habitat enhancement and
23 recreational opportunities.
24 Tourism is estimated to bring over a
25 hundred million dollars annually to the Lower Rio Grande
Draft PEIS Comments Page 76
48667 Line
48667 Text Box
(cont)
1 Valley and increased attention to water quality and
2 habitat restoration to build on an economic potential.
3 Thank you for the opportunity to speak.
4 MR. PENA: Thank you, Laura. Next speaker
5 is Eric Ellmer.
6 MR. ELLMER: I didn't have time to prepare
7 a text because I was reminded of this meeting recently.
8 I represent Los Ninos Del Rio. It's a
9 nonprofit organization that was founded in '91 to promote
10 and preserve, preserve and promote the environmental and
11 cultural heritage of the Valley from Laredo to
12 Brownsville. And we just recently have received new
13 funding to reinvigorate the organization. It's been quiet
14 the last few years. We're doing -- our goal is to get
15 more people to visit historical places that have been
16 previously preserved by the organization along the
17 corridor and to get them to do that through recreational
18 programs.
19 We're in the process of identifying wraps
20 for peddling and paddling in and around the river, and all
21 of this is very closely tied to economic initiative. The
22 medium term goal is to get national heritage area status
23 for the region and all that kind of goes underlying with
24 what Laura de la Garza was saying about ecco-tourism for
25 the area.
Draft PEIS Comments Page 77
48667 Text Box McA-H2 Mr. Eric Ellmer
48667 Line
48667
McA-H2a
1 There's been a huge investment in birding
2 made down here which appeals to the twelve million birds
3 in the country. Their numbers are declining though
4 according to the studies by the outdoor industry
5 association. The people who are most active at it are
6 getting older and retiring, and worse, they're not really
7 being replaced by a younger generation.
8 Conversely, there's 20 million paddlers in
9 the country and the same studies shows that their numbers
10 are increasing and it's particularly increasing among
11 Hispanics. So twice as many paddlers out there that could
12 be potentially coming down to this area to engage in that
13 kind of activity, and seven times as many cyclists, there
14 are 80 million cyclists in the country.
15 We just finished making a presentation
16 yesterday with the City of McAllen that involves creating
17 a 50-mile loop that stitches together irrigation drainage
18 and IBWC right-of-ways. We've had some preliminary
19 discussions with the IBWC about using the levees with some
20 of the absolute finest opportunities down here. We got a
21 representative from the Hidalgo County Drainage District
22 here who has been involved in the same discussions.
23 And one of the real challenges to attract
24 the people that come down here and bicycle and also to get
25 the local people primarily involved in more active use of, Draft PEIS Comments Page 78
48667 Line
48667 Text Box
1 really, some of the best habitat that is down here which
2 is along your levee system. One of the true challenges is
3 getting people to come out when all the trees have been
4 cut down.
5 So one of the things we really want to
6 encourage and we are really pleased to see that the draft
7 includes an alternative, and I really emphasize multiple
8 use. We'd really like to see long hard thought given to
9 how levee improvements can incorporate amenities that will
10 encourage more people to get out there.
11 Some other managers of property, like, 12 Godfrey Garza has told me that, you know, he feels like
13 having more people out there is something that is actually
14 an impediment, deterrents to vandalism and other things
15 that are going to endanger your work.
16 So we'd like to see where -- in fact, we
17 are offering small stipends to engineering students to
18 investigate possible alternatives or design alternatives
19 that will allow you to incorporate shade trees, native
20 vegetation, you know, into levee improvements so that in
21 10 or 20 years in addition to preventing flooding that's
22 going to jeopardize the area, you can actually be
23 providing something that's going to create some economic, 24 you know, stimulants for more growth here. So thank you
25 very much.
Draft PEIS Comments Page 79
48667 Line
48667 Text Box
1 MR. PENA: Thank you.
2 Next speaker is Godfrey Garza.
3 MR. GARZA: Thank you very much for your
4 time and opportunity to speak here.
5 As I mentioned, my name is Godfrey Garza.
6 I serve as a drainage manager for Hidalgo County. I would
7 just like the IBWC, to remind them, I guess, that one of
8 the core objective is flood control. It is great for the
9 economy, for the ecco for water resources, but a lot of
10 these issues have come to pass because the population
11 growth we had in Hidalgo County.
12 If these levee systems are not repaired, 13 properly maintained, there is no ecco growth down in South
14 Texas. Again, we need to remember that the levees are for
15 flood control. If they have dual use that's great, but we
16 need to look at the primary objective of the levee system
17 when it was built, which is mandated by the treaty and
18 maintain flood control in our area.
19 As citizens, we want to have the best for
20 everybody, but I think life is one of the most important
21 things down in our area, and this levee system we have
22 down here protects over a million population, and we got
23 over $30 billion worth of assets down over here. And this
24 community is not just a community itself, but fine
25 financial resources as a whole. We are talking hundreds
Draft PEIS Comments Page 80
48667 Text Box McA-H3 Mr. Godfrey Garza
48667 Line
48667
McA-H3a
1 of thousands maquilas down over here that operate both in
2 Mexico and the United States. They keep the General Motor
3 plants, the Emerson Electric, and all companys operating.
4 If we do not have a solid flood control system that we can
5 maintain and properly, then we're going to lose the
6 advantage, all the growth we had.
7 And part of the issue the IBWC has gotten
8 into, this is my personal opinion, is allowing more
9 vegetation growing in the floodway system that is causing
10 the levees, because the levees do not wear away nine feet
11 to ten feet. Start looking at the environmental issues, 12 the back water, start looking at different moments in the
13 ground. And those are millions and millions of dollars we
14 the taxpayer is not spending in to raise levees because
15 levees do not disappear eight or nine feet like people
16 driving up and down on them over a short period of time.
17 There are other issues that are in place
18 for levees to be efficient and we need to be sure if we're
19 going to do these improvements, what needs to happen is
20 ten years from now, 20 years from now we're not going to
21 have a similar situation where the environment is taking
22 over and the wetlands have taken over and trees have grown
23 in there, and we need to start looking at different
24 priorities, not against vegetation.
25 I've got farmland. I love it. But I have
Draft PEIS Comments Page 81
48667 Line
48667 Text Box McA-H3a
1 to look at the citizens that live down here and I think
2 IBWC needs to remember what their core objective is flood
3 control. Thank you.
4 MR. PENA: I don't have anymore cards.
5 Would anybody else like to make a comment.
6 MR. REYES: I'll make one.
7 MR. PENA: Please state your name.
8 MR. REYES: My name is Ernesto Reyes for
9 the ecological service, U.S. Fish and Wildlife Service and
10 the refuge manager could not be here for the Lower Rio
11 Grande Valley National Wildlife Refuge.
12 One of their concerns is, which I hate to
13 bring this is up, is the proposed border fence. And of
14 course, they're proposing to build that fence on the north
15 side of the levee. And one of the things is some of these
16 levees are supposed to be raised, you know, several feet
17 high and wide, and so we just, the refuge is concerned
18 about if the fence is not coordinated with the levee with
19 expansion, then what's going to happen if they put it too
20 close to the levee on the north side, what's going to
21 be -- what's going to happen it's going to have to expand
22 to the south side, and that's where they have the most, 23 the better habitat for some of the refuge which is the
24 south side of the levee.
25 So that's one of the considerations that
Draft PEIS Comments Page 82
48667 Text Box McA-H4 Mr. Ernesto Reyes
48667 Line
48667
McA-H4a
1 the refuge would like the IBWC to look is when they
2 propose a fence not to be too close because if that
3 expansion happens, you know, we would like to have it on
4 the north side instead of the south side that's going to
5 be impacting the better habitat on the refuge. Thank you.
6 MR. PENA: Anybody else like to make a
7 comment?
8 If there's not, I would like to make a
9 final reminder that the comment period is open until
10 September 24; therefore, any comments you wish to submit
11 you can do so. Here is the mailing address for mailing
12 your comments in.
13 And if you haven't done so, I know some
14 people got here late. There's a registration form in the
15 back so we can get your name and number, e-mails, to have
16 further information or documentation to make sure we get
17 that to you.
18 For the record, the time now is 6:50. This
19 public hearing is concluded. And I thank you again for
20 coming out and taking part in this process and we'll be
21 seeing more documentation in the near future regarding
22 this process.
24 (Proceedings concluded at 6:50 PM.)
Draft PEIS Comments Page 83
48667 Line
48667 Text Box McA-H4a
| Untitled |
| Tempo_Nov 6th_ Letters & Nov 9th_Public Comments Numbered by RG Project.pdf |
| Untitled |
| Tem 2.pdf |
| Untitled |
| Tempo_Nov 6th_ Letters & Nov 9th_Public Comments Numbered by RG Project.pdf |
| Untitled |
| Tem 1.pdf |
| Untitled |
| Tempo_Nov 6th_ Letters & Nov 9th_Public Comments Numbered by RG Project.pdf |
| Untitled |
| Tem 1.pdf |
| Untitled |
| Tempo_Nov 6th_ Letters & Nov 9th_Public Comments Numbered by RG Project.pdf |
| Untitled |
| Tem 1.pdf |
| Untitled |
| Tempo_Nov 6th_ Letters & Nov 9th_Public Comments Numbered by RG Project.pdf |
| Untitled |
| Tem 1.pdf |
| Untitled |
| Tempo_Nov 6th_ Letters & Nov 9th_Public Comments Numbered by RG Project.pdf |
| Untitled |
| Tem 1.pdf |
| Untitled |
| Tempo_Nov 6th_ Letters & Nov 9th_Public Comments Numbered by RG Project.pdf |
| Untitled |
| Tem 1.pdf |
| Untitled |
| Tempo_Nov 6th_ Letters & Nov 9th_Public Comments Numbered by RG Project.pdf |
| Untitled |
| Tem 1.pdf |
| Untitled |
| Tempo_Nov 6th_ Letters & Nov 9th_Public Comments Numbered by RG Project.pdf |
| Untitled |
File details come from the government source that posted it. Updated .