1) This question/response is a reissue of Question No. 40 in Amendment 3. The response given in Amendment 3 was incorrect. This is the correct response.
Question: On Contract Drawing C14, the 84-inch SE line is shown as FRP pipe. Contract Drawing M1503 shows the 84- inch SE line as RCPP. However Specification 40 00 51, Buried Piping Installation, specifies the Secondary Effluent to be AWWA C200 pipe. What is the correct pipe material for the 84 – inch SE line.
Response: The correct pipe material is FRP; Drawing C14, M1008, M1010, and M1503 have been revised to reflect FRP, and are attached for issue under Amendment 6. SPECIFICATION 40 00 51 Buried Piping Installation has been revised, and is attached for issue under Amendment 6.
2) Question: (note) Architectural, Mechanical, and Structural drawings show three
Different sizes of roll up door.
Response: Doors are 16’x16’; Drawings M801, M803, and M804 have been revised, and are attached for issue under Amendment 6.
3) Question: On Drawing # M710 the 72” SI Line is called out as being “FRP”. On Drawing # M716 the same line is called out as “RCPP”. Which drawing is correct? Is the existing line “FRP” or “RCPP”?
Response: Drawing M716 has been revised, and is attached for issue under Amendment 6.
4) Question: We are an instrumentation manufacture listed in specification 25 20 16
2.27 C 8 b. We have been ask to quote, but in review of the documents provided, we do not see an Instrument schedule. I do see reference to file 25 20 14 attachment.xls and reference to a "COMPONENTS SCHEDULE" in specification 25 20 14. This may be the file we need to best complete our quote. Please advise as to where we may obtain a copy of this file. Response: The attachment to SPECIFICATION 25 20 16 is attached for issue under Amendment 6.
5) Question : On Sheet M109, reference section views on sheet M112 and M 114 that do not exist.
Response: Revised Drawings M109, M451, M2212, and M3721 are attached for issue under Amendment 6.
6) Question: Sheet M801 shows #26 48” x 24”x 48” lateral wye on all blower piping connections, on M701 plan view shows a detail of long radius 24” 90 elbow and some type of 24” x 48” reducer fitting.
Response: Drawing M801 is correct; Drawing M701 has been modified and is attached for issue under Amendment 6.
7) Question: Sheet M706, 10” RAS Header system call out material as steel in zone 3A and DI in zone 4A then zone’s 5A and 6A etc. reference #167 which calls out steel as the material. Please advise as to which materials are to be used on all. Response: All headers should be steel and not DI; Drawing M702 and M706 have been modified and are attached for issue under Amendment 6.
8) Question: Please reference sheet A3103, interior elevation F for the lobby/ waiting area and the kitchen area. The doors for meeting rooms 113 and 114 and kitchen room 101 (doors #113-1, 114-1, and 101-3) are shown on these elevations as full glazed aluminum doors similar to type O.1 on the door schedule on sheet A14. However, on the floor plans sheet A3101 these two doors are called out as a solid core type D door. Please clarify if these doors are supposed to be aluminum full glazed doors to match the interior storefront or solid core doors. Response: Dwg #A3103 and Dwg #A14 are correct; the doors for meeting rooms 113 and 114 and kitchen room 101 (doors #113-1, 114-1, and 101-3) shall be full glazed aluminum doors similar to type O.1 on the door schedule on sheet A14. Dwg #A3101 has been revised to call-out these three doors to be full glazed aluminum doors similar to type O.1 on the door schedule on sheet A14, and Drawing A3101 is attached for issue under Amendment 6.
9) Question: Please reference the interior elevation for the laboratory area, rooms 105 and 106, the elevations show what look like a type O.1 on the door schedule on sheet A14, but do not have any call outs on the floor plans. Please confirm the type and material for these doors.
Response: The doors for rooms 105 and 106 shall be full glazed aluminum doors similar to type O.1 on the door schedule on sheet A14. Dwg #A3101 has been revised to call-out these two doors to be full glazed aluminum doors similar to type O.1 on the door schedule on sheet A14, and Drawing A3101 is attached for issue under Amendment 6.
10) Question: Spec 11 82 01 (PD Blowers) calls for 2 blowers in one section and 3 in another section of the spec. The mechanical drawings show 3 blowers and the P&ID shows 2. The instrumentation part of spec calls for the supply of 3 blowers. Can you please clarify.
Response: There are three (3) blowers: 1 for the AST channel, 1 for the SST channels, and 1 standby; SPECIFICATION 11 82 01 Rotary Positive Displacement Blowers has been revised, and is attached for issue under Amendment 6.
11) Question: Specification Section 40 00 62 references AWWA C200 Steel Pipe; however no direction is given for the steel pipe joints. Please provide details on the C200 pipe joints.
Response: SPECIFICATION 40 00 62 Steel Pipe – AWWA C200 has been revised, and is attached for issue under Amendment 6.
12) Question: Contract Drawing C14 shows the 4-inch NPW, PVC C900 line branching off the 16-inch NPW PVC C905 line. However detail 3 on the same page shows the 4-inch branching off a 12 –inch line. Is the 12-inch line on detail 3 supposed to be 16-inch.
Response: The Bidder is misinterpreting the drawing; the drawing does not show the 4-inch NPW, PVC C900 branching off the 16-inch NPW PVC C905. Detail 3 was misidentified on the C-14; the call-out box should have indicated C19 as the applicable drawing. However, Detail 3 - C19 actually shows a 10 x 4 reducer branching off from a 16 x 10 reducer. Drawing C14 has been revised, and is attached for issue under Amendment 6.
13) Question: Note 7 on Contract Drawing C15 references ‘Restrained Joint Piping Schedule” on Drawing C25; however there is no C25 in the contract plans. Please provide C25 for joint details.
Response: Note 7 on Drawing C15 and C15-B1 has been revised to reference C14, and a joint selection chart has been added to Drawing C-14, Drawings C14, C15, and C15-B1 are attached for issue under Amendment 6.
14) Question: On Contract Drawing C14, the 6-inch SSK line from the SSK Pump Station is shown as DI pipe. However, specification 40 00 51, Buried Piping Installation specifies the Secondary Skimmings to be Glass Lined Ductile Iron Pipe. What is the correct material for the 6-inch SSK line? If it is Ductile Iron, is it a restrained joint?
Response: The proposed material for the 6-inch SSK line is Glass Lined Ductile Iron Pipe as per page 23 of the Spec. 40-00-51, “Buried Pipe Schedule” chart. The spec is attached for issue under Amendment 6.
15) Question: On Contract Drawing M801, there is a 3-inch NPW, DI supplying the blowers that branches off the 10-inch NPW, PVC C900 line. However, on detailed Section 1/M802 the line is shown as a 4-inch NPW, DI line. Also on Contract Drawing C14, the line is shown as a 4-inch, PVC C900 pipe. Is the NPW line supplying the blowers a 3-inch, 4inch DI or a 4-inch PVC pipe? Response: The NPW line supplying the blowers is a 3-inch PVC pipe: Drawings C14 and M801 have been revised, and are attached for issue under Amendment 6.
16) Question: On Contract Drawing C14, there is a 6-inch D, PVC C900 line draining the Blower Building. However, on Contract Drawing M 801, the 6-inch D line is shown to be CISP. Also, Specification 40 00 51, Buried Piping Installation, specifies the drain to be Ductile Iron. What is the correct material for this 6-inch D line?
Response: The proposed line is a 6-inch D, PVC C900; Drawing M801 and SPECIFICATION 40 00 51 have been revised, and are attached for issue under Amendment 6.
17) Question: On Contract Drawing M702, there is a 14-inch CA, DI line and a 10-inch CA, DI line shown on the north end of the tanks. Reference is made to Detail 2, Drawing C19 and Drawing 701 for continuation of these lines. However, both drawings show only one CA line feeding the Activated Sludge Tanks. Which is the correct CA line from the North Blower Structure? Response: The 10-inch CA line is correct; the 14-inch CA line has been removed from Drawings M702 and M703, and the elevation of the 10-inch CA and the 12-inch DI pipe on Drawing M801 was revised; Drawings M702, M703, and M801 are attached for issue under Amendment 6.
18) Question: The coordinates shown on Drawing C-2 for the DDC compaction area is illegible. Please provide the coordinates for this area.
Response: Drawing C-2 has been revised; Drawings C-2 and C-2 –B1 / B2 are attached for issue under Amendment 6.
19) Question: Please find below a list of referenced mechanical drawings which we have been unable to find in the downloaded plan set:
a. M116
b. M117
c. M118
d. M13 A-B
e. M713H
Please provide the missing drawings or advise a course of action.
Response: Revised Drawings M109, M451, M2212, and M3721 are attached for issue under Addendum 6. Drawing M713H has been revised to show it is Bid Option 2, and is attached for issue under Amendment 6.
20) Question: On revised drawing M703, the blower 10” CA is now connected to the 12” CA line attached to Activated Sludge Tank North Wall. Originally this line was independent and fed air to the SST Influent Channel. Please provide clarification if this line is to be deleted, is there modifications to the above ground air piping or was the line relocated next to building?
Response: The 10-inch CA and 12-inch CA are buried piping from the North Blower Building and stub-up at the AST. For Drawing M702, the 12-inch CA and the 14-inch CA have been deleted, and the 10-inch CA as shown on M702 is correct. Drawing M703 should show a 12-inch CA from the North Blower Building to the SST Influent Channel. Drawings M702, M703, and M801 have been revised to reflect this scenario, and are attached for issue under Amendment 6.
21) Question: According to drawing M802, M801 and M702, the blower diagram show 10” air line outside of building to AST. Drawing C-19 depict the air line as 14”. Please provide clarification as to line size?
Response: The 10-inch CA line, as shown on M-801 & M-802, is correct; Drawing C19 has been revised, and is attached for issue under Amendment 6.
22) Question: Per the door schedule, sheet A-14 door types F,G & P.1 specify wired glass. Wired glass does not meet safety glazing requirements. Tempered or laminated must be used. What type of glass is acceptable?
Response: Contractor is incorrect; wired glass shown in the plans meets safety glazing requirements; Contractor needs to bid according to plans & spec.
23) Question: Door’s # 102-1,109-1,209-2, 101-1 are all 20 min rated doors. The door and window schedule specifies clear wired glass for these doors. Wired glass does not meet safety glazing requirements. Do they want Firelite? Response: Contractor is incorrect; wired glass shown in the plans meets safety glazing requirements; Contractor needs to bid according to plans & spec.
24) Question: Per the door schedule, Door types H.1,M.1 & O specify wired glass in the doors and the removable transoms. Wired glass does not meet safety glazing requirements. Do they want the glass in the transom to match the doors? What type of glass do they want in the transom?
Response: Contractor is incorrect; wired glass shown in the plans meets safety glazing requirements; Contractor needs to bid according to plans & spec.
25) Question: The door and window schedule specifies window J in building AST-LCC-N in room 801. The floor plan does not show any windows located in room 801. Where is the window located?
Response: Drawing A14 has been revised to remove Window J from the door and window schedule specified for building AST-LCC-N in room 801, and is attached for issue under Amendment 6.
26) Question: Sheets M710, M713A, M713E, show the RAS Line (10") has a 6" Plug Valve @ tanks 6,8, and 9. It is unclear how this riser assembly off the 10" is constructed. Is the plug valve above grade or buried? Please provide detail. Response: The Contractor shall provide a 10x6 reducer; the centerline of the pipe is 43.97, which is below grade.
27) Question: The 16" NPW Line, on sheet C14 shows 16" on plan view while showing 12" tee in the Detail 3. Should this be a 16" tee that reduces down to 4"? Response: Yes; as shown on Detail 3 / C19 on Drawing C14; Drawing C14 has been revised and is attached for issue under Amendment 6.
28) Question: On C17, 72" is labeled FRP, spec pipe schedule calls out RCPP. Are both acceptable?
Response: Yes, but in the following respect: Drawing C17 has been revised to clearly show that FRP is for the proposed 72-inch PE pipe in the north-south direction, and RCPP is for the proposed extension of the existing 72-inch PE pipe in the western direction; spec schedule has been revised. SPECIFICATION 40 00 51 and Drawings C17, M716 and M713E have been revised and are attached for issue under Amendment 6.
29) Question: CA line is shown as 14" on C14 & C15 but 10" on M801? Also the 12" line on M801 is not shown on C14?
Response: CA line should be 10-inch and 12-inch line should be shown on C14; Drawings C14, C15, and C15-B1 have been revised and are attached for issue under Amendment 6.
30) Question: On C14, the 84" SE is shown as FRP, M1503 shows it as RCPP, and the pipe schedule calls for Steel. Please verify type of pipe for 84” SE line. Response: Pipe is FRP, and drawings and specification have been revised previously.
31) Question: Sheet 358 of 500, E1016, identifies a light fixture type “COLOR” that is not described on the Light Fixture Schedule sheet 303 of 500, E03. They appear to be stanchion as well as wall mount type fixtures. Please provide the required type and description/s of the light fixtures shown on E1016.
Response: On drawing E1016, the nine stanchion mounted fixtures shall be Type J as shown on E3, and the other wall mounted fixtures shall be Type D; Drawing E1016 is attached for issue under Amendment 6.
32) Question: Sheet 391 of 500, E3103 identifies a light fixture type “LV” that is not described on the Light Fixture Schedule sheet 303 of 500, E03. Please provide the required type and description/s of the light fixtures shown on E3103.
Response: On Drawing E3103, the fixtures in the MCC room that are not labeled shall be Type B; Drawing E3103 is attached for issue under Amendment 6.
33) Question: Specification 26 05 00 – 3.3 - C provides the Hazardous Locations. Per this specification the Dissolved Air Flotation Units are considered to be hazardous classified locations. The light fixtures identified on sheet 373 of 500, E1602 for the DAF Units are not approved for hazardous location. Is the fixture type identified on E1602 acceptable or are light fixtures approved for a hazardous location required in this area per the Specification?
Response: This area is classified as hazardous, change the light fixtures labeled “J” to type “W”; Drawing E1602 has been revised and is attached for issue under Amendment 6.
34) Question: Specification 26 05 00 – 3.3 - C provides the Hazardous Locations. Per this specification the Secondary Skimmings Pump Station Wet Well is considered to be a hazardous location. The light fixtures identified on sheet 353 of 500, E1010 for the Secondary Skimming Wet Well are not approved for hazardous location. Is the fixture type identified on E1010 acceptable or are light fixtures approved for a hazardous location required in this area per the Specification?
Response: This areas is classified as hazardous, change the light fixtures labeled “J” to type “W”, and change the type labeled “U1” to “V”, Drawing E1010 is revised and is attached for issue under Amendment 6.
35) Question: For the 84”SE Spiral Welded Steel Pipe a pipe profile drawing is needed. Response: Pipe has been changed to FRP; the Contractor shall field verify elevations and propose a profile to the COR.
36) Question: Specification 21 00 51-2.2-M-(2) identifies interfacing the FM 20 Total Flooding Fire Suppression System with the Fire Alarm System specified in Division 26. There is no specification for the Fire Arm System in Div. 26. Please provide the Specification for the Fire Detection and Alarm System.
Response: If the administration building is to be built, then the FM-200 system will be in the MCC room and the control room. In such a case, a building fire alarm system will be required, and is shown on the FP drawings. If the Administration building is not being built, then the control room will transfer to the Operation Building, and the FM-200 system will connect to the existing fire alarm system, which is also shown on the those drawings. There is no requirement for a fire alarm specification, because any fire alarm system that is used must be classified for that use, and must be labeled as such according to NFPA. We do not have a preference for a particular type of unit, so the Contractor is free to select any product that meets the regulations and the details shown on the drawings. Specification 21 00 50 and Specification 21 00 51 were revised (and attached) to clarify the interface of the existing and new fire alarm system, to accommodate both Bid Options (Base Bid and Bid Option 1). (For Specification 21 00 50, it is shown in Paragraph 1.2(4), and for Specification 21 00 51 it is shown on Paragraph 1.2.C
37) Question: We need connection detail to the existing effluent blending structure. Note 1 on dwg 1503 talks about removing and salvaging the existing (OGW) bulkhead – most likely there is an existing steel spool piece associated with this bulkhead. if yes, does it have to be removed or the new pipe should be connected to it? Need detail drawing clarifying existing connection. How do you want the new pipe be connected?
Response: Existing connection from Effluent Blending Structure to 84” pipe is 316 SS wall thimble extending 2 feet beyond edge of structure. Contractor to field verify existing condition; and propose mechanical coupling, dresser or equal connection detail to the COR.
38) Question: What is overall length of the 84” pipe?
Response: Approximately 130’.
39) Question: We do not recommend B&S (bell & spigot connection for the 84” line) see page 40 00 51- 24 buried piping installation schedule. We are asking fo r lap welded joints (especially at the 84” Tee with a blind flange).
Response: This pipe has been changed to FRP; the pipe schedule has been revised.
40) Question: 72” RCPP We are asking to allow 72” Welded steel pipe (AWWA C-200) with polyurethane lining (AWWA C-222) & CMC (C-205) as an alternate to the RCPP.
Response: No.
41) Question: Would you allow CML&C pipe per AWWA - C200 as an alternate to DI pipe for the 42”-RAS piping ?
Response: No.
42) Question: Other than the small borrow site identified at the prebid will the International Boundary and Water Commission make available a second borrow site of 50,000 CY +/-?
Response: No.
43) Question: Page 8 Section F.2 it states we have 730 days to complete the work in its entirety and ready for use. In Section 01.75.02-1.3 Final Testing: after a thirty day field/run test constitutes substantially complete. In Section 01.77.00-1.4B states the requirements for Final Acceptance. The question is 730 day construction schedule is for final acceptance or is it substantially complete. Please clarify.
Response: Final acceptance.
44) Question: Seeding the Activated Sludge Tanks: In Section 01.75.01 state the requirements for equipment start up only. If I read this section literally the seeding would be done by others. Was this the intent of this contract or would the contractor be responsible for seeding the activated sludge basins with bugs. If it was not your intent please specify the volume and a procedure for seeding these tanks as it can differ from location to location, depending on waste characteristics. Response: The operations and maintenance contractor will be responsible for seeding of the activated sludge tanks.
45) Question: During the start up and operation phase of this project who will run the plant? We would propose the current operators would run the plant with startup by the contractor with technical assistants from the engineer of record and equipment suppliers.
Response: The plant will be run by an operations and maintenance contractor selected by the Government.
46) Question: Section F.5 of the Solicitation, Offer and Award entitled Actual Damages-Construction indicates that the Contractor shall pay actual damages to the Government for each calendar day of delay until the work is completed or accepted. Our surety is objecting to this provision, as it is not a usual and customary provision for payment due to an Owner in the event of late project completion by a Contractor. Normally, the language designed to compensate the Owner for late completion by a Contractor reads as follows: "Contractor shall be liable for and shall pay to the Owner as fixed and agreed liquidated damages the sum of $x,xxx per day for each calendar day of delay in completion of the Work from the date for Final Completion (as specified herein or in any written extension of time granted by the Owner) until the Engineer has issued a Certificate of Substantial Completion for the Project. The foregoing liquidated damages shall constitute full compensation (for any and all actual, incidental or consequential damages including, without limitation, for public inconvenience, loss of use, loss of revenue, or additional financing to the Owner and public for the completed Work) to the Owner for Contractor's failure to substantially complete the Project before the date for Final Completion. Liquidated damages may be deducted from amounts due to the Contractor". Will the Government consider changing Section F.5 to allow for liquidated damages instead of actual damages?
Response: Liquidated damages are now included.
47) Question: C4 and sheet 3934 shows a dumpster enclosure by option 1 administration building. On sheet A3100 of option 1 shows the dumpster enclosure. The question is whether the dumpster is included in the base bid price or under the Option 1 price?
Response: The dumpster / transformer are included in Bid Option #1; Sheet S3934 is revised and is attached for issue under Amendment 6.
48) Question: In Specification Section 31.05.16, “Crushed Stone and Gravel,” Part 2 – Materials, Equipment, and/or Product, there is a Paragraph E “Permeable Material for Subdrain Filters.” We cannot find any other reference to Subdrain Filters on the plans or in the specifications. Please identify “Subdrain Filters.”
Response: Paragraph E removed from spec; SPECIFICATION 31 05 16 is revised and is attached for issue under Amendment 6.
49) Question: I would like to know which way to proceed with the sound insulation at the interior walls shown on the plans. The interior wall details on A5C call for a three inch sound attenuation blanket which could be fiberglass. The Specs (072101) call out for a mineral fiber fire blanket-which are about three times the cost. If the intent is stc ratings the fiberglass is just as good.
Response: 3-inch sound attenuation blanket is correct; specification has been revised. SPECIFICATION 07 21 01 is attached for issue under Amendment 6.
50) Question: Sheet 337 of 500, E812 Identifies a 225 Amp Automatic Transfer Switch. There is no specification section for an ATS. Please provide the specification for the Automatic Transfer Switch identified on Sheet 337of 500, E812.
Response: SPECIFICATION 26 32 01 Automatic Transfer Switch is attached for issue under Amendment 6.
51) Question: In Spec section 24.20.14 on page 8 it refers to an attachment, Section 25.20.14Attachment.xls but no file exists. Please advise to where we can find this file.
Response: Attachment has been provided in Amendment 6.
52) Question: On drawings M109, M451, M1305, M2212 and M3721 it references a Sodium Hypochlorite storage tank, but it does not specify what kind of tank it is or size. Typically these are fiber glass tanks. In Spec Section 11.82.10 it calls out for two polymer tanks, in the WAS Thickening Facility. Are these Sodium Hypochlorite tanks reference on the above drawings, existing tanks or new tanks. If they are new what type of tank is required, size, capacity, tank diameter, Chemical and Specific gravity.
Response: Existing
53) Question: We are requesting confirmation on the stainless steel aeration piping, specifically the pipe wall thickness. Note ITT/Sanitaire's scope includes the stainless steel droplegs and 'in-basin mains' (which is our manifold pipe). The fine bubble specifications refer to section 40 00 63 for more information on the stainless steel required for the aeration system. Depending on the interpretation of 'exposed piping', Section 40 00 63 calls for either 0.219 or 0.250 inch thick wall for pipes sizes of 6 through 10" (which are the sizes we would be supplying). This wall thickness would be highly unusual for aeration system piping. Industry standard is either SCH 10 or 12 gauge stainless piping, which is more than adequate for our purposes (low pressure air). Note that SCH 10 piping is allowed for this project in the Channel Aeration specification (page 11.82.29-6). We are requesting that we be allowed to bid/supply either SCH 10 or 12 gauge, 304 stainless steel piping for our droplegs and manifolds. It will be more than adequate to handle low-pressure air, it will be more economical than SCH 40, it will be much easier to handle and install, and it will transfer heat better than SCH 40 (thus cooling the air more prior to the transition to PVC.
Response: Specification is correct and unchanged with regard to process air piping wall thickness. Unrelated revisions have been made to Specification Section 11 82 29, and it has been reissued in Amendment 6.
54) Question: In spec section 02.92.00 part 2 item 2.2 D it calls for 9’ high fence existing fence is 10’ high with 1” mesh 11 gauge core wire.
Response: The existing fence is 9 feet high; bid the fence according to the requirements of the plans & specifications.
55) Question: Is there going to be a concrete curb around the new fence?
Response: No.
56) Question: 118204-6.2.2.C – States that pumps shall be 4 stage. Our pumps selected to meet the design conditions are 3 stage for the Main Pumps and 5 stage for the Jockey Pumps. Will this be a problem?
Response: The specification calls for a 4 stage pumping unit; specific design points that should be met; pumps must comply with the specification.
57) Question: 118204-6.2.2.C.1- Main Pumps require Minimum Efficiency at Design Point 2 of 55%, however our pumps will meet 43%. Will this be a problem? Response: Yes, pumps must comply with the specification.
58) Question: 118204-7.2.3.D and E. The spec calls for a “discharge bowl” with “two symmetrically arranged diffuser vanes” and a suction bell “free of bearing hubs and supporting vanes to allow unobstructed flow to the impeller”. These requirements appear to be for Solids Handling Pumps. This could easily be a carry over from another specification, please clarify.
Response: The specification is correct; please comply with the specification.
59) Question: 118204-9.3.2.B.3 States that “Each pump and variable frequency drive shall be tested…” Can we offer to performance test with our factory VFD? Per the specification, the Contractor is responsible for supplying the VFDs so if we can’t use ours we will need the contractor to ship each of the VFDs to our factory along with a VFD tech, at his expense, for the tests. This requirement may increase the risk of freight damage to the VFDs during transit to multiple destinations prior to installation at the jobsite. This will also impact the pump delivery schedule as they are then tied directly to the VFD production schedule. Please clarify.
Response: The specification is correct; the requirement shown in/on the first line of that same paragraph says, “Each complete pumping unit shall be factory tested”.
60) Question: Coating specification 099100 – This specification is vague in regards to pumps and whether field applied or not. It does state in 3.2C “Equipment that would be damaged by sandblasting shall receive the shop coatings and finish coatings.” We plan to offer our standard coating. Please clarify the intent of the specification.
Response: The specification is clear; please review paragraph 2.5 of the specification.
61) Within Section L of the Solicitation there are two sections L.8 that are similar. The first section L.8 is the “Qualification of Bidders” and the second is the “Best Value Evaluation Criteria” a) Do both sections L8 apply? Ie is it the intent that the first section L.8 be completed (i.e a Statement of Construction Experience and Financial Condition) and submitted in a “separately sealed envelope” to be “returned unopened unless necessary” in addition to summary of qualifications for the Best Value Evaluation Criteria (which refers to attachment J-4 Summary of Qualifications). B) If so we are unable to find Page D-2 in regard to the Statement of Equipment referenced in the L.8 Qualifications of Bidders – IBWC (APR 1989). The page numbers are numeric and Section D pertains to Package and Marking. What section of the Solicitation can this information be found?
Response: The Qualification of Bidders must be completed in its entirety and will be the information used to evaluate the Bidder’s under the Best Value Evaluation Criteria. The intent is not to have the information submitted in a separately sealed envelope but as part of a bidder’s overall proposal/bid package. Section D pertains to the Attachment J-4 “Summary of Qualifications Form” and not the draft contract.
62) Question: On sheet M450 of the contract drawings, Construction Interface Note 1 refers to the 72” PE line at the Primary Effluent Bypass Structure and states, “Contractor shall remove existing (OGW) 72” Blind Flange and install 72” primary effluent gate (PEG).” However the response to RFI #7 references the 72” PE line and states that “A blind flange is available for the closure of the 72” pipe at the Primary Effluent Bypass Structure.” Please confirm that the Blind Flange has been removed from the 72” PE line inside of the PEBS?
Response: Blind flange has been removed from the 72” line.
63) Question: The plans call out for 2 types of window coverings: 4 different styles. Please clarify that the architect is looking for aluminum vanes, not PVC vanes for the vertical blinds only. Aluminum is more costly and offers fewer color choices. Response: We could not find any conflict with the plans; please bid Aluminum vanes for the vertical blinds in accordance with Dwg A3101 under office accessory key #1, 2 and 3 notes.
64) Question: I would like to get some clarification on types J, P, S, V, W, and A1. What types of fixtures will be required for these types? Please advise as soon as you have a chance.
Response: The lighting fixtures are described in detail on the lighting fixture schedule on drawing E3.
65) Question: Please provide a specification and/or detail for the temporary security fence.
Response: It is already included in the plans & specifications; Specification 02 02 00 Security, Part 1, Section 1.2 C states that, “If fencing or barriers are breached or removed for purposes of construction, the Contractor shall provide and maintain temporary security fencing equal to the existing.” The Contractor must propose security measures, including fencing to the COR. Additionally, Section 1.2 B states “The Contractor shall repair all damage to property of Government and others arising from failure to provide adequate security.”