B.08 RFP Att 15 - Price Schedule.docx

DOCX document 35 KB Posted

Attached to
IAF-25-0004 Ndava Primary School Construction
Solicitation number
IAF-25-0004
Issued by

About this file

The document is a Price Schedule for a design-build contract for the Ndava Primary School project in Oyem, Gabon. The price schedule outlines base and option items for constructing school facilities, including design and construction of school buildings, latrine facilities, a rainwater catchment system, and a perimeter fence. The base items include designing and constructing school buildings and a latrine facility, with option items for a rainwater catchment system and perimeter fence. The project is associated with a pre-solicitation announcement (Solicitation Number: IAF-25-0004) by the US Army Corps of Engineers (USACE) Europe District, with an estimated contract value between $500,000 and $1,000,000. The contract is a firm-fixed-price design-build construction contract with an anticipated duration of one to two calendar years, targeting increased educational access in the local Gabon population by constructing a new primary school facility with enhanced infrastructure.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRICE SCHEDULE

GAB NDAVA PRIMARY SCHOOL

OYEM, GABON

23-September-2024

PRICE SCHEDULE

IMPROVE WATER SUPPLY FOR TSAGHKABER & ARVASHOGH COMMUNITIES

TSAGHKABER & ARVASHOGH, ARMENIA

29-NOV-22

Offerors shall provide pricing for all base and option items.

The following items include providing all labor, materials, equipment, and services necessary to complete the design and construction of the work identified in the attached Plans, Specifications, Statement of Work (SOW), Request for Proposal and Base Contract. It also includes preparation of all documents, submittals, and schedules; inspections; and compliance with all technical, quality control, administrative, and safety requirements. All work shall be performed in accordance with these documents. Refer to Specification Section 01 22 00 Price and Payment Procedures for additional description of the work associated with each of the items.

Period of Performance: Refer to clause COMMENCEMENT PROSECUTION AND EXECUTION OF WORK (52.211-10) in the Request for Proposal for the period of performance for all base and option items.

Liquidated Damages: Refer to clause LIQUIDATED DAMAGES-CONSTRUCTION (52.211-12) in the for Proposal for the liquidated damages for all base and option items.

Option Items: The Government reserves the right to award the options up to 90 calendar days from contact award. See Section 01 22 00 for additional information regarding the award of options.

Item No.
Title
Quantity
Unit
Unit Price
Amount

BASE ITEMS

0001
Design and Construct School Buildings
1
Job
$
$
0002
Design and Construct Latrine Facility
1
Job
$
$
Total of Base Items 0001 – 0002
$

OPTION ITEMS

0003
Option 1, Design and Construct Rainwater Catchment System
1
Job
$
$
0004
Option 2, Design and Construct Perimeter Fence
1
Job
$
$
Total of Option Item 0003 – 0004
$
Total of all Base and Option Items
$

EXTENSIONS: All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.

-- END OF PROPOSAL SCHEDULE --