B.08 RFP_Att 2 Conceptual Site Plan.pdf

PDF 938 KB Posted

Attached to
IAF-25-0004 Ndava Primary School Construction
Solicitation number
IAF-25-0004
Issued by

About this file

This is a conceptual site plan drawing from the US Army Corps of Engineers Europe District for the NDAVA School construction project in Oyem, Gabon. The drawing shows the proposed layout for a new school facility including two main school buildings connected by a sloping concrete pad and ABA ramp.

The site plan details several key infrastructure elements: a 5000L rainwater tank system with downspouts and overflow drainage, a VIP latrine, perimeter fencing with an access gate, an aggregate access road and parking lot, and a proposed electrical feed (noted as "to be done by others"). The drawing includes a concrete apron around the buildings and connects to an existing dirt road. The plan is marked as being for reference only, with a note that the contractor must verify existing conditions and provide a design meeting all codes and Statement of Work requirements. The drawing is labeled as Attachment #2 and includes a scale in meters with compass orientation.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET OF

SHEET ID

U S

AR

M

Y C

O R

PS

O

F

EN

G

IN

EE

R

S

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

AN

SI

'D

FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

1 2 3 4 5

D

C

B

A

ATT. #2

C O

N C

EP

TU

AL

S

IT

E

PL

AN

EU

R

O

PE

D

IS

TR

IC

T W

IE

SB

AD

EN

, G

ER

M

AN

Y

1 CONCEPTUAL SITE PLAN

SCALE IN METERS

0 10 20

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

N D

AV

A

SC

H

O O

L, O

YE

M

, G

AB

O N

NOTE:

DRAWINGS PROVIDED FOR REFERENCE ONLY. CONTRACTOR IS TO VERIFY ALL EXISTING

CONDITIONS AND PROVIDE A DESIGN THAT MEETS CODES AND REQUIREMENTS OF THE SOW.

4 PROPOSED 5000L RAIN WATER TANK CONNECTED TO DOWNSPOUTS

1 PROPOSED SCHOOL BUILDING

2 PROPOSED ABA RAMP

3 PROPOSED SLOPING CONCRETE PAD

NOTE

PROPOSED TANK OVERFLOW PIPE DRAINING AWAY FROM BUILDINGS

9 PROPOSED VIP LATRINE

6 PROPOSED FENCE

7 PROPOSED ACCESS GATE

8 PROPOSED AGGREGATE ACCESS ROAD

10 PROPOSED ELECTRICAL FEED (TO BE DONE BY OTHERS)

11 PROPOSED CONCRETE APRON

1 1

2 23

4 5

12 PROPOSED AGGREGATE PARKING LOT

EXISTING DIRT ROAD13

Sheets and Views
Conceptual Site Plan

File details come from the government source that posted it. Updated .