B.08 RFP_Att 2 Conceptual Site Plan.pdf
PDF 938 KB Posted
- Attached to
- IAF-25-0004 Ndava Primary School Construction
- Solicitation number
- IAF-25-0004
- Issued by
-
Department of the Army European Command
About this file
This is a conceptual site plan drawing from the US Army Corps of Engineers Europe District for the NDAVA School construction project in Oyem, Gabon. The drawing shows the proposed layout for a new school facility including two main school buildings connected by a sloping concrete pad and ABA ramp.
The site plan details several key infrastructure elements: a 5000L rainwater tank system with downspouts and overflow drainage, a VIP latrine, perimeter fencing with an access gate, an aggregate access road and parking lot, and a proposed electrical feed (noted as "to be done by others"). The drawing includes a concrete apron around the buildings and connects to an existing dirt road. The plan is marked as being for reference only, with a note that the contractor must verify existing conditions and provide a design meeting all codes and Statement of Work requirements. The drawing is labeled as Attachment #2 and includes a scale in meters with compass orientation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET OF
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
FI
LE
N
AM
E:
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N U
M
BE
R
1 2 3 4 5
D
C
B
A
ATT. #2
C O
N C
EP
TU
AL
S
IT
E
PL
AN
EU
R
O
PE
D
IS
TR
IC
T W
IE
SB
AD
EN
, G
ER
M
AN
Y
1 CONCEPTUAL SITE PLAN
SCALE IN METERS
0 10 20
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
N D
AV
A
SC
H
O O
L, O
YE
M
, G
AB
O N
NOTE:
DRAWINGS PROVIDED FOR REFERENCE ONLY. CONTRACTOR IS TO VERIFY ALL EXISTING
CONDITIONS AND PROVIDE A DESIGN THAT MEETS CODES AND REQUIREMENTS OF THE SOW.
4 PROPOSED 5000L RAIN WATER TANK CONNECTED TO DOWNSPOUTS
1 PROPOSED SCHOOL BUILDING
2 PROPOSED ABA RAMP
3 PROPOSED SLOPING CONCRETE PAD
NOTE
PROPOSED TANK OVERFLOW PIPE DRAINING AWAY FROM BUILDINGS
9 PROPOSED VIP LATRINE
6 PROPOSED FENCE
7 PROPOSED ACCESS GATE
8 PROPOSED AGGREGATE ACCESS ROAD
10 PROPOSED ELECTRICAL FEED (TO BE DONE BY OTHERS)
11 PROPOSED CONCRETE APRON
1 1
2 23
4 5
12 PROPOSED AGGREGATE PARKING LOT
EXISTING DIRT ROAD13
| Sheets and Views |
| Conceptual Site Plan |
File details come from the government source that posted it. Updated .