IA02 Statement of Work - Barracks Wifi rev 17 Jan 2025.pdf
PDF 3 MB Posted
- Attached to
- Barracks Wifi
- Solicitation number
- W9124D25R0004
About this file
This Statement of Work outlines requirements for Wi-Fi and internet services across 210 rooms in 5 buildings at Fort Knox supporting the Command Assessment Program (CAP) for the U.S. Human Resources Command. The contractor must provide temporary installation of individual access points in 42 rooms per building, delivering 200MBPS bandwidth per building using existing coaxial infrastructure, with no rewiring permitted. Service delivery is required for 3 months during the CAP assessment period.
The contract includes a base period from September 10, 2025 to September 9, 2026, with three one-year option periods through September 9, 2029. Key requirements include 24/7 onsite coverage with 4-hour response time, monitoring for illegal activity, automatic software updates, and comprehensive support services. The contractor must provide equipment serial numbers, login credentials, and maintain all hardware/software without additional travel costs. Security requirements include completion of Level 1 Antiterrorism Awareness Training, iWATCH training, and OPSEC training within specified timeframes. The five buildings are located at Old Ironsides and 12th Armored Division Ave, ranging from 42,130 to 44,543 square feet each.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAP WI-FI SERVICES
STATEMENT OF WORK REQUIRED
PART 1
GENERAL INFORMATION
1. GENERAL: This is a non-personal services contract to provide for Wi-Fi and internet services for 210 rooms/installations across the 5 buildings in support of the Command Assessment Program (CAP) in support of the United States Human Resources Command (HRC).
Specific Tasks include but not limited to:
1.) Provide managed Internet services and Wi-Fi services across 5 buildings.
2.) Period of Performance: The Period of Performance is from 10 September 2025 to 9 September 2026 for base year with three options of period of performance from 10 September 2026 to 9 September 2027.
10 September 2027 to 9 September 2028.
10 September 2028 to 9 September 2029.
3.) Provide full service for 3 months. The one-year periods are provided for flexibility in the CAP scheduling and coordination for contractor install/clean up each year. CAP is a 3-month assessment program. CAP does not own the buildings, therefore install must be temporary. The contractor must arrive prior to CAP, do a temporary set up, and then remove their hardware after CAP ends.
4.) Provide Wi-Fi Internet connectivity across 210 rooms with individual access points, 42 rooms in each of 5 buildings (Offices not required), room numbers as listed below for all 5 buildings.
DRAFT
5.) Each room will have their own access point (AP) or router. At start of service contractor will providing master list of serial numbers, log-ins and passwords by room number and building, providing updates as equipment is changed out.
6.) Provide Internet speeds and bandwidth of 200MBPS per building.
7.) Existing infrastructure owner, U.S. Government, has co-axial cables for cable modem solutions. Rewiring, or re-cabling is not allowable.
8.) Cover all necessary replacement parts and associated labor without additional travel cost.
9.) Cover all software, diagnostic, licenses and telephone support.
10.) Cover automatic software updates to include any fixes or newly released versions 11.) Onsite coverage up to 24 hours a day, 7 days a week 12.) Short term extended coverage for special project needs 13.) Weekend and holiday coverage for routine recurring needs 14.) Guaranteed response time within 4 hours to ensure critical availability 15.) Monitor for illegal activity (file sharing, other criminal actions)
1.1 Building Breakdown – All buildings listed for this requirement (Listed by building number then address):
1. Building 1482 1272 Old Ironsides - 44,127sq. ft.
2. Building 1483 1274 Old Ironsides - 44,127sq. ft.
3. Building 1484 1276 Old Ironsides - 42,130 sq. ft.
4. Building 1485 431 12th Armored Division Ave - 42,130 sq. ft.
5. Building 1486 463 12th Armored Division Ave – 44, 543 sq. ft.
1.2 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform The contractor shall perform to the standards in this contract.
PART 2
SECURITY
Anti-Terrorism and Operational Security Training:
Level 1 Antiterrorism Awareness Training. All contractor employees, including subcontractor employees, requiring access to Fort Knox and its facilities, shall complete Antiterrorism Level I Awareness Training within 30 calendar days after contract start date. AT Level I awareness training is available at https://jko.jten.mil/courses/AT-level1/launch.html .
iWATCH Training. All contractor employees, including subcontractor employees, shall view an iWATCH program video. This video will inform employees of the types of suspicious behavior to watch for and instruct employees to report suspicious activity. This training shall be completed within 30 calendar days of contract award and within seven calendar days of new employees' commencing work. The iWatch training video is available at https://www.youtube.com/watch?v=39snOUYXdYY
Level 1 Operations Security (OPSEC) Training/OPSEC Awareness Training. All Contractors performing services under this contract are required to complete OPSEC training located at https://securityawareness.usalearning.gov/opsec/index.htm within 30 days of contract being awarded and within seven calendar days after the start of work
Access, General Protection, and Security Policy and Procedures. This standard language text is for contractor employees with and area of performance within an Army controlled installation, facility, or area. Contractor and all associated subcontractor employees shall comply with applicable installation, facility, and area commander installation and/or facility access and local security policies and procedures (provided by government representatives). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office. Director of Emergency Services, or Security Office, Contractor workforce must comply with all personnel identify verification requirements as directed by
DRAFT
https://jko.jten.mil/courses/AT-level1/launch.html https://jko.jten.mil/courses/AT-level1/launch.html https://www.youtube.com/watch?v=39snOUYXdYY https://securityawareness.usalearning.gov/opsec/index.htm
DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
Building 1482
Building 1483
Building 1484
Building 1485
Building 1486
Building 1482
Building 1483
Building 1484
Building 1485
Building 1486
File details come from the government source that posted it. Updated .