I _ KSU Transportation Study_2025_10_2.pdf
PDF 12 MB Posted
- Solicitation number
- PE-54300-RFQC-2026-000000111
- Issued by
- Cobb County, Georgia
About this file
This is a Request for Qualifications (RFQ) from the Board of Regents of the University System of Georgia on behalf of Kennesaw State University (KSU) for professional consultant services to develop Sports & Recreation and Athletics Facilities Master Plans for Project No. 555-25-341. The project encompasses KSU's main campus in Kennesaw and satellite campus in Marietta, Georgia. KSU is seeking qualified firms to provide comprehensive master planning services that will guide the development and improvement of athletic and recreational facilities across both locations. The RFQ process invites statements of qualifications from interested firms, with the most qualified respondents to be selected for interviews. KSU reserves the right to reject any or all submissions and waive technicalities at its discretion. Interested firms must submit questions regarding the RFQ by the deadline specified in the Schedule of Events, with inquiries directed to Theresa Neylon, Senior Campus Planner, at tneylon@kennesaw.edu.
The RFQ document provided does not contain specific information regarding pricing terms, contract duration, renewal options, funding sources, or award amounts. The file primarily consists of the transportation study findings and recommendations that provide context for KSU's broader campus planning initiatives. Prospective consultants should expect to coordinate their master planning efforts with the university's comprehensive transportation plan, which outlines multi-year improvements across immediate, short-term, medium-term, and long-term timelines (one to ten-plus years). The master plan will need to align with KSU's strategic priorities including campus connectivity, traffic and congestion mitigation, and support for campus district development across multiple locations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Exhibit E _ Contractor Affidavit.docx | DOCX document | |
| H _ KSU Sports and Recreation EPR Report.pdf | ||
| G _ KSU_campus maps.pdf | ||
| Exhibit F _ Proposer_s Disclosure Statement.doc | DOC document | |
| Exhibit B _ Certificate of Insurance and Mino.docx | DOCX document | |
| I _ KSU Transportation Study_2025_10_1.pdf | ||
| Exhibit A _ Certification Form.docx | DOCX document | |
| Exhibit C _ Project Team Composition.docx | DOCX document | |
| Exhibit D _ Design Professional Fee Proposal .doc | DOC document | |
| 555_25_341_S_Rec Athletics MP_PC RFQ_RFP.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2035 Build Alternative 2 AM Approach LOS
Figure X
Page X
KSU Transportation Plan: Frey Rd at Chastain Rd
D
D
D
D
D
Alternative 2 PM Approach LOS
Figure X
Page X
KSU Transportation Plan: Frey Rd at Chastain Rd
D
D
D E
E
Alternative 2
Queue Length 95th Percentile
Figure X
Page X
KSU Transportation Plan: Frey Rd at Chastain Rd
55 ft
140 ft 280 ft
100 ft
190 ft
0 ft 235* ft390* ft
540 ft585 ft 0 ft
5 ft
110 ft
510 ft
35 ft
100* ft
50 ft
785* ft
130 ft170 ft75 ft
410* ft220 ft140 ft
LEGEND
AM 95th Percentile Queue Length (ft)
PM 95th Percentile Queue Length (ft)
XX
XX
* 95th percentile volume exceeds capacity
2035 Build AM Lane Group LOS
Figure X
Page X
KSU Transportation Plan: Frey Rd at Skip Spann Connector
LEGEND
2035 Build PM Lane Group LOS
Figure X
Page X
KSU Transportation Plan: Frey Rd at Skip Spann Connector
LEGEND
Queue Length 95th Percentile
Figure X
Page X
KSU Transportation Plan: Frey Rd at Skip Spann Connector
35 ft
20 ft
20 ft
45 ft 45 ft
5 ft
5 ft
35 ft
150 ft145 ft
50 ft
55 ft
120 ft120 ft
40 ft
40 ft
LEGEND
AM 95th Percentile Queue Length (ft)
PM 95th Percentile Queue Length (ft)
APPENDIX C
Recommendations Presentation
Transportation Plan - Recommendations Presentation
October 1, 2025
Key Needs from the Baseline Assessment
Improve Transit
Improve Operations1
Dedicate Infrastructure2
3 Expand Service
Encourage Bike/Ped Modes
Build Safer Infrastructure4
Increase Connectivity 5
Improve Traffic/Parking
Improve Campus Gateways8
Advance Parking Permit Allocation Processes
Support EV/ Fleet needs10
Improve Game Day Experience 11
Influence Land Use
Enhance Access to Destinations6
Support Student Housing Growth7
Today’s Priorities for Tomorrow’s Campus
Creating a safety-first campus
Connecting campus districts
Mitigating traffic and congestion
Recommendations
Overarching Recommendations
Transit
Traffic (SOV)/ Parking
Micromobility (Bike/Pedestrian)
The Welcome Experience
Provide reliable and convenient transit service to and between campus districts
• Streamline existing service, encouraging walking to destinations from the transit stops.
• Expand service to nearby housing and campus districts.
Encourage bike and pedestrian modes as a viable method of transportation
• Enhance existing bike/pedestrian connectivity within the campus.
• Prioritize safe bike and pedestrian connections between the campus districts.
Manage parking demand and mitigate traffic congestion within the campus
• Balance parking demand across the existing supply and add limited new parking.
• Enhance vehicular connectivity entering/exiting campus while prioritizing alternative modes for travel within campus.
• Support EV and fleet needs as the campus grows.
Increase KSU’s presence in the community
• Leverage signage and wayfinding to enhance campus gateways.
• Prioritize the visitor experience when entering/exiting campus.
Timeline
Immediate Term
• 1 – 2 years
Short Term
• 2 – 5 years
Medium Term
• 5 – 10 years
Long Term
• 10+ years
Goal: Provide reliable and convenient transit service to and between campus districts
Key Strategy Action Item Number Action Item Immediate Short Term Medium Term Long Term Cost
Streamline existing service
I.1 Remove redundant stops $
I.2 Transition to hub-and-spoke model with hubs at each district ($)
I.3 Rename existing district connector routes $
I.4 Launch on-demand transit from 500 Chastain (Mon. – Fri. 8 am – 5 pm) $$
I.5 Evaluate cost of apartment routes and increase fees as needed ($)
M.2 Convert Kennesaw State University (KSU) Road to bus-only $$
L.1 Relocate transit hub to East District center N/A
L.2 Adjust routes as new infrastructure (e.g., I-75 bridge) comes online $
Expand service to nearby housing and campus districts
S.1 Expand apartment shuttle routes and funding Net $0
S.2 Formalize transit hub at the Arts District N/A
S.3 Consider fixed route service between Main Campus and 500 Chastain Net $0
M.1 Formalize transit hubs at Main Campus, Town Pointe, and Marietta Campus $$$
M.3 Add district connector linking Main Campus, Arts District, Town Pointe, and East District $$
($) = earned revenue/cost savings N/A = assumed to be incorporated into a larger project $0 = KSU supports partner efforts, but no financial investment expected Net $0 = Expenses and revenue/cost savings should balance tneylon Rectangle tneylon Rectangle tneylon Rectangle tneylon Rectangle
Key Strategy Action Item Number Action Item Immediate Short Term Medium Term Long Term Cost
Streamline existing service
I.1 Remove redundant stops $
I.2 Transition to hub-and-spoke model with hubs at each district ($)
I.3 Rename existing district connector routes $
I.4 Launch on-demand transit from 500 Chastain (Mon. – Fri. 8 am – 5 pm) $$
I.5 Evaluate cost of apartment routes and increase fees as needed ($)
M.2 Convert Kennesaw State University (KSU) Road to bus-only $$
L.1 Relocate transit hub to East District center N/A
L.2 Adjust routes as new infrastructure (e.g., I-75 bridge) comes online $
Expand service to nearby housing and campus districts
S.1 Expand apartment shuttle routes and funding Net $0
S.2 Formalize transit hub at the Arts District N/A
S.3 Consider fixed route service between Main Campus and 500 Chastain Net $0
M.1 Formalize transit hubs at Main Campus, Town Pointe, and Marietta Campus $$$
M.3 Add district connector linking Main Campus, Arts District, Town Pointe, and East District $$
($) = earned revenue/cost savings N/A = assumed to be incorporated into a larger project $0 = KSU supports partner efforts, but no financial investment expected Net $0 = Expenses and revenue/cost savings should balance
Bike/Pedestrian Goal: Encourage bike and pedestrian modes as a viable method of transportation
Key Strategy Action Item Number Action Item Immediate Short Term Medium Term Long Term Cost
Enhance existing bike/pedestrian connectivity within the campus
I.6 Install a pedestrian hybrid beacon and midblock crossing at Frey Road and
Hopkins Drive. Add sidewalk connecting Frey Road and Hopkins Drive midblock crossings
I.8 Construct sidewalk along the south side of Campus Loop Road from ARC parking to Big Shanty Road $$
S.5 Connect existing pedestrian infrastructure with new surface lot west of
Campus Loop Road. Add additional crosswalks to support access to resident halls
N/A
M.4 Close Marietta Street and Kennesaw State University Road (north of the student center) to vehicles to create bike/pedestrian promenades $$
Prioritize safe bike and pedestrian connections between the campus districts
I.7 Formalize Busbee Drive @ George Busbee Parkway intersection with crosswalks and traffic signal $0
S.4 Support TCCID efforts for Chastain Road improvements and programmed trail infrastructure projects $0
M.5 Add a pedestrian connection between Marietta Drive to Campus Loop Road and the Arts District $
M.6 Support CobbLinc efforts for a cycle track along Busbee Drive $0
L.3 Construct a grade separated bike/pedestrian path underneath Chastain Road that connect Town Pointe and Main Campus via Campus Loop Road $$$$
($) = earned revenue/cost savings N/A = assumed to be incorporated into a larger project $0 = KSU supports partner efforts, but no financial investment expected Net $0 = Expenses and revenue/cost savings should balance tneylon Rectangle tneylon Rectangle tneylon Rectangle tneylon Rectangle tneylon Rectangle tneylon Rectangle
Bike/Pedestrian
Key Strategy Action Item Number Action Item Immediate Short Term Medium Term Long Term Cost
Enhance existing bike/pedestrian connectivity within the campus
I.6 Install a pedestrian hybrid beacon and midblock crossing at Frey Road and Hopkins Drive. Add sidewalk connecting Frey Road and Hopkins
Drive midblock crossings
I.8 Construct sidewalk along the south side of Campus Loop Road from ARC parking to Big Shanty Road $$
S.5 Connect existing pedestrian infrastructure with new surface lot west of
Campus Loop Road. Add additional crosswalks to support access to resident halls
N/A
M.4 Close Marietta Street and Kennesaw State University Road to vehicles (north of the student center) to create bike/pedestrian promenades $$
Prioritize safe bike and pedestrian connections between the campus districts
I.7 Formalize Busbee Drive @ George Busbee Parkway intersection with crosswalks and traffic signal $0
S.4 Support TCCID efforts for Chastain Road improvements and programmed trail infrastructure projects $0
M.5 Add a pedestrian connection between Marietta Drive to Campus Loop Road and the Arts District $
M.6 Support CobbLinc efforts for a cycle track along Busbee Drive $0
L.3 Construct a grade separated bike/pedestrian path underneath Chastain Road that connect Town Pointe and Main Campus via Campus Loop Road $$$$
($) = earned revenue/cost savings N/A = assumed to be incorporated into a larger project $0 = KSU supports partner efforts, but no financial investment expected Net $0 = Expenses and revenue/cost savings should balance
Traffic (SOV)/Parking Goal: Manage parking demand and mitigate traffic congestion within the campus
Key Strategy Action Item Number Action Item Immediate Short Term Medium Term Long Term Cost
Balance parking demand across the existing supply and add limited new parking
I.9 Switch Faculty and Staff permits to facility-specific in the core of campus, prioritizing those along KSU Road ($)
S.6 Add a surface lot on the west side of Campus Loop Road $$$
S.8 Remove parking on Marietta Drive $
M.8 Remove Lot B for Main campus transit hub and potential new buildings N/A
L.6 Continue to evaluate KSU and East District parking demand. Add parking garages as needed $$$
Enhance vehicular connectivity entering/exiting campus while prioritizing alternative modes for travel within campus
I.10 Design and construct Frey Road Road Diet with Skip Spann Roundabout $$$$
S.7 Construct a new east – west roadway connection between Campus Loop Road and Frey Road $$$$
S.9 Implement intersection improvements at Campus Loop Road @ Big Shanty Road $$$
S.10 Build out street grid in East District in conjunction with new developments N/A
M.7 Evaluate new east-west connection for roundabouts at KSU Road and Frey Road $$$
M.9 Add new driveway from ARC South surface parking to Campus Loop Road $
M.10 Continue to build out East District street grid N/A
L.4 Partner with Cobb DOT and GDOT to construct a bridge over I-75 connecting East District to Gutenberg Drive $$$$
L.5 Partner with Cobb DOT to add new roadway connections surrounding East District to increase circulation and reduce congestion on gamedays $$$$
Support EV and fleet needs as the campus grows
I.11 Fix all non-operational EV chargers. Evaluate existing and future EV demand $
I.12 Determine a permanent Fleet and Transit vehicle storage location N/A
($) = earned revenue/cost savings N/A = assumed to be incorporated into a larger project $0 = KSU supports partner efforts, but no financial investment expected Net $0 = Expenses and revenue/cost savings should balance
Traffic (SOV)/Parking
Key Strategy Action Item Number Action Item Immediate Short Term Medium Term Long Term Cost
Balance parking demand across the existing supply and add limited new parking
I.9 Switch Faculty and Staff permits to facility-specific in the core of campus, prioritizing those along KSU Road ($)
S.6 Add a surface lot on the west side of Campus Loop Road $$$
S.8 Remove parking on Marietta Drive $
M.8 Remove Lot B for Main campus transit hub and potential new buildings N/A
L.6 Continue to evaluate KSU and East District parking demand. Add parking garages as needed $$$
Enhance vehicular connectivity entering/exiting campus while prioritizing alternative modes for travel within campus
I.10 Design and construct Frey Road Road Diet with Skip Spann Roundabout $$$$
S.7 Construct a new east – west roadway connection between Campus Loop Road and Frey Road $$$$
S.9 Implement intersection improvements at Campus Loop Road @ Big Shanty Road $$$
S.10 Build out street grid in East District in conjunction with new developments N/A
M.7 Evaluate new east-west connection for roundabouts at KSU Road and Frey Road $$$
M.9 Add new driveway from ARC South surface parking to Campus Loop Road $
M.10 Continue to build out East District street grid N/A
L.4 Partner with Cobb DOT and GDOT to construct a bridge over I-75 connecting East District to Gutenberg Drive $$$$
L.5 Partner with Cobb DOT to add new roadway connections surrounding East District to increase circulation and reduce congestion on gamedays $$$$
Support EV and fleet needs as the campus grows
I.11 Fix all non-operational EV chargers. Evaluate existing and future EV demand $
I.12 Determine a permanent Fleet and Transit vehicle storage location N/A
($) = earned revenue/cost savings N/A = assumed to be incorporated into a larger project $0 = KSU supports partner efforts, but no financial investment expected Net $0 = Expenses and revenue/cost savings should balance
The Welcome Experience Goal: Increase KSU’s presence in the community
Key Strategy Action Item Number Action Item Immediate Short Term Medium Term Long Term Cost
Leverage signage and wayfinding to enhance campus gateways.
I.13 Add KSU branding on medians along Frey Road N/A
I.15 Add KSU branding for the Arts District with wayfinding for parking at Town Point. Consider developing a comprehensive wayfinding plan N/A
M.11 Use new roundabouts at KSU Road and Frey Road as new “front doors” $$
Prioritize the visitor experience when entering/exiting campus
I.14 Conduct further analyses surrounding event day circulation, specifically regarding the East District. Develop an operational playbook based on findings.
I.16 Consider purchase of parcel adjacent to Big Shanty Road @ Campus Loop Road $$
($) = earned revenue/cost savings N/A = assumed to be incorporated into a larger project $0 = KSU supports partner efforts, but no financial investment expected Net $0 = Expenses and revenue/cost savings should balance
The Welcome Experience Goal: Increase KSU’s presence in the community
Key Strategy Action Item Number Action Item Immediate Short Term Medium Term Long Term Cost
Leverage signage and wayfinding to enhance campus gateways.
I.13 Add KSU branding on medians along Frey Road N/A
I.15 Add KSU branding for the Arts District with wayfinding for parking at Town Point. Consider developing a comprehensive wayfinding plan N/A
M.11 Use new roundabouts at KSU Road and Frey Road as new “front doors” $$
Prioritize the visitor experience when entering/exiting campus
I.14 Conduct further analyses surrounding event day circulation, specifically regarding the East District. Develop an operational playbook based on findings.
I.16 Consider purchase of parcel adjacent to Big Shanty Road @ Campus Loop Road $$
($) = earned revenue/cost savings N/A = assumed to be incorporated into a larger project $0 = KSU supports partner efforts, but no financial investment expected Net $0 = Expenses and revenue/cost savings should balance
Supportive Policies and Initiatives
Transit Policies
• Transit Service Optimization Each year, evaluate route efficiency and stop usage to streamline service and reduce redundancy.
• Transit Access Equity Ensure transit routes serve all major student housing areas within a defined radius (e.g., 3 miles), with priority given to underserved or disconnected (via bike/pedestrian infrastructure) locations.
• On-Demand Transit Pilot Program Launch and evaluate flexible transit during off-peak hours or for remote locations, starting with the 500 Chastain on-demand service.
• Transit Fee Adjustment As KSU continues to serve more apartments, implement a scalable fee structure for apartment complexes based on distance and ridership demand. Ensure apartment fees cover the entire cost of service.
• Transit Communication & Branding Standardize route naming and signage to improve clarity and promote district identity.
Bike/Pedestrian Policies
• Campus Connectivity Enhancement Require all new KSU developments to include bike/pedestrian infrastructure that connects to existing networks.
• Safe Crossings Initiative Prioritize the installation of midblock crossings, pedestrian beacons, and traffic calming measures near high-traffic areas.
• Bike Infrastructure Investment Policy Allocate annual funding for bike lane improvements/maintenance, additional bike share, and end-of-trip facilities (e.g., racks, showers, lockers).
• Walkability Standards for Campus Design Develop and adopt design guidelines that prioritize pedestrian pathways and minimize vehicle-pedestrian conflicts.
• Partnership with Local Agencies Collaborate with Cobb DOT and TCCID to support regional trail and cycle track projects in and around campus.
tneylon Rectangle tneylon Rectangle tneylon Rectangle
Traffic (SOV)/Parking Policies
• Permit Zoning Policy Transition to facility-specific permits with tiered pricing based on proximity to campus core. As new parking comes online, permit those as facility-specific locations.
• Parking Demand Management Each semester, conduct parking utilization studies by lot and adjust demand through permit pricing structure and alternative commute benefits. Aim for the utilization of each lot to be at/above 85% occupied before bringing more parking online.
• EV Infrastructure Expansion Conduct an EV demand study to expand EV charging stations based on usage data and fleet conversion plans. Ensure operability of existing EV chargers.
• Fleet Co-Location Consolidate fleet and transit vehicle storage in areas with sufficient electrical capacity and operational efficiency.
• Complete Streets Development Require all new KSU (including the districts) roadways to include pedestrian and bike facilities and support multimodal access.
The Welcome Experience Policies
• Gateway Branding Standardization Design and install consistent KSU signage and wayfinding at all major campus entrances, including the districts.
• Event Day Operations Playbook Develop and maintain a playbook for traffic, signage, and staffing during major events.
• District Identity Development Integrate branding and wayfinding standards into district development plans (e.g., Arts District, Town Point).
• Land Acquisition for Gateway Enhancement Identify and evaluate parcels for strategic acquisition to improve campus visibility and access.
• Roundabout Branding Design Standards Incorporate public art, signage, and landscaping into roundabout designs to serve as campus “front doors.”
tneylon Rectangle tneylon Rectangle tneylon Rectangle
Action Items by Timeline:
Immediate Term (1 – 2 years)
• Remove redundant stops
• Transition to a hub and spoke model with hubs at each district
• Rename existing district connector routes
• Provide on-demand transit from 500 Chastain (Mon. – Fri.
8 am – 5 pm)
• Evaluate cost of apartment routes and increase fees as needed
Bike and Pedestrian
• Install a pedestrian hybrid beacon and midblock crossing at Frey Road at the East Economy Lot
• Add midblock crossing at Hopkins Drive, in front of East Deck, in conjunction with the Frey Road midblock crossing
• Add sidewalk connecting Frey Road and Hopkins Drive crossings
• Formalize Busbee Drive @ George Busbee Parkway intersection with crosswalks and traffic signal
• Construct sidewalk along the south side of Campus Loop Road from ARC parking to Big Shanty
Immediate Term Solutions
Traffic (SOV) and Parking
• Switch Faculty and Staff permits to facility specific in the core of campus, prioritizing those along KSU Road
• Design and construct Frey Road Road Diet with Skip Spann Roundabout
• Fix all non-operational EV chargers. Evaluate existing and future EV demand
• Determine permanent Fleet and Transit vehicle storage location
The Welcome Experience
• Add KSU branding on medians along Frey Road
• Conduct further analyses surrounding event day circulation, specifically regarding the East District.
Develop an operational playbook based on findings.
• Add KSU Branding for the Arts District with wayfinding for parking at Town Point
• Consider developing a comprehensive wayfinding plan
• Consider purchase of parcel adjacent to Big Shanty Road @ Campus Loop Road
Short Term Solutions Medium Term Solutions Long Term Solutions tneylon Rectangle tneylon Rectangle tneylon Rectangle tneylon Rectangle tneylon Rectangle
Immediate Term: Transit
Immediate Term Solutions
• Transit
• Remove redundant stops1
2025 Cost Estimate $10,000
Cost Type N/A
Responsible Organization
KSU Department of Transportation
Partner None
Next Steps 1. Begin Removal
Enabling Project None
Existing Transit Route
Bring the existing Dance School stop closer to the future Arts District front door.
• Church Lot
• Dance School
• Education Building
• KSU Center
• South Residential
• North Residential
• Math and Sciences
• Social Sciences
• SOVA
• The Commons
• Back of Town Point
• U-Pointe
• South Residential 2
• Stillwell Stadium
• ARC Town Hall
• Owl's Nest
• West Lot
• Transition to a hub + spoke model with hubs at each district
• Relocate each route to stop at the Rec Center
• Remove Skip Spann Connector and Chastain Point Express
• Will require bus turnaround movement in Lot B
2025 Cost Estimate
$ (400,000) (Savings)
Cost Type Operating Cost (per year)
Responsible Organization
KSU Department of Transportation
Partner None
Next Steps 1. Reroute all routes to the main campus transit hub
2. Begin communication regarding the removal of Skip Spann Connector and the Chastain Point Express Routes
Enabling Project None
Big Shanty Loop
Existing
3305 Express
Proposed
Frey Road Chastain Pointe
Town Point Kennesaw/Marietta
Removed Routes West Campus
Skip Spann
Chastain Pointe Express
Skip Spann Removed
Chastain Pointe Express Removed
All other routes start/end at the
Rec Center
• Rename existing district connector routes
• 3305 Express East District Connector
• Chastain Pointe Arts District Connector
• Town Point Town Point Connector
2025 Cost Estimate $2,000
Cost Type N/A
Responsible Organization
KSU Department of Transportation
Partner KSU Strategic Communications/Marketing
Next Steps 1. Finalize name and communicate name changes to students
Enabling Project None
• Provide on-demand transit from 500
Chastain acquisition between this location and other districts
• Operate Mon. – Fri. 8 am – 5 pm
• Can reallocate a bus from the removed routes (Skip Spann or Chastain Pointe Express)
2025 Cost Estimate $100,000 per year*
Cost Type Operating Costs
Responsible Organization
KSU Department of Transportation
Partner None
Next Steps 1. Promote new service to faculty and staff who have been relocated to 500 Chastain
Enabling Project None
Example: Auburn University On-Demand Shuttle, Auburn Journal
*based on $86/hr per FY 26 proforma data provided by KSU
• Evaluate cost of apartment routes and increase fees as needed
• At $86/hr, West Campus route costs
~$400k to operate per year to serve one apartment complex
• Consider adding new apartment locations to existing routes to offset existing costs
• Currently charging $83,000 per apartment complex served
2025 Cost Estimate ($83,000) per apartment served
Cost Type Operating Cost
Responsible Organization
KSU Department of Transportation
Partner None
Next Steps 1. Determine operating costs for each apartment transit route
2. Determine cost sharing model (i.e. what % of service should be funded by apartments)
3. Reach out to existing apartments to gauge appetite for increased service fees
4. Reach out to apartments on existing routes but not currently served to gauge appetite for being included
Enabling Project None
Clarinbridge Apartments*
Avana Townpark*
*Apartments students reported living in via the
Survey
Immediate Term: Bike and Pedestrian
• Bike and Pedestrian
• Install a pedestrian hybrid beacon and midblock crossing at Frey Road @ the East Economy Lot
• Add midblock crossing at Hopkins Drive, in front of East Deck, in conjunction with the Frey Road midblock crossing
• Add sidewalk connecting Frey Road and Hopkins Drive
Midblock Crossing at Frey Road and Hopkins Drive
2025 Cost Estimate $250,000
Cost Type Capital Cost
Responsible Organization
Cobb DOT
Partner • KSU Planning, Development, and Construction
• KSU Department of Transportation
Next Steps 1. Coordinate with Cobb DOT for the design phase and funding requirements
Enabling Project None
Install Mid-block Crossing with Pedestrian Refuge
Install Mid-block Crossing
Install Sidewalk
• Formalize Busbee Drive @ George
Busbee Parkway intersection with crosswalks and traffic signal
• Dependent on Traffic Signal Warrant Analysis or other George Busbee Parkway projects
2025 Cost Estimate Assumed to be part of TCCID efforts for George Busbee Parkway
Cost Type Capital Cost
Responsible Organization
Cobb DOT
Partner • Cobb DOT
• KSU Events and Venue
Management
• KSU Department of
Transportation
Next Steps 1. Coordinate with Cobb DOT for the design phase and funding requirements
Enabling Project None
Traffic signal at Busbee Drive @ George Busbee Parkway
Proposed Traffic Signal
Install New Crosswalks
• Construct sidewalk along the east/south side of Campus Loop Road from ARC parking to Big Shanty
• Connect to existing sidewalk as possible
2025 Cost Estimate $ 200,000
Cost Type Capital Cost
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
Next Steps 1. Enter design phase
Enabling Project None
Existing Right of Way, Campus Loop Road looking South
Existing Right of Way, Campus Loop Road looking Southwest
Missing sidewalk on eastern edge of Campus
Loop Road
Sidewalk ends
Missing sidewalk on southern edge of Campus
Loop Road
Immediate Term: Traffic (SOV) and Parking
• Traffic (SOV) and Parking
• Switch Faculty and Staff permits to facility-specific in the core of campus.
• Charge premiums for the core campus lots (proposed $45/month).
• Proposed permit prices:
• Premium: $45/month
• Regular: $23/month
• Economy: $10/month
• Shuttle: Free
2025 Cost Estimate $ (200,000) per year (Revenue)
Cost Type Operating Revenue
Responsible Organization
KSU Department of Transportation
Partner • KSU Planning, Development, and Construction
Next Steps 1. Confirm the “Core Campus” lots for permitting
2. Confirm permit price increase (monthly or by semester)
3. Communicate the changes to faculty and staff
4. Determine permit oversell ratio (aim for ~1.3) and develop a waitlist management system for each lot
• Design and construct Frey Road Road
Diet with Skip Spann Roundabout
• Ensure pedestrian protection at the Frey Road @ Skip Spann Connector roundabout
• Partner with TCCID to connect pedestrian infrastructure here to the planned Town Center Loop
2025 Cost Estimate Road Diet: $2.25M – $3M Roundabout: $5M – 6M
Cost Type Capital Cost
Responsible Organization
Cobb DOT
Partner • KSU Planning, Design, and Construction
• KSU Department of Transportation
• TCCID
Next Steps 1. Coordinate with Cobb DOT for the design phase and funding requirements
Enabling Project I.6 PHB and Midblock crossing at Frey Road and Hopkins Drive
Frey Road Proposed Cross Section
Example: Pedestrian Friendly Roundabouts, Crafton Tull
• Fix all non-operational EV chargers.
• Evaluate existing and future EV demand to begin planning for additional charging needs
2025 Cost Estimate
Up to $5,000 (dependent on charger issue)
Cost Type Capital Cost
Responsible Organization
KSU Department of Transportation
Partner • KSU Facilities
Next Steps 1. Identify non-operational chargers and contact the vendor for maintenance and repair
2. Conduct an EV demand study for community charging and fleet charging
Enabling Project
None
Existing Non-Functioning EV Chargers
• Determine permanent Fleet and Transit vehicle storage location
• Prioritize co-location of vehicles and locations with electrical capacity for potential EV fleet conversion
2025 Cost Estimate
Assumed to be completed with larger campus planning efforts
Cost Type N/A
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
• KSU Fleet
Next Steps 1. Identify locations that have enough space and electrical capacity for both fleet and transit operations
2. Consider EV fleet conversion operational and capital costs
Enabling Project I.11 EV demand study
Existing Transit Storage
Existing Fleet Location
Immediate Term: The Welcome Experience
• The Welcome Experience
• Add KSU branding on expanded median along Frey Road and Skip Spann roundabout
• Skip Spann at Frey Road intersection becomes a formalized “front door” to campus
2025 Cost Estimate Assumed to be included in the Frey Road Road Diet and roundabout design
Cost Type N/A
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Strategic Communications/Marketing
Next Steps 1. Partner with Cobb DOT to determine allowable signage
2. Develop branding signage in conjunction with road diet and roundabout design
Enabling Project I.10 Design and construct Frey Road Road Diet with Skip Spann Roundabout
Example: Village of Holmen Welcome Signage, Wisconsin, S Main Street @ Gaardar Road Roundabout
• Conduct further analyses surrounding event day circulation, specifically regarding the East District. Develop an operational playbook based on findings.
2025 Cost Estimate $100,000
Cost Type Operating Costs
Responsible Organization
KSU Events and Venue Management (EVM)
Partner • KSU Department of Transportation
Next Steps 1. Begin conversations with EVM to use this signage
2. Conduct an operational study for event days using findings from existing traffic study
Enabling Project None
Convocation Center
Event Day Parking
Football Stadium
Event Day Parking
• Add KSU Branding for the Arts
District with wayfinding for parking at Town Point
• Consider developing a comprehensive wayfinding plan
2025 Cost Estimate Assumed to be included in costs of Arts District development
Cost Type Capital Costs
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Strategic Communications/Marketing
Next Steps 1. Ensure branding and wayfinding is incorporated into the Arts District design
2. Determine if a comprehensive wayfinding plan for the campuses and districts is needed
Enabling Project None
Davidson Community College Signage, Corbin Design
Town Point Parking
• Consider purchase of parcel adjacent to Big Shanty Road @ Campus Loop Road
• Add wayfinding and branding here as another gateway into campus
2025 Cost Estimate $300,000
Cost Type Capital Costs
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Strategic Communications/Marketing
Next Steps 1. Determine appetite and funding availability for purchase of parcel
Enabling Project None
Potential Acquisition Opportunity
Short Term (2 – 5 years)
• Expand apartment shuttle routes and funding
• Formalize transit hub at the Arts District with easy access to and from the “front door” of the district
• Consider a formalized transit route between main campus and 500 Chastain if demand is high enough
Bike and Pedestrian
• Support TCCID efforts for Chastain Road improvements and programmed trail infrastructure projects
• Connect existing pedestrian infrastructure with new surface lot west of Campus Loop Road.
• Add additional crosswalks to support access to resident halls
Traffic (SOV) and Parking
• Add a surface lot on the west side of Campus
Loop Road
• Construct a new east – west roadway connection between Campus Loop Road and Frey Road
• Remove parking along Marietta Drive
• Implement intersection improvements at Campus Loop Road @ Big Shanty Road
• Build out street grid in East District in conjunction with new developments
• Evaluate parking needs and locations in East District
Immediate Term Solutions Short Term Solutions Medium Term Solutions Long Term Solutions
Short Term: Transit
Short Term Solutions
• Expand apartment shuttle routes and funding
• Consider restricting eligible complexes to a 3-mile radius and/or basing the fee on distance from campus
• Routes would operate 7AM – 11PM Monday – Thursday and 7 AM - 7PM Friday
14 SixtyFive *
The Collective*
*Apartments students reported living in via the
Survey
2025 Cost Estimate $300,000 per route NOTE: Should net $0; KSU’s additional operating costs should be covered by apartment fees
Cost Type Operating Costs
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Strategic Communications/Marketing
Next Steps 1. 1. Begin conversations with nearby off-campus apartments (either purpose built student housing or regular apartments that KSU students live at)
• Formalize transit hub at the Arts
District with easy access to and from the “front door” of the district
• Prioritize easy access to buildings for transit riders and easy access from the roadway for the bus (right turn in/out ideally)
Arts District Master Plan Draft February 2025
2025 Cost Estimate Assumed to be included in costs of Arts District development
Cost Type N/A
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Strategic Communications/Marketing
Next Steps 1. Begin conversations with Arts District design team to finalize the "front door" and transit hub location.
• Consider a formalized transit route between main campus and 500 Chastain if demand is high enough
• This would replace the on-demand transit service
2025 Cost Estimate Net $0 since it would replace the on-demand service
Cost Type Operating Costs
Responsible Organization
KSU Department of Transportation
Partner
Next Steps 1. Evaluate on-demand ridership between 500 Chastain and main campus
Enabling Project I.4 Provide on-demand transit from 500 Chastain acquisition
Short Term: Bike and Pedestrian
• Support TCCID efforts for Chastain
Road improvements and programmed trail infrastructure projects
2025 Cost Estimate $0
Cost Type N/A
Responsible Organization
TCCID
Partner • KSU Planning, Design, and Construction
Next Steps 1. Begin conversations with
TCCID
Chastain Road Typical Cross Section, TCCID Chastain Road Complete Streets Study
• Connect existing pedestrian infrastructure with new surface lot west of Campus Loop Road.
• Add additional crosswalks to support access to resident halls
• Implementing with new surface lot construction
• Details in the Short Term:
Traffic/Parking Section
2025 Cost Estimate Assumed to be part of the new surface lot construction (S.6)
Cost Type Capital Cost
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
• TCCID
• Cobb DOT
Next Steps 1. Determine funding source
Enabling Project S. 6 Add a surface lot on the west side of Campus Loop Road
Install New Crosswalks
Proposed Surface Lot
On – Campus Housing
Formalize sidewalk along east edge of the surface lot tneylon Rectangle
Arrow
Short Term: Traffic (SOV) and
• Add a surface lot on the west side of
Campus Loop Road
• Estimated 900 spaces
2025 Cost Estimate $5 M
Cost Type Capital Cost
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
Next Steps 1. Determine funding source
2. Begin design phase
Proposed Surface Lot Area
• Construct a new east – west roadway connection between Campus Loop Road and Frey Road
• Right in – right out connection on Frey Road
• Requires removal of parking and baseball facilities
• Loss of 83 spaces
2025 Cost Estimate $4 M
Cost Type Capital Cost
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
Next Steps 1. Determine funding source
2. Begin design phase
Enabling Project None
Removal of residential parking
Stop controlled intersection at Marietta
Drive and KSU Road
Right in-right out (RIRO) movement on Frey Road
• Remove parking along Marietta Drive
• Loss of 219 spaces
• Reallocate existing parkers to the new surface lot (S.6)
2025 Cost Estimate $3,000
Cost Type Capital Cost
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
Next Steps 1. Ensure reallocation of existing parkers can go to the new surface lot
Enabling Project S. 7 Add a surface lot on the west side of Campus Loop Road
Removed Parking along Marietta Drive
• Implement intersection improvements at
Campus Loop Road @ Big Shanty Road
• Ensure safe pedestrian crossing from Campus Loop Road to the Arts District Entrance
2025 Cost Estimate 5-Leg Roundabout
Roadway Widening along Big Shanty
Realignment for Signal for Big Shanty at Arts District
$4M -$6M
$1.7M - $2.5M
$2.5M - $3.5M
Cost Type Capital Cost
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
Next Steps 1. Ensure reallocation of existing parkers can go to the new surface lot
Enabling Project S. 7 Add a surface lot on the west side of Campus Loop Road
Campus Loop Road @ Big Shanty Road Realignment Option 1
• Build out street grid in East District in conjunction with new developments
• Prioritize Complete Street design
• Walkable, urban streets (400- 600 ft per block, 2 lane roads) with large bike and pedestrian pathways
• Evaluate parking needs and locations in East District -dependent on developments
• Consider sharing parking analyses to determine parking needs
• Prioritize multifamily housing to serve students with retail on the first floor to serve those living there.
2025 Cost Estimate Assumed to be done as part of East District Development
Cost Type N/A
Responsible Organization KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
• Cobb DOT
• CobbLinc
• TCCID
• The ATL
Next Steps 1. Begin conversations with East District design team to determine development program
Enabling Project I.7 Formalize Busbee Drive @ George Busbee Parkway intersection with crosswalks
Complete Street Example, Andrew Alexander Price
Medium Term (5 – 10 years)
• Formalize transit hubs at:
• Main Campus
• Town Pointe
• Marietta Campus
• Convert KSU Road to bus only from new east-west connection to the main campus hub
• Add a district connector between Main campus, Arts District, Town Pointe, and East District
Bike and Pedestrian
• Close Marietta Street and KSU
Road (north of the Student Center) to vehicles to create bike and pedestrian promenades
• Add a pedestrian connection between Marietta Drive to Campus Loop Road and the Arts District
• Support CobbLinc efforts for a cycle track along Busbee Drive
The Welcome Experience
• Use new roundabouts at KSU
Road and Frey Road as new “front doors”
• Add branding and entrance pieces on those roundabouts
Traffic (SOV) and Parking
• Evaluate new east-west connection for roundabouts at KSU Road and Frey Road
• Remove Lot B for Main campus transit hub and potential new buildings
• Add new driveway from ARC South surface parking to Campus loop Road
• Continue to build out East District street grid
Immediate Term Solutions Short Term Solutions Medium Term Solutions Long Term Solutions tneylon Rectangle tneylon Rectangle tneylon Rectangle tneylon Rectangle
Medium Term: Transit
Medium Term Solutions
• Formalize transit hubs at:
• Main Campus
• Town Pointe
• Marietta Campus (not shown)
• Marietta Campus transit hub location will be based on partnership opportunities with CobbLinc and/or other gateway developments
Proposed Main Campus Transit Hub
2025 Cost Estimate $700,000 per site
Cost Type Capital Cost
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
Next Steps 1. Determine funding source and priority of transit hub construction
2. Begin design phase
Enabling Project None Medium Term Formalized Hubs
Previously Formalized Hubs
• Convert KSU Road to bus only from new east-west connection to the main campus hub
Example of Bus Only Roadway, San Francisco, CA, Planetizan
2025 Cost Estimate $80,000
Cost Type Capital Cost
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
Next Steps 1. Conduct circulation analysis for vehicles based on previously implemented roadway network changes
2. Begin design phase - build off conceptual design
Enabling Project I.2 Transition to a hub + spoke model with hubs at each district.
S.7 Construct a new east – west roadway connection between Campus Loop Road and Frey Road.
M.1 Formalize transit hubs at Main, Town Pointe, and Marietta campuses
• Add a district connector between Main campus, Arts District, Town Pointe, and East District
• Operates 7AM – 11PM Monday – Thursday and 7 AM - 7PM Friday
• Allocate one of the buses from the removal of Skip Spann/Chastain Point Express (the other bus serves 500 Chastain)
2025 Cost Estimate $300,000 per year
Cost Type Operating Cost
Responsible Organization
KSU Department of Transportation
Partner • KSU Strategic Communications/Marketing
Next Steps 1. Allocate funding in Transportation budget
2. Begin communication with KSU transit provider
Enabling Project I.2 Transition to a hub + spoke model with hubs at each district.
Type
Medium Term: Bike and Pedestrian
Close Marietta Street to cars to create a bike and pedestrian thoroughfare
Add a pedestrian connection between Marietta Drive to Campus Loop Road and the Arts District
Close KSU Road to all vehicles north of the Student Center Support CobbLinc efforts for a cycle track along Busbee Drive
Medium Term Solutions
• Bike/Pedestrian
• Close Marietta Street and Kennesaw
State University Road to vehicles to create bike and pedestrian promenades
Example: Atlantic Drive Pedestrian Promenade, Georgia Tech
2025 Cost Estimate $100,000
Cost Type Capital Cost
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
Next Steps 1. Conduct circulation analysis for vehicles based on previously implemented roadway network changes
2. Begin design phase
Enabling Project I.2 Transition to a hub + spoke model with hubs at each district.
S.9 Remove parking along Marietta Drive, loss of 77 residential/F/S spaces Pedestrian Promenade tneylon Rectangle
Add a pedestrian connection between Marietta Drive to Campus Loop Road and the Arts District
Close KSU Road to all vehicles north of the Student Center Support CobbLinc efforts for a cycle track along Busbee Drive
Medium Term Solutions
• Bike/Pedestrian
• Add a pedestrian connection between
Marietta Drive to Campus Loop Road and the Arts District
2025 Cost Estimate $50,000
Cost Type Capital Cost
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
Next Steps 1. Determine funding source
2. Begin design phase
Enabling Project None
Proposed Pedestrian Connection
Marietta Drive Pedestrian Promenade
Pedestrian Promenade
Add a pedestrian connection between Marietta Drive to Campus Loop Road and the Arts District
Close KSU Road to all vehicles north of the Student Center Support CobbLinc efforts for a cycle track along Busbee Drive
Medium Term Solutions
• Bike/Pedestrian
• Support CobbLinc efforts for a cycle track along Busbee Drive
CobbLinc Town Center/Busbee Park-n-Ride TOD Study
2025 Cost Estimate $0
Cost Type N/A
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
Next Steps 1. Continue conversations with CobbLinc and Cobb DOT
Proposed Cycle Track
Medium Term: Traffic (SOV) and
• Evaluate new east-west connection for roundabouts (RABs) at KSU Road and Frey Road
• RABs would likely improve traffic circulation at these intersections and provide full turning movement along Frey Road
2025 Cost Estimate $5 M per roundabout
Cost Type Capital Costs
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
• Cobb DOT
Next Steps 1. Conduct traffic study analysis once new east-west connection is built
2. Determine funding source
3. Begin design phase
Enabling Project S.7 Construct a new east – west roadway connection between Campus Loop Road and Frey Road
Roundabout at Kennesaw State University Road
Roundabout at Frey Road
• Remove Lot B for Main campus transit hub and potential new buildings
2025 Cost Estimate Assumed this cost is factored into transit hub’s and new buildings’ design/ construction
Cost Type N/A
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
Next Steps 1. Reallocate permit holders to another nearby lot and/or the surface lot west of Campus Loop Road
Enabling Project S.6 Add a surface lot on the west side of Campus Loop Road S.11 Convert all parking to Lot-specific permits instead of hunting style
Proposed Main Campus Transit Hub
Building Opportunities on Lot B (adjacent to proposed transit hub)
• Add new driveway from the ARC surface parking to Campus Loop Road
• Provides increased vehicular circulation to Campus Loop Road with the closure of Marietta Drive north of the lot
2025 Cost Estimate $50,000
Cost Type Capital Cost
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
Next Steps 1. Conduct circulation analysis for vehicles based on previously implemented roadway network changes
2. Determine funding source
3. Begin design phase
Enabling Project M.4 Close Marietta Street to cars to create a bike and pedestrian thoroughfare
Proposed Ingress/Egress Movements for the ARC Lot
Proposed New Roadway Connection between the ARC Lot and Campus Loop Road
• Continue to build out East District street grid
• Prioritize complete street design
• 400- 600 ft per block, 2 lane roads with large bike and pedestrian pathways
2025 Cost Estimate Assumed to be done as part of East District Development
Cost Type N/A
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
• Cobb DOT
• CobbLinc
• TCCID
• The ATL
Next Steps 1. Continue conversations with East District design team to determine program and street design
Enabling Project S.11 Build out street grid in East District in conjunction with new developments
Medium Term: The Welcome Experience
• Use new roundabouts at KSU Road and
Frey Road as new “front doors”
• Add branding and entrance pieces on those roundabouts
Example: Orange Avenue @ Ringling Boulevard, Sarasota, FL, 83 Degrees Media
Example: South Milledge Avenue @ Whitehall Road, Athens GA, Benesch
2025 Cost Estimate $750k - $1M per roundabout, largely dependent on the size and complexity of the piece
Cost Type Capital Cost
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Strategic Communications/Marketing
Next Steps 1. If roundabouts are needed, ensure planning and design for large signage/branding is incorporated into the roundabout design
Enabling Project S.8 Construct a new east – west roadway connection between Campus Loop Road and Frey Road M.8 Evaluate new east-west connection for roundabouts at KSU Road and Frey Road
Long Term (10+ years)
• Relocate KSU transit hub to the middle of
East District
• Adjust transit routes as new infrastructure comes online (i.e. i-75 bridge)
Bike and Pedestrian
• Construct a grade separated bike/pedestrian path underneath Chastain Road that connect Town Pointe and Main Campus via Campus Loop Road
Traffic (SOV) and Parking
• Partner with Cobb DOT and GDOT to construct a bridge over I-75 connecting East District to Gutenberg Drive
• Partner with Cobb DOT to add new roadway connections surrounding East District to increase circulation and reduce congestion on gamedays
• Continue to evaluate KSU and East District parking demand.
Immediate Term Solutions Short Term Solutions Medium Term Solutions Long Term Solutions
Long Term: Transit
Long Term Solutions
• Relocate KSU transit hub to the middle of East District
2025 Cost Estimate Assumed to be done as part of East District Development
Cost Type Capital Cost
Responsible Organization
KSU Planning, Design, and Construction
Partner • KSU Department of Transportation
Next Steps 1. Begin conversations with CobbLinc to understand appetite for shared resources
Enabling Project S.10 Build out street grid in East District in conjunction with new developments M.3 Add a district connector between Main campus, Arts District, Town Pointe, and East District
Immediate – Medium Term East District Transit Hub
Proposed Long Term East District Transit Hub
• Adjust transit routes as new infrastructure comes online (i.e. i-75 bridge)
2025 Cost Estimate $1,000
Cost Type N/A
Responsible Organization
KSU Department of Transportation
Partner
Next Steps 1. Ensure transit hub locations are based on easy entrance and exit for buses
Enabling Project I.2 Transition to a hub + spoke model with hubs at each district M.3 Add a district connector between Main campus, Arts District, Town Pointe, and East District L.6 Partner with Cobb DOT and GDOT to construct a bridge over I-75 connecting East District to Gutenberg Drive
Shorter transit route once I-75 bridge is built
Previous District Connector Route Grade Separation
Long-term transit hub
Long Term: Bike and Pedestrian
• Construct a grade separated bike/pedestrian path underneath Chastain Road that connect Town Pointe and Main Campus via Campus Loop Road
Example: Bike/Pedestrian Bridge under I-77, Lake Norman, NC
2025 Cost Estimate $5M
Cost Type Capital Cost
Responsible Organization
Cobb DOT
Partner • KSU Planning, Design, and Construction
• KSU Department of Transportation
• TCCID
Next Steps 1. Continue conversation with Cobb DOT and TCCID to determine feasibility and timeline
2. Determine funding source
Enabling Project I.8 Construct sidewalk along the south side of Campus Loop Road from ARC parking to Big Shanty S.6 Add pedestrian infrastructure between the new surface lot west of Campus Loop Road and Arts District Entrance/Big Shanty Road.
Grade Separation
Long Term: Traffic (SOV) and
• Partner with Cobb DOT and GDOT to construct a bridge over I-75 connecting East District to Gutenberg Drive
• Prioritize Complete Street Design
• Proposed 2 lane road with large separated bike lanes and pedestrian paths
Example of Complete Street Bridge: 5th Street Bridge, Georgia Tech
2025 Cost Estimate $60M
Cost Type Capital Cost
Responsible Organization
Cobb DOT
Partner • GDOT
• KSU Planning, Design, and
Construction
• TCCID
Next Steps 1. Continue conversations with Cobb DOT and TCCID
2. Determine funding source and potential timeline
Enabling Project S.11 Build out street grid in East District in conjunction with new developments M.10 Continue to build out East District street grid
Grade Separation
• Partner with Cobb DOT to add new roadway connections surrounding East District to increase circulation and reduce congestion on gamedays
2025 Cost Estimate $36M
Cost Type Capital Cost
Responsible Organization
Cobb DOT
Partner • GDOT
• KSU Planning, Design, and
Construction
• TCCID
Next Steps 1. Continue conversations with Cobb DOT and TCCID
2. Determine funding source and potential timeline
Enabling Project S.11 Build out street grid in East District in conjunction with new developments M.10 Continue to build out East District street grid tneylon Rectangle
• Continue to evaluate KSU and East
District parking demand.
• Consider…